This document is a Request for Proposals (RFP) issued by the Tualatin Valley Water District (District) for a Progressive Design-Build contract for the 189th Pump Station & Pipeline Project No. C12772. The project involves the design and construction of a new 5.2 million gallon per day pump station, approximately 1,850 feet of 16-inch ductile iron pipeline, and the demolition of existing pump stations and reservoirs at the 189th and Goyak sites. The proposed schedule includes a mandatory confidential meeting on March 1-3, 2023, a deadline for questions on March 7, 2023, and a proposal submission due date of March 21, 2023. The District reserves the right to cancel the solicitation, reject any and all proposals not in compliance, and may negotiate a contract with the highest scored proposer.
The RFP does not provide details on pricing terms, set asides, incumbents, funding requirements or sources, or other salient financial information. The focus is on the technical requirements of the project and the procurement process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 35572 Preliminary Bid Results.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 189th Pump Station & Pipeline Project Page 1 February 13, 2023
TUALATIN VALLEY WATER DISTRICT
REQUEST FOR PROPOSALS FOR PROGRESSIVE DESIGN BUILDERS
189TH PUMP STATION & PIPELINE PROJECT NO. C12772
PROPOSALS DUE MARCH 21, 2023 BY 2:00 P.M.
Tualatin Valley Water District (District) is requesting proposals for Progressive Design Builders for the 189th Pump Station & Pipeline Project No. C12772 (Project). Proposals must be submitted to https://bidlocker.us/details/3287_189th_Pump_Station_Pipeline_Pdb (Bid Locker) by March 21, 2023 by 2:00 p.m. (Deadline). Any proposals submitted after the specified time will not be considered.
The RFP documents are available on Bid Locker. Potential proposers who do not already have an approved vendor profile set up with the District will need to register with Bid Locker at https://bidlocker.us/a/tvwd/BidLocker before accessing the RFP documents. There is no cost to register.
Registration with Bid Locker requires a correctly completed Confidentiality Agreement, which is available through the registration process. Following completion of the requested vendor information and upload of the Confidentiality Agreement, the vendor profile will be sent for a manual approval. Please allow one business day for your vendor profile to be approved. If it has not been approved within one business day, or if you have questions about this process, please contact bidsandproposals@tvwd.org.
Proposers will be notified via email when addenda are published. It is the responsibility of the proposer to obtain all addenda. There will be a link to Bid Locker for addenda provided in the automated email.
The District is undertaking the 189th Pump Station & Pipeline Project to provide a reliable water supply to customers in the area.
The existing 189th Pump Station, located at 7400 SW 189th Ave in Beaverton, Oregon, needs to be replaced with a 5.2 million gallon per day pump station. The existing 2-million-gallon concrete reservoir on the site is anticipated to be demolished as part of this Project. The existing well will remain as is.
The existing Goyak Pump Station and 1-million-gallon concrete reservoir, located at 18700 Rigert Road in Beaverton, Oregon, are also aging and anticipated to be demolished as part of this Project. A 16-inch diameter high pressure transmission main is proposed to be installed between the 189th site and the District’s Goyak facilities.
The District is proposing to replace the existing 189th Pump Station with a seismically resilient pump station. The Project includes the following major activities:
Design and construction of a new 5.2 MGD pump station which includes permanent on-demand backup power
Design and construction of approximately 1,850 feet of 16-inch ductile iron pump discharge piping
Demolition of the existing pump stations and reservoirs at the 189th and Goyak sites Updated site security system at the 189th site, including cameras with local backup
The proposed schedule for selecting and contracting with a Progressive Design-Builder is provided below. Minor deviations may occur due to unforeseen circumstances.
Issue Request for Proposals February 13, 2023
Proposer Request to Attend Mandatory Confidential Meeting February 20, 2023
RFP 189th Pump Station & Pipeline Project Page 2 February 13, 2023
Mandatory Confidential Meetings March 1-3, 2023
Deadline for Questions March 7, 2023
Issue Final Addenda March 14, 2023
Proposal Submission Due Date March 21, 2023
Short List of Teams for Interview (if required) April 4, 2023
Interviews (in-person interview) April 11, 2023
Design-Builder Selection April 12, 2023
Late proposals, proposals received by email, fax, or in hard copy will not be accepted or considered.
Proposals will not be publicly opened.
The District reserves the right to cancel this solicitation, reject any and all proposals not in compliance with all prescribed public contracting procedures and requirements, including proposer responsibility under ORS 279C.375(3)(b), and may reject for good cause any and all proposals upon the District’s finding that it is in the District’s or the public’s best interest to do so. The District reserves the right to waive informalities and to negotiate a contract with the highest scored proposer.
Proposers are responsible for all costs associated with preparing a proposal.
For more information regarding this project, please contact Corie Moolenkamp, West Yost Associates at
(503) 601-9520 or CMoolenkamp@WestYost.com
Advertised February 13, 2023