RFI Mobile Scanners - Sources Sought.pdf
PDF 142 KB Posted
- Attached to
- INL/Costa Rica: Mobile Scanner Systems
- Solicitation number
- 191NLE25N0034
About this file
This is a Request for Information (RFI) issued by the Department of State's Office of Acquisition Management seeking potential sources for mobile X-ray scanning solutions to be donated to the Government of Costa Rica under U.S. foreign assistance programs. The RFI targets manufacturers, suppliers, and integrators to gather technical, operational, and commercial information to support the acquisition strategy for mobile vehicle X-ray scanners located in San Jose, Costa Rica.
Respondents must submit a 20-page written response via email to Courtney Wesely at WeselyCJ@state.gov by May 21, 2025, at 5:00 PM EST, with the subject line "RFI – Mobile Scanning Solution for INL/San José". To be eligible for potential future solicitation, vendors must have a current CAGE Code, UEI#, and be registered in the System for Award Management (SAM). The RFI requires detailed information about company capabilities, socio-economic status, product specifications, past performance, existing contracts, and recommendations for sustainable, cost-efficient mobile scanning solutions with comprehensive host government support capabilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Mobile Scanning Costa Rica - FINAL DRAFT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SENSITIVE BUT UNCLASSIFIED
SOURCES SOUGHT NOTICE
I. REQUEST FOR INFORMATON SUBMISSION NOTICE
This Request for Information (RFI) will be used to identify potential sources that are interested in and capable of providing a mobile scanning solution outside of the U.S., specifically San Jose, Costa Rica. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. This RFI is issued solely for conducting market research, information and planning purposes and does not constitute a solicitation or obligation on the part of the Government. Neither unsolicited proposals nor any other kind of offer will be considered in response to this RFI. No reimbursement will be made for any costs associated with providing information in response to this announcement and/or any follow-up information requests.
The purpose of this RFI is to communicate and solicit feedback from industry on the draft version of an upcoming overseas requirement for a mobile scanning solution and does not constitute a solicitation or agreement. No solicitation is guaranteed to be resultant from the RFI. We are gathering technical, operational, and commercial information from manufacturers, suppliers, and integrators to support the acquisition strategy for procuring a mobile vehicle X-ray scanners to be donated to the Government of Costa Rica under U.S. foreign assistance programs. This market research will help assess availability, local sustainability, maintenance, training requirements, and long-term support.
Contractors shall provide company capabilities. The contractor shall provide their NAICS code and provide suggested NAICS codes for market research.
Please do not provide generic capability statements as they shall add no value to this RFI. The Government is seeking specific information in conjunction with the specifications of this requirement as outlined in the Statement of Work.
The page limitation for responses is 20 pages.
All responses shall be submitted in writing via email to Courtney Wesely (Contracting Officer) at WeselyCJ@state.gov by Wednesday, May 21, 2025, 5:00PM EST. Subject line of email shall be "RFI – Mobile Scanning Solution for INL/San José".
In order to participate in the resulting RFQ/RFP and to be eligible for an award, the proposer must have (i) a current CAGE Code, (ii) a UEI#, (iii) be registered to do business with the Government of the United States in the System For Award Management (SAM) and not be on the Excluded Parties List: https://www.sam.gov.
II. COMPANY INFORMATION
https://www.sam.gov/
Company Name:
Address:
UEI:
Company Website:
POC Name:
Phone:
Email:
III. SOCIOEONOMIC STATUS
a. Provide information pertaining to your company’s socio-economic status for federal procurement programs (small, HUBZone, 8(a), Women-owned, veteran-owned, etc.) under their suggested NAICS.
Response:
IV. PRODUCTS AND SERVICES
a. Provide a list of the products/services sold by your company meeting the requirements of this
RFI. Where a particular standard is included in the RFI address your company’s product/service compliance with said requirement. Additionally, make note if the performance work statement specifications prevent competition (such as specifications are too narrow) or if the specifications are not clear.
b. Provide details such as sustainability features (training, maintenance, energy use). To include warranty durations, coverage details, lifecycle expectancy, and service support timelines.
Compliance with Costa Rican laws and certifications. Details on operating conditions and durability.
c. Does your company have the ability to deliver the requirements listed in the performance work statement, AND within what timeframe if it resulted in an award? Please elaborate on your core competencies. Be sure to include delivery timeline for equipment, installation, and training. Additionally, a description of proposed training modules, and plan for in-country support and repair services.
d. Can your company provide past performance history for similar requirements? Be sure to demonstrate previous experience in supplying and supporting mobile x-ray scanning equipment of a similar nature and complexity as the SOW. Such as operational experience with equipment deployed in international or border security contexts, collaboration or service provision to the
Government of Costa Rica, capabilities for system compatibility and integration with existing
Viken models currently in use by the Government of Costa Rica, ability to securely transfer x-ray imaging and operational data to centralized communication centers using secure and efficient transmission technologies (e.g., VPN, encrypted cloud-based systems, or direct satellite uplinks), and use of technologies that facilitate seamless interoperability, system upgrades, and digital networking across existing platforms.
e. Please provide a recommended CLIN structure for this requirement as outlined in the SOW.
V. EXISTING CONTRACTS
a. List of existing contract vehicles through which the US Department of State can access your company’s products and services (i.e., GSA FSS, IDIQs, etc.)
VI. RECOMMENDATION
a. Did your company identify any areas in the draft specifications that present excessive risks or other concerns? To include potential challenges in deployment or support or meeting Costa Rican regulatory standards for health and/or emissions. If so, please provide detailed information and suggested mitigation. This can be provided utilizing track changes in the SOW as well.
b. Based on the Performance Work Statement what is a recommended quality assurance plan standard that could be used to measure successful performance.
c. The Government is particularly interested in solutions that ensure long-term sustainability and low total cost of ownership. Provide suggestions to improve sustainability or cost-efficiency, including low power usage and energy-efficient systems, minimal downtime and simple fault isolation procedures, modular systems that allow for scalable upgrades, non-proprietary or open architecture components, minimal software license renewals and long-term firmware support, proven performance in similar climates and locations.
d. Is the vendor in the capacity to fulfill HOST GOVERNMENT SUPPORT needs?
Some aspects for support include: 1) initial operator and technician training in Spanish, 2) provision of training materials, user manuals, and maintenance guides (In Spanish), 3) ability to deliver refresher or advanced training sessions within the first year, 4) availability of technical support for system diagnostics, troubleshooting, and repairs within 72 hours, 5) local presence or capability to establish in-country servicing agreements, 6) replacement parts delivery within two weeks or less, and 7) support for preventive and corrective maintenance through trained personnel.
VII. ATTACHMENTS
Draft Performance Work Statement (SOW)
File details come from the government source that posted it. Updated .