Exhibit_C.docx
DOCX document 29 KB Posted
- Attached to
- Maintenance Services in Florence, Italy
- Solicitation number
- 191T7019R0002
- Issued by
-
Department of State US Embassy Rome
About this file
Exhibit C
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers.docx | DOCX document | |
| 00001.pdf | ||
| SF-1442.doc | DOC document | |
| Exhibit_G.pdf | ||
| Cover_Letter.pdf | ||
| Exhibit_B.zip | ZIP file | |
| 191T7019R0002.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C
MULTITRADE CHECKLIST - CARPENTRY & PAINTING
Address: OBO Property ID:
Initial Inspection - Name: Date:
| Item |
| Comment |
| Completed |
· Controllare l’esistenza di ringhiere in ogni dislivello superiore a 76 cm. Controllarne lo stato e veificare che l’altezza non sia inferiore a 100 cm. Con interspazi non superiori a 10 cm. (balconi, scale, patii, etc.)
· Check condition of handrails, railings, balusters and cladding higher than 30 “, verify the high of the fence is not lower than 36” with gaps no bigger than 4” (balconies, stairwells, patios, etc.)
| POSHO REQUIREMENTS |
| Yes No |
· Installazione dei mobili della cucina (devono essere ben fissati) (fissarli bene nella parte inferiore)
· Check installation of kitchen cabinets (must be fully secured) (secure cabinets on the bottom)
Yes No
· Controllare tutti I cabinet della cucina,dispense, armadi e scaffali (porte, cassetti, scaffali, maniglie, cerniere, serrature, etc.)
· Check all kitchen and pantry cabinets & shelves (doors, drawers, shelves, handles, hinges, locks, etc.)
Yes No
· Controllare condizioni dei piani della cucina e l’alzatina
· Check condition of kitchen counters and backsplash
Yes No
· Controllare tutti I cabinet del bagno (porte, cassetti, scaffali, maniglie, cerniere, serrature, etc.)
· Check all bathroom cabinets & shelves (doors, drawers, shelves, handles, hinges, locks, etc.)
Yes No
· Controllo di tutti gli accessori del bagno (aste,ganci e supporti)
· Check all bathroom accessories (rods, hooks and holders)
Yes No
· Controllo di tutti gli armadi e cassettiere (porte, cassetti, scaffali, maniglie, cerniere, serrature, etc.)
· Check all wardrobes and shelves (doors, drawers, handles, hinges, locks, etc.)
Yes No
· Controllo degli specchi (devono essere ben fissati)
· Check all mirrors - must be fully secured
Yes No
· Controllo dei cabinet e scaffali in tutte le altre stanze inclusa la cantina
· Check cabinets and shelves in all other rooms including storage
Yes No
· Controllare che non vi siano crepe o graffi su muri, porte, soffitti e finestre (vernice, legno, vetro)
· Check all walls, doors, ceilings & windows for cracks/scratches (paint, wood and glass)
Yes No
· Controllo di tutte le porte interne – devono aprirsi/chiudersi scorrere senza problemi e bloccarsi (maniglie, chiavistelli, cerniere, serrature)
· Check all interior doors - must open/close/slide smoothly and lock/latch (alignment, handles, latches, locks, hinges)
Yes No
· Controllo di tutte le finestre devono aprirsi/chiudersi scorrere senza problem e bloccarsi (maniglie, chiavistelli, cerniere, serrature)
· Check all windows (must open/close smoothly and lock/latch) (alignment, handles, latches, locks, hinges)
Yes No
· Controllo di tutte le zanzariere (Se esistenti)
· Check all mosquito screens (If there are any)
Yes No
· Controllare funzionamento serrande (sostituire cinta se necessario)
· Check operation of rolling shutters (replace strap/belt if needed)
Yes No
· Controllare funzionamento degli avvolgibili
· Perform maintenance on rolling components
Yes No
· Controllare funzionamento degli avvolgibili delle serrande elettriche
· Perform maintenance on rolling shutter motors
Yes No
· Controllare funzionamento tende esterne
· Check operation of all awnings
Yes No
· Controllo del pavimento(piastrelle e parquet)in tutte le aree sia interne che esterne
· Check flooring (tiles and parquet) in all interior and exterior areas
Yes No
· Controllo della porta e della finestra della cantina e del garage
· Check cantina doors and windows
Yes No
· Fare ritocchi di pittura sui muri,porte,soffitti e finestre
· Touch-up paint for all walls, doors, ceilings & windows
Yes No
· Fornire una nuova scala se necessario
· Replace ladder if needed (remove old ladder)
Yes No
· Controllo tutte le chiavi dei 3 set inclusa quella della cantina
· Check for 3 sets of keys for all doors including storage
Yes No
· Sostituire nastri antiscivolo sulle scale se necessario
· Replace safety strips/tape (if needed)
Yes No
· Pulire e spazzare la zona dove si e’ lavorato (rimuovere tutta la polvere,materiali usati e rifiuti)
· Clean and sweep up work area (remove all debris, dust, excess material and trash)
Yes No
· Altro
· Other:
Yes No
· Altro
Yes No
Comments:
| ______________________________ | _________________________ | ______ | ||
| Technician Name | Sign | Date |
| ______________________________ | _________________________ | ______ | ||
| Inspector Name | Sign | Date |
MULTITRADE CHECKLIST - ELECTRICAL
Address: OBO Property ID:
Initial Inspection - Name: Date:
| Item |
| Comment |
| Completed |
· Cambiare tutti i smocke detector rimuovere se hanno piu’ di 7 anni (installarli a 260 cm dal pavimento)
· Remove and check dates of all smoke detectors (replace if more than 7 years old) (smoke detectors installed at 2.6 meters above floor)
POSHO REQUIREMENTS
Yes No
· Cambiare batterie smoke detectors
· Install new batteries in smoke detectors
POSHO REQUIREMENTS
Yes No
· Sostituire monossidi di carbonio se hanno piu’ di 3 anni (installarli a 160 cm dal pavimento)
· Remove and check carbon monoxide alarm date (replace if more than 3 years old) (carbon monoxide alarm installed at 1.6 meters above floor)
| POSHO REQUIREMENTS |
| Yes No |
· Sostituire batterie monossidi di carbonio
· Install new batteries in carbon monoxide alarms
POSHO REQUIREMENTS
Yes No
· Mettere etichette monossido di carbonio
· Install carbon monoxide warning sign under alarm
Yes No
· Installare estintore in cucina (installarlo a 120 cm dal pavimento vicino l’entrata e scrivere il numero di serie nei commenti)
· Check and inspect fire extinguisher (Hook must be hung at 1.2 meters above floor near entrance) (Write extinguisher serial number in comments)
Serial Number: _________________
POSHO REQUIREMENTS
Yes No
· Togliere ciabatte in cucina ed istallare multi prese
· Remove unsafe power strips and multi-prong adaptors
POSHO REQUIREMENTS
Yes No
· Controllo e test di tutti i differenziali (sostituirli se non funzionano).
· Contollare la presenza e funzionamento di differenziali da 10 mA nelle zone umide (Bagni, Cucina,Lavanderie ect)
· Check and test all GFCIs (replace if not functioning)
· Check and test 10mA GFCIs installed in wet location (Bathrooms, kitchens, laundry etc.)
POSHO REQUIREMENTS
Yes No
· Controllare tutti gli interruttori all’interno del quadro elettrico
· Test all breakers in all electrical panels
Yes No
· Mettere etichette in lingua inglese e italiana sul quadro elettrico
· Label all circuit breakers in all panels in English and Italian
POSHO REQUIREMENTS
Yes No
· Controllare la sezione dei conduttori, sia all’interno dei quadri elettrici sia dell’impiando, verificando che siano protetti adeguatamente dagli interruttori ed in grado di sopportare il carico in particolare che ad ogni sezione non sia superata la soglia di protezione 1,5mmq 10A 2,5mmq 16A 4 mmq 25A 6 mmq 40A 10 mmq 50A 16 mmq 60A
· Inspect all wiring inside the electrical panels and in the system verify that each circuit is proper protected by the CB as per follow chart:
1,5mmq 10A 2,5mmq 16A 4 mmq 25A 6 mmq 40A 10 mmq 50A 16 mmq 60A
POSHO REQUIREMENTS
Yes No
· Chiudere eventuali aperture nel quadro
· Close gaps/openings in all electrical panels
POSHO REQUIREMENTS
Yes No
· Pulire all’interno del quadro aria compressa
· Clean inside of all electrical panels with compressed air
Yes No
· Misure di terra da prendere tra il conduttore di fase ed il conduttore di terra, verificare che non superi i 25 ohms. (scrivere la misurazione nei commenti)
· Take grounding measurement between the phase and ground conductors (write measurement in comments) Not exceed 25 ohms
POSHO REQUIREMENTS
____________ ohms
Yes No
· Controllo e test di tutti I trasformatori
· Inspect and check function of all transformers
Yes No
· Portare 5 piastrelle per i trasformatori
· Provide 5 ceramic tiles for transformers
POSHO REQUIREMENTS
Yes No
· Verificare la messa a terra di tutti gli elettrodomestici
· Check grounding of all appliances
Yes No
· Controllo di tutte le luci( interruttori e lampadine )
· Check all lights (fixtures, switches and bulbs)
Yes No
· Sostituzione lampadine
· Replace all burnt light bulbs
Yes No
· Controllare luci di emergenza se esistenti sostituendo batterie e verifica funzionamento .
· Check emergency lights if there are any and replace batteries as needed.
POSHO REQUIREMENTS
Yes No
· Controllo funzionalita’ prese, che abbiamo gli alveoli protetti, e che siano propiamente istallate, es. A tenuta stagna nel luoghi scoperti .
· Check all receptacles/outlets
POSHO REQUIREMENTS
Yes No
· controllo funzionalita’ ceiling fan
· Check operation of all ceiling fans
Yes No
· Controllo e test asciugatrice (controllare messa a terra e mettere etichetta di sicurezza)
· Inspect and check dryer operation (check grounding connection) (apply safety labels)
Yes No
· Controllo e test lavatrice (controllare messa a terra)
· Inspect and check washing machine operation
Yes No
· Controllo funzionalita’ frigo (controllo messa a terra)
· Inspect and check refrigerator /freezer operation
Yes No
· Controllo funzionalita’ lavastoviglie (controllare messa a terra)
· Inspect and check dishwasher operation
Yes No
· Controllo e test dei fornelli e del forno
· Inspect and check stove/oven electrical connection
Yes No
· Controllo funzionamento di tutti I fornelli
· Check operation of all stove burners
Yes No
· Controllo funzionalita’ forno
· Check operation of oven
Yes No
· Controllo avvolgibili elettrici
· Inspect and check electric shutter operation
Yes No
· Controllo citofono
· Inspect and check doorbell/access control
Yes No
· Pulire e spazzare la zona dove si e’lavorato
· Clean and sweep up work area
Yes No
· Altro:
Yes No
· Altro
Yes No
· Altro
Yes No
| ______________________________ | _________________________ | ______ | ||
| Technician Name | Sign | Date |
| ______________________________ | _________________________ | ______ | ||
| Inspector Name | Sign | Date |
MULTITRADE CHECKLIST - HVAC
Address: OBO Property ID:
Initial Inspection - Name: Date:
| Item |
| Comment |
| Completed |
· Controllare funzionamento di tutti gli split, telecomandi,batterie unita’ interne ed esterne (riparare o sostituire se necessario)
· All spilt-packs: check and test fan, coil and other components of indoor unit (replace and/or perform needed maintenance)
Yes No
· Tutti gli split: Rimuovere e pulire tutti I filtri
· All spilt-packs: remove, check and clean all filters
Yes No
· Tutti gli split: Controllare funzionamento delle macchine esterne, condensatore, e altri componenti dell’unita’ esterna (riparare o sostituire se necessario)
· All spilt-packs: check and test compressor, condenser fan and other components of outdoor unit (replace and/or perform needed maintenance
Yes No
· Tutti gli split: Controllare tipo di gas refrigerante usato, livello ed eventuale rabocco
· All spilt-packs: check and inspect refrigerant gas (check for leaks, check for level and re-fill as needed) Tipo di gas refrigerante:
Yes No
· Tutti gli split: Controllare funzionamento della connessione elettrica
· All spilt-packs: check and test electrical connection
Yes No
· Tutti gli split: controllare e pulire le linee di scarico
· All spilt-packs: check and cleat drain lines
Yes No
· Tutti gli split: Inserire nuove batterie nei telecomandi
· All spilt-packs: place new batteries in remote
Yes No
· Tutti gli split: Verificare tutte le impostazioni per il funzionamento
· All spilt-packs: check and test all operations and settings
Yes No
· Impianti canalizzati, pulizia delle bocchette e serrandine, previo smontaggio e rimontaggio .
· Duct air system, cleaning of outlet grills including removal and re-installation
Yes No
· Pinguini: Controllare funzionamento di tutti gli split, ventilatori,telecomandi,batterie unita’ interne ed esterne (riparare o sostituire se necessario)
· All portable units: check and test fan, coil and other components of indoor unit (replace and/or perform needed maintenance)
Yes No
· Pinguini:Rimuovere e pulire tutti I filtri
· All portable units: remove, check and clean all filters
Yes No
· Pinguini: Controllare funzionamento della connessione elettrica
· All portable units: check and test electrical connection
Yes No
· Pinguini: controllare e pulire le cassette di scarico
· All portable units: check and clean drain lines (drain tank)
Yes No
· Pinguini:controllare il buco di connessione sulla finestra
· All portable units: check hose connection through window
Yes No
· Pinguini: sostituire batterie nei telecomandi
· All portable units: place new batteries in remote
Yes No
· Pinguini: Verificare tutte le impostazioni per il funzionamento
· All portable units: check and test all operations and settings
Yes No
· Radiatori:controllare funzionamento e verificare eventuali perdite
· All Radiators: Check and test operation and check for leaks
Yes No
· Controllare tubo di sfiato della caldaia
· Check venting of exhaust gases
Yes No
· Controllare termostato sistema di riscaldamento
· Check radiator thermostat
Yes No
· Pulire e spazzare la zona dove si e’lavorato (rimuovere tutta la polvere,materiali usati e rifiuti)
· Clean and sweep up work area (remove all debris, dust, excess material and trash)
Yes No
· Altro:
Yes No
· Altro
Yes No
· Altro
Yes No
| ______________________________ | _________________________ | ______ | ||
| Technician Name | Sign | Date |
| ______________________________ | _________________________ | ______ | ||
| Inspector Name | Sign | Date |
MULTITRADE CHECKLIST - PLUMBING AND GAS
Address: OBO Property ID:
Initial Inspection - Name: Date:
| Item |
| Comment |
| Completed |
· Controllare eventuali perdite dal tubo del gas/contatore
· Controllare floessibile di collegamente e sostituirlo se scaduto
· Check main gas connection/meter for leaks or other problems
· Check hose and replace if expired.
| POSHO REQUIREMENTS |
| Yes No |
· Installare valvola del gas sulla parete della cucina in modo da essere facilmente raggiungibile , segnalarla nel caso non sia visibile
· Install stove/oven gas valve on the wall of the kitchen, install signage in case valve is hidden inside cabinet
| POSHO REQUIREMENTS |
| Yes No |
· Controllare chiusura gas del forno e della macchina del gas e vedere se ci sono eventuali fuoriuscite
· Check and test stove/oven gas shutoff valves (check for leaks)
| POSHO REQUIREMENTS |
| Yes No |
· Controllare funzionamento macchina del gas e forno
· Check gas stove/oven operation and all burners
Yes No
· Mettere etichetta norme sicurezza gas
· Apply Gas Safety Warning sign
Yes No
· Controllare le luci e il timer del forno e della macchina del gas
· Check stove/oven lights and timer
Yes No
· Controllare funzionamento cappa (ventilazione e luce) Sostituire filtro cappa Verificare che vi sia ventilazione verso l’esterno
· Check stove hood operation (ventilation & lights) Replace Filters Check appropriate ventilation
| POSHO REQUIREMENTS |
| Yes No |
· Controllare funzionamento lavastoviglie
· Check, test and run dishwasher
Yes No
· Controllare tutti I rubinetti (cucina, bagni, lavanderia, etc.)
· Check and test all faucets (kitchen, bathroom, laundry, etc.)
Yes No
· Controllare tutte le valvole di chiusura dell’acqua
· (generale, lavandini, toilets, bidets, etc.)
· Check and test all water shut-off valves (main, sinks, toilets, bidets, etc.)
Yes No
· Controllare scarico wc
· Check toilet flushing mechanism
Yes No
· Controllare se ci sono eventuali perdite dal wc e/o dal bidet
· Check toilets and bidets for leaks
Yes No
· Controllare tutti I rubinetti sul balcone o sul patio
· Check faucets and connections on balconies/patios
Yes No
· Pulire, e controllare sifoni e pilette in tutti I lavandini
· Check and clean
· p-traps and drains in all sinks
Yes No
· Controllare e pulire tutti gli scarichi (pavimento, lavandini, doccia, vasca, lavatrice, lavastoviglie, balcon)
· Check and clear all drains (floor, sink, showers, bathtubs, washer, dishwasher, balconies)
Yes No
· Pulire tutti gli scarichi (doccia, vasca e a pavimento con Storm/Drano)
· Treat shower, bathtub and floor drains with Drano/Storm
Yes No
· Rimuovere tutto il vecchio silicone e ri-siliconare intorno a Lavandini/doccia e vasca (cucina, bagni e lavanderia)
· Remove old caulk and re-caulk around all sinks, counters, showers and bathtubs (kitchen, bathrooms and laundry)
Yes No
· Controllare box doccia e vedere se ci sono eventuali perdite
· Check shower boxes for leaks or other problems
Yes No
· Verificare le ante e/o pannelli dei box doccia o vasca
· Verificare che in caso di cristallo sia vetro temperato antifortunistico
· Check shower/bathtub doors & panel
· Verify that the glass panes are temperate and match safety requirements ( No breakable material )
| POSHO REQUIREMENTS |
| Yes No |
· Installare ad una certa altezza una nuova tenda per la doccia e la vasca in modo tale da poter evitare la fuoriuscita di acqua
· Install new shower curtain at level to prevent water overflow
Yes No
· Controllare funzionamento scaldabagni
· Check water heater(s) operation
Yes No
· Controllare eventuali perdite dallo scaldabagno
· Check water heater(s) for leaks
Yes No
· Impostare temperatura dell’acqua a 49 C
· Set water temperature at 49 C or less
| POSHO REQUIREMENTS |
| Yes No |
· Controllare la pressione dell’acqua (non inferiore di 2.5bar)
· Check water pressure (not less than 2.5 bar)
| POSHO REQUIREMENTS |
| Yes No |
· Controllare tubazioni dell’acqua/contatore e controllare se non vi siano eventuali problemi o perdite
· Check main water connection/meter for leaks or other problems
Yes No
· Etichette valvole gas e acqua
· Label gas and water valves
Yes No
· Controllare funzionamento termosifoni
· Check radiator operation
Yes No
· Controllare perdite dai termosifoni
· Check radiator(s) for leaks
Yes No
· Controllo termostato
· Check radiator thermostat(s)
Yes No
· Controllare fornitura gas (dove esiste un impianto autonomo)
· Check gas furnace (where there is autonom system)
Yes No
· Pulire e spazzare la zona dove si e’ lavorato (rimuovere tutta la polvere,materiali usati e rifiuti)
· Clean and sweep up work area (remove all debris, dust, excess material and trash)
Yes No
· Altro:
Yes No
· Altro:
· Other:
Yes No
· Altro:
Yes No
| ______________________________ | _________________________ | ______ | ||
| Technician Name | Sign | Date |
| ______________________________ | _________________________ | ______ | ||
| Inspector Name | Sign | Date |
File details come from the government source that posted it.