This is a Questions and Answers document for solicitation 192127FHOFPS0001, issued by the Department of Homeland Security Immigration and Customs Enforcement (ICE) for the installation of black privacy screening at the Houston Field Office secure parking-lot perimeter fencing, entry/exit gates, and sallyport fencing. The document addresses 13 vendor inquiries regarding procurement requirements and site conditions, with responses clarifying ambiguities in the original solicitation and Statement of Work (SOW).

Key clarifications from the Q&A include: the pricing template has been removed from the updated solicitation; the 30-day performance period begins 30 days after award (not November 30, 2026, which serves as a deadline reference); insurance requirements have been removed from the updated solicitation; labor classification determination is the vendor's responsibility under Wage Determination 2015-5233 Revision 35; site access involves exterior work only in the secured parking lot with daily access granted by ICE, requiring coordination with the Contracting Officer's Representative (COR) post-award; prospective subcontractors may be shown the solicitation and scope without written approval; opaque fabric screening material providing 100% visual blockage is acceptable and preferred over privacy slats; and the government will meet with the contractor post-award to review installation methods, with the contractor responsible for installing six-foot-tall privacy screening across the entire iron fence length. Amendment 0001 addresses site visit availability, while Amendment 0003 indicates an updated solicitation and SOW have been released, with the quote deadline remaining November 17 at 3:00 PM ET.

View the file

Other files

File Type Posted
2.2.1-A0003-Attachment A-SOW.docx DOCX document
2.2.1-A0003-HOU Privacy Screen Solicitation.docx DOCX document
2.2.1-HOU Privacy Screen Solicitation-AMENDMENT 0001.docx DOCX document
2.2.1-HOU Privacy Screen Solicitation.docx DOCX document
2.2.1-Attachment A-SOW.docx DOCX document
2.2.1-Attachment C - Terms and Conditions.docx DOCX document
2.2.1-Attachment B - 2015-5233 Rev 35.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

#QuestionsAnswers
1Pricing template — Solicitation, page 2, “Instruction to Vendor(s),” Price volume paragraph: Could you provide the referenced pricing spreadsheet? Should pricing be broken down by day or provided as lump sums for CLINs 0001–0003?This has been removed. See updated solicitation.
2Completion date — Attachment A, page 3, section 5.0, both paragraphs: The SOW states a 30-day performance period and completion by November 30, 2026. What starts the 30-day period, and which deadline governs if the award date leaves fewer than 30 days?30 days after award.
3Insurance — Solicitation, page 2, “Instruction to Vendor(s),” Price volume paragraph: What insurance types and minimum limits are required, and what proof should accompany the quote?This has been removed. See updated solicitation.
4Labor classification — Attachment A, page 3, section 4.0, labor bullet: Which classification under Wage Determination 2015-5233 Revision 35 applies to the installation? If none applies, what conformance process is required?This is up to the vendor to determine.
5Site access — Attachment A, page 2, section 3.1, item 8: Is a pre-quote site visit available? What work hours, badging, background checks, escorts or other access requirements apply?Site visit addressed in A0001.

This is exterior work. The vendor would only need access to the secured parking lot. Access will be gratned each day by ICE. The vendor should coordinate with the COR for additional information after award.

6Prospective subcontractors — Solicitation, page 2, “Release of Information,” sole paragraph: Does this restriction apply to sharing the solicitation and scope with prospective subcontractors solely to obtain pricing? If written approval is required, how should it be requested?No.
7Price format (Solicitation, p.2, Instruction to Vendor(s), “utilizing the attached spreadsheet”): No price quote template or spreadsheet is attached; only Attachments A, B and C are listed. Please provide the template, or confirm that a price table using line items 0001, 0002 and 0003 with a total is acceptable. If a breakdown by day is required, please state the period it should cover.This has been removed. See updated solicitation.
8Fence and gates (Statement of Work, p.2, 3.2 Back Fence and Entry/Exit Gates and 3.3 Sallyport Fence): Please state the type of the back perimeter fence (chain-link or other); the number, width and type (swing or slide) of the entry and exit gates; and whether the 12-foot sallyport fence has a mid rail. Can a site visit be arranged before quotes are due?Site visit addressed in A0001.
9Finish date (Statement of Work, p.3, 5.0 Period of Performance): Since quotes close on 12 November, does the 30-day period run from the date of award, or must all work still be complete by 30 November 2026?This has been updated. See attached solicitation.
10Site access (Statement of Work, p.2, 3.1 General Requirements, item 8): Will crew members need a badge, escort or background check to work inside the secure parking area, and are there restrictions on working hours or days?This is exterior work. The vendor would only need access to the secured parking lot. Access will be gratned each day by ICE. The vendor should coordinate with the COR for additional information after award.
11Insurance (Solicitation, p.2, Instruction to Vendor(s), “proof of insurance”): What types of insurance and minimum amounts should the proof of insurance show?This has been removed. See updated solicitation.
12Privacy screening material and coverage: Please confirm whether an opaque fabric screening material that provides 100% visual blockage is acceptable, or whether privacy slats are preferred. The vendor noted that privacy slats may not provide complete visual blockageOpaque fabric screening material that provides 100% visual blockage is acceptable and preferred. Slats are not preferred.
13Screening height on the ornamental iron fence: The SOW requires six feet of privacy blockage; however, the vendor observed that the clear space between the existing upper and lower horizontal bars is approximately five feet. Please confirm whether five feet of screening between the existing bars is acceptable or provide direction on an alternate installation approach to achieve the required six feet of coverage.The requirement is for six feet high of privacy screening. Once the contract is awarded, the government will meet with the contractor prior to ordering materials to review the contractor’s proposed method of installation, however the contractor will be responsible for installing a secure six-foot tall privacy screening material the entire iron fence length.