Bill of Quantities - 191T7026Q0026.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- ACCESSIBLE PARKING SPACE
- Solicitation number
- 191T7026Q0026
- Issued by
-
Department of State
About this file
This is a Bill of Quantities (BOQ) spreadsheet for RFQ 191T7026Q0026, which details the scope of work required for resurfacing an accessible parking space and installing hand railings at the U.S. Embassy in Rome, Italy. The document serves as the quantitative breakdown of materials and labor necessary to execute the project, providing vendors with precise specifications for pricing and resource planning purposes.
The BOQ outlines the specific quantities of work items and materials required for the accessible parking space renovation project, enabling bidders to develop accurate quotes based on defined deliverables. As a supporting document to the RFQ issued by the Department of State, this Bill of Quantities establishes clear expectations regarding scope, allowing contractors to calculate labor hours, material costs, and overhead based on standardized line items rather than estimates or assumptions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Technical Specifications - 191T7026Q0026.pdf | ||
| RFQ - 191T7026Q0026.pdf | ||
| SF-1442 - 191T7026Q0026.pdf | ||
| Cover Letter - 191T7026Q0026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bill of Quantities
| 191T7026Q0026 - ACCESSIBLE PARKING SPACE | PLEASE ONLY FILL OUT THE "UNIT COST" COLUMN | ||||
| DESCRIPTION | UM | Quantity | Unit Cost | EURO |
| PARKING (A) | ||||
| Construction site area using of bollards and/or fences, orsogrill or equivalent collective safety devices. Temporary safety railing must be installed. Included: electrical construction panel, equipment and tools needed to carry out the work safely. | lump sum | 1 | € - 0 | € - 0 |
| DEMOLITION AND EXCAVATION: Saw-cutting and removal of existing asphalt pavement; Removal of base course and subgrade to 30 cm depth, including excavation, loading, transport, and disposal at authorized landfill; Trimming and compaction of exposed subgrade | sqm | 40 | € - 0 | € - 0 |
| FOUNDATIONS FOR BOLLARDS: Construction of concrete foundation plinths with cavities for bollard fixing; Filling cavities with semi-fluid concrete and installation of bollards; Verification and maintenance of vertical alignment with temporary supports | lump sum | 1 | € - 0 | € - 0 |
| SUBBASE AND BASE LAYERS: Supply, placement, leveling, and compaction of granular subbase; Construction of lean concrete base or cement-stabilized layer; Verification and adjustment of pavement slopes for surface water runoff | sqm | 40 | € - 0 | € - 0 |
| INSTALLATION OF CONCRETE PAVERS (BETONELLE): Construction of bedding layer in sand or fine aggregate; Supply and installation of interlocking concrete pavers (betonelle), with different colors/finishes for pedestrian pathway; Cutting and adjustment of pavers along edges, around bollards, and near existing structures; Joint filling and final compaction of paved surface | sqm | 20 | € - 0 | € - 0 |
| MODIFICATION OF EXISTING PARKING AREA PAVEMENT: Removal of existing RC8 pavement (or equivalent) in new accessible parking space area; Installation of subbase/base layers; Supply and installation of concrete pavers (betonelle) for ADA-compliant surface | sqm | 20 | € - 0 | € - 0 |
| INSTALLATION OF BOLLARDS AND CHAINS: Supply and installation of metal bollards anchored to plinths; Supply and installation of galvanized or painted chains between bollards; Application of anti-corrosion protection and reflective elements on bollards | lump sum | 1 | € - 0 | € - 0 |
| MARKINGS AND SIGNAGE: Application of road markings for disabled parking space (symbol, outlines, hatching) with high-visibility, non-slip paint; Installation of vertical signage for reserved disabled parking space and pedestrian pathway; Installation of additional directional and warning signs | lump sum | 1 | € - 0 | € - 0 |
| RESTORATION AND FINISHING WORKS: Restoration of adjacent areas, including cutting and reinstatement of asphalt or existing paving; Site cleaning and removal of all construction debris; Final inspection, alignment checks, and minor adjustments | lump sum | 1 | € - 0 | € - 0 |
| TOTAL for PARKING (A) | € - 0 |
| HANDRAILS FOR USUN AND CONSULATE MAIN STAIRCASES (B) | ||||
| SUPPORT STRUCTURE AND FIXING: Construction of self-supporting concrete structure (end posts and connecting curb); Supply and installation of protective layer between concrete elements and existing stairs | each | 8 | € - 0 | € - 0 |
| HANDRAILS AND POSTS: Prefabrication and supply of handrails and posts in galvanized hot-rolled steel with grey anthracite powder-coat finish, diameter 32-51 mm; Installation of continuous handrails along full length of each stair flight, height 960 mm; Extension of handrails 305 mm beyond first and last riser; Fixing of handrails and posts exclusively to self-supporting concrete elements | m | 12 | € - 0 | € - 0 |
| CLADDING AND FINISHES: Cladding of concrete posts and curbs with travertine slabs, color and cut similar to existing finishes; Rounding of all edges and smoothing of exposed surfaces; Final verification of continuity, ergonomics, and regulatory compliance | sqm | 18 | € - 0 | € - 0 |
| TOTAL for HANDRAILS FOR USUN AND CONSULATE MAIN STAIRCASES (B) | € - 0 |
COST OF SAFETY (C) € 1,500.00
GRAND TOTAL (A+B+C) € 1,500.00
File details come from the government source that posted it. Updated .