About this file
This is a State of Michigan prevailing wage rate schedule issued by the Michigan Department of Labor and Economic Growth for parking lot, road, highway, bridge and airport construction work requested by Dowagiac Union School District. The schedule was issued on January 17, 2018 and required contracts to be awarded by April 17, 2018. The document details wage rates for various construction trades including carpenters, cement masons, ironworkers, laborers, operating engineers, truck drivers, and other specialized workers across different geographic zones within Michigan.
The schedule provides comprehensive wage rate information including base rates, overtime rates, and fringe benefits for different worker classifications. It divides the state into multiple zones, with Zone 1 typically covering Genesee, Oakland, Macomb, Monroe, Washtenaw and Wayne counties, while Zone 2 covers the remaining counties. The document includes apprenticeship rates for applicable trades and details specific working conditions such as make-up days and four-ten hour work week provisions. Overtime codes and requirements are specified for each classification, with most requiring time-and-a-half or double time for work beyond regular hours or on holidays.
Text of this file
State of Michigan WHPWRequest@michigan.gov
| Official Request | 19 | |||||||||||
| Requestor: | Dowagiac Union School District | |||||||||||
| Project | To be determined | |||||||||||
| Project Number: | To be determined | |||||||||||
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 1 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| CARPENTERS | ||||||||||||
| RBCZ1 | 6/6/2017 | |||||||||||
| CARPENTERS ZONE 1 | $56.90 | $81.18 | X | X | H | X | X | X | H | H | Y | |
| Apprentice Rates: | ||||||||||||
| 1ST 6 MONTHS | $29.71 | $40.40 | ||||||||||
| 2ND 6 MONTHS | $35.05 | $48.41 | ||||||||||
| YEAR 2 | $39.90 | $55.68 | ||||||||||
| YEAR 3 | $44.76 | $62.97 | ||||||||||
| YEAR 4 | $49.61 | $70.25 | ||||||||||
| Comment | ||||||||||||
| For all hours worked on Memorial Day, July 4, Labor Day, Thanksgiving Day, Christmas Day and New Years Day, double | ||||||||||||
| time is due | ||||||||||||
| County information: | ||||||||||||
| CARPENTERS ZONE 1 | ||||||||||||
| Wayne, Oakland, Macomb, Sanilac, St. Clair, Monroe | ||||||||||||
| and the following townships of Livingston County | ||||||||||||
| Brighton, Deerfield, Genoa, Hartland, Osceola and | ||||||||||||
| Tyrone | ||||||||||||
| RBCZ1_CW | 6/6/2017 | |||||||||||
| CARPENTER - CERTIFIED WELDERS ZONE 1 | $58.52 | $83.61 | X | X | H | X | X | X | H | H | Y | |
| Comment | ||||||||||||
| For all hours worked on Memorial Day, July 4, Labor Day, Thanksgiving Day, Christmas Day and New Years Day, double | ||||||||||||
| time is due | ||||||||||||
| County information: | ||||||||||||
| CARPENTERS ZONE 1 | ||||||||||||
| Wayne, Oakland, Macomb, Sanilac, St. Clair, Monroe | ||||||||||||
| and the following townships of Livingston County | ||||||||||||
| Brighton, Deerfield, Genoa, Hartland, Osceola and | ||||||||||||
| Tyrone | ||||||||||||
| Official Request #: | 19 | Official Rate Schedule | ||||||||||
| Requestor: | Dowagiac Union School District | |||||||||||
| Every contractor and subcontractor shall keep posted on the | ||||||||||||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all | ||||||||||
| prevailing wage and fringe benefit rates prescribed in a | ||||||||||||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 2 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBCZ1_LH | 6/6/2017 | |||||||||||
| CARPENTER - LOFTSMAN HEIGHTS OVER 150 FT. ZONE 1 | $58.52 | $83.61 | X | X | H | X | X | X | H | H | Y | |
| Comment | ||||||||||||
| For all hours worked on Memorial Day, July 4, Labor Day, Thanksgiving Day, Christmas Day and New Years Day, double | ||||||||||||
| time is due | ||||||||||||
| County information: | ||||||||||||
| CARPENTERS ZONE 1 | ||||||||||||
| Wayne, Oakland, Macomb, Sanilac, St. Clair, Monroe | ||||||||||||
| and the following townships of Livingston County | ||||||||||||
| Brighton, Deerfield, Genoa, Hartland, Osceola and | ||||||||||||
| Tyrone | ||||||||||||
| RBCZ1_LS | 6/6/2017 | |||||||||||
| CARPENTER - LOFTSMAN & STICKER UNDER 150 FT. | $58.12 | $83.01 | X | X | H | X | X | X | H | H | Y | |
| ZONE 1 | ||||||||||||
| Comment | ||||||||||||
| For all hours worked on Memorial Day, July 4, Labor Day, Thanksgiving Day, Christmas Day and New Years Day, double | ||||||||||||
| time is due | ||||||||||||
| County information: | ||||||||||||
| CARPENTERS ZONE 1 | ||||||||||||
| Wayne, Oakland, Macomb, Sanilac, St. Clair, Monroe | ||||||||||||
| and the following townships of Livingston County | ||||||||||||
| Brighton, Deerfield, Genoa, Hartland, Osceola and | ||||||||||||
| Tyrone | ||||||||||||
| RBCZ1_PD | 6/6/2017 | |||||||||||
| CARPENTER - PILEDRIVER CARPENTERS ZONE 1 | $60.29 | $86.27 | X | X | H | X | X | X | H | H | Y | |
| Comment | ||||||||||||
| For all hours worked on Memorial Day, July 4, Labor Day, Thanksgiving Day, Christmas Day and New Years Day, double | ||||||||||||
| time is due | ||||||||||||
| County information: | ||||||||||||
| CARPENTERS ZONE 1 | ||||||||||||
| Wayne, Oakland, Macomb, Sanilac, St. Clair, Monroe | ||||||||||||
| and the following townships of Livingston County | ||||||||||||
| Brighton, Deerfield, Genoa, Hartland, Osceola and | ||||||||||||
| Tyrone | ||||||||||||
| Official Request #: | 19 | Official Rate Schedule | ||||||||||
| Requestor: | Dowagiac Union School District | |||||||||||
| Every contractor and subcontractor shall keep posted on the | ||||||||||||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all | ||||||||||
| prevailing wage and fringe benefit rates prescribed in a | ||||||||||||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 3 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBCZ2 | 6/6/2017 | |||||||||||
| CARPENTERS ZONE 2 | $46.41 | $59.75 | X | X | H | X | X | X | H | H | Y | |
| Apprentice Rates: | ||||||||||||
| 1ST YEAR | $35.74 | $43.74 | ||||||||||
| 2ND YEAR | $38.41 | $47.74 | ||||||||||
| 3RD YEAR | $41.08 | $51.75 | ||||||||||
| 4TH YEAR | $42.41 | $53.74 | ||||||||||
| Comment | ||||||||||||
| SUNDAYS PAID TIME AND ONE HALF | ||||||||||||
| HOLIDAYS PAID DOUBLE | ||||||||||||
| County information: | ||||||||||||
| CARPENTERS ZONE 2 | ||||||||||||
| The entire state except those counties and | ||||||||||||
| townships listed in Zone 1 | ||||||||||||
| CEMENT MASONS | ||||||||||||
| RBCMZ1 | 6/6/2017 | |||||||||||
| CEMENT MASONS ZONE 1 | $44.53 | $60.00 | X | X | H | X | X | H | H | H | Y | |
| Apprentice Rates: | ||||||||||||
| 1ST YEAR | $32.05 | $41.28 | ||||||||||
| 2ND YEAR | $36.18 | $47.47 | ||||||||||
| 3RD YEAR | $40.32 | $53.69 | ||||||||||
| Comment | ||||||||||||
| If only Sat & Sun worked, time and one-half due | ||||||||||||
| County information: | ||||||||||||
| CEMENT MASONS ZONE 1 | ||||||||||||
| Genesee, Oakland, Macomb, Monroe, Washtenaw, | ||||||||||||
| Wayne, Livingston and Saginaw Counties. | ||||||||||||
| Official Request #: | 19 | Official Rate Schedule | ||||||||||
| Requestor: | Dowagiac Union School District | |||||||||||
| Every contractor and subcontractor shall keep posted on the | ||||||||||||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all | ||||||||||
| prevailing wage and fringe benefit rates prescribed in a | ||||||||||||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 4 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBCMZ2 | 6/6/2017 | |||||||||||
| CEMENT MASONS ZONE 2 | $43.03 | $57.75 | X | X | H | X | X | H | H | H | Y | |
| Apprentice Rates: | ||||||||||||
| 1ST YEAR | $31.22 | $40.03 | ||||||||||
| 2ND YEAR | $35.17 | $45.96 | ||||||||||
| 3RD YEAR | $39.34 | $52.21 | ||||||||||
| Comment | ||||||||||||
| If only Sat & Sun worked, time and one-half due | ||||||||||||
| County information: | ||||||||||||
| CEMENT MASONS ZONE 2 | ||||||||||||
| All counties not listed in Zone 1 | ||||||||||||
| IRONWORKER | ||||||||||||
| IR-55-MF | 10/3/2017 | |||||||||||
| Metal Fence & Guard Rail | $39.87 | $59.81 | $79.74 | H | H | D | H | H | H | H | D | Y |
| Comment | Make up day allowed | |||||||||||
| Four Tens allowed M-Th. Friday make-up day allowed if M-Th schedule not worked due to weather conditions or holiday. | ||||||||||||
| County information: | ||||||||||||
| Road Builder Lenawee | Road Builder Monroe | |||||||||||
| Official Request #: | 19 | Official Rate Schedule | ||||||||||
| Requestor: | Dowagiac Union School District | |||||||||||
| Every contractor and subcontractor shall keep posted on the | ||||||||||||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all | ||||||||||
| prevailing wage and fringe benefit rates prescribed in a | ||||||||||||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 5 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBIRZ1 | 6/14/2016 | |||||||||||
| IRONWOKERS ZONE 1: Fence, sound barrier and | $35.55 | $47.55 | $59.55 | X | X | H | X | X | X | H | D | Y |
| guardrail erection/installation work, and exterior signage | ||||||||||||
| Apprentice Rates: | ||||||||||||
| 60% | $25.15 | $32.35 | $39.55 | |||||||||
| 65% | $26.45 | $34.25 | $42.05 | |||||||||
| 70% | $27.76 | $36.16 | $44.56 | |||||||||
| 75% | $29.05 | $38.05 | $47.05 | |||||||||
| 80% | $30.35 | $39.95 | $49.55 | |||||||||
| 85% | $31.65 | $41.85 | $52.05 | |||||||||
| Comment | Make up day allowed | |||||||||||
| Four 10 hour work days may be worked Monday-Saturday. | ||||||||||||
| County information: | ||||||||||||
| IRONWORKERS ZONE 1 | ||||||||||||
| Genesee, Oakland, Macomb, Washtenaw and Wayne | ||||||||||||
| Counties | ||||||||||||
| RBIRZ2 | 6/14/2016 | |||||||||||
| IRONWORKERS ZONE 2: Fence, sound barrier and | $31.55 | $41.55 | $51.55 | X | X | H | X | X | X | H | D | Y |
| guardrail erection/installation work, and exterior signage | ||||||||||||
| work. | ||||||||||||
| Apprentice Rates: | ||||||||||||
| 60% | $22.75 | $28.75 | $34.75 | |||||||||
| 65% | $23.85 | $30.35 | $36.85 | |||||||||
| 70% | $24.96 | $31.96 | $38.96 | |||||||||
| 75% | $26.05 | $33.55 | $41.05 | |||||||||
| 80% | $27.15 | $35.15 | $43.15 | |||||||||
| 85% | $28.25 | $36.75 | $45.25 | |||||||||
| Comment | Make up day allowed | |||||||||||
| Four 10 hour work days may be worked Monday-Saturday. | ||||||||||||
| County information: | ||||||||||||
| IRONWORKERS ZONE 2 | ||||||||||||
| The entire state except those counties listed in Zone | ||||||||||||
| 1:Genesee, Oakland, Macomb, Monroe, Washtenaw | ||||||||||||
| and Wayne and Lenawee | ||||||||||||
| Official Request #: | 19 | Official Rate Schedule | ||||||||||
| Requestor: | Dowagiac Union School District | |||||||||||
| Every contractor and subcontractor shall keep posted on the | ||||||||||||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all | ||||||||||
| prevailing wage and fringe benefit rates prescribed in a | ||||||||||||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 6 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| LABORERS | ||||||||||||
| RBLABC1Z1 | 6/6/2017 | |||||||||||
| LABORERS CLASS 1 ZONE 1 | $38.89 | $51.76 | X | X | X | X | X | X | X | H | Y | |
| Apprentice Rates: | ||||||||||||
| 0-1000 WORK HOURS | $33.24 | $43.28 | ||||||||||
| 1001-2000 WORK HOURS | $34.37 | $44.98 | ||||||||||
| 2001-3000 WORK HOURS | $35.50 | $46.68 | ||||||||||
| 3001-4000 WORK HOURS | $37.76 | $50.06 |
| County information: | |||||||||||
| LABORERS ZONE 1 | |||||||||||
| Genesee, Macomb, Monroe, Oakland, Washtenaw | |||||||||||
| and Wayne | |||||||||||
| RBLABC1Z2 | 6/6/2017 | ||||||||||
| LABORERS CLASS 1 ZONE 2 | $36.84 | $48.68 | X | X | X | X | X | X | X | H | Y |
| Apprentice Rates: | |||||||||||
| 0-1000 WORK HOURS | $31.68 | $40.94 | |||||||||
| 1001-2000 WORK HOURS | $32.72 | $42.50 | |||||||||
| 2001-3000 WORK HOURS | $33.75 | $44.05 | |||||||||
| 3001-4000 WORK HOURS | $35.81 | $47.13 |
| County information: | ||
| LABORERS ZONE 2 | ||
| Allegan, Barry, Bay, Berrien, Branch, Calhoun, Cass, | ||
| Clinton, Eaton, Gratiot, Hillsdale, Huron, Ingham, | ||
| Jackson, Kalamazoo, Lapeer, Lenawee, Livingston, | ||
| Midland, Muskegon, Saginaw, Sanilac, Shiawassee, | ||
| St. Clair, St. Joseph, Tuscola, and Van Buren | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 7 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBLABC1Z3 | 6/6/2017 | |||||||||||
| LABORERS CLASS 1 ZONE 3 & 4 | $36.09 | $47.56 | X | X | X | X | X | X | X | H | Y | |
| Apprentice Rates: | ||||||||||||
| 0-1000 WORK HOURS | $31.11 | $40.09 | ||||||||||
| 1001-2000 WORK HOURS | $32.10 | $41.57 | ||||||||||
| 2001-3000 WORK HOURS | $33.10 | $43.07 | ||||||||||
| 3001-4000 WORK HOURS | $35.09 | $46.06 |
| County information: | |||||||||||
| LABORERS ZONE 3 | LABORERS ZONE 4 | ||||||||||
| Alcona, Alpena, Antrim, Arenac, Benzie, Charlevoix, | Alger, Baraga, Chippewa, Delta, Dickinson, Gogebic, | ||||||||||
| Cheboygan, Clare, Crawford, Emmet, Gladwin, Grand | Houghton, Iron, Keweenaw, Luce, Mackinac, | ||||||||||
| Traverse, Ionia, Iosco, Isabella, Kalkaska, Kent, | Marquette, Menominee, Ontonagon and Schoolcraft | ||||||||||
| Lake, Leelanau, Manistee, Mason, Mecosta, | |||||||||||
| Missaukee, Montcalm, Montmorency, Newaygo, | |||||||||||
| Oceana, Ogemaw, Osceola, Oscoda, Otsego, Ottawa, | |||||||||||
| Presque Isle, Roscommon and Wexford | |||||||||||
| RBLABC2Z1 | 6/6/2017 | ||||||||||
| LABORERS CLASS 2 ZONE 1 | $39.02 | $51.96 | X | X | X | X | X | X | X | H | Y |
| Apprentice Rates: | |||||||||||
| 0-1000 WORK HOURS | $33.34 | $43.44 | |||||||||
| 1001-2000 WORK HOURS | $34.47 | $45.13 | |||||||||
| 2001-3000 WORK HOURS | $35.61 | $46.84 | |||||||||
| 3001-4000 WORK HOURS | $37.88 | $50.24 |
| County information: | ||
| LABORERS ZONE 1 | ||
| Genesee, Macomb, Monroe, Oakland, Washtenaw | ||
| and Wayne | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 8 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBLABC2Z2 | 6/6/2017 | |||||||||||
| LABORERS CLASS 2 ZONE 2 | $37.04 | $48.98 | X | X | X | X | X | X | X | H | Y | |
| Apprentice Rates: | ||||||||||||
| 0-1000 WORK HOURS | $31.84 | $41.18 | ||||||||||
| 1001-2000 WORK HOURS | $32.88 | $42.74 | ||||||||||
| 2001-3000 WORK HOURS | $33.92 | $44.30 | ||||||||||
| 3001-4000 WORK HOURS | $36.00 | $47.42 |
| County information: | |||||||||||
| LABORERS ZONE 2 | |||||||||||
| Allegan, Barry, Bay, Berrien, Branch, Calhoun, Cass, | |||||||||||
| Clinton, Eaton, Gratiot, Hillsdale, Huron, Ingham, | |||||||||||
| Jackson, Kalamazoo, Lapeer, Lenawee, Livingston, | |||||||||||
| Midland, Muskegon, Saginaw, Sanilac, Shiawassee, | |||||||||||
| St. Clair, St. Joseph, Tuscola, and Van Buren | |||||||||||
| RBLABC2Z4 | 6/6/2017 | ||||||||||
| LABORERS CLASS 2 ZONES 3 & 4 | $36.30 | $47.88 | X | X | X | X | X | X | X | H | Y |
| Apprentice Rates: | |||||||||||
| 0-1000 WORK HOURS | $31.26 | $40.31 | |||||||||
| 1001-2000 WORK HOURS | $32.27 | $41.83 | |||||||||
| 2001-3000 WORK HOURS | $33.28 | $43.35 | |||||||||
| 3001-4000 WORK HOURS | $35.29 | $46.36 |
| County information: | ||
| LABORERS ZONE 3 | LABORERS ZONE 4 | |
| Alcona, Alpena, Antrim, Arenac, Benzie, Charlevoix, | Alger, Baraga, Chippewa, Delta, Dickinson, Gogebic, | |
| Cheboygan, Clare, Crawford, Emmet, Gladwin, Grand | Houghton, Iron, Keweenaw, Luce, Mackinac, | |
| Traverse, Ionia, Iosco, Isabella, Kalkaska, Kent, | Marquette, Menominee, Ontonagon and Schoolcraft | |
| Lake, Leelanau, Manistee, Mason, Mecosta, | ||
| Missaukee, Montcalm, Montmorency, Newaygo, | ||
| Oceana, Ogemaw, Osceola, Oscoda, Otsego, Ottawa, | ||
| Presque Isle, Roscommon and Wexford | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 9 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBLABC3Z1 | 6/6/2017 | |||||||||||
| LABORERS CLASS 3 ZONE 1 | $39.20 | $52.23 | X | X | X | X | X | X | X | H | Y | |
| Apprentice Rates: | ||||||||||||
| 0-1000 WORK HOURS | $33.47 | $43.63 | ||||||||||
| 1001-2000 WORK HOURS | $34.62 | $45.36 | ||||||||||
| 2001-3000 WORK HOURS | $35.76 | $47.06 | ||||||||||
| 3001-4000 WORK HOURS | $38.05 | $50.50 |
| County information: | |||||||||||
| LABORERS ZONE 1 | |||||||||||
| Genesee, Macomb, Monroe, Oakland, Washtenaw | |||||||||||
| and Wayne | |||||||||||
| RBLABC3Z2 | 6/6/2017 | ||||||||||
| LABORERS CLASS 3 ZONE 2 | $37.28 | $49.34 | X | X | X | X | X | X | X | H | Y |
| Apprentice Rates: | |||||||||||
| 0-1000 WORK HOURS | $32.02 | $41.45 | |||||||||
| 1001-2000 WORK HOURS | $33.07 | $43.03 | |||||||||
| 2001-3000 WORK HOURS | $34.12 | $44.60 | |||||||||
| 3001-4000 WORK HOURS | $36.23 | $47.77 |
| County information: | ||
| LABORERS ZONE 2 | ||
| Allegan, Barry, Bay, Berrien, Branch, Calhoun, Cass, | ||
| Clinton, Eaton, Gratiot, Hillsdale, Huron, Ingham, | ||
| Jackson, Kalamazoo, Lapeer, Lenawee, Livingston, | ||
| Midland, Muskegon, Saginaw, Sanilac, Shiawassee, | ||
| St. Clair, St. Joseph, Tuscola, and Van Buren | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 10 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBLABC3Z3 | 6/6/2017 | |||||||||||
| LABORERS CLASS 3 ZONES 3 & 4 | $36.59 | $48.31 | X | X | X | X | X | X | X | H | Y | |
| Apprentice Rates: | ||||||||||||
| 0-1000 WORK HOURS | $31.48 | $40.65 | ||||||||||
| 1001-2000 WORK HOURS | $32.50 | $42.17 | ||||||||||
| 2001-3000 WORK HOURS | $33.52 | $43.71 | ||||||||||
| 3001-4000 WORK HOURS | $35.57 | $46.78 |
| County information: | |||||||||||
| LABORERS ZONE 3 | LABORERS ZONE 4 | ||||||||||
| Alcona, Alpena, Antrim, Arenac, Benzie, Charlevoix, | Alger, Baraga, Chippewa, Delta, Dickinson, Gogebic, | ||||||||||
| Cheboygan, Clare, Crawford, Emmet, Gladwin, Grand | Houghton, Iron, Keweenaw, Luce, Mackinac, | ||||||||||
| Traverse, Ionia, Iosco, Isabella, Kalkaska, Kent, | Marquette, Menominee, Ontonagon and Schoolcraft | ||||||||||
| Lake, Leelanau, Manistee, Mason, Mecosta, | |||||||||||
| Missaukee, Montcalm, Montmorency, Newaygo, | |||||||||||
| Oceana, Ogemaw, Osceola, Oscoda, Otsego, Ottawa, | |||||||||||
| Presque Isle, Roscommon and Wexford | |||||||||||
| RBLABC4Z1 | 6/6/2017 | ||||||||||
| LABORERS CLASS 4 ZONE 1 | $39.28 | $52.35 | X | X | X | X | X | X | X | H | Y |
| Apprentice Rates: | |||||||||||
| 0-1000 WORK HOURS | $33.53 | $43.72 | |||||||||
| 1001-2000 WORK HOURS | $34.68 | $45.44 | |||||||||
| 2001-3000 WORK HOURS | $35.83 | $47.17 | |||||||||
| 3001-4000 WORK HOURS | $38.13 | $50.62 |
| County information: | ||
| LABORERS ZONE 1 | ||
| Genesee, Macomb, Monroe, Oakland, Washtenaw | ||
| and Wayne | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 11 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBLABC4Z2 | 6/6/2017 | |||||||||||
| LABORERS CLASS 4 ZONE 2 | $37.63 | $49.86 | X | X | X | X | X | X | X | H | Y | |
| Apprentice Rates: | ||||||||||||
| 0-1000 WORK HOURS | $32.28 | $41.84 | ||||||||||
| 1001-2000 WORK HOURS | $33.35 | $43.45 | ||||||||||
| 2001-3000 WORK HOURS | $34.42 | $45.05 | ||||||||||
| 3001-4000 WORK HOURS | $36.56 | $48.26 |
| County information: | |||||||||||
| LABORERS ZONE 2 | |||||||||||
| Allegan, Barry, Bay, Berrien, Branch, Calhoun, Cass, | |||||||||||
| Clinton, Eaton, Gratiot, Hillsdale, Huron, Ingham, | |||||||||||
| Jackson, Kalamazoo, Lapeer, Lenawee, Livingston, | |||||||||||
| Midland, Muskegon, Saginaw, Sanilac, Shiawassee, | |||||||||||
| St. Clair, St. Joseph, Tuscola, and Van Buren | |||||||||||
| RBLABC4Z3 | 6/6/2017 | ||||||||||
| LABORERS CLASS 4 ZONES 3 & 4 | $37.03 | $48.97 | X | X | X | X | X | X | X | H | Y |
| Apprentice Rates: | |||||||||||
| 0-1000 WORK HOURS | $31.81 | $41.14 | |||||||||
| 1001-2000 WORK HOURS | $32.85 | $42.70 | |||||||||
| 2001-3000 WORK HOURS | $33.90 | $44.27 | |||||||||
| 3001-4000 WORK HOURS | $35.99 | $47.41 |
| County information: | ||
| LABORERS ZONE 3 | LABORERS ZONE 4 | |
| Alcona, Alpena, Antrim, Arenac, Benzie, Charlevoix, | Alger, Baraga, Chippewa, Delta, Dickinson, Gogebic, | |
| Cheboygan, Clare, Crawford, Emmet, Gladwin, Grand | Houghton, Iron, Keweenaw, Luce, Mackinac, | |
| Traverse, Ionia, Iosco, Isabella, Kalkaska, Kent, | Marquette, Menominee, Ontonagon and Schoolcraft | |
| Lake, Leelanau, Manistee, Mason, Mecosta, | ||
| Missaukee, Montcalm, Montmorency, Newaygo, | ||
| Oceana, Ogemaw, Osceola, Oscoda, Otsego, Ottawa, | ||
| Presque Isle, Roscommon and Wexford | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 12 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBLABC5Z1 | 6/6/2017 | |||||||||||
| LABORERS CLASS 5 ZONE 1 | $39.49 | $52.66 | X | X | X | X | X | X | X | H | Y | |
| Apprentice Rates: | ||||||||||||
| 0-1000 WORK HOURS | $33.69 | $43.96 | ||||||||||
| 1001-2000 WORK HOURS | $34.85 | $45.70 | ||||||||||
| 2001-3000 WORK HOURS | $36.01 | $47.44 | ||||||||||
| 3001-4000 WORK HOURS | $38.33 | $50.92 |
| County information: | |||||||||||
| LABORERS ZONE 1 | |||||||||||
| Genesee, Macomb, Monroe, Oakland, Washtenaw | |||||||||||
| and Wayne | |||||||||||
| RBLABC5Z2 | 6/6/2017 | ||||||||||
| LABORERS CLASS 5 ZONE 2 | $37.50 | $49.67 | X | X | X | X | X | X | X | H | Y |
| Apprentice Rates: | |||||||||||
| 0-1000 WORK HOURS | $32.18 | $41.69 | |||||||||
| 1001-2000 WORK HOURS | $33.24 | $43.28 | |||||||||
| 2001-3000 WORK HOURS | $34.31 | $44.89 | |||||||||
| 3001-4000 WORK HOURS | $36.44 | $48.08 |
| County information: | ||
| LABORERS ZONE 2 | ||
| Allegan, Barry, Bay, Berrien, Branch, Calhoun, Cass, | ||
| Clinton, Eaton, Gratiot, Hillsdale, Huron, Ingham, | ||
| Jackson, Kalamazoo, Lapeer, Lenawee, Livingston, | ||
| Midland, Muskegon, Saginaw, Sanilac, Shiawassee, | ||
| St. Clair, St. Joseph, Tuscola, and Van Buren | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 13 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBLABC5Z3 | 6/6/2017 | |||||||||||
| LABORERS CLASS 5 ZONES 3 & 4 | $36.65 | $48.40 | X | X | X | X | X | X | X | H | Y | |
| Apprentice Rates: | ||||||||||||
| 0-1000 WORK HOURS | $31.53 | $40.72 | ||||||||||
| 1001-2000 WORK HOURS | $32.55 | $42.25 | ||||||||||
| 2001-3000 WORK HOURS | $33.57 | $43.78 | ||||||||||
| 3001-4000 WORK HOURS | $35.62 | $46.85 |
| County information: | |||||||||||
| LABORERS ZONE 3 | LABORERS ZONE 4 | ||||||||||
| Alcona, Alpena, Antrim, Arenac, Benzie, Charlevoix, | Alger, Baraga, Chippewa, Delta, Dickinson, Gogebic, | ||||||||||
| Cheboygan, Clare, Crawford, Emmet, Gladwin, Grand | Houghton, Iron, Keweenaw, Luce, Mackinac, | ||||||||||
| Traverse, Ionia, Iosco, Isabella, Kalkaska, Kent, | Marquette, Menominee, Ontonagon and Schoolcraft | ||||||||||
| Lake, Leelanau, Manistee, Mason, Mecosta, | |||||||||||
| Missaukee, Montcalm, Montmorency, Newaygo, | |||||||||||
| Oceana, Ogemaw, Osceola, Oscoda, Otsego, Ottawa, | |||||||||||
| Presque Isle, Roscommon and Wexford | |||||||||||
| RBLABC6Z1 | 6/6/2017 | ||||||||||
| LABORERS CLASS 6 ZONE 1 | $39.79 | $53.11 | X | X | X | X | X | X | X | H | Y |
| Apprentice Rates: | |||||||||||
| 0-1000 WORK HOURS | $33.91 | $44.29 | |||||||||
| 1001-2000 WORK HOURS | $35.09 | $46.06 | |||||||||
| 2001-3000 WORK HOURS | $36.26 | $47.82 | |||||||||
| 3001-4000 WORK HOURS | $38.61 | $51.34 |
| County information: | ||
| LABORERS ZONE 1 | ||
| Genesee, Macomb, Monroe, Oakland, Washtenaw | ||
| and Wayne | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 14 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBLABC6Z2 | 6/6/2017 | |||||||||||
| LABORERS CLASS 6 ZONE 2 | $37.84 | $50.18 | X | X | X | X | X | X | X | H | Y | |
| Apprentice Rates: | ||||||||||||
| 0-1000 WORK HOURS | $32.44 | $42.08 | ||||||||||
| 1001-2000 WORK HOURS | $33.52 | $43.70 | ||||||||||
| 2001-3000 WORK HOURS | $34.60 | $45.32 | ||||||||||
| 3001-4000 WORK HOURS | $36.76 | $48.56 |
| County information: | |||||||||||
| LABORERS ZONE 2 | |||||||||||
| Allegan, Barry, Bay, Berrien, Branch, Calhoun, Cass, | |||||||||||
| Clinton, Eaton, Gratiot, Hillsdale, Huron, Ingham, | |||||||||||
| Jackson, Kalamazoo, Lapeer, Lenawee, Livingston, | |||||||||||
| Midland, Muskegon, Saginaw, Sanilac, Shiawassee, | |||||||||||
| St. Clair, St. Joseph, Tuscola, and Van Buren | |||||||||||
| RBLABC6Z3 | 6/6/2017 | ||||||||||
| LABORERS CLASS 6 ZONES 3 & 4 | $37.08 | $49.05 | X | X | X | X | X | X | X | H | Y |
| Apprentice Rates: | |||||||||||
| 0-1000 WORK HOURS | $31.85 | $41.20 | |||||||||
| 1001-2000 WORK HOURS | $32.89 | $42.76 | |||||||||
| 2001-3000 WORK HOURS | $33.94 | $44.33 | |||||||||
| 3001-4000 WORK HOURS | $36.03 | $47.47 |
| County information: | ||
| LABORERS ZONE 3 | LABORERS ZONE 4 | |
| Alcona, Alpena, Antrim, Arenac, Benzie, Charlevoix, | Alger, Baraga, Chippewa, Delta, Dickinson, Gogebic, | |
| Cheboygan, Clare, Crawford, Emmet, Gladwin, Grand | Houghton, Iron, Keweenaw, Luce, Mackinac, | |
| Traverse, Ionia, Iosco, Isabella, Kalkaska, Kent, | Marquette, Menominee, Ontonagon and Schoolcraft | |
| Lake, Leelanau, Manistee, Mason, Mecosta, | ||
| Missaukee, Montcalm, Montmorency, Newaygo, | ||
| Oceana, Ogemaw, Osceola, Oscoda, Otsego, Ottawa, | ||
| Presque Isle, Roscommon and Wexford | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 15 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBLABC72 | 6/6/2017 | |||||||||||
| LABORERS CLASS 7 ZONES 2, 3, 4 | $40.41 | $54.03 | X | X | X | X | X | X | X | H | Y | |
| Apprentice Rates: | ||||||||||||
| 0-1000 WORK HOURS | $34.36 | $44.96 | ||||||||||
| 1001-2000 WORK HOURS | $35.57 | $46.77 | ||||||||||
| 2001-3000 WORK HOURS | $36.78 | $48.59 | ||||||||||
| 3001-4000 WORK HOURS | $39.20 | $52.22 |
| County information: | |||||||||||
| LABORERS ZONE 2 | LABORERS ZONE 3 | LABORERS ZONE 4 | |||||||||
| Allegan, Barry, Bay, Berrien, Branch, Calhoun, Cass, | Alcona, Alpena, Antrim, Arenac, Benzie, Charlevoix, | Alger, Baraga, Chippewa, Delta, Dickinson, Gogebic, | |||||||||
| Clinton, Eaton, Gratiot, Hillsdale, Huron, Ingham, | Cheboygan, Clare, Crawford, Emmet, Gladwin, Grand | Houghton, Iron, Keweenaw, Luce, Mackinac, | |||||||||
| Jackson, Kalamazoo, Lapeer, Lenawee, Livingston, | Traverse, Ionia, Iosco, Isabella, Kalkaska, Kent, | Marquette, Menominee, Ontonagon and Schoolcraft | |||||||||
| Midland, Muskegon, Saginaw, Sanilac, Shiawassee, | Lake, Leelanau, Manistee, Mason, Mecosta, | ||||||||||
| St. Clair, St. Joseph, Tuscola, and Van Buren | Missaukee, Montcalm, Montmorency, Newaygo, | ||||||||||
| Oceana, Ogemaw, Osceola, Oscoda, Otsego, Ottawa, | |||||||||||
| Presque Isle, Roscommon and Wexford | |||||||||||
| RBLABC7Z1 | 6/6/2017 | ||||||||||
| LABORERS CLASS 7 ZONE 1 | $40.86 | $54.72 | X | X | X | X | X | X | X | H | Y |
| Apprentice Rates: | |||||||||||
| 0-1000 WORK HOURS | $34.72 | $45.50 | |||||||||
| 1001-2000 WORK HOURS | $35.95 | $47.35 | |||||||||
| 2001-3000 WORK HOURS | $37.17 | $49.18 | |||||||||
| 3001-4000 WORK HOURS | $39.63 | $52.87 |
| County information: | ||
| LABORERS ZONE 1 | ||
| Genesee, Macomb, Monroe, Oakland, Washtenaw | ||
| and Wayne | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 16 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBLANDLABCB1Z1 | 6/6/2017 | |||||||||||
| LANDSCAPE LABORER CLASS B1 ZONE 1 Skilled | $27.04 | $37.20 | X | X | X | X | X | X | X | H | Y | |
| Landscape Operator includes air, gas and diesel | ||||||||||||
| equipment operators, lawn sprinkler installers, skid | ||||||||||||
| steer/track loaders, mini excavators, off-road dump | ||||||||||||
| vehicle, articulated haulers, hydroseeder, backhoe | ||||||||||||
| loaders, wheel loaders, excavators, ride and walk-behind | ||||||||||||
| trenchers and telescope handlers. |
| County information: | |||||||||||
| Road Builder Statewide | |||||||||||
| RBLANDLABCB2Z1 | 6/6/2017 | ||||||||||
| LANDSCAPE LABORER CLASS B2 Skilled Landscape | $25.04 | $34.20 | X | X | X | X | X | X | X | H | Y |
| Laborer includes small power tool operator, lawn | |||||||||||
| sprinkler installers’ tender, irrigation installers’ tender | |||||||||||
| and material mover. |
| County information: | |||||||||||
| Road Builder Statewide | |||||||||||
| RBLANDLABCCZ1 | 6/6/2017 | ||||||||||
| LANDSCAPE LABORER CLASS C: Landscape Laborer with | $22.90 | $30.99 | X | X | X | X | X | X | X | H | Y |
| ninety (90) plus calendar days worked |
| County information: | ||
| Road Builder Statewide | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 17 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBLANDLABCDZ1 | 6/6/2017 | |||||||||||
| LANDSCAPE LABORER CLASS D: Inexperienced | $13.78 | $27.39 | X | X | X | X | X | X | X | H | Y | |
| Landscape Laborer is an individual who has not worked | ||||||||||||
| ninety | ||||||||||||
| (90) calendar days |
| County information: | ||||||||||||
| Road Builder Statewide | ||||||||||||
| Operating Engineer Underground | ||||||||||||
| EN-324A1-UC1 | 9/7/2017 | |||||||||||
| Class I Equipment -Backfiller Tamper, Backhoe, Batch | $55.54 | $71.56 | $87.57 | H | H | H | H | H | H | H | D | Y |
| Plant Operator, Clamshell, Concrete Paver 2 drums or | ||||||||||||
| larger, Conveyor Loader Euclid type, Crane (crawler, | ||||||||||||
| truck type or pile driving), Dozer, Dragline, Elevating | ||||||||||||
| Grader, endloader, gradall, grader, hydro excavator, | ||||||||||||
| power shovel, roller asphalt, scraper self-propelled or | ||||||||||||
| tractor drawn, side boom tractor, slip form paver, slope | ||||||||||||
| paver, trencher over 8 ft. digging capacity, well drilling | ||||||||||||
| rig, concrete pump with boom operator | ||||||||||||
| Apprentice Rates: | ||||||||||||
| 0-999 hours | $44.09 | $55.30 | $66.52 | |||||||||
| 1,000-1,999 hours | $45.68 | $57.70 | $69.70 | |||||||||
| 2,000-2,999 hours | $47.28 | $60.09 | $72.90 | |||||||||
| 3,000-3,999 hours | $48.88 | $62.49 | $76.10 | |||||||||
| 4,000-4,999 hours | $50.49 | $64.91 | $79.32 | |||||||||
| 5,000-5,999 hours | $52.09 | $67.30 | $82.52 |
| County information: | ||
| Opert Eng Underground Area 1 | ||
| Genesee, Lapeer, Livingston, Macomb, Monroe, | ||
| Oakland, St. Clair, Washtenaw, Wayne | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 18 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| EN-324A1-UC2 | 9/6/2017 | |||||||||||
| Class II Equipment -Boom Truck, Crusher, Hoist, Pump 6 | $50.81 | $64.46 | $78.11 | H | H | H | H | H | H | H | D | Y |
| inch discharge or larger, side boom tractor, Tractor | ||||||||||||
| (pneu-tired other than backhoe or front end loader), | ||||||||||||
| Trencher 8 ft. digging capcity and smaller, Vac Truck |
| County information: | ||||||||||||
| Opert Eng Underground Area 1 | ||||||||||||
| Genesee, Lapeer, Livingston, Macomb, Monroe, | ||||||||||||
| Oakland, St. Clair, Washtenaw, Wayne | ||||||||||||
| EN-324A1-UC3 | 9/6/2017 | |||||||||||
| Class III Equipment - Air Compressors 600 cfm or larger, | $50.08 | $63.37 | $76.65 | H | H | H | H | H | H | H | D | Y |
| Air Compressors 2 or more less than 600 dfm, Boom | ||||||||||||
| Truck non-swinging non-powered type boom, Concrete | ||||||||||||
| Breaker self-propelled or truck mounted, Concrete paver | ||||||||||||
| 1 drum 1/2 yd. or larger, Elevator other than passenger, | ||||||||||||
| Pump 4 inch to 6 inch discharge, pumpcrete machine, | ||||||||||||
| wagon drill, welding machine or generator 2 or more 300 | ||||||||||||
| amp or larger |
| County information: | ||||||||||||
| Opert Eng Underground Area 1 | ||||||||||||
| Genesee, Lapeer, Livingston, Macomb, Monroe, | ||||||||||||
| Oakland, St. Clair, Washtenaw, Wayne | ||||||||||||
| EN-324A1-UC4 | 9/6/2017 | |||||||||||
| Class IV Equipment - Boiler, Concrete Saw 40 hp or over, | $49.51 | $62.52 | $75.51 | H | H | H | H | H | H | H | D | Y |
| curing machine self propelled, end dumps, extend a | ||||||||||||
| boom forklift, farm tractor with attachment, finishing | ||||||||||||
| machine concrete, firemen, hydraulic pipe pushing | ||||||||||||
| machine, mulching equipment, oiler, pumps up to 4 inch | ||||||||||||
| discharge, roller other than asphalt, stump remover, | ||||||||||||
| sweeper wayne type, trencher, vibrating compaction | ||||||||||||
| equipment self propelled 6 ft. wide or over, water wagon. |
| County information: | ||
| Opert Eng Underground Area 1 | ||
| Genesee, Lapeer, Livingston, Macomb, Monroe, | ||
| Oakland, St. Clair, Washtenaw, Wayne | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 19 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| EN-324A1-UMM | 9/6/2017 | |||||||||||
| Master Mechanic | $55.79 | $71.93 | $88.07 | H | H | H | H | H | H | H | D | Y |
| County information: | ||||||||||||
| Opert Eng Underground Area 1 | ||||||||||||
| Genesee, Lapeer, Livingston, Macomb, Monroe, | ||||||||||||
| Oakland, St. Clair, Washtenaw, Wayne | ||||||||||||
| EN-324A2-UC1 | 9/7/2017 | |||||||||||
| Class I Equipment - Backfiller Tamper, Backhoe, Batch | $53.29 | $68.46 | $83.62 | H | H | H | H | H | H | H | D | Y |
| Plant Operator, Clamshell, Concrete Paver 2 drums or | ||||||||||||
| larger, Conveyor Loader Euclid type, Crane (crawler, | ||||||||||||
| truck type or pile driving), Dozer, Dragline, Elevating | ||||||||||||
| Grader, endloader, gradall, grader, hydro excavator, | ||||||||||||
| power shovel, roller asphalt, scraper self-propelled or | ||||||||||||
| tractor drawn, side boom tractor, slip form paver, slope | ||||||||||||
| paver, trencher over 8 ft. digging capacity, well drilling | ||||||||||||
| rig, concrete pump with boom operator | ||||||||||||
| Apprentice Rates: | ||||||||||||
| 0-999 hours | $42.89 | $53.50 | $64.12 | |||||||||
| 1,000-1,999 hours | $44.41 | $55.78 | $67.16 | |||||||||
| 2,000-2,999 hours | $45.93 | $58.06 | $70.20 | |||||||||
| 3,000-3,999 hours | $47.43 | $60.32 | $73.20 | |||||||||
| 4,000-4,999 hours | $48.95 | $62.60 | $76.24 | |||||||||
| 5,000-5,999 hours | $50.47 | $64.88 | $79.28 |
| County information: | ||
| Opert Eng Underground Area 2 | ||
| All Counties except: Genesee, Lapeer, Livingston, | ||
| Macomb, Monroe, Oakland, St. Clair, Washtenaw, | ||
| Wayne | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 20 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| EN-324A2-UC2 | 9/6/2017 | |||||||||||
| Class II Equipment - Boom Truck, Crusher, Hoist, Pump 6 | $48.39 | $61.11 | $73.82 | H | H | H | H | H | H | H | D | Y |
| inch discharge or larger, side boom tractor, Tractor | ||||||||||||
| (pneu-tired other than backhoe or front end loader), | ||||||||||||
| Trencher 8 ft. digging capcity and smaller, Vac Truck |
| County information: | ||||||||||||
| Opert Eng Underground Area 2 | ||||||||||||
| All Counties except: Genesee, Lapeer, Livingston, | ||||||||||||
| Macomb, Monroe, Oakland, St. Clair, Washtenaw, | ||||||||||||
| Wayne | ||||||||||||
| EN-324A2-UC3 | 9/6/2017 | |||||||||||
| Class III Equipment - Air Compressors 600 cfm or larger, | $47.89 | $60.36 | $72.82 | H | H | H | H | H | H | H | D | Y |
| Air Compressors 2 or more less than 600 dfm, Boom | ||||||||||||
| Truck non-swinging non-powered type boom, Concrete | ||||||||||||
| Breaker self-propelled or truck mounted, Concrete paver | ||||||||||||
| 1 drum 1/2 yd. or larger, Elevator other than passenger, | ||||||||||||
| Pump 4 inch to 6 inch discharge, pumpcrete machine, | ||||||||||||
| wagon drill, welding machine or generator 2 or more 300 | ||||||||||||
| amp or larger |
| County information: | ||||||||||||
| Opert Eng Underground Area 2 | ||||||||||||
| All Counties except: Genesee, Lapeer, Livingston, | ||||||||||||
| Macomb, Monroe, Oakland, St. Clair, Washtenaw, | ||||||||||||
| Wayne | ||||||||||||
| EN-324A2-UC4 | 9/6/2017 | |||||||||||
| Class IV Equipment - Boiler, Concrete Saw 40 hp or over, | $47.60 | $59.93 | $72.24 | H | H | H | H | H | H | H | D | Y |
| curing machine self propelled, end dumps, extend a | ||||||||||||
| boom forklift, farm tractor with attachment, finishing | ||||||||||||
| machine concrete, firemen, hydraulic pipe pushing | ||||||||||||
| machine, mulching equipment, oiler, pumps up to 4 inch | ||||||||||||
| discharge, roller other than asphalt, stump remover, | ||||||||||||
| sweeper wayne type, trencher, vibrating compaction | ||||||||||||
| equipment self propelled 6 ft. wide or over, water wagon. |
| County information: | ||
| Opert Eng Underground Area 2 | ||
| All Counties except: Genesee, Lapeer, Livingston, | ||
| Macomb, Monroe, Oakland, St. Clair, Washtenaw, | ||
| Wayne | ||
| Official Request #: | 19 | Official Rate Schedule |
| Requestor: | Dowagiac Union School District | |
| Every contractor and subcontractor shall keep posted on the | ||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all |
| prevailing wage and fringe benefit rates prescribed in a | ||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 21 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| OPERATING ENGINEERS | ||||||||||||
| RBOEC1Z1 | 6/6/2017 | |||||||||||
| OPERATING ENGINEERS CLASS I ZONE 1& 2 | $55.67 | $71.78 | H | H | H | H | H | H | H | H | Y | |
| Apprentice Rates: | ||||||||||||
| 1ST 6 MONTHS | $46.73 | $58.64 | ||||||||||
| 2ND 6 MONTHS | $48.13 | $60.74 | ||||||||||
| 3RD 6 MONTHS | $49.53 | $62.84 | ||||||||||
| 4TH 6 MONTHS | $50.92 | $64.93 | ||||||||||
| 5TH 6 MONTHS | $52.32 | $67.03 | ||||||||||
| 6TH 6 MONTHS | $53.72 | $69.13 | ||||||||||
| Comment | Make up day allowed | |||||||||||
| 4 tens allowed M-Th or T-F. If work cannot be performed due to weather during the M-Th schedule, Friday may be worked | ||||||||||||
| as a make-up day. | ||||||||||||
| County information: | ||||||||||||
| OPERATING ENGINEERS ZONE 1 | OPERATING ENGINEERS ZONE 2 | |||||||||||
| Genesee, Oakland, Macomb, Monroe, Washtenaw | The entire state except those counties listed in Zone | |||||||||||
| and Wayne counties | 1:Genesee, Oakland, Macomb, Monroe, Washtenaw | |||||||||||
| and Wayne | ||||||||||||
| RBOEC2Z1 | 6/6/2017 | |||||||||||
| OPERATING ENGINEERS CLASS II ZONE 1 | $48.94 | $61.68 | H | H | H | H | H | H | H | H | Y | |
| Comment | Make up day allowed | |||||||||||
| 4 tens allowed M-Th or T-F. If work cannot be performed due to weather during the M-Th schedule, Friday may be worked | ||||||||||||
| as a make-up day. | ||||||||||||
| County information: | ||||||||||||
| OPERATING ENGINEERS ZONE 1 | ||||||||||||
| Genesee, Oakland, Macomb, Monroe, Washtenaw | ||||||||||||
| and Wayne counties | ||||||||||||
| Official Request #: | 19 | Official Rate Schedule | ||||||||||
| Requestor: | Dowagiac Union School District | |||||||||||
| Every contractor and subcontractor shall keep posted on the | ||||||||||||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all | ||||||||||
| prevailing wage and fringe benefit rates prescribed in a | ||||||||||||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 22 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBOEC2Z1GT | 6/6/2017 | |||||||||||
| OPERATING ENGINEERS GREASE TRUCK CLASS II ZONE | $50.24 | $63.63 | H | H | H | H | H | H | H | H | Y | |
| Comment | Make up day allowed | |||||||||||
| 4 tens allowed M-Th or T-F. If work cannot be performed due to weather during the M-Th schedule, Friday may be worked | ||||||||||||
| as a make-up day. | ||||||||||||
| County information: | ||||||||||||
| OPERATING ENGINEERS ZONE 1 | ||||||||||||
| Genesee, Oakland, Macomb, Monroe, Washtenaw | ||||||||||||
| and Wayne counties | ||||||||||||
| RBOEC2Z2 | 6/6/2017 | |||||||||||
| OPERATING ENGINEERS CLASS 2 ZONE 2 | $48.79 | $61.46 | H | H | H | H | H | H | H | H | Y | |
| Comment | Make up day allowed | |||||||||||
| 4 tens allowed M-Th or T-F. If work cannot be performed due to weather during the M-Th schedule, Friday may be worked | ||||||||||||
| as a make-up day. | ||||||||||||
| County information: | ||||||||||||
| OPERATING ENGINEERS ZONE 2 | ||||||||||||
| The entire state except those counties listed in Zone | ||||||||||||
| 1:Genesee, Oakland, Macomb, Monroe, Washtenaw | ||||||||||||
| and Wayne | ||||||||||||
| RBOEC2Z2GT | 6/6/2017 | |||||||||||
| OPERATING ENGINEERS GREASE TRUCK CLASS 2 ZONE 2 | $50.09 | $63.41 | H | H | H | H | H | H | H | H | Y | |
| Comment | Make up day allowed | |||||||||||
| 4 tens allowed M-Th or T-F. If work cannot be performed due to weather during the M-Th schedule, Friday may be worked | ||||||||||||
| as a make-up day. | ||||||||||||
| County information: | ||||||||||||
| OPERATING ENGINEERS ZONE 2 | ||||||||||||
| The entire state except those counties listed in Zone | ||||||||||||
| 1:Genesee, Oakland, Macomb, Monroe, Washtenaw | ||||||||||||
| and Wayne | ||||||||||||
| Official Request #: | 19 | Official Rate Schedule | ||||||||||
| Requestor: | Dowagiac Union School District | |||||||||||
| Every contractor and subcontractor shall keep posted on the | ||||||||||||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all | ||||||||||
| prevailing wage and fringe benefit rates prescribed in a | ||||||||||||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 23 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate | ||||||||||
| Construction Mechanic Classification | Rate | Rate | Overtime Code | |||||||||
| ========================================================================================================== | ||||||||||||
| RBOEC3Z1 | 6/6/2017 | |||||||||||
| OPERATING ENGINEERS CLASS III ZONE 1 | $48.38 | $60.84 | H | H | H | H | H | H | H | H | Y | |
| Comment | Make up day allowed | |||||||||||
| 4 tens allowed M-Th or T-F. If work cannot be performed due to weather during the M-Th schedule, Friday may be worked | ||||||||||||
| as a make-up day. | ||||||||||||
| County information: | ||||||||||||
| OPERATING ENGINEERS ZONE 1 | ||||||||||||
| Genesee, Oakland, Macomb, Monroe, Washtenaw | ||||||||||||
| and Wayne counties | ||||||||||||
| RBOEC3Z2 | 6/6/2017 | |||||||||||
| OPERATING ENGINEERS CLASS III ZONE 2 | $48.23 | $60.62 | H | H | H | H | H | H | H | H | Y | |
| Comment | Make up day allowed | |||||||||||
| 4 tens allowed M-Th or T-F. If work cannot be performed due to weather during the M-Th schedule, Friday may be worked | ||||||||||||
| as a make-up day. | ||||||||||||
| County information: | ||||||||||||
| OPERATING ENGINEERS ZONE 2 | ||||||||||||
| The entire state except those counties listed in Zone | ||||||||||||
| 1:Genesee, Oakland, Macomb, Monroe, Washtenaw | ||||||||||||
| and Wayne | ||||||||||||
| RBOEC4Z1 | 6/6/2017 | |||||||||||
| OPERATING ENGINEERS CLASS IV ZONE 1 | $48.21 | $60.59 | H | H | H | H | H | H | H | H | Y | |
| Comment | Make up day allowed | |||||||||||
| 4 tens allowed M-Th or T-F. If work cannot be performed due to weather during the M-Th schedule, Friday may be worked | ||||||||||||
| as a make-up day. | ||||||||||||
| County information: | ||||||||||||
| OPERATING ENGINEERS ZONE 1 | ||||||||||||
| Genesee, Oakland, Macomb, Monroe, Washtenaw | ||||||||||||
| and Wayne counties | ||||||||||||
| Official Request #: | 19 | Official Rate Schedule | ||||||||||
| Requestor: | Dowagiac Union School District | |||||||||||
| Every contractor and subcontractor shall keep posted on the | ||||||||||||
| Project Description: | To be determined | construction site, in a conspicuous place, a copy of all | ||||||||||
| prevailing wage and fringe benefit rates prescribed in a | ||||||||||||
| contract. |
| Official 2018 Prevailing Wage Rate Schedule | ||||||||||||
| for Parking Lot, Road, Highway, Bridge and Airport Construction | ||||||||||||
| Issue Date: | 1/17/2018 | |||||||||||
| Contract must be awarded by: | 4/17/2018 | |||||||||||
| Page 24 of 29 | ||||||||||||
| Straight | Time and | Double | ||||||||||
| Time | One Half | Time Rate |
This is the start of the file's text. The full file is on GovTribe.
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .