191BWC26B0006 Amistad Plugging Pen4.pdf

PDF 419 KB Posted

Attached to
Amistad Reservoir Plugging of Penstock #4
Solicitation number
191BWC26B0006
Issued by

About this file

This is a sealed bid Invitation for Bid (IFB) for construction services issued by the International Boundary and Water Commission (IBWC) for the plugging of Penstock No. 4 at Amistad Dam located in Val Verde County, Texas. The solicitation number is 191BWC26B0006, issued July 21, 2026, with bids due September 3, 2026 at 3:00 PM Mountain Daylight Time. The estimated project value ranges between $1,000,000 and $5,000,000. The work must commence within 90 calendar days of award and be completed within 300 calendar days total, with construction work to be finished within 180 calendar days and closeout documentation completed within 120 calendar days. The primary work activities include mobilization/demobilization, removal and storage of irrigation and penstock gates, unwatering of the concrete repair area, installation of a concrete plug in Penstock No. 4, and base slab repair.

A mandatory pre-bid conference and site visit will be held August 5, 2026 at 9:00 AM Central Daylight Time at the USIBWC Amistad Field Office in Del Rio, Texas. Written questions must be submitted by August 13, 2026 at 12:00 PM Mountain Daylight Time, with government responses anticipated by August 20, 2026. Performance and payment bonds are required within 10 days of award at 100 percent of the contract price. Specific insurance requirements include general liability ($500,000/$1,000,000), automobile liability ($250,000/$500,000/$100,000), workers' compensation ($100,000/$100,000/$500,000), and builder's risk insurance at 100 percent of completed contract value. The contract applies prevailing wage standards under Wage Determination TX20260090. Award will be made to the responsible bidder submitting the lowest conforming bid. The work involves heavy construction operations (NAICS 237990) with a small business size standard of 45 employees.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Number: 191BWC26B0006 PROCESSED Page 1 of 62

SOLICITATION,OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER

191BWC26B0006 X

SEALED BID (IFB)

INVITATION TO BID

NEGOTIATED (RFP)

REQUEST FOR

PROPOSAL

2. TYPE OF SOLICITATION 3. DATE ISSUED

07/21/2026

PAGE OF PAGES

1 62

IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER

FY264221002

6. PROJECT NUMBER

CODE IBWC_

International Boundary and Water Commission (IBWC)

USIBWC - ACQUISITIONS DIV

4191 NORTH MESA ST

EL PASO, TX 79902-1441

7. ISSUED BY 8. ADDRESS OFFER TO

See Section L

9. FOR INFORMATION

CALL:

a. NAME

Suzette A. Smith

b. TELEPHONE NO. (Include area code)(NO COLLECT CALLS)

(915)832-4110

c. EMAIL

SUZETTE.SMITH@IBWC.GOV

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

Solicitation 191BWC26B0006, Amistad Reservoir Plugging of Penstock No. 4, Val Verde County, Texas, NAICS 237990, Heavy Construction, Wage Determination TX20260090, will be issued as a full and open competition under sealed bidding procedures. The estimated magnitude of the project is between $1,000,000 and $5,000,000.

The pre bid conference and site visit will be held on August 5, 2026 at 9:00 AM CDT at the USIBWC Amistad Field Office, 670 Texas Spur 349, Del Rio, Texas 78840.

Written questions must be submitted to suzette.smith@ibwc.gov and philip.johnson@ibwc.gov no later than August 13, 2026 at 12:00 PM MDT, referencing solicitation number 191BWC26B0006. Questions received after the deadline will not be answered unless the Contracting Officer determines the question identifies a material mistake, error, omission, or issue in the Invitation for Bid. Government responses are anticipated by August 20, 2026. Bids are due September 3, 2026 at 3:00 PM MDT. Bids received after the closing date and time will not be considered except as permitted by the solicitation and applicable FAR late bid provisions. Access to SBU documents will be provided only after the contractor submits a completed IBWC Form 358, Nondisclosure Agreement, and provides the email address for the SharePoint link. Contractors that submit the required NDA and receive Government authorization will be provided access to the same SBU project information.

11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving90 300

X award, notice to proceed. This performance period is X mandatory negotiable. (See __________________________.)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).

X YES NO

12b. CALENDAR DAYS

Sealed offers in original and copies to perform the work required are due at the place specified in item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

03:00 MTa.

09/03/2026

b. An offer guarantee is, is not required.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.

d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

13. ADDITIONAL SOLICITATION REQUIREMENTS:

NSN 7540-01-155-3212 STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

CGFS // CGFS

X

60 calendar days

Document Number: 191BWC26B0006 PROCESSED Page 2 of 62

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CONTACT:

CODE FACILITY CODE

The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ___________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

17.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY

IPP

Invoices to be uploaded to Invoice Processing Platform at http://www.ipp.gov

CHARLESTON, SC 29415

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

STANDARD FORM 1442 (REV. 12/2022)BACK

Document Number: 191BWC26B0006 PROCESSED Page 3 of 62

Table of Contents

Section Description Page Number

B Supplies or Services and Prices/Costs E Inspection and Acceptance

52.246-12 Inspection of Construction (Aug 1996) F Deliveries or Performance

52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) 52.211-12 Liquidated Damages-Construction (Sept 2000)

H Special Contract Requirements H.01 - H.17B Special Contract Requirements

I Contract Clauses 52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.202-1 Definitions (Jun 2020) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-7 Anti-Kickback Procedures (Jun 2020) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation On Payments to Influence Certain Federal Transactions (Jun 2020) 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Nov 2021) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) 52.204-27 Prohibition on a ByteDance Covered Application (Jun 2023) 52.228-11 Individual Surety-Pledge of Assets (Feb 2021) 52.236-13 Alt I Accident Prevention (Nov 1991) - Alternate I (Nov 1991) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.204-16 Commercial and Government Entity Code Reporting 52.204-18 Commercial and Government Entity Code Maintenance 52.222-4 Contract Work Hours and Safety Standards -Overtime Compensation 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work 52.228-17 Individual Surety—Pledge of Assets (Bid Guarantee) 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (Jan 2025) 52.214-29 Order of Precedence-Sealed Bidding (Jan 1986) 52.219-9 Small Business Subcontracting Plan (Jan 2025) 52.225-10 Notice of Buy American Requirement-Construction Materials (May 2014) 52.228-5 Insurance-Work on a Government Installation (Jan 1997) 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) - Alternate I (Apr 1984) 52.246-21 Warranty of Construction (Mar 1994) 52.222-10 Compliance with Copeland Act Requirements 52.222-11 Subcontracts (Labor Standards) 52.222-12 Contract Termination-Debarment 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations 52.222-14 to 52.225-13 Clauses by IBR 52.222-6 Construction Wage Rate Requirements 52.222-7 Withholding of Funds 52.222-8 Payrolls and Basic Records

Document Number: 191BWC26B0006 PROCESSED Page 4 of 62

52.222-9 Apprentices and Trainees 52.232-5 to 52.253-1 Payment, Data, Environmental, Changes, Disputes,& Termination

52.236 to 52.236-27 Alt 1 Construction Specific FAR Clauses

J List of Attachments J.01 List of Attachments

K Representations, Certifications, and Other Statements of Offerors or Respondents 52.204-8 Alt I Annual Representations and Certifications (Mar 2026) - Alternate I (Mar 2023) 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation (Nov 2015) 52.209-5 Certification Regarding Responsibility Matters (Aug 2020) 52.214-14 Place of Performance-Sealed Bidding (Apr 1985) 52.219-1 Small Business Program Representations (Feb 2024) 52.219-1 Alt I Small Business Program Representations (Feb 2024) - Alternate I (Feb 2024) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment 52.204-26 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment

L Instructions, Conditions, and Notices to Offerors and Respondents 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) 52.214-6 Explanation to Prospective Bidders (Apr 1984) 52.214-12 Preparation of Bids (Apr 1984) 52.214-18 Preparation of Bids-Construction (Apr 1984) 52.214-19 Contract Award-Sealed Bidding-Construction (Aug 1996) 52.204-7 System for Award Management (Nov 2024) 52.214-3 Amendments to Invitations for Bids (Dec 2016) 52.214-4 False Statements in Bids (Apr 1984) 52.214-5 Submission of Bids (Dec 2016) 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999) 52.214-15 Period for Acceptance of Bids (Apr 1984) 52.228-1 Bid Guarantee (Sept 1996)

M Evaluation Factors for Award M.01 Basis of Award

Document Number: 191BWC26B0006 PROCESSED Page 5 of 62

Section B - Supplies or Services and Prices/Costs

Line Item Summary

Solicitation Number:

191BWC26B0006

Contract Number: Title:

AMISTAD PLUGGING PENSTOCK 4

Date of Solicitation:

07/21/2026

Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)

PSC: Z2KA

PSC Description: REPAIR OR ALTERATION OF DAMS

Type of Contract Pricing: Firm Fixed Price

1.0 LS $0.00 $0.00

Delivery Schedule:

Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination

Description: Mobilization/Demobilization (01.71.13)

1900 2026 19___X10780000 3094 IBWC 309422 3723 3240

Reference Line: FY264221002 - 001

Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)

PSC: Z2KA

PSC Description: REPAIR OR ALTERATION OF DAMS

Type of Contract Pricing: Firm Fixed Price

1.0 LS $0.00 $0.00

Delivery Schedule:

Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination

Description: Contract Closeout (01.77.19)

1900 2026 19___X10780000 3094 IBWC 309422 3723 3240

Reference Line: FY264221002 - 002

Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)

PSC: Z2KA

PSC Description: REPAIR OR ALTERATION OF DAMS

Type of Contract Pricing: Firm Fixed Price

1.0 LS $0.00 $0.00

Delivery Schedule:

Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination

Description: Removal-Storage of Irrigation Gate (02.42.13)

1900 2026 19___X10780000 3094 IBWC 309422 3723 3240

Reference Line: FY264221002 - 003

Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)

PSC: Z2KA

PSC Description: REPAIR OR ALTERATION OF DAMS

Type of Contract Pricing: Firm Fixed Price

1.0 LS $0.00 $0.00

Delivery Schedule:

Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination

Description: Removal-Storage of Penstock Gate (02.42.13)

1900 2026 19___X10780000 3094 IBWC 309422 3723 3240

Reference Line: FY264221002 - 004

Document Number: 191BWC26B0006 PROCESSED Page 6 of 62

Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)

PSC: Z2KA

PSC Description: REPAIR OR ALTERATION OF DAMS

Type of Contract Pricing: Firm Fixed Price

1.0 LS $0.00 $0.00

Delivery Schedule:

Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination

Description: Unwatering of Concrete Repair Area (35.01.70.51)

1900 2026 19___X10780000 3094 IBWC 309422 3723 3240

Reference Line: FY264221002 - 005

Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)

PSC: Z2KA

PSC Description: REPAIR OR ALTERATION OF DAMS

Type of Contract Pricing: Firm Fixed Price

1.0 LS $0.00 $0.00

Delivery Schedule:

Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination

Description: Penstock #4 Concrete Plug (35.21.33.61)

1900 2026 19___X10780000 3094 IBWC 309422 3723 3240

Reference Line: FY264221002 - 006

Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees)

PSC: Z2KA

PSC Description: REPAIR OR ALTERATION OF DAMS

Type of Contract Pricing: Firm Fixed Price

1.0 LS $0.00 $0.00

Delivery Schedule:

Delivery Number Delivery Date Quantity FOB Point 1 1.000000 Destination

Description: Base Slab Repair (35.71.13.61)

1900 2026 19___X10780000 3094 IBWC 309422 3723 3240

Reference Line: FY264221002 - 007 ipp.gov

CLIN Funding: Cost:

Base Totals: $0.00 $0.00

Exercised Options Totals: $0.00 $0.00

Unexercised Options Totals: $0.00 $0.00

Base and Options Totals: $0.00 $0.00

Section E - Inspection and Acceptance

52.246-12 - Inspection of Construction (Aug 1996)

(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to

Document Number: 191BWC26B0006 PROCESSED Page 7 of 62

Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not--

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this- section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may--

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately.

Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

(End of clause)

Section F - Deliveries or Performance

52.211-10 - Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within 90 days after NTP [Contracting Officer insert number] calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 days construction; 120 days closeout; 300 calendar days.“three hundred (300) calendar days. Construction work shall be completed within one hundred and eighty (180) calendar days. All closeout documents and final paperwork shall be provided within one hundred and twenty (120) calendar days”. .* The time stated for completion shall include final cleanup of the premises.

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

(300) calendar days. Construction work shall be completed within one hundred and eighty (180) calendar days. All closeout documents and final paperwork shall be provided within one hundred and twenty (120) calendar days”.

52.211-12 - Liquidated Damages-Construction (Sept 2000)

Document Number: 191BWC26B0006 PROCESSED Page 8 of 62

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $626.92 [Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

Section H - Special Contract Requirements

H.01 - H.17B - Special Contract Requirements

Section H - Special Contract Requirements

H.01 Performance and Payment Bonds (DEC 2015)………………..

H.01.A. For contracts that exceed $150,000.00 the Contractor shall, within 10 calendar days after award of contract, furnish to the Government bonds as follows:

H.01.A.1. SF 25, Performance Bond. Performance bond with a surety or sureties approved by the Contracting Officer, securing performance and fulfillment of the Contractor's obligations under this contract, with a penal amount of not less than 100% of the price of the contract at the time of award.

H.01.A.2. SF 25A, Payment Bond. Payment bond with a surety or sureties approved by the Contracting Officer, assuring payment as required by law to all persons supplying labor or materials in the prosecution of the work provided for in the contract with a penal amount of not less than 100% of the price of the contract at the time of award.

H.01.B. Costs. All costs of furnishing performance and payment bonds shall be included in the total bid in the schedule.

H.01.C. Requirements for execution of surety bonds. Each surety company bond (performance or payment), that purports to have been executed by an agent or attorney in fact for the corporate surety, is required to have submitted with it a power of attorney to the signatory agency or attorney in fact, and (1) be executed by the corporate surety upon a date reasonably proximate to the date of the bond, or (2) the power of attorney shall be accompanied by a certification of the surety to the effect that the power of attorney was in full force and effect upon a date reasonable proximate to the date of the bond.

H.01.D. Individual Sureties.

H.01.D.1. If individual surety bonds are furnished for payment and performance bonds, the individual sureties must submit with their bonds proof of ownership and value of the assets which they claim in their net worth. The Government's preferred method of proof is to have a statement of net worth prepared by a certified public accountant in accordance with generally accepted accounting principles. The statement of net worth on the SF 28, Affidavit of Individual Surety is not in itself sufficient and will not be accepted absent of additional proof of value and ownership.

H.01.D.2. Bidders are also cautioned that individual sureties must provide complete and detailed information in block 10 of the SF 28 concerning other contracts on which they have provided bonds. This information should include contract number, contract location, amount and type of bond, email address, and telephone number of the involved contracting officer.

H.01.D.3. Failure to provide the proof and information requested above will cause delays to the start of construction for which the contractor must bear the responsibility and may result in termination of contract for failure to provide adequate bonds.

[End of Clause]

H.02 Compensation and Liability Insurance (DEC 2015)………………..

H.02.A. The Contractor shall within ten (10) calendar days after award of contract provide and maintain minimum insurance as follows:

H.02.A.1. General Liability Insurance. General Liability Insurance for bodily injury and property damage with minimum limits $500,000 each occurrence with an aggregate of $1,000,000.

Document Number: 191BWC26B0006 PROCESSED Page 9 of 62

H.02.A.2. Automobile Liability. Automobile Liability for bodily injury and property damage with minimum of $250,000 for injury to or death of any one (1) person, $500,000 each accident or occurrence for bodily injury, and $100,000 for each accident or occurrence for property damage liability.

H.02.A.3. Worker's Compensation Insurance. Worker's Compensation Insurance for all labor employed on the project who may come within the protection of workers' compensation laws and Employers General Liability with minimum limits of $100,000 each accident, bodily injury by disease $100,000 each employee, $500,000 aggregate. In every case the insurance coverage shall amount to at least the limits stated above. However, where the Financial Responsibility Compulsory Insurance Law of the State in which the project is located requires higher limits, the Automobile Liability Insurance Policy shall provide coverage of at least those limits required by State law. The insurance obtained by the Contractor must (1) be effective for the term of the contract and (2) must name both the United States of America by and through the United States Section of the International Boundary and Water Commission as additionally insured. The requirement for naming the United States of America as an additional insured does not apply to Worker's Compensation Insurance. Before commencing work under this contract, the Contractor shall certify to the Contracting Officer in writing that the required insurance has been obtained.

H.02.B. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer. The Contractor's written certification shall be accompanied by either a Certificate issued by the insurer or photocopies of the insurance policies which reflect that the cancellation/change provisions of this contract have been met.

H.02.C. The Contractor shall insert the substance of this clause including this paragraph in subparagraphs under this contract and shall require subcontractors to provide and maintain the same limits. At least 5 days prior to each such subcontractor's personnel commencing work on this project, the Contractor shall furnish (or ensure that there has been furnished) to the Contracting Officer a current Certificate of Insurance meeting the requirements as stated above.

H.03 Builders Risk Insurance (DEC 2015)………………..

H.03.A. The Contractor is responsible for losses suffered prior to Government acceptance of the work. Therefore, the Contractor is responsible for protection of the work and repair of damages. For the protection of the Contractor and the Government, the Contractor is required to obtain Builder's Risk Insurance with the maximum level of coverage available in the project locality and no less than 100% of the contract price.

H.03.B. The Contractor shall not commence work under this contract until he has obtained all the insurance required and such insurance has been approved by the Contracting Officer, nor shall the Contractor allow any subcontractor to commence work on their subcontract until the insurance required of the subcontractor has been so obtained and approved.

H.03.C. The Contractor shall procure within 10 calendar days after award of contract, and maintain during the life of this contract, Builder's Risk Insurance based on 100% of the completed value of the insurable portion of the project.

H.03.D. The Contractor shall furnish the Contracting Officer with certificates showing the type, amount, class of operations covered, effective dates, and dates of expiration. Such certificates shall also contain substantially the following statement: "The insurance covered by this certificate will not be canceled or materially altered, except after thirty (30) calendar days written notice has been received by the Contracting Officer."

H.03.E. The insurance obtained by the Contractor must (1) be effective for the term of the contract and (2) must name the United States of America by and through the United States Section of the International Boundary and Water Commission as an additional insured.

H.04 Brand Name or Equal (DEC 2015)………………..

If items called for by this Solicitation have been identified in the specifications by a "Brand Name or Equal" description, such identification is intended to be descriptive, but not restrictive, and is to indicate the quality and characteristics of products that will be satisfactory (Reference Section I, FAR Clause 52.236-5 entitled Material and Workmanship). The determination as to equality of a product shall be the responsibility of the Government and will be based on information furnished during the submittal process (Reference Technical Specification Section 01.33.00-Submittals). As used in this clause, the term "brand name" includes identification of products by manufacturer, make, and/or model.

Document Number: 191BWC26B0006 PROCESSED Page 10 of 62

H.05 Technical Data Submittal Requirements (DEC 2015)………………..

H.05.A. Technical data required to be provided to the government are described in the paragraph entitled "Submittal Requirements" in the Technical Specifications Section 01.33.00-Submittals.

H.05.B. If the Contractor fails to provide required technical data within the time(s) specified in this contract, or any extension, such failures shall be considered to demonstrate unsatisfactory progress and:

H.05.B.1. There shall be retained from the progress or other payments under this contract such amount(s) as the Contracting Officer considers adequate protection to the Government, therefore.

H.05.B.2. The Contractor and its sureties shall be liable to and assessed by the Government for all damages caused by such failure.

H.05.B.3. The Contractor’s right to proceed with the work that has been delayed may be terminated for default.

H.05.C. In the event the Contractor provides submittals prior to Notice to Proceed, the Government may review the submittals prior to the Notice to Proceed. The Contractor shall not seek compensation for efforts spent on the preparation of submittal documents submitted prior to the Notice to Proceed.

H.05.D. The rights and remedies of the Government in this clause are in addition to any other rights and remedies provided by law or under this contract.

H.05.E. The Government may expedite the review of submittals. Expedite is defined as any review time less than the allotted time specified for the review of the submittal in Section 01.33.00. However, the Government reserves the right to require up to the amount of time specified in Section 01.33.00 for review of submittals or resubmittals.

H.06 Accident Prevention and Pre-Planning (DEC 2015)………………..

H.06.A. With reference to the requirements of Contract Clause 52.236-13 (Alternate I) for an overall safety program, the Contractor shall:

H.06.A.1. Submit a detailed plan for performing each major phase of work.

H.06.A.2. Require Subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.

H.06.A.3. Be prepared to discuss the plans in conferences convened by the Contracting Officer or Contracting Officer’s Representative prior to starting work on each major phase of work. Plans shall include all pertinent information, such as methods of providing safety measures for personnel performing required work. The plan for accomplishing work shall be submitted prior to commencing operations.

H.07 Construction Program (DEC 2015)………………..

H.07.A. The Contractor shall submit a progress schedule of construction in accordance with the requirements set forth in the Technical Specifications Section 01.32.16-Construction Progress Schedule. The initial compliance confirmed progress schedule under Section 01.32.16 shall serve as a baseline for the project. The Contractor's progress schedule shall account for the assigned workday calendar, seasonal weather conditions, and other constraints considered in the planning and scheduling of all work to ensure the completion within the allotted contract time. The progress schedule shall be of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a progress schedule within the time prescribed, the Contracting Officer (CO) may withhold approval of progress payments until the Contractor submits the required progress schedule. Until such time as the submitted progress schedule is compliance confirmed as the official schedule of the project, the CO may withhold approval of progress payments.

H.07.B. If, in the opinion of the CO, the Contractor falls behind the compliance confirmed progress schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the CO, without additional cost to the Government. In this circumstance, the CO may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the CO deems necessary to demonstrate how the approved rate of progress will be regained.

H.07.C. Failure of the Contractor to comply with the requirements of the CO under this clause shall be grounds for a determination by the CO that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the CO may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

Document Number: 191BWC26B0006 PROCESSED Page 11 of 62

H.08 Construction Safety Standards (DEC 2024)………………..

H.08.A. Offerors shall obtain and review the current Construction Industry "OSHA Safety and Health Standards (29 CFR 1926)" and the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, dated March 15, 2024 (see Specification Section 01.35.23-Safety), prior to submitting offers and preparing required safety program. Offerors shall utilize these standards in preparing required safety programs.

H.08.B. The Contractor shall comply with all pertinent provisions of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, dated March 15, 2024. This manual is available from: www.publications.usace.army.mil/ Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf.

H.08.C. In the event there is a conflict between the requirements contained in OSHA Safety and Health Standards (29 CFR 1926), U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1), specifications paragraphs, Contractor's approved safety program, or referenced safety and health standards, the more stringent requirement will prevail.

H.09 Cultural Resources (DEC 2015)………………..

H.09.A. In accordance with the National Historic Preservation Act of 1966 (16 U.S.C. 470), the following procedures are implemented to ensure historic preservation and fair compensation to the Contractor for delays attendant to cultural resources investigations. In the event potential historical, architectural, archaeological, or cultural resources (herein after cultural resources) are discovered during subsurface excavations at the site of construction, the following procedures shall be instituted:

H.09.A.1. The Contractor shall immediately cease work in that area, secure the location from further disturbance and possible vandalism, and immediately notify the Contracting Officer and the Contracting Officer’s Representative.

H.09.A.2. The Contracting Officer shall issue a "Suspension of Work" directing the Contractor to cease all construction operations at the location of such potential cultural resources find.

H.09.A.3. Such "Suspension of Work" shall be effective until such time as a qualified archaeologist can be called to assess the value of these potential cultural resources and make recommendations to the State Historical Preservation Officer. Any "Suspension of Work" shall contain the following:

H.09.A.3.a. A clear description of the work to be suspended;

H.09.A.3.b. Any instructions regarding issuance of further orders by the Contractor for material services;

H.09.A.3.c. Guidance as to action to be taken on subcontracts;

H.09.A.3.d. Any suggestions to the Contractor as to minimization of costs;

H.09.A.3.e. Estimated duration of the temporary suspension.

H.09.B. If the archaeologist determines that the potential find is a bona fide cultural resource, at the direction of the State Historical Preservation Officer, the Contracting Officer shall extend the duration of the "Suspension of Work" in writing, and the Contractor shall suspend work at the location of the find. Equitable adjustment of the construction contract shall be made in the following manner:

H.09.B.1. Time Extension. If the work temporarily suspended is on the "critical path," the total number of days for which the suspension is in effect shall be added to the number of allowable contract days. If a portion of work at the time of such suspension is not on the "critical path," but subsequently becomes work on the critical path, the allowable contract time will be computed from the date such work is classified as on the critical path.

H.09.B.2. Additional Compensation. If, as a result of a suspension of the work, the Contractor sustains a loss which could not have been avoided by judicious handling of forces, equipment, and (plant) or redirection of forces or equipment to perform other work on the contract, there shall be paid to the Contractor an amount as determined by the Contracting Officer to be fair and reasonable compensation for the Contractor’s actual loss in accordance with the following:

H.09.B.2.a. Idle Time of Equipment. Compensation for equipment idle time will be determined on a force account (time and materials) basis and shall include the cost of extra moving of equipment and rental loss.

H.09.B.2.b. Idle Time of Labor. Compensation for idle time of workers will be determined by the Contracting Officer as "Labor" less any actual productivity factor of this portion of the work force.

H.09.B.2.c. Increased Costs of Labor and Materials. Increased costs of labor and materials will be compensated only to the extent such increase was in fact caused by the suspension as determined by the Contracting Officer.

H.09.C. Compensation for actual loss due to idle time of either equipment or labor shall not include markup for profit. The hours for which compensation will be paid will be the actual normal working time during which such delay condition exists but will in no case exceed eight hours in any one day. The days for which compensation will be paid shall be full or partial calendar days, excluding Saturdays, Sundays, Federal and State holidays, during the existence of such delay.

Document Number: 191BWC26B0006 PROCESSED Page 12 of 62

H.09.D. Applicable State Historical Preservation Officer. The Texas Historical Commission is located at 1511 Colorado St., Austin, TX 78701. The Texas Historical Commission may be reached by email at thc@thc.state.tx.us, by telephone at (512) 463-6100, or by mail at: Mailing Address: PO Box 12276, Austin, TX 78711.

H.10 Contract Work Schedule (JUN 2021)………………..

H.10.A. Normal working hours for the Contractor shall not be earlier than 7:00 am nor later than 3:30 pm, Monday through Friday, excluding Federal Holidays. If the Contractor wishes to work during periods other than that above or in excess of 40 hours per week, additional Government inspection forces will be required. The Contractor shall notify the Contracting Officer's Representative (COR) 3 business days in advance of their desire to work during other periods to allow the determination if additional inspection forces are reasonably available. If such forces are reasonably available, the Contracting Officer or COR may authorize the Contractor to perform work during periods other than normal duty hours/days or in excess of 40 hours per week; however, if additional inspection forces are required to perform in excess of their normal duty hours/days, the actual cost of the overtime inspection at overtime rates will be charged to the Contractor and will be deducted from the final payment of the Contract amount.

H.10.B. Consistent with Section 6103(a) of Title 5 of the United States Code the following are legal public holidays:

H.10.B.1. New Year’s Day, January 1.

H.10.B.2. Birthday of Martin Luther King, Jr., the third Monday in January.

H.10.B.3. Washington’s Birthday, the third Monday in February.

H.10.B.4. Memorial Day, the last Monday in May.

H.10.B.5. Juneteenth National Independence Day, June 19.

H.10.B.6. Independence Day, July 4.

H.10.B.7. Labor Day, the first Monday in September.

H.10.B.8. Columbus Day, the second Monday in October.

H.10.B.9. Veterans Day, November 11.

H.10.B.10. Thanksgiving Day, the fourth Thursday in November.

H.10.B.11. Christmas Day, December 25.

H.10.C. A listing of Federal Holidays are available at the following link:

www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ For Holidays that fall on a Saturday, for Federal employees, the preceding Friday will be treated as a holiday for pay and leave purposes (See 5 U.S.C. 6103(b)). For Holidays that fall on a Sunday, for Federal employees, the following Monday will be treated as a holiday for pay and leave purposes (See section 3(a) of Executive order 11582, February 11, 1971).

H.10.D. If the above holidays are a paid holiday and results in works hours in excess of 40 hours in any workweek, laborers and mechanics shall be paid at least 1 and 1/2 times the basic rate of pay for each hour worked over 40 hours consistent with FAR Clause 52.222-4.

H.11 Utility and Telephone Services (DEC 2015)………………..

The U.S. Section, International Boundary and Water Commission will not provide utility (internet, gas, and electricity) and telephone services to the Contractor. The Government will allow the Contractor to use power from the drop at 29°26'55"N 101°3'5"W but the Contractor shall reimburse the Government for the full amount billed to that meter (including any fees or charges). Water is available at no cost for the Contractor's use at the same location. If no meter is on the water source, the Contractor shall install one and document water used on the project. Otherwise, the Contractor shall, at their own expense and in a workmanlike manner satisfactory to the Contracting Officer, install and maintain all necessary temporary connections and distribution lines, and shall remove the same prior to final acceptance of the work by the Government.

See Section 01.11.00

H.12 Administration of Default (Fixed-Price Construction) (DEC 2015)………………..

H.12.A. Notwithstanding Paragraph (b)(1)(xi) of Contract Clause 52.249-10, Default (Fixed-Price Construction), the Contractor shall not be excused for delays, and shall be liable for any excess costs for failure to perform, if the subcontracted or purchased supplies or services were obtainable from other sources in sufficient time for the Contractor to meet the required delivery schedule or other performance requirements.

Document Number: 191BWC26B0006 PROCESSED Page 13 of 62

H.12.B. Unusually severe weather, as used in Paragraph (b)(1) of Contract Clause 52.249-10, Default (Fixed-Price Construction), means adverse weather which at the time of the year in which it occurred, was unusual for the place in which it occurred. No matter how severe or destructive, if the weather is not unusual for the particular time and place, or if a Contractor could have reasonably foreseen it, the Contractor is not entitled to an extension in contract time. Climatological records are available for the Contractor's information online from the National Weather Service. The Government shall not be responsible for any interpretation or a conclusion drawn from the data or information by the Contractor.

H.12.C. Upon acknowledgment of the Notice to Proceed and continuing throughout the contract on a monthly basis, adverse weather will be recorded on a calendar day basis (including weekends and holidays). The COR will examine these records each month and determine whether the Contractor is entitled to a time extension.

H.12.D. Adverse weather must prevent work for 50% or more of the Contractor's work during any workday and delay work critical to the timely completion of the project.

H.13 Time Extensions for Unusually Severe Weather (DEC 2015)………………..

H.13.A. This provision specifies the procedures for the determination of time extensions for unusually severe weather in accordance with the Contract Clause, 52.249-10, Default (Fixed-Price Construction). The listing below defines the monthly anticipated adverse weather for the contract period and is based on NOAA or similar data for the geographical location of the project. The weather conditions for this contract is based upon the weather station at NOAA sites around Amistad Dam.

H.13.B. Monthly Anticipated Adverse Weather Calendar Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual 2 1 1 0 0 0 4 4 2 0 0 2 16

H.13.B. Determination:

H.13.B.1. The above schedule of anticipated adverse weather will constitute the base line for monthly (or portion thereof) weather time evaluations. Upon acknowledgment of the Notice to Proceed and continuing throughout the contract on a monthly basis, actual adverse weather days will be recorded on a calendar day basis (including weekends and holidays) and compared to the monthly anticipated weather in Paragraph H.13.A. above. For purposes of Paragraph H.13.B., the term actual adverse weather days shall include days impacted by actual adverse weather days.

H.13.B.2. The number of actual adverse weather days shall be calculated chronologically from the first to the last day in each month.

Once the number of actual adverse weather days anticipated in Paragraph H.13.A. above have been incurred, the Contracting Officer will examine any subsequently occurring adverse weather days to determine whether a Contractor is entitled to a time extension.

These subsequently occurring adverse weather days must prevent work for 50% or more of the Contractor's workday and delay work critical to the timely completion of the project. These subsequently occurring adverse weather days must fall on a scheduled workday to count towards the entitled time extension. The Contracting Officer will convert any delays to meeting the above requirements to calendar days and issue a modification in accordance with the Contract Clause, 52.249-10, Default (Fixed-Price Construction).

H.13.B.3. The Contractor shall not request a modification to the contract to add the adverse weather delay days more frequently than every fourth month after the start of mobilization.

H.13.C. The Contractor's progress schedule must reflect the above anticipated adverse weather delays on all weather dependent activities.

H.14 Change Orders and Contract Modifications: Limitations on Markups (DEC 2015)…… H.14.A. In the event the Government elects to direct a change order or enter into a contract modification that increases the scope of work during the course of performance of this contract, allowances for overhead and fee of higher tier subcontractors and the prime contractor shall be subject to the limitations below.

H.14.B. Changes and Modifications up to $150,000.00 (Exclusive of Markups) H.14.B.1. No subcontractor, vendor or material man, at any level, shall apply markups in excess of 10% overhead and 10% profit on additional contract scope, added by change order or modification, in which all, or substantially all, of the physical work is performed by a lower tier subcontractor subject to the restrictions described below.

Document Number: 191BWC26B0006 PROCESSED Page 14 of 62

H.14.B.2. In the event that the physical work arising out of a change order is performed by a subcontractor or vendor that is two or more levels below the general contractor, the sum of all markups for overhead and profit for all subcontractors (regardless of the number of tiers of subcontractors), and the general contractor may not exceed 5% of the price, or adjustment in price, to the lower tier subcontract under which the physical work was performed. For example, if, as a result of a change order, the contract price of a fifth tier subcontractor is increased by $150,000.00, and the work performed by this fifth tier subcontractor constitutes all or substantially all of the work contemplated by this modification or change order, the resulting increase in the price of the prime contract shall not exceed $157,500.00 ($150,000.00 x 1.05).

H.14.B.3. Overhead and fee percentages, for the purposes of this provision, shall include insurance (excluding bonds), field and office supervisors and staff (including clerical), home office overhead, field overhead, security, use of small tools, and incidental job site burdens (including office equipment, trailer rental, utilities).

H.14.B.4. Bond premium adjustments and state and local taxes arising out of changes and modifications directed by the Government shall be subject to a separate allowance independent of the overhead and fee limitations described above.

H.14.B.5. The fee and overhead limitations described above shall not apply to self performed work by any contractor at any level.

H.14.B.6. In the event that a modification or change order results in a credit(s) to the Government, the same fee and overhead restrictions shall be applied in calculating the reduction in contract price.

H.14.C. Changes and Modifications from $150,000.01 to $499,999.99 (Exclusive of Mark ups). Modify Paragraphs H.14.B.1. and H.14.B.2. above as follows:

H.14.C.1. No subcontractor or vendor, at any level,…