This is a Request for Proposals (RFP) for clarifier equipment repair and refurbishment services at the Nogales International Wastewater Treatment Plant in Rio Rico, Arizona. The United States Section of the International Boundary and Water Commission (USIBWC) is soliciting one firm fixed price contract for complete repair, rebuild, installation, alignment, testing, commissioning, training, documentation, and warranty of one existing wastewater clarifier and one spare clarifier drive unit. The solicitation is a 100 percent small business set aside under NAICS 811310 (Commercial and Industrial Machinery and Equipment Repair and Maintenance) with a $12.5 million size standard. The procurement method uses FAR Parts 12 and 13.5 for commercial services with a lowest price technically acceptable (LPTA) evaluation approach. The proposal due date is Friday, September 18, 2026, at 3:00 PM Mountain Time, with target award on September 29, 2026, and latest award date of September 30, 2026. All proposals must be submitted exclusively through the USIBWC secure Microsoft SharePoint portal, with one authorized representative and approved business email address per offeror.
The contract involves ten line items encompassing sandblasting and painting, clarifier drive rebuild, hardware replacement with stainless steel, seal replacement, scraper blade replacement, clarifier leveling, concrete wall sanding, panel box relocation, shelf clarifier drive rebuild with new pinion gear and shaft, and draft tube modification. The contractor must complete all work within 180 calendar days after contract award, with a kickoff meeting required within five business days and a project schedule due within seven calendar days of award. The offeror must provide at least a one-year warranty beginning on Government acceptance, qualified personnel with demonstrated expertise in clarifier and industrial drive repair, and a detailed price breakdown with Schedule of Values for billing purposes. Replacement parts may be original equipment manufacturer (OEM) or equal provided they meet compatibility with existing Ovivo equipment specifications. The Service Contract Act applies with wage determinations specified for Arizona counties (Graham, Greenlee, and Santa Cruz), and the Government will provide site drainage, electrical power, water, and disposal containers but will not furnish cranes, rigging, tools, parts, or materials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FINAL_PWS.pdf | ||
| WD_2015-5481.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document Number: 191BWC26R0016 PROCESSED Page 1 of 5
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 & 30 1. REQUISITION NUMBER
FY264321001
5. SOLICITATION NUMBER
191BWC26R0016
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 6. SOLICITATION ISSUE
DATE
08/20/2026
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME Suzette A. Smith
b. TELEPHONE NUMBER (No collect calls) (915)832-4146
8. OFFER DUE DATE / LOCAL
TIME
09/18/2026
03:00 MT
CODE IBWC_
International Boundary and Water Commission (IBWC)
USIBWC - ACQUISITIONS DIV
4191 NORTH MESA ST
EL PASO, TX 79902-1441
9. ISSUED BY UNRESTRICTED OR X SET ASIDE: 100.00 % FOR
X SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED WOMEN-
OWNED SMALL BUSINESS (EDWOSB)
8(A)
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS):811310
SIZE STANDARD:12.5
10. THE ACQUISITION IS
SEE
SCHEDULE
11. DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS BLOCK IS
MARKED
0 Days: 0.00 %
0 Days: 0.00 % 0 Days: 0.00 % 0 Days: 0.00 %
12. DISCOUNT TERMS
13a. THIS CONTRACT IS
RATED ORDER UNDER THE
DEFENSE PRIORITIES AND
ALLOCATIONS SYSTEM -
DPAS (15 CFR 700)
13b. RATING
REQUEST
FOR
QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
X REQUEST
FOR
PROPOSAL
(RFP)
14. METHOD OF SOLICITATION
CODE15. DELIVER TO CODE16. ADMINISTERED BY
FACILITY
CODE
CODE
Contact UEI:
Telephone No.
17a. CONTRACTOR/
OFFEROR
IPPCODE18a. PAYMENT WILL BE MADE BY
IPP
Invoices to be uploaded to Invoice Processing Platform at http://www.ipp.gov
CHARLESTON, SC 29415
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER SEE ADDENDUM
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS
CHECKED
19. ITEM NUMBER 20. SCHEDULE OF SUPPLIES/SERVICES
(Use Reverse and/or Attach Additional Sheets as Necessary)
21. QUANTITY 22. UNIT 23. UNIT PRICE 24. AMOUNT
See Line Information
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____ COPIES TO
ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE
TERMS AND CONDITIONS SPECIFIED.
29. AWARD OF CONTRACT: REFERENCE _____________________________
OFFER DATED _________________ . YOUR OFFER ON SOLICITATION (BLOCK
5) INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (TYPE OR PRINT) Suzette A. Smith
31c. DATE SIGNED 08/19/2026
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
Nogales International Wastewater Treatment Plant 865 E. Frontage Road Rio Rico, Arizona 85648
USIBWC - ACQUISITIONS DIV
4191 NORTH MESA ST
EL PASO, TX 79902-1441
Document Number: 191BWC26R0016 PROCESSED Page 2 of 5
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _________________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
PARTIAL FINAL
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
COMPLETE PARTIAL FINAL
36. PAYMENT 37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 11/2021) BACK
Document Number: 191BWC26R0016 PROCESSED Page 3 of 5
Section A - Solicitation/Contract Form
Line Item Summary
Solicitation Number:
191BWC26R0016
Contract Number: Title:
Nogales Clarifier (Rebuild)
Date of Solicitation:
08/20/2026
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)
PSC: J046
PSC Description: MAINT/REPAIR/REBUILD OF
EQUIPMENT- WATER PURIFICATION AND SEWAGE
TREATMENT EQUIPMENT
Type of Contract Pricing: Firm Fixed Price
1.0 EA $0.00 $0.00
Delivery Schedule:
Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination
Description: Complete sandblast and paint
Reference Line: FY264321001 - 001
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)
PSC: J046
PSC Description: MAINT/REPAIR/REBUILD OF
EQUIPMENT- WATER PURIFICATION AND SEWAGE
TREATMENT EQUIPMENT
Type of Contract Pricing: Firm Fixed Price
1.0 EA $0.00 $0.00
Delivery Schedule:
Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination
Description: Rebuild Clarifier Drive
Reference Line: FY264321001 - 002
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)
PSC: J046
PSC Description: MAINT/REPAIR/REBUILD OF
EQUIPMENT- WATER PURIFICATION AND SEWAGE
TREATMENT EQUIPMENT
Type of Contract Pricing: Firm Fixed Price
1.0 EA $0.00 $0.00
Delivery Schedule:
Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination
Description: Replace all hardware with SS ware
Reference Line: FY264321001 - 003
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)
PSC: J046
PSC Description: MAINT/REPAIR/REBUILD OF
EQUIPMENT- WATER PURIFICATION AND SEWAGE
TREATMENT EQUIPMENT
Type of Contract Pricing: Firm Fixed Price
1.0 EA $0.00 $0.00
Delivery Schedule:
Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination
Description: Replace clarifier seals with new seals
Reference Line: FY264321001 - 004
Document Number: 191BWC26R0016 PROCESSED Page 4 of 5
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)
PSC: J046
PSC Description: MAINT/REPAIR/REBUILD OF
EQUIPMENT- WATER PURIFICATION AND SEWAGE
TREATMENT EQUIPMENT
Type of Contract Pricing: Firm Fixed Price
1.0 EA $0.00 $0.00
Delivery Schedule:
Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination
Description: Replace scraper blades
Reference Line: FY264321001 - 005
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)
PSC: J046
PSC Description: MAINT/REPAIR/REBUILD OF
EQUIPMENT- WATER PURIFICATION AND SEWAGE
TREATMENT EQUIPMENT
Type of Contract Pricing: Firm Fixed Price
1.0 EA $0.00 $0.00
Delivery Schedule:
Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination
Description: Level clarifier
Reference Line: FY264321001 - 006
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)
PSC: J046
PSC Description: MAINT/REPAIR/REBUILD OF
EQUIPMENT- WATER PURIFICATION AND SEWAGE
TREATMENT EQUIPMENT
Type of Contract Pricing: Firm Fixed Price
1.0 EA $0.00 $0.00
Delivery Schedule:
Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination
Description: Sand wall where bulges
Reference Line: FY264321001 - 007
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)
PSC: J046
PSC Description: MAINT/REPAIR/REBUILD OF
EQUIPMENT- WATER PURIFICATION AND SEWAGE
TREATMENT EQUIPMENT
Type of Contract Pricing: Firm Fixed Price
1.0 EA $0.00 $0.00
Delivery Schedule:
Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination
Description: Relocate panel box 3 feet to improve access
Reference Line: FY264321001 - 008
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)
PSC: J046
PSC Description: MAINT/REPAIR/REBUILD OF
EQUIPMENT- WATER PURIFICATION AND SEWAGE
TREATMENT EQUIPMENT
Type of Contract Pricing: Firm Fixed Price
1.0 EA $0.00 $0.00
Document Number: 191BWC26R0016 PROCESSED Page 5 of 5
Delivery Schedule:
Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination
Description: Rebuild shelf clarifier drive w new pinion gear and shaft
Reference Line: FY264321001 - 009
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)
PSC: J046
PSC Description: MAINT/REPAIR/REBUILD OF
EQUIPMENT- WATER PURIFICATION AND SEWAGE
TREATMENT EQUIPMENT
Type of Contract Pricing: Firm Fixed Price
1.0 EA $0.00 $0.00
Delivery Schedule:
Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination
Description: Draft tube modification
Reference Line: FY264321001 - 010
CLIN Funding: Cost:
Base Totals: $0.00 $0.00
Exercised Options Totals: $0.00 $0.00
Unexercised Options Totals: $0.00 $0.00
Base and Options Totals: $0.00 $0.00
USIBWC | 191BWC26R0016 | CLARIFIER EQUIPMENT REPAIR AND REFURBISHMENT SERVICES
191BWC26R0016 | Page 1
UNITED STATES SECTION
INTERNATIONAL BOUNDARY AND WATER COMMISSION
REQUEST FOR PROPOSALS
SOLICITATION NO. 191BWC26R0016
CLARIFIER EQUIPMENT REPAIR AND REFURBISHMENT SERVICES
Nogales International Wastewater Treatment Plant, Rio Rico, Arizona
Acquisition method Commercial services, FAR Parts 12 and 13.5
Contract type Firm fixed price
Evaluation method Lowest price technically acceptable
Set aside 100 percent small business set aside
NAICS and size standard 811310, Commercial and Industrial Machinery and Equipment, except Automotive and Electronic, Repair and Maintenance; $12.5 million
PSC
J046, Maintenance, Repair, and Rebuilding of Equipment, Water Purification and Sewage Treatment Equipment
Period of performance 180 calendar days after contract award
Proposal due date Friday, September 18, 2026, at 3:00 PM Mountain Time
PROPOSALS MUST BE SUBMITTED ONLY THROUGH THE USIBWC SECURE MICROSOFT
SHAREPOINT PORTAL. EMAIL, FAX, MAIL, HAND DELIVERY, AND PHYSICAL MEDIA ARE NOT
AUTHORIZED.
Contract Specialist: Suzette Smith | Suzette.Smith@ibwc.gov
191BWC26R0016 | Page 2
CONTENTS
• Section A, Solicitation and acquisition information
• Section B, Supplies or services and prices
• Section C, Description and performance requirements
• Section D, Packaging and marking
• Section E, Inspection and acceptance
• Section F, Deliveries and performance
• Section G, Contract administration data
• Section H, Special contract requirements
• Section I, Contract clauses
• Section J, List of attachments
• Section K, Representations and certifications
• Section L, Instructions, conditions, and notices to offerors
• Section M, Evaluation factors and basis for award
KEY SOLICITATION DATES
Event Date and time Solicitation posted Monday, August 24, 2026
Optional site visits by appointment with Albert Flores Completed no later than Friday, September 11, 2026
Written questions and requests for information due Friday, September 11, 2026, at 12:00 PM Mountain Time
SharePoint access request due Friday, September 11, 2026, at 12:00 PM Mountain Time
Proposals due through SharePoint Friday, September 18, 2026, at 3:00 PM Mountain Time
Target award Tuesday, September 29, 2026
Latest award date Wednesday, September 30, 2026
Kickoff meeting Within 5 business days after award
Contractor project schedule due Within 7 calendar days after award
Contract completion Within 180 calendar days after award
191BWC26R0016 | Page 3
SECTION A, SOLICITATION AND ACQUISITION INFORMATION
A.1 The United States Section, International Boundary and Water Commission requests proposals for complete repair, rebuild, refurbishment, installation, alignment, testing, commissioning, training, documentation, and warranty services for one existing wastewater clarifier and one existing spare clarifier drive unit at the Nogales International Wastewater Treatment Plant.
A.2 This acquisition is a 100 percent total small business set aside. Offers from concerns that are not small business concerns under NAICS 811310 will not be considered for award.
A.3 The Government intends to award one firm fixed price contract using FAR Parts 12 and 13.5. The Government will use a streamlined lowest price technically acceptable evaluation as described in Section M.
A.4 This solicitation is for equipment repair and refurbishment services. It is not a construction solicitation. Surface preparation, touch up painting, localized concrete clearance adjustment, electrical reconnection, rigging, installation, alignment, and site restoration are incidental to the principal equipment repair service.
A.5 The existing clarifier drives are Ovivo equipment. Genuine Ovivo parts are not mandatory unless a specific PWS requirement expressly states otherwise. Replacement parts may be original equipment manufacturer parts or equal parts that are fully compatible with the existing equipment and meet applicable dimensions, materials, ratings, performance, safety, and interface requirements. The pinion gear and pinion shaft shall be rebuilt or replaced to meet applicable Ovivo specifications.
A.6 The Government may cancel this solicitation at any time before award and may reject any or all proposals if cancellation or rejection is in the Government's interest.
A.7 This solicitation does not authorize work. The Government incurs no obligation until a warranted Contracting Officer executes a written award.
(see pages 1-5)
SECTION B, SUPPLIES OR SERVICES AND PRICES
B.1 The offeror shall enter a firm fixed price for each contract line item. Prices shall include all labor, supervision, project management, engineering support, parts, materials, tools, crane and rigging, transportation, freight, travel, lodging, per diem, permits, testing, training, manuals, warranty, insurance, overhead, general and administrative expense, and profit necessary to complete the PWS.
B.2 A detailed price breakdown and proposed Schedule of Values shall be submitted for price analysis and contract administration. The breakdown is informational and does not convert this firm fixed price contract into a cost reimbursement, time and materials, or construction contract.
B.3 The Government will not separately reimburse costs that the solicitation requires the contractor to include in the firm fixed price.
(see pages 1-5)
SECTION C, DESCRIPTION AND PERFORMANCE REQUIREMENTS
C.1 Attachment 1, Performance Work Statement, May 2026, is incorporated into this solicitation, subject to the clarifications in C.2. If a conflict exists between Attachment 1 and C.2, C.2 controls.
C.2 Solicitation Clarifications to the PWS
• The required quantity is one clarifier rebuild and one spare drive unit rebuild. References to rebuilding two clarifiers, or to more than one clarifier rebuild, are deleted.
• This is a nonpersonal equipment repair and refurbishment service. References to construction, constructed works, or a new system mean the repaired, rebuilt, reinstalled, and commissioned existing equipment.
• References to Texas statutes or Texas professional licensing requirements are inapplicable. The contractor shall comply with applicable Federal, Arizona, Santa Cruz County, and local requirements.
• Only localized touch up painting and surface preparation are required unless the Contracting Officer issues a written amendment or modification. Complete sandblasting and full coating replacement are not included.
191BWC26R0016 | Page 4
• Localized sanding or grinding of the concrete wall is limited to removal of minor bulges needed to provide operating clearance for the rake arm. Structural alteration is not authorized.
• The Government will drain, clean, lock out, and tag out the clarifier before contractor performance.
Existing site electrical power, water, drainage, and designated disposal containers will be made available. The Government will not furnish cranes, rigging, contractor tools, replacement parts, materials, or other equipment.
• Replacement parts may be OEM or equal. The contractor shall submit technical documentation showing compatibility before installation. No statement in the PWS requires the prime contractor to be an Ovivo authorized dealer or requires all parts to be Ovivo branded.
• The contractor shall use qualified personnel with demonstrated expertise in clarifier and industrial drive repair. Factory trained personnel are required only when a specific task or offered product requires such training for safe and proper performance.
• The Schedule of Values is a billing allocation for accepted service milestones. It does not establish construction progress payment procedures or permit payment for unaccepted work.
• The period of performance is 180 calendar days after contract award. The kickoff meeting shall occur within five business days after award. The contractor shall submit the project schedule within seven calendar days after award.
• The contractor shall provide at least a one year warranty beginning on the date of Government acceptance, as required by the PWS.
SECTION D, PACKAGING AND MARKING
D.1 The contractor shall protect all removed, repaired, rebuilt, new, and Government retained components from damage, corrosion, contamination, weather, and improper handling. Reusable and rebuildable Government property shall remain at the site unless the Contracting Officer provides written direction otherwise.
D.2 Deliveries shall identify the solicitation or contract number, contractor name, CLIN, component description, and destination point of contact.
SECTION E, INSPECTION AND ACCEPTANCE
E.1 Inspection and acceptance will occur at the Nogales International Wastewater Treatment Plant. The Contracting Officer or authorized Contracting Officer's Representative will determine acceptance after review of required documentation and successful completion of alignment, electrical, no load, operational, full load, safety, and commissioning tests required by the PWS.
E.2 Government review, observation, or approval does not relieve the contractor of responsibility for compliance with the contract.
E.3 The Government may require correction, repair, replacement, or reperformance of nonconforming work at no increase in contract price.
SECTION F, DELIVERIES AND PERFORMANCE
F.1 Place of Performance. Nogales International Wastewater Treatment Plant, 865 E. Frontage Road, Rio Rico, Arizona 85648.
F.2 Period of Performance. The contractor shall complete all work, testing, training, documentation, and acceptance requirements within 180 calendar days after contract award.
F.3 Working Hours. Normal site working hours are 7:00 AM through 4:00 PM, Monday through Friday, excluding Federal holidays and Government closures. Different hours require advance written approval.
F.4 The contractor shall coordinate outages, draining, lockout and tagout, equipment removal, delivery, installation, and testing with the Contracting Officer's Representative.
F.5 Kickoff Meeting. The contractor shall participate in a kickoff meeting within 5 business days after contract award.
F.6 Contractor Project Schedule. The contractor shall submit the project schedule within 7 calendar days after contract award.
191BWC26R0016 | Page 5
SECTION G, CONTRACT ADMINISTRATION DATA
G.1 Contracting Officer. [NAME, TITLE, EMAIL, AND TELEPHONE TO BE INSERTED BEFORE ISSUANCE OR AWARD]. Only the warranted Contracting Officer may bind the Government or change scope, price, schedule, or contract terms.
G.2 Contract Specialist. Suzette Smith, Suzette.Smith@ibwc.gov.
G.3 Contracting Officer's Representative. The Contracting Officer will identify the authorized representative in writing after award. The representative may monitor technical performance but may not change the contract.
G.4 Invoices shall be submitted through the Invoice Processing Platform in accordance with the award instructions.
The contractor may invoice only for work completed and accepted under the approved Schedule of Values.
SECTION H, SPECIAL CONTRACT REQUIREMENTS
H.1 Secure Electronic Proposal Submission and Communications All proposals shall be submitted exclusively through the USIBWC secure Microsoft SharePoint portal. No proposal or proposal revision may be submitted by email, fax, mail, hand delivery, or physical media unless the Contracting Officer issues a written amendment authorizing another method.
USIBWC will approve only one authorized representative and one associated business, corporate, or enterprise managed email address for each offeror. The approved email address must belong to the individual who will upload the proposal. The Government will not approve a second uploader or second email address unless the Contracting Officer determines in writing that an exception is necessary.
Personal, free, consumer, disposable, temporary, anonymous, or shared email services are prohibited for SharePoint access and official proposal submission. Prohibited domains include gmail.com, yahoo.com, aol.com, outlook.com, hotmail.com, live.com, msn.com, icloud.com, protonmail.com, and similar consumer or temporary services. USIBWC may deny or revoke access when an address does not satisfy this requirement.
The SharePoint link is nontransferable. The authorized representative shall not forward, share, or permit another person to use the link or credentials. Unauthorized use may result in access revocation and referral for review under applicable procurement integrity and information security requirements.
H.2 Contractor Responsibility for Site and Equipment The contractor is responsible for worksite safety, protection of existing facilities and equipment, housekeeping, waste handling, permits, and coordination of subcontractors. The contractor shall immediately report damage, unsafe conditions, spills, and incidents to the Government.
H.3 Sustainable Products and Services To the extent compatible with equipment manufacturer specifications and performance requirements, the contractor shall use applicable sustainable paints, coatings, lubricants, cleaning products, and other EPA or USDA designated products. Product substitutions require technical compatibility and Government approval.
H.4 Order of Precedence Any inconsistency shall be resolved using FAR 52.212-4(s). For purposes of the solicitation schedule and addenda, the order is: amendments, award document and Schedule, Sections A through M, Section C clarifications, Attachment 1 PWS, other attachments, and contractor proposal portions incorporated into the award.
191BWC26R0016 | Page 6
SECTION I, CONTRACT CLAUSES
The FAR provisions and clauses in this solicitation use the versions in FAC 2026-01, effective March 13, 2026, unless a later version is shown. No FAR Overhaul deviation clause is included.
I.1 Clauses Incorporated by Reference
FAR provision or clause Title and date Method 52.202-1 Definitions, Jun 2020 IBR
52.204-9 Personal Identity Verification of Contractor Personnel, Jan 2011
IBR, if routine facility access requires credentials
52.204-13 System for Award Management Maintenance, Oct 2018 IBR
52.204-18 Commercial and Government Entity Code Maintenance, Aug 2020 IBR
52.204-19 Incorporation by Reference of Representations and Certifications, Dec 2014
IBR
52.204-21 Basic Safeguarding of Covered Contractor Information Systems, Nov
IBR
52.212-4 Contract Terms and Conditions, Commercial Products and Commercial Services, Nov 2023
IBR, with Section H addenda
52.212-5
Contract Terms and Conditions Required To Implement Statutes or Executive Orders, Commercial Products and Commercial Services, Mar 2026
IBR; applicable paragraphs identified in I.4
52.219-6 Notice of Total Small Business Set Aside, Nov 2020 Incorporated through 52.212-5
52.219-8 Utilization of Small Business Concerns, Jan 2025 Incorporated through 52.212-5
52.219-14 Limitations on Subcontracting, Oct 2022 Incorporated through 52.212-5
52.219-28 Postaward Small Business Program Rerepresentation, Jan 2025 Incorporated through 52.212-5
52.222-41 Service Contract Labor Standards, Aug 2018 Incorporated through 52.212-5
52.222-44 Fair Labor Standards Act and Service Contract Labor Standards, Price Adjustment, May 2014
Incorporated through 52.212-5
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026, Jan 2022
Incorporated through 52.212-5
52.222-62 Paid Sick Leave Under Executive Order 13706, Jan 2022 Incorporated through 52.212-5
52.223-23 Sustainable Products and Services, May 2024 Incorporated through 52.212-5
52.225-1 Buy American, Supplies, Oct 2022 Incorporated through 52.212-5 for the supply portion
191BWC26R0016 | Page 7
FAR provision or clause Title and date Method
52.225-13 Restrictions on Certain Foreign Purchases, Feb 2021 Incorporated through 52.212-5
52.232-33 Payment by Electronic Funds Transfer, System for Award Management, Oct 2018
Incorporated through 52.212-5
52.232-40 Providing Accelerated Payments to Small Business Subcontractors, Mar
Incorporated through 52.212-5
52.237-2 Protection of Government Buildings, Equipment, and Vegetation, Apr
IBR
52.242-15 Stop Work Order, Aug 1989 IBR 52.247-34 F.O.B. Destination, Nov 1991 IBR
I.2 52.252-2, Clauses Incorporated by Reference, Feb 1998 This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The full text of a clause may be accessed electronically at https://www.acquisition.gov/far/.
(End of clause)
I.3 52.222-42, Statement of Equivalent Rates for Federal Hires, May 2014 In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor, this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if employed by the contracting agency subject to 5 U.S.C. 5341 or 5332.
Employee class | Federal equivalent | Monetary wage and fringe benefits Industrial Equipment Mechanic | WG 10, Step 2 | $32.04 per hour, plus standard Federal fringe benefits Electrician or Electrical Equipment Repairer | WG 10, Step 2 | $32.04 per hour, plus standard Federal fringe benefits Maintenance Mechanic | WG 10, Step 2 | $32.04 per hour, plus standard Federal fringe benefits Electronics Mechanic or Instrumentation Technician | WG 11, Step 2 | $33.72 per hour, plus standard Federal fringe benefits (End of clause)
191BWC26R0016 | Page 8
I.4 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders, Commercial Products and Commercial Services, Mar 2026 FAR 52.212-5 is incorporated by reference under FAR 52.102. All clauses listed in paragraph (a) of FAR 52.212-5 apply. The following additional clauses in paragraphs (b) and (c) are applicable to this acquisition. Clauses not identified below are not selected.
• 52.203-6, Restrictions on Subcontractor Sales to the Government, Jun 2020, with Alternate I, Nov
2021.
• 52.203-17, Contractor Employee Whistleblower Rights, Nov 2023.
• 52.204-10, Reporting Executive Compensation and First Tier Subcontract Awards, Jun 2020.
• 52.204-27, Prohibition on a ByteDance Covered Application, Jun 2023.
• 52.204-30, Federal Acquisition Supply Chain Security Act Orders, Prohibition, Dec 2023.
• 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded, Jan 2025.
• 52.219-6, Notice of Total Small Business Set Aside, Nov 2020.
• 52.219-8, Utilization of Small Business Concerns, Jan 2025.
• 52.219-14, Limitations on Subcontracting, Oct 2022.
• 52.219-28, Postaward Small Business Program Rerepresentation, Jan 2025.
• 52.222-3, Convict Labor, Jun 2003.
• 52.222-21, Prohibition of Segregated Facilities, Apr 2015.
• 52.222-26, Equal Opportunity, Sep 2016.
• 52.222-35, Equal Opportunity for Veterans, Jun 2020.
• 52.222-36, Equal Opportunity for Workers with Disabilities, Jun 2020.
• 52.222-37, Employment Reports on Veterans, Jun 2020.
• 52.222-40, Notification of Employee Rights Under the National Labor Relations Act, Dec 2010.
• 52.222-50, Combating Trafficking in Persons, Oct 2025.
• 52.222-54, Employment Eligibility Verification, Jan 2025.
• 52.223-23, Sustainable Products and Services, May 2024.
• 52.225-1, Buy American, Supplies, Oct 2022.
• 52.225-13, Restrictions on Certain Foreign Purchases, Feb 2021.
• 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving, May 2024.
• 52.232-33, Payment by Electronic Funds Transfer, System for Award Management, Oct 2018.
• 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American
Security Drone Act Covered Foreign Entities, Nov 2024.
• 52.222-41, Service Contract Labor Standards, Aug 2018.
• 52.222-42, Statement of Equivalent Rates for Federal Hires, May 2014.
• 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards, Price Adjustment, May
2014.
• 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026, Jan 2022.
• 52.222-62, Paid Sick Leave Under Executive Order 13706, Jan 2022.
The official full text of FAR 52.212-5 and each incorporated clause is available at https://www.acquisition.gov/far/.
Upon request, the Contracting Officer will provide the full text.
191BWC26R0016 | Page 9
SECTION J, LIST OF ATTACHMENTS
Attachment Title Date or revision Status
Performance Work Statement, Clarifier Complete Rebuild and Spare Drive Rebuild
May 2026 Included as separate document
Service Contract Act Wage Determination No.
2015-5481, Revision 30, Arizona Counties of Graham, Greenlee, and Santa Cruz
May 13, 2026 Reference sheet included;
attached
Price Schedule and Schedule of Values template
Solicitation date Contained in Sections B and L
SharePoint Access Request and Submission Certification
Solicitation date Contained in Section L
J.1 The Contracting Officer shall verify that the current applicable wage determination is attached at issuance and shall incorporate any required updated wage determination by amendment before award.
SECTION K, REPRESENTATIONS AND CERTIFICATIONS
FAR provision or clause Title and date Method
52.204-7 System for Award Management, Oct
2018 IBR
52.204-16 Commercial and Government Entity Code Reporting, Aug 2020 IBR
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment, Nov 2021
IBR; complete disclosures when required
52.204-26 Covered Telecommunications Equipment or Services, Representation, Oct 2020
IBR
52.204-29 Federal Acquisition Supply Chain Security Act Orders, Representation and Disclosures, Dec 2023
IBR; complete disclosures when required
52.209-5 Certification Regarding Responsibility Matters, Oct 2015 IBR
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law, Feb 2016
IBR
52.212-3 Offeror Representations and Certifications, Commercial Products and Commercial Services, Oct 2025
IBR; complete paragraph (b) and any representations not current in SAM
52.225-2 Buy American Certificate, Oct 2022 IBR; complete if foreign end products are proposed
K.1 The offeror shall maintain an active SAM registration through proposal submission and award. The offeror shall ensure that its SAM representations are current, accurate, complete, and applicable to NAICS 811310 and this solicitation.
191BWC26R0016 | Page 10
K.2 The offeror shall identify any exception to its SAM representations and submit all required solicitation specific representations and disclosures in Volume III.
191BWC26R0016 | Page 11
SECTION L, INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.01 Provisions Incorporated by Reference 52.252-1, Solicitation Provisions Incorporated by Reference, Feb 1998. This solicitation incorporates one or more provisions by reference with the same force and effect as if given in full text. Upon request, the Contracting Officer will make full text available. Full text may be accessed at https://www.acquisition.gov/far/.
FAR provision or clause Title and date Method
52.212-1 Instructions to Offerors, Commercial Products and Commercial Services, Sep 2023
IBR, as supplemented by this Section L
52.233-2 Service of Protest, Sep 2006 Full text in L.12
L.02 Questions and Requests for Information L.02.A Offerors shall submit written questions only to Suzette.Smith@ibwc.gov no later than Friday, September 11, 2026, at 12:00 PM Mountain Time. The subject line shall read: RFI, Solicitation 191BWC26R0016, Clarifier Equipment Repair Services.
L.02.B Questions shall identify the solicitation section, PWS paragraph, drawing, attachment, or clause at issue and state the requested clarification. Telephone and oral questions will not receive binding answers.
L.02.C Only a written solicitation amendment issued by the Contracting Officer changes the solicitation or binds the Government. The Government anticipates issuing responses by Tuesday, September 15, 2026, but may revise that date.
L.02.D Optional site visits are available by appointment with Albert Flores and must be completed no later than Friday, September 11, 2026. A site visit request does not extend the question, SharePoint access request, or proposal deadline.
L.03 SharePoint Access Request L.03.A Each offeror shall submit one SharePoint access request by email to Suzette.Smith@ibwc.gov no later than Friday, September 11, 2026, at 12:00 PM Mountain Time.
L.03.B The subject line shall read: Request for SharePoint Access, Solicitation 191BWC26R0016.
L.03.C The request shall include:
• Company legal name and doing business as name, if applicable.
• Unique Entity Identifier.
• Name and title of the single authorized representative.
• The authorized representative's business, corporate, or enterprise managed email address.
• Direct telephone number.
• Solicitation number.
L.03.D The email address provided must be the address of the individual who will upload the proposal. Only one access request, one authorized representative, and one approved email address will be honored for each offeror unless the Contracting Officer approves an exception in writing.
L.03.E Personal, free, consumer, disposable, temporary, anonymous, shared, or group email accounts will not be approved. The SharePoint link is nontransferable and shall not be forwarded or shared.
L.03.F Offerors are responsible for requesting access early enough to resolve access issues. USIBWC is not responsible for late submission caused by an untimely access request, a prohibited email domain, failure to test access, or technical issues within the offeror's control.
L.04 Proposal Submission Deadline and Method L.04.A Proposals shall be uploaded to the designated secure SharePoint folder no later than Friday, September 18, 2026, at 3:00 PM Mountain Time. The SharePoint upload record and time stamp will determine timely receipt.
L.04.B Email, fax, mailed, hand delivered, and physical media proposals will not be accepted unless the Contracting Officer issues a written amendment authorizing another method.
L.04.C Late proposals will be handled strictly under FAR 52.212-1(f). The Government ordinarily will not reactivate an expired link after the deadline. There will be no public proposal opening.
191BWC26R0016 | Page 12
L.04.D The offeror shall upload all files before the deadline and verify that the upload completed successfully. A draft, incomplete, corrupted, password protected, or inaccessible file may be treated as not received or may make the proposal unacceptable.
L.05 Proposal Organization The proposal shall contain three separately labeled electronic volumes. Searchable PDF is preferred. Microsoft Excel may be used for the price schedule. Files shall not contain executable code, macros, external links requiring access, or passwords.
Volume Required content Volume I, Technical Acceptability 20 pages maximum, excluding resumes, licenses, certifications, and manufacturer literature.
Volume II, Price No page limit. Include signed offer, completed Section
B prices, and detailed price breakdown.
Volume III, Administrative and Representations No page limit. Include SAM confirmation, amendments, representations, and contact information.
L.06 Volume I, Technical Acceptability The offeror shall provide enough information for the Government to determine compliance without assumptions.
Merely repeating the PWS or stating that the offeror will comply is insufficient when the solicitation requests supporting details.
Technical approach: Describe the sequence for inspection, disassembly, repair, machining or remanufacture, parts selection, installation, alignment, electrical work, testing, commissioning, training, documentation, and warranty. Identify planned subcontracted work.
Compatibility and parts: Explain how proposed OEM or equal parts will meet existing Ovivo dimensions, materials, operating ratings, interfaces, performance, safety, and maintenance requirements. Identify the proposed approach for the pinion gear and shaft.
Relevant experience: Provide at least two projects completed within the last five years involving wastewater clarifiers, clarifier drives, large industrial gear drives, or comparable rotating equipment rebuilds. Include customer, scope, value, completion date, and reference contact.
Key personnel: Identify the project manager, lead mechanical technician, electrical or instrumentation technician, and quality control lead. Provide qualifications and relevant experience.
Schedule: Provide a milestone schedule showing completion within 180 calendar days after award, including long lead parts, removal, shop work, reinstallation, testing, training, and acceptance.
Quality control and safety: Provide the quality control process, inspection hold points, measurement and alignment methods, testing approach, job safety analysis process, and incident reporting process.
Warranty and support: Confirm the minimum one year warranty and describe warranty response, repair, replacement, and point of contact.
Small business performance: Describe how the offeror will comply with FAR 52.219-14, including the work the prime will perform and any similarly situated subcontractors.
L.07 Volume II, Price
• Completed Section B CLIN pricing and total evaluated price.
• Detailed price breakdown separating labor, travel, freight, parts and materials, crane and rigging, subcontracted effort, testing, training, overhead, and profit. The breakdown is for price analysis and does not change the FFP nature of the contract.
• Proposed Schedule of Values for invoicing. At minimum include mobilization and parts receipt, clarifier rebuild and installation, spare drive rebuild, electrical and alignment testing, commissioning, training and manuals, and final acceptance.
191BWC26R0016 | Page 13
• Identification of any assumptions, exceptions, discounts, or contingent pricing. Contingent or open ended pricing may make the proposal unacceptable.
• Confirmation that the offer remains valid for 90 calendar days after the proposal deadline.
L.08 Volume III, Administrative and Representations
• Signed SF 1449 or signed offer cover sheet identifying the solicitation number and legal offeror name.
• Acknowledgment of every amendment.
• Unique Entity Identifier, CAGE code, legal address, remittance address, and small business representation under NAICS 811310.
• Name, title, telephone number, and approved business email address of the authorized representative.
• Confirmation of active SAM registration and current FAR 52.212-3 representations.
• Completed solicitation specific representations and disclosures required by Section K.
• Disclosure of actual or potential organizational conflicts of interest, or a statement that none are known.
• Identification of exceptions to solicitation terms. Silence constitutes acceptance of the solicitation terms.
L.09 Discussions, Clarifications, and Award Without Discussions The Government intends to evaluate initial proposals and may award without discussions. Offerors shall submit their best technical and price proposal initially. The Government may request clarifications or conduct exchanges permitted by FAR Parts 12 and 13.5, but is not obligated to do so.
L.10 Proposal Preparation Costs The Government will not reimburse proposal preparation, site visit, SharePoint access, or other solicitation response costs.
L.11 Contractor Responsibility The apparent successful offeror shall provide information requested by the Contracting Officer to support a responsibility determination under FAR 9.104. The Government may refer a small business nonresponsibility determination to SBA for a Certificate of Competency when required.
L.12 52.233-2, Service of Protest, Sep 2006
(a) Protests, as defined in FAR 33.101, that are filed directly with an agency, and copies of protests filed with the Government Accountability Office, shall be served on the Contracting Officer by obtaining written and dated acknowledgment of receipt from: Contracting Officer, United States Section, International Boundary and Water Commission, 4191 North Mesa Street, El Paso, Texas 79902, with an electronic courtesy copy to Suzette.Smith@ibwc.gov.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the Government Accountability Office.
(End of provision)
191BWC26R0016 | Page 14
L.13 SharePoint Access Request and Submission Certification
Company legal name
UEI
Authorized representative
Title
Approved business email
Direct telephone
Solicitation number 191BWC26R0016
Certification I certify that the SharePoint link and credentials will be used only by the authorized representative and will not be forwarded, shared, or transferred.
191BWC26R0016 | Page 15
SECTION M, EVALUATION FACTORS AND BASIS FOR AWARD
M.01 52.212-2, Evaluation, Commercial Products and Commercial Services, Nov 2021
(a) The Government will award one firm fixed price contract to the responsible small business offeror whose proposal conforms to the solicitation, is technically acceptable, and has the lowest total evaluated price that the Contracting Officer determines fair and reasonable.
The Government will use a lowest price technically acceptable process. The nonprice factors are Technical Capability and Past Performance. Each nonprice factor will receive a rating of Acceptable or Unacceptable. No additional credit will be given for exceeding an acceptable requirement, and the Government will not make a price and technical tradeoff.
The evaluation factors are:
• Factor 1, Technical Capability.
• Factor 2, Past Performance.
• Factor 3, Price.
Technical Capability and Past Performance are not weighted against price. They are minimum acceptability requirements. Price will determine the apparent successful offeror among proposals rated acceptable under both nonprice factors.
(b) Options. No option CLINs are included. Paragraph (b) of the basic provision does not apply.
(c) A written notice of award or acceptance of an offer furnished to the successful offeror within the offer acceptance period shall result in a binding contract without further action by either party. Before the offer expiration time, the Government may accept an offer, whether or not exchanges occurred, unless the Government received a written withdrawal before award.
(End of provision)
M.02 Factor 1, Technical Capability The Government will evaluate the proposal as a whole and determine whether it clearly demonstrates the ability to meet every material PWS and solicitation requirement. Technical Capability will be rated Acceptable only when all subfactors below are acceptable:
Approach: The approach is complete, logical, feasible, and addresses repair, rebuild, installation, alignment, testing, commissioning, training, documentation, and warranty.
Compatibility: The proposal demonstrates a sound method to verify that OEM or equal parts will be fully compatible with the existing Ovivo equipment and that pinion gear and shaft work will meet applicable Ovivo specifications.
Relevant experience: The offeror demonstrates at least two relevant projects completed within the last five years, or other evidence that provides equivalent confidence in its ability to perform.
Key personnel: Proposed personnel possess qualifications and experience appropriate to the mechanical, electrical, instrumentation, quality, and project management work.
Schedule: The milestone schedule is realistic and shows completion within 180 calendar days.
Quality and safety: The quality control, inspection, testing, safety, and incident response processes satisfy the PWS.
Warranty: The proposal accepts and supports the required minimum one year warranty.
Small business performance: The proposed performance structure is consistent with FAR 52.219-14.
M.03 Factor 2, Past Performance The Government may evaluate submitted references and information from CPARS, SAM.gov, other Government databases, customers, and other sources. The Government will consider recency, relevance, quality, schedule control, cost or price control, management, safety, and customer satisfaction.
An offeror with no relevant past performance will not be rated favorably or unfavorably solely because of the absence of past performance. The Government may evaluate the offeror's experience information under Technical Capability
191BWC26R0016 | Page 16 and assign a neutral Past Performance rating when appropriate. For this LPTA evaluation, a neutral rating will be treated as Acceptable if the proposal otherwise demonstrates technical capability and responsibility.
M.04 Factor 3, Price The total evaluated price is the sum of all CLINS. The Government will evaluate price completeness, mathematical accuracy, reasonableness, and material unbalancing. The Government may use competition, comparison with the independent Government estimate, market research, historical prices, parametric methods, or other price analysis techniques permitted by FAR 13.106-3 and FAR 15.404-1(b).
The Government may reject a proposal with omitted prices, contingent pricing, material exceptions, materially unbalanced pricing, or a price that cannot be determined fair and reasonable.
M.05 Ratings Rating Definition Acceptable The proposal meets the solicitation requirement and presents no material deficiency or unacceptable risk.
Unacceptable The proposal fails to meet a material solicitation requirement, contains a deficiency, or presents risk that cannot be accepted without a material proposal revision.
M.06 Award Sequence
1. The Government will rank proposals by total evaluated price from lowest to highest.
2. The Government will evaluate the lowest priced proposal for technical acceptability, past performance, responsibility, and price reasonableness.
3. If the lowest priced proposal is unacceptable or the offeror is not eligible or responsible, the
Government may evaluate the next lowest priced proposal.
4. Award will be made to the lowest priced offeror that is acceptable under all nonprice factors, responsible, eligible for award, compliant with the total small business set aside, and priced fairly and reasonably.
5. The Government may evaluate all proposals or may stop when it identifies the lowest priced acceptable, responsible, and eligible offeror.
M.07 No Tradeoff and No Public Opening The Government will not make a best value tradeoff or pay a price premium for a technically superior proposal.
Proposals will not be publicly opened. Proposal information will be protected in accordance with applicable procurement integrity requirements.
END.
| ���������� | ������������ �!"�!#� $������� %���!#��%&!������������������� | |
| �� | ��� | |
| ����� | ������������������������������������������������������������������� | �� |
� ��+�"% �!"��!�,�'()-.-/0) %"��1������++2���������� �3�2�!"�!#�����������������3�2�!"��!�,�4( � ��+�"% �!"2��� % �� #��%2 ���3�2�!",�-5)45'('6777777777777777777777777777777777777777�77777777777777777777777777777777777777777777�777777777777777777777777777777777777777777777777777777777777777777777777777777777777� % �,����8!"%���%,����8!"%��!9" ��2�!#���%$%+:�����"1���%"���%" %���98777777777777777777777777777777777777777777777777777777777777777777777777777777777777����������;;
��"*����"�#� 2���<9����� !11!=� $�� ��9>% �!"%1���2 �"*;;������� ������� ���
| �� | ����������()(((�.���+�"�2 �% �3���9>>!� ��"���1����%1� | ��9>% �!"2()())�.����!9" �"*��1��?�����������������������������������������������)@�)(()()'�.����!9" �"*��1��?�����������������������������������������������)A�)A()()4�.����!9" �"*��1��?�����������������������������������������������')�/@()('(�.���+�"�2 �% �3���22�2 %" ���������������������������������������'@�)/()(4-�.��!9� ���>!� ���������������������������������������������������'(�6-()(/)�.��92 !+������3������>��2�" % �3���������������������������������)-�-6()(/'�.��92 !+������3������>��2�" % �3���������������������������������)6�A0()(/4�.��92 !+������3������>��2�" % �3���������������������������������)A�(-()(-)�.� | ||
| % %��" ��� | >��% !���������������������������������������������)-�A-()(-'�.� | |||
| % %��" ��� | >��% !���������������������������������������������)@�/(()(6(�.� |
�2>% �$��:��! !����$��1���������������������������������������''�-0()(@(�.� !�9+�" ����>%�% �!"��1��?�������������������������������������)6�/-()(A(�.�
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .