19-0108_NOTICE Advertisement for Bids-Motabella JR_SR chiller (1).docx
DOCX document 14 KB Posted
- Attached to
- Advertisement for Bids
- Solicitation number
- RFP-MOCS-190000000890-1
- Issued by
- Macomb County, East Grand Rapids City, Michigan
About this file
This is a Notice Advertisement for Public Bids issued by Montabella Community Schools in Blanchard, Michigan, seeking sealed bids for the "2019 JR/SR High School Chiller Addition and HVAC Upgrades" project. The project involves installing one air-cooled chiller with new distribution pumps and piping, and replacing eighteen existing blower coil heating units with new heating and cooling units. Electronic bid packets will be available starting January 25, 2019, with a mandatory pre-bid meeting and contractor walk-through scheduled for January 29, 2019, at 2:00 p.m. in the high school cafeteria. Sealed bids must be submitted by 2:00 PM on February 12, 2019, to the Montabella Community Schools Administration Building, with bids to be honored for 30 days after opening.
The project will be executed as a direct contract with a single mechanical contractor acting as the general contractor, with a requirement that contractors demonstrate at least five years of active mechanical work experience and possess all required licenses. The estimated construction cost is $500,000, and Montabella Community Schools reserves the right to reject all bids or award to the lowest responsible bidder. No plan deposit is required, and no plans will be available directly from the school district. Interested contractors must obtain bid packets from Ability Engineering via email or in person at the pre-bid meeting.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19-0108_NOTICE Advertisement for Bids-Motabella JR_SR chiller (1) (1).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE Advertisement for Public Bids: JR/SR High School Chiller Addition and HVAC Upgrades. Montabella Community Schools, 1324 N County Line Rd, Blanchard, MI 49310, is soliciting sealed bids for the project identified as “2019 JR/SR High School Chiller Addition and HVAC Upgrades”, consisting of the installation of one (1) air cooled chiller with all new distribution pumps and distribution piping, along with the replacement of eighteen (18) existing blower coil heating only units with new heating and cooling blower coil units. Beginning at 8 AM on Friday, January 25, 2019, electronic bid packets may be obtained from the engineer, Ability Engineering; E-mail: cnolan@ability-engineer.com; or in person at the contractor pre-bid meeting. No plan deposit will be required. No plans will be available from the School District. Project pre-bid meeting and contractor walk-through will be conducted on Tuesday, January 29, 2019 at 2:00 p.m. in the JR/SR High School Cafeteria (1324 N County Line Rd, Blanchard, MI 49310). This project will be executed under a direct contract between the owner and a single mechanical contractor, with that mechanical contractor acting as the general contractor and handling all other trades as sub-contractor(s) under their work scope (Mechanical Prime). To be considered, contractors must be able to demonstrate their firm has been actively performing this type of mechanical work for a minimum of five (5) years and carries all required mechanical licenses. Sealed bids must be received no later than 2:00 PM local time on Tuesday February 12th, 2019 at the Montabella Community Schools Administration Building located at 302 W Main St, Edmore, MI 48829. All bids will be publicly opened, read aloud, and taken under consideration by the School District. No awards will be made at the bid opening. Bids must be honored for a period of 30 days after the bid opening. A bid tabulation will be made available as soon as is practical after the bid opening. Montabella Community Schools reserves the right to reject all bids, reject individual non-responsive bids, or award the bid to the lowest responsible bidder. Estimated Construction Cost: $500,000.
File details come from the government source that posted it. Updated .