18-General Notices, Notes and Information.pdf

PDF 8 MB Posted

Attached to
ITB - Installation of Solar Lighting along Sidewalks of Freeport Street for Harris County Precinct 2
Solicitation number
25/0414
Issued by
Harris County, Texas

About this file

Summary

This is a specification and general notice document issued by Harris County Engineering Department for the installation of solar-powered pedestrian LED lighting along the sidewalks of Freeport Street in Precinct 2 (UPIN #23102MF2Y601). The project involves a turnkey solution including design, illumination study, furnishing, installation, and testing of solar-powered LED luminaire assemblies along existing sidewalks connecting multiple schools, businesses, and neighborhoods. The scope encompasses approximately 31 solar lighting assemblies mounted on 30-foot direct buried aluminum or hot dip galvanized steel poles with industrial-grade powder coat finish, featuring 16-foot luminaire mounting height and solar panels/batteries positioned at 30 feet above finished grade. The contractor must provide detailed project management, coordinate with subcontractors, prepare a comprehensive illumination study following IES standards and RP-8-00, submit photometric analysis reports, and complete installation within 150 days of design acceptance. Required submittals include manufacturer catalog pages, product data sheets, IES electronic photometric files, LM-79 reports, system calculations, and sealed foundation design drawings for county approval.

The project specifications require the contractor to furnish maintenance-free lithium iron phosphate (LiFePO4) battery systems, monocrystalline solar panels capable of 100% power operation from dusk to dawn, MPPT charge controllers with wireless mobile app management, and LED fixtures with Dark Sky certification and BUG ratings. The solar lighting system must operate reliably in temperatures ranging from -4°F to +120°F and withstand wind loads up to 130 mph. The contractor shall provide a minimum five-year non-prorated warranty on all system components from the date of substantial completion, including manufacturer repair and exchange service without charge. All work must comply with Harris County Engineering Department Standard Specifications (2023), and applicable specifications from Harris County Flood Control District, Texas Department of Transportation, and City of Houston. Contractor payment is based on actual accepted work completed at unit prices bid, with estimated bid quantities used only for evaluation purposes. The successful bidder must ensure a minimum of 25% of work is performed by the bidder itself and supply lists of all suppliers and subcontractors prior to work commencement.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preparer’s Certification for

Specifications, Special Specifications, Special

Provisions, Estimate and Specification Data

FOR:

Project Description with Limits, Precinct, and UPIN

Special Note:

The following items developed per the published Construction

Drawings have been verified and included in the Purchasing

Department’s Bid Specification Package which can be located at https//harriscountytx.bonfirehub.com/portal/. The items include:

Pricing/Delivery Information

Scope of Work

Special Provision to Standard Specifications

Special Specifications

Supplement to General Requirements

Contract Time

Solar Lighting - Freeport Street Precinct 2

UPIN #: 23102MF2Y601

https://harriscountytx.bonfirehub.com/portal/

Solar Lighting Freeport Street November 2025

SCOPE OF WORK

BASE BID: SOLAR WALWAY LIGHTING FREEPORT STREET – FROM IH10 TO ALDERSON,

PRECINCT 2 (23102MF2Y601)

The Contractor shall provide turnkey proposal solution to include design, furnishing, installation and testing of pedestrian style solar-powered light-emitting diode (LED) luminaire assemblies along the existing sidewalks of Freeport Street.

Prioritizing illumination at street intersections, the pedestrian-scale solar lights along sidewalks will improve traffic and public safety. Existing Sidewalks connect multiple schools, businesses, and neighborhoods.

The estimated bid quantities used in the bid sheets are contingent and used only to evaluate bidder submissions.

The Contractor shall be paid based upon actual accepted work completed, at the unit price included with the bid. The Contractor shall not be entitled to any additional payment due to variations between the bid and actual quantities.

The work includes all labor, equipment, materials, and incidentals necessary to perform the following scope of work, all complete, operational, and in place in accordance with the supporting documentation, specifications, and all applicable codes and standards:

1. Project Management - Provide project management of the project from initiation to completion.

• Coordination with Subcontractors: Coordinate, monitor and manage the project Subcontractors and vendors per determined project duration. The Prime shall ensure all components in the Scope of Work are being met by monitoring progress and taking corrective action when necessary.

• Schedule: Provide a detailed project baseline schedule, indicating milestones, major activities, and deliverables for HCED Project Manager to review and comment as part of proposal submittal. The schedule shall reflect assumed review times necessary by the agency involved. During the execution of the project the Contractor shall maintain and update the schedule. Adjustments shall be made, if necessary, due to changing circumstances.

• Invoices: The contractor shall submit, in a format acceptable to HCED, invoices that detail all project costs based on percentage of completion for each task and submit to HCED by the end of the month.

• Status Reports: Prepare status reports of project progress and submit to HCED by the end of the month regardless of invoicing submittals.

• Permits and Agreements if needed (Interlocal, Utility, Railroad, etc.)

• Contractor shall review, comment, and provide Interpose No Objection (INO) concurrence or Agreement documentation as required.

2. Illumination study and proposed lighting placement. The Contractor shall be responsible for visiting the scope area, identifying existing street illumination, site conditions and existing utilities.

The Contractor shall perform field work and analysis necessary to model the proposed illumination street light layout and summarize the analysis in a detailed photometric study report included in the Bid documents.

• Prepare streetlight layout mapping coverage of luminaires based on design minimum illuminance recommendation levels per the latest IES standards and RP-8-00 for sidewalks, prioritizing illumination at street intersections to maximize public safety.

Estimated project quantities: 31 solar lighting assemblies.

• Prepare photometric study report summarizing the results of the model and providing recommendations for the installation.

• Perform revisions to the model and/or technical memo as necessary to address any comments received from the County after bid acceptance.

• The design shall include 30’ direct buried aluminum poles or hot dip galvanized steel poles with industrial grade powder coat finish and anchor base on concrete foundation, 6” above grade per DWG S1.01. Luminaire mounting height will be 16’, solar panels and battery at 30’ above finished grade.

• Prepare and submit signed concrete foundation structural detail after bid acceptance.

• The solar lights should be able to work at 100% power from dusk to dawn.

3. Product recommendation and submittal to be provided with the Bid documents:

Provide manufacturer's standard catalog pages and data sheets including detailed information on luminaire construction, dimensions, ratings, finishes, mounting requirements, listings, service conditions, photometric performance, weight, effective projected area (EPA), and installed accessories; include model number nomenclature clearly marked with all proposed features.

Provide engineer sealed foundation design for County approval.

4. Project challenges requiring additional coordination may include:

• Limited ROW

• Coordination with existing utilities.

• Plans of the currently ongoing Harris County projects are provided for coordination, however the contractor is required to field-verify or confirm the sidewalk lengths and lighting locations prior to start of construction and place an 811 call.

• Traffic control

• Elevation differences between sidewalk and surrounding areas

• Coordination with property owners

5. Construction and closeout:

Install Solar Sidewalk lights per the approved and finalized photometric plan.

It is the expectation that solar lights will be installed within 150 days of acceptance of a design for each street included in the scope.

Provide Test Reports of the measured Illumination levels and closeout warranty documents within one month of project completion. Demonstrate proper operation to the owner, correct deficiency and adjust as directed.

6. All work shall be coordinated with the Precinct representative.

The Contractor shall recommend items for routine maintenance, replacement, or adjustment and respond to non-emergency calls within twenty-four (24) hours and be onsite for repairs within ten

(10) days.

The Contractor must have his own service trucks and necessary related equipment. The usage of contractor’s equipment is incidental to inspections and repairs and shall not be paid for separately.

The Contractor is responsible for protecting existing fields and lawn areas to prevent rutting or tracking. Work shall be scheduled to minimize matting or other means of protection.

7. Required documents to be submitted with the Bid document for evaluation:

• Manufacturer standard catalog pages

• Illumination study

END OF SCOPE OF WORK

May 2019

GENERAL NOTICE TO CONTRACTORS

In accordance with House Bill 1059, a minimum of 25% of the work to be performed on this project shall be performed by the Bidder.

Special Notice: By law, the original price on firm fixed price contracts may not be increased by more than 25%. The original price may not be decreased by 18% or more without the consent of the contractor. Please monitor additions to your contract -additions in excess of 25% will not be paid under any circumstances.

On public works projects, all contractors shall supply a list of all suppliers and subcontractors with addresses and phone numbers, prior to work commencing.

At the time of the scheduled preconstruction meeting, the successful bidder shall supply to the County a list of representatives signed by an Officer of the Company who are authorized to sign official documents, i.e., Purchase Orders, Change Orders, Final Estimates, etc.

In determining who is a responsible bidder, Harris County may take into account the past performance of the bidder on Harris County projects. Commissioners Court adopted a written definition and criteria for determining the performance of a contractor which may be considered in determining the responsibility of a bidder.

Harris County is using an internet-based Construction Program Management Software, e-Builder to maintain consistent administrative and technical control for its projects throughout the County. The Contractor is required to use e-Builder on this project in accordance with procedures provided by the County.

At no cost to the Contractor, the County will provide system login account(s) and provide training for Contractor personnel. The Contractor must update e-Builder with any new or changed information within 24 hours of that information becoming known to Contractor. The Contractor must have access to a computer with internet access and a scanner to use eBuilder.

NOTICE TO CONTRACTORS

ON STORM WATER QUALITY AND

ENVIRONMENTAL ISSUES

In addition to the regulatory requirements stated in the General Conditions, the Contractor shall recognize and comply with the following:

SECTION 1. STORM WATER POLLUTION PREVENTION PLANS

A. COVERAGE

Coverage under the Texas Pollutant Discharge Elimination System (TPDES)

General Permit TXR150000 for storm water discharges associated with construction activities is required for a project that disturbs 1 acre or greater (or is a part of a larger common plan of development with the potential to disturb 1 acre or greater). Coverage requires the preparation, implementation, inspection, and maintenance of a Storm Water Pollution Prevention Plan (SWPPP), in accordance with the TPDES General Permit.

B. PROJECT CLASSIFICATION

This project is classified as one of three categories listed below. The

Contractor shall be responsible for the storm water quality items, accordingly.

1. “Construction Sites That Do Not Require TPDES General Permit

Coverage” The project disturbs less than 1 acre (and is not part of a common plan of development with the potential to disturb 1 acre or more); therefore, coverage under the TPDES General Permit is not required. However, the Contractor shall implement good housekeeping measures to minimize the potential for pollutants, associated with the construction activities, to enter the storm sewer system. Item 725, “General Source Controls”, shall be implemented by the Contractor, as well as any other erosion, sedimentation, and pollution controls shown in the plans and project manual.

or

2. “Small Construction Sites”

The project disturbs 1 acre or more, but less than 5 acres, (or is part of a common plan of development with the potential to disturb 1 acre or more);

therefore, coverage under the TPDES General Permit is required. The Contractor shall implement, inspect, and maintain the Storm Water Pollution Prevention Plan shown in the plans and project manual.

Certification of a TCEQ Small Construction Site Notice (CSN) in accordance with Part II.E.2 of the TPDES General Permit is required. The Contractor, as a primary operator, as defined by TPDES General Permit, shall certify one Construction Site Notice (CSN) and provide this to Harris County at the time that the contract is awarded. Harris County (owner), as primary operator, as defined by TPDES General Permit, shall certify a second Construction Site Notice (CSN) at the time the contract is awarded. After the project is awarded, Harris County shall provide copies of the two certified Construction Site Notices (CSN) to the Contractor, and send copies to the local storm sewer operator for notification purposes. Prior to commencing construction activities, the Contractor shall laminate and post the notices on the project site in a location where they are readily available for public viewing. The Contractor shall maintain the posted notices until after completion of the construction activities and final stabilization of the project site as defined by the TPDES General Permit. When the project is completed and stabilization is achieved, as defined by the TPDES General Permit, then the Contractor shall note the date that the Small Construction Site Notice was removed from the project site. A copy of the completed Small Construction Site Notice shall be provided to the Engineer with the SWPPP records. The County shall then notify the local storm sewer operator that storm water associated with construction activities is no longer being discharged from the site.

3. “Large Construction Sites”

The project disturbs 5 acres or greater (or is part of a common plan of development with the potential to disturb 5 acres or more); therefore, coverage under the TPDES General Permit is required. The Contractor shall implement, inspect, and maintain the Storm Water Pollution Prevention Plan shown in the plans and project manual. Certification of a Notice of Intent (NOI) in accordance with Part II.E.3 of the TPDES General Permit is required and shall be completed in accordance with Harris County Specification Item Number 700. The Contractor shall not commence with any earth disturbing activities on the project site until:

• at least seven (7) days after submittal of the NOI (Harris County & Contractors) via U.S. Postal Service, or if Utilizing electronic submittal, prior to commencing construction activities,

• copies of signed NOI’s are submitted to any municipal separate storm sewer system (MS4) receiving discharge, at least seven (7) days prior to commencing construction activities. Contractor shall list in the SWPPP the names and addresses of all MS4 operators receiving a copy.

• copies of the Certified NOI’s are posted in a publicly accessible location (copies shall be laminated or placed in weather resistant display case),

• and copies (Harris County & Primary Contractors) of construction site notice for large sites (CSN) are posted in a publicly accessible location. After construction activities are complete and final stabilization is achieved (as defined by the TPDES General Permit), the Contractor shall certify one Notice of Termination (NOT) form and provide it to Harris County. Harris County shall certify a second NOT form. Harris County shall submit the two NOTs to the TCEQ and the local storm sewer system operator. After the NOTs have been submitted to the TCEQ, then the Contractor shall remove all temporary SWPPP controls, cease SWPPP inspections, and deliver copies of all SWPPP records to the Engineer who shall archive them for a minimum of three years. The final payment to the Contractor may be held until all SWPPP records are received by the Engineer.

SECTION 2. STORM WATER QUALITY MANAGEMENT PLANS

A. COVERAGE

If this project meets the definition of “new development” or “significant redevelopment” as defined in the Harris County regulations or City of Houston ordinance on storm water quality and the project is not “grandfathered” or “exempt” as defined by the regulation or ordinance, then a Storm Water Quality Management Plan (SWQMP) is required for the project, as shown in the construction plans.

B. CLASSIFICATION

This project is classified as one of three categories listed below. The Contractor shall be responsible for the storm water quality items, accordingly.

1. “SWQ Permit Within Unincorporated Harris County”

If a Storm Water Quality Management Plan with permanent storm water quality controls is shown in the construction plans and the project is located in unincorporated Harris County, then a Storm Water Quality Management Plan is required prior to the start of construction. Prior to the start of construction, the Engineer shall submit the plans and Written Storm Water Quality Management Plan to the Harris County Permits Group and obtain the necessary signatures acknowledging acceptance of the Storm Water Quality Management Plan. The Contractor shall construct the SWQMP structural controls in accordance with the construction plans, and maintain the SWQMP structural controls until completion of the project and until the Engineer can certify that the SWQMP structural controls are constructed in accordance with the plans.

2. “SWQ Permit Within City of Houston” If a Storm Water Quality Management Plan with permanent storm water quality controls is shown in the construction plans and the project is located in the jurisdiction of the City of Houston, then a Storm Water Quality Management Permit is required prior to the start of construction.

Prior to the start of construction, the Engineer shall submit to the City of Houston the construction plans, the City of Houston Storm Water Quality Management Plan Application for Permit, and all other related documents shown on the permit application and obtain the Storm Water Quality Management Permit. Prior to the start of construction, the Contractor shall post a performance bond to the City of Houston for the construction of the storm water quality structural controls. The Contractor shall post a copy of the issued permit on the project site, construct the SWQMP structural controls in accordance with the construction plans, and maintain the SWQMP structural controls until completion of the project and until the Engineer can certify that the SWQMP structural controls are constructed in accordance with the plans.

The Engineer shall submit the Storm Water Quality Permit As-built Certificate to the City of Houston and Harris County shall begin implementation of the SWQMP.

3. “Grandfathered or Exempt from SWQ Permit” or “Storm Water Quality

Bank” If a Storm Water Quality Management Plan, or permanent storm water quality feature, is not shown in the construction plans, then a Storm Water Quality Management Permit is not required prior to the start of construction because it is grandfathered, exempt, or has provided storm water quality measures through the Storm Water Quality Bank.

SECTION 3. OTHER ENVIRONMENTAL ISSUES

A. BIOLOGICAL ISSUES

In accordance with requirements under the federal Migratory Bird Treaty Act, if in the course of construction, a bird rookery, an identified special migratory bird habitat, or a nesting site is discovered on the project site, then the Contractor shall cease work in the area and immediately notify the Engineer.

In accordance with the Federal Endangered Species Act and the Texas Parks and Wildlife Code, if a biological mitigation plan for specially protected flora and fauna species has been provided within the construction plans, then the Contractor shall comply with all requirements noted within the plan.

B. WATERS OF THE UNITED STATES INCLUDING ADJACENT WETLANDS

In accordance with Section 404 and Section 401 of the Clean Water Act and Section 10 of the Rivers and Harbors Act, waters of the United States including adjacent wetlands shall not be impacted by the Contractor unless a Department of the Army Permit has been obtained from the U.S. Army Corps of Engineers for the project.

If Harris County has obtained a Department of the Army Permit for this project, a copy of the permit is provided in the project manual. The Contractor shall comply with all requirements of the Department of the Army Permit. The Contractor shall not impact any waters of the United States and adjacent wetlands greater than the area and volume shown in the permit. If the Contractor impacts waters of the United States including adjacent wetlands on the project site that exceeds the area and volume shown in the permit, then the Contractor shall be responsible for any violations that may be issued by the regulatory agencies. If the Contractor deems it necessary to impact waters of the United States including adjacent wetlands that exceed the permit, then the Contractor must first notify the Engineer and the Engineer may obtain the necessary regulatory clearances prior to allowing the additional impacts to occur.

During construction of the project, if the Contractor uses off-site areas (not owned by Harris County) for placement of borrow material, disposal of construction debris, staging of construction materials, usage as a field office, or other types of construction related activities, then the Contractor shall be solely responsible for obtaining all environmental permits for the off-site activity, as well as providing all environmental controls and compensatory mitigation requested by the permitting agency. If a regulatory violation occurs as a result of this off-site activity, then the Contractor shall be solely responsible for this violation.

C. STATE OWNED SUBMERGED LANDS

The Contractor shall not impact submerged lands regulated under the authority of the Texas General Land Office, or other local agency, without an easement agreement. If an easement agreement is necessary for the construction activities, then the easement agreement shall be obtained by Harris County.

D. CULTURAL RESOURCES

In accordance with the National Historic Preservation Act and the Antiquities Code of Texas, the Contractor shall not remove or disturb, or cause or permit to be removed or disturbed, any historical, archeological, architectural, or other cultural artifacts, relics, vestiges, remains, or objects of antiquity from the project site. In the event that such items are discovered on the project during construction activities, the Contractor shall immediately notify the Engineer. The site and the potentially significant material shall be protected by the Contractor from further disturbance until a professional examination of them can be made and/or until clearance to proceed with construction has been provided by the Engineer.

E. HAZARDOUS AND PETROLEUM SUBSTANCES

If during the course of construction, the Contractor discovers hazardous or petroleum substances or wastes on the project site, then the Contractor shall immediately cease work in the area and remove all personnel from the area. The contractor shall temporarily close the area to the public, as well; temporary fencing or caution tape shall be installed around the area. The Contractor shall notify the Engineer immediately. Work in the area shall not be permitted until the Engineer has determined that safety and environmental issues have been properly addressed.

NOTICE TO CONTRACTORS

BIDDING TRAFFIC SIGNAL INSTALLATIONS

To ensure completion of the project within the specified time, acquisition and accumulation of needed materials (poles, signal heads, controllers, cabinets and detector amplifiers) should begin upon receipt of purchase order from Harris County.

The Contractor shall commence work immediately upon receipt of materials.

The Contractor shall be required to provide Harris County a copy of their purchase order(s) to supplier(s) for all material(s) ordered along with acknowledgement from the supplier and projected delivery date.

The date of commencement shall be at Harris County’s discretion subject to availability of materials. The Contractor shall be allowed not more than 15 calendar days for initial submittal of shop drawings and not more than 10 calendar days for each submittal during the job that requires shop drawings.

The Contractor shall notify Harris County 48 hours prior to the turn-on of the traffic signal system.

The Final payment to the Contractor will be based upon the final inspection approval that the signal system was installed in accordance with the drawings and specifications, and has successfully undergone the field test to Harris County’s satisfaction (See Item 1000, “Traffic Signal Installation and Modification”).

NOTICE OF SPECIFICATIONS

For the construction of this project, the Contractor shall use the attached Special Provisions, Special Specifications, and Harris County Engineering Department (HCED) Specifications Book – 2023 Harris County Standard Specifications for the Construction of Roads and Bridges, effective date October 10, 2023. The current HCED specifications may be found at the HCED website: https://www.eng.hctx.net/Consultants/Standards- Specifications/Standard-Engineering-Design-Specifications

When applicable, the Contractor shall use the Harris County Flood Control District (HCFCD) 2020 Standard Specifications Book. The current HCFCD specifications may be found at the HCFCD website: https://www.hcfcd.org/Resources/Technical-Manuals/Standard- Specifications-Related-Drawings?folderId=15985&view=gridview&pageSize=10

When applicable, the Contractor shall also use the Texas Department of Transportation (TxDOT) 2014 Standard Specifications Book. The current TxDOT specifications may be found at the TxDOT website: https://www.txdot.gov/business/resources/txdot-specifications.html

When applicable, the Contractor shall also use the City of Houston (COH) Standard Specifications. The current COH specifications may be found at the COH website:

https://www.houstonpermittingcenter.org/office-city-engineer/design-and-construction-standards https://www.eng.hctx.net/Consultants/Standards-Specifications/Standard-Engineering-Design-Specifications https://www.eng.hctx.net/Consultants/Standards-Specifications/Standard-Engineering-Design-Specifications https://www.hcfcd.org/Resources/Technical-Manuals/Standard-Specifications-Related-Drawings?folderId=15985&view=gridview&pageSize=10 https://www.hcfcd.org/Resources/Technical-Manuals/Standard-Specifications-Related-Drawings?folderId=15985&view=gridview&pageSize=10 https://www.txdot.gov/business/resources/txdot-specifications.html https://www.txdot.gov/business/resources/txdot-specifications.html https://www.houstonpermittingcenter.org/office-city-engineer/design-and-construction-standards https://www.houstonpermittingcenter.org/office-city-engineer/design-and-construction-standards

SPECIAL SPECIFICATION

ITEM 6020

SOLAR POWERED EXTERIOR LIGHTING

PRECINCT 2

1. DESCRIPTION

Include detailed survey and analysis of the existing lighting conditions in the project area.

Provide turnkey proposal solution to include the design, illumination study report, furnishing, and installation of the solar-powered light-emitting diode (LED) luminaire assemblies. The luminaire assemblies shall be designed to provide efficient and effective illumination for pedestrian pathways, parking lots, roads, and other park areas, while also being energy-efficient and environmentally sustainable. The objective includes - A. Provide solar-powered pedestrian LED luminaires with all necessary components, including solar panels, batteries, LED light fixtures, foundation, mounting hardware, and control systems.

B. Install and configure the luminaires as per the approved layout, ensuring proper alignment, functionality, and aesthetic integration into the park environment.

C. Perform testing and commissioning of the solar-powered LED roadway luminaires to ensure compliance with performance standards.

2. SUBMITTALS

Provide new materials as included on the scope description and in accordance with the following Items:

A. Specification Conformance Document - Manufacturer will provide documentation showing system complies with all technical specification requirements in order to be considered compliant.

B. Product Data - Catalog cut sheets with performance specifications demonstrating compliance with specified requirements.

C. IES electronic files of lamp output and/or Photometric Plots on a surface from a defined lamp height compliant with IES LM-79. Winter light level should be noted with files and/or reflected in any lighting plots.

D. LM-79 and report for chosen Luminaire confirming efficacy values.

E. Calculation of Effective Projected Area (EPA) and weight of the solar lighting system, and EPA rating of the pole.

F. System Calculations

a) Photovoltaic Array Sizing

b) Luminaire load

G. Line drawing or photograph of lighting system(s).

H. Installation Instructions.

3. DESIGN REQUIREMENTS

The system must consist of a top of pole mounted solar engine that houses the solar panel, a single battery, and controller in a single self-contained unit. System must be designed for operation in temperatures between -4F and +120F A. The Pole must be able to support the weight of the specified equipment and exceed EPA and wind rating for the geographic location. System must be designed for up to 130 MPH wind loads.

B. Mount

a) All mounting hardware shall be made of corrosion-resistant materials (e.g., stainless steel, aluminum) and designed to withstand environmental conditions, including wind, rain, and UV exposure.

b) Solar engine must be able to mount to a pole less than or equal to 10” diameter.

c) Solar engine must mount to the pole in such a manner that does not require the pole to be drilled.

C. Solar Engine and Enclosure

a) Solar panel must be monocrystalline and sized sufficiently to charge the required battery with 2-3 hours of midday sun during the winter months

b) Solar engine enclosure must be sealed behind UV stabilized tempered glass.

c) Solar engine must have a single opening which provides barrier free access to all components for easy maintenance and replacement.

d) Solar engine enclosure must be formed from marine grade aluminum.

e) Solar engine must be able to rotate horizontally by 360 degrees.

f) Solar engine must have fool proof, keyed, automotive grade, IP67 latching connectors for the solar panel, battery, controller, and luminaire.

g) Cabling must be UV resistant and outdoor rated.

h) Battery compartment must have anti-theft screws

D. Fasteners

a) Solar engine must use stainless steel and/or aluminum fasteners.

E. Color Coating

a) Type: Outdoor, Architectural grade, powder coat.

b) Color: black, bronze, white gray or custom colors upon request

F. Installation

a) System must not require any site-specific configuration.

b) Solar engine must require no on-site assembly.

c) The system must use an automatic self-test when batteries are connected as the only required commissioning step.

G. Luminaire

a) LED driver must be a separate component mounted in the luminaire or integrated with the solar charge controller.

b) LED driver must support 0-10V dimming.

c) Luminaire suitable for use in wet locations with IP65 or greater

d) LED housing must be Cast Aluminum Alloy

e) LED Module Ingress Protection IP65

H. LED Color Temperature

Luminaire must be available with the color temperatures of 2700K,3000K, 4000K.

I. Lighting Distribution

J. Luminaire must have a BUG rating and must be Dark Sky approved Energy Management System

a) Solar charging system must incorporate self-learning adaptive light management to ensure reliable operation in all conditions and utilize a MPPT (maximum power point tracker) topology for maximum efficiency.

b) Battery must be maintenance free single, sealed lithium iron phosphate (LiFePO4), NiMH or Nickel Metal Hydride batteries with minimum 5-year warranty. Wet spillable lead acid is not acceptable. Battery terminals must be IP-68 rated screw-type connectors and use fire-retardant material.

c) Battery connection must use a sealed, keyed, and latched automotive connector with no exposed DC voltage when connected and/or anti-theft screws.

d) Battery must have a BMS including over-charge protection, over-discharge protection, over-current protection, over-temperature protection, cell balancing.

e) Light profiles must be factory set and must be field adjustable with a wireless mobile controller. Controller schedule must be field adjustable and finalized with the park personnel. The following control options should be available:

i. ON at dusk, OFF at dawn

ii. ON at dusk, OFF after 6 hours

iii. ON at dusk, dim to 30% after 6 hours till dawn

iv. ON at dusk, OFF after 5 hours, ON 1 hour before dawn

v. ON at dusk, dim to 30% after 5 hours, ON 1 hour before dawn

vi. ON at dusk, OFF after 3 hours

vii. ON at dusk, OFF after 4 hours

viii. ON at dusk, OFF after 4 hours, ON 1 hour before dawn

ix. ON at dusk, dim to 30% after 3 hours, ON 1 hour before dawn

x. 30% at dusk, OFF at dawn

f) Controller must have internal daily data logging. Data must be available via wireless mobile app.

g) Controller must be capable of software upgrades via wireless mobile app.

h) Controller must be housed in a sealed, automotive grade enclosure.

i) System must have 360-degree Microwave Motion Sensor

K. Maintenance and Service

a) The system should be designed for minimal maintenance with easy access to all components (LED fixture, battery, charge controller).

b) Routine maintenance should include cleaning of solar panels, checking the health of the battery, and verifying the operational status of the lights.

4. DELIVERY, STORAGE, AND HANDLING

A. Delivery - Deliver materials to site in manufacturer’s original, unopened containers and packaging, with labels clearly identifying product name and manufacturer.

B. Storage - Store materials in clean, dry area in accordance with manufacturer’s instructions. Keep materials in manufacturer’s original, unopened containers and packaging until installation.

C. Handling - Protect materials and finish during handling and installation to prevent damage.

5. EXECUTION

A. Examination

a) Examine areas to receive luminaires.

b) Notify the precinct representative of conditions that would adversely affect installation or subsequent use.

c) Do not begin installation until unacceptable conditions are corrected.

B. Installation

a) Install lights in accordance with manufacturer’s instructions at locations indicated on the Illumination study report drawings that have 2 to 3 hours of midday southern sun exposure.

b) Avoid shading from surrounding trees, buildings, or other structures.

c) All electrical work shall be in accordance with the local electrical code, and proper safety procedures must be followed.

d) Ensure that all wiring is neatly organized and secured to avoid damage during operation and maintenance.

e) Install lights plumb if any.

C. Protection

a) Protect installed lights to ensure that, except for normal weathering, system will be without damage or deterioration at time of Substantial Completion.

D. Foundation

The requirement of foundation and related items for the solar powered exterior lighting system should be considered incidental depending on the reuse of existing foundation items at the project site. When foundation for the solar powered exterior lightening structure is provided followings should be considered.

a) Provide appropriate foundation for mounting poles or structures based on local soil conditions, wind loads, and engineering recommendations.

b) The foundation design shall ensure stability and prevent tilting or shifting of poles over time.

6. TESTING AND COMMISSIONING

A. Pre-Installation Testing Conduct pre-installation testing of the LED light fixtures, solar panels, and batteries to ensure proper functionality and compliance with manufacturer specifications.

B. System Activation and Testing

a) After installation, test the verification of battery charge and discharge cycles.

b) Conduct testing to ensure the proper light output and uniformity of illumination.

c) Check the solar panel alignment for optimal charging.

7. WARRANTY

The entire solar-powered lighting system, including materials, workmanship, photometrics, and labor, must have a minimum 5-year warranty non-prorated on all system components, from the date of substantial completion. During the warranty period, the manufacturer must provide repair and exchange service without charge (including freight). This specification is provided to guide the design, procurement, installation, and maintenance of solar-powered LED luminaires, ensuring the delivery of reliable, efficient, and environmentally friendly lighting solutions for park pathways and sidewalks.

8. EXTRA MATERIALS

Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

B. Batteries: 10 for every 100 of each type and rating installed. Furnish at least one of each type.

9. MEASUREMENT

This Item will be measured as each solar-powered LED luminaire assembly is installed.

10. PAYMENT

The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid for “Solar Powered Exterior Lighting” of the type specified. This price is full compensation for survey as well as analysis of survey data for the existing lighting condition, proposal, furnishing, installing, and testing LED luminaires and solar assemblies; luminaire arms, brackets, poles, anchor bolt assemblies, templates, internal conductors, and connections; conducting system performance testing; and materials, equipment, labor, tools, and incidentals. When foundation and related items, e.g., excavation, drilling, removal of excess material etc. for the exterior solar light installation are required and payable under this item, cost of these should be included in the unit bid price for the type of the solar-powered lighting system.

END OF SECTION

EnGo illumo

COMPACT AND POWERFUL

Remote Management System

Environmental Sensors

Smart Sensors Powered By The Sun

High Quality Battery

Easy Installation & Maintenance

POWERED BY THE SUN

OR APPROVED EQUAL

20W-100W 180 lm/W

200Wp - 400Wp, SunPower Monocrystalline Solar Cell

Lithium Ion Phosphate – LiFePO4 12V, 52 - 156Ah

MPPT Controller - 12 V

Hot Dip Galvanized + Powder Coated

9m / 30ft Environmental Sensors

EnGo Illumo 9 Technical Data Sheet

Protection

Rated Power

Rated Voltage

Operating Temperature

Power Factor (PF)

LED LAMP ELECTRICAL PARAMETERS

Lumen Output

Correlated Color Temperature (CCT)

LED LAMP PHOTOMETRIC CHARACTERISTICS

LED LAMP MECHANICAL CHARACTERISTICS

Pole Fitter Diameter

Fixture Dimension

Packing Weight

Ratings

Lifetime

Body

Packing Dimension

Fixture Weight

SOLAR PANEL MAIN CHARACTERISTICS

Weight

Solar Cell Type

Dimensions of Module

Cables Specialized for PV use

Current Temperature Coefficient

Voltage Temperature Coefficient

Power Temperature Coefficient

Class I (Class II Optional)

12 VDC

30W

>0.9

180lm/W

2200 K ↔ 4000 K

0.05 % / °C

-0.45 % / °C

-0.35 % / °C

2.5mm2 × 1 m

10.5 kg / 23.15 lbs

1330 x 670 x 35mm / 52.4 x 26.4 x 1.4 in

Monocrystalline

156.75 × 156.75 mm / 6.17 × 6.17 in

-40 °C ↔ +50 °C / -40 °F ↔ +122°F

IP 66 IK 10

> 100.000 hours – L70 @25°C (77 °F)

Anodized Aluminum

60 mm / 2.4 in (50 mm / 2 in - Optional)

431 × 316 × 136 mm / 17 x 12.4 x 5.4 in

6.3 kg / 13.9 lbs

480 × 370 × 200 mm / 18.9 x 14.6 x 7.9 in

5.3 kg / 11.7 lbs

200 Wp

9.52 A

≥ 24%

21 V

25.2 V

10.5 A

+/-5%

1000 V

20 A

-40 °C ↔ +85 °C / -40 °F ↔ 185 °F

Short Circuit Current (Isc)

Voltage at Pmpp (Vmpp)

Maximum Output Power (Pmpp)

Current at Pmpp (Impp)

Power Tolerance

Solar Cell Efficiency

Open Circuit Voltage (Voc)

Operating Temperature

Maximum System Voltage

Maximum Series Fuse Rating

SOLAR PANEL MECHANICAL CHARACTERISTICS

SOLAR PANEL TEMPERATURE CHARACTERISTICS

POLE CHARACTERISTICS

Battery Storage

Height

Arm - Pole Angle

Finishing Colors

Pole Wall Thickness

Pole

LED Lamp

Solar Power

Battery System

Charge Controller

ILLUMO GENERAL SPECIFICATIONS

• EnGoPlanet Energy LLC • info@engoplanet.com • www.engoplanet.com

4900 Woodway Drive, Suite No. 980, Houston, TX 77056, USA

Available upon request

Dimensions

Rated Voltage

Weight

Rated Capacity

Internal Resistance

LiFePO4 BATTERY MAIN CHARACTERISTICS

Shell Material

Charge Voltage

Charge Current

Operating Temperature

Passive Protection

Type

Self-Consumption - Load On/Off

Nominal PV Power, 12 V

Model

Max. PV Short Circuit Current

Battery Voltage (auto select)

Rated Charge Current

Max. PV Open Circuit Voltage

Peak Efficiency

CHARGER CONTROLLER MODEL CHARACTERISTICS

Charge Voltage 'Absorption'

Charge Voltage 'Float'

Operating Temperature

Dimensions

Color

Protection Category

Weight

Safety Standards

*varies based on specific requirements

Black – RAL 9005 or RAL color of customer's choosing

9m / 30ft

90° approx. 4mm / 8 gauge*

Inside Pole

15 A

440 W

15 A

75 V

24 V: 15 mA

98%

12 V

27.6 V (Adjustable)

28.8 V (Adjustable)

0.5 kg / 1.1 lbs

100 x 113 x 40 mm / 3.9 x 4.5 x 1.6 in

EN/IEC 62109-1, UL 1741, CSA C22.2

Blue (RAL 5012)

IP43 (electronic components), IP22 (connection area)

VICTRON ENERGY SmartSolar MPPT 75/15 or EnGoPlanet MPPT Controller

-30°C ↔ + 60°C / -22°F ↔ + 140°F

12.8 V

≤ 45 Ohm

Poly Vinyl Chloride (PVC)

14.4 +/- 0.15 V

52 Ah

≤ 5 A

Over–charge Protection Over–discharge Protection Temperature Protection Balanced Function

LiFePO4

-15 °C ↔ +70 °C / 5 °F ↔ +158 °F

4.2 kg / 9.25 lbs (with housing)

936 mm 82 mm 42 mm

36.9 in 3.2 in 1.7 in

EnGo illumo

COMPACT AND POWERFUL

Remote Management System

Environmental Sensors

Smart Sensors Powered By The Sun

High Quality Battery

Easy Installation & Maintenance

POWERED BY THE SUN

20W-100W 180 lm/W

200Wp - 400Wp, SunPower Monocrystalline Solar Cell

Lithium Ion Phosphate – LiFePO4 12V, 52 - 156Ah

MPPT Controller - 12 V

Aluminum + Powder Coated 9m / 30ft Exposed (36ft total pole height)

Environmental Sensors

EnGo Illumo 9 Technical Data Sheet

Protection

Rated Power

Rated Voltage

Operating Temperature

Power Factor (PF)

LED LAMP ELECTRICAL PARAMETERS

Lumen Output

Correlated Color Temperature (CCT)

LED LAMP PHOTOMETRIC CHARACTERISTICS

LED LAMP MECHANICAL CHARACTERISTICS

Pole Fitter Diameter

Fixture Dimension

Packing Weight

Ratings

Lifetime

Body

Packing Dimension

Fixture Weight

SOLAR PANEL MAIN CHARACTERISTICS

Weight

Solar Cell Type

Dimensions of Module

Cables Specialized for PV use

Current Temperature Coefficient

Voltage Temperature Coefficient

Power Temperature Coefficient

Class I (Class II Optional)

12 VDC

30W

>0.9

180lm/W

2200 K ↔ 4000 K

0.05 % / °C

-0.45 % / °C

-0.35 % / °C

2.5mm2 × 1 m

10.5 kg / 23.15 lbs

1330 x 670 x 35mm / 52.4 x 26.4 x 1.4 in

Monocrystalline

156.75 × 156.75 mm / 6.17 × 6.17 in

-40 °C ↔ +50 °C / -40 °F ↔ +122°F

IP 66 IK 10

> 100.000 hours – L70 @25°C (77 °F)

Anodized Aluminum

60 mm / 2.4 in (50 mm / 2 in - Optional)

431 × 316 × 136 mm / 17 x 12.4 x 5.4 in

6.3 kg / 13.9 lbs

480 × 370 × 200 mm / 18.9 x 14.6 x 7.9 in

5.3 kg / 11.7 lbs

200 Wp

9.52 A

≥ 24%

21 V

25.2 V

10.5 A

+/-5%

1000 V

20 A

-40 °C ↔ +85 °C / -40 °F ↔ 185 °F

Short Circuit Current (Isc)

Voltage at Pmpp (Vmpp)

Maximum Output Power (Pmpp)

Current at Pmpp (Impp)

Power Tolerance

Solar Cell Efficiency

Open Circuit Voltage (Voc)

Operating Temperature

Maximum System Voltage

Maximum Series Fuse Rating

SOLAR PANEL MECHANICAL CHARACTERISTICS

SOLAR PANEL TEMPERATURE CHARACTERISTICS

POLE CHARACTERISTICS

Battery Storage

Height

Arm - Pole Angle

Finishing Colors

Pole Wall Thickness

Pole

LED Lamp

Solar Power

Battery System

Charge Controller

ILLUMO GENERAL SPECIFICATIONS

• EnGoPlanet Energy LLC • info@engoplanet.com • www.engoplanet.com

4900 Woodway Drive, Suite No. 980, Houston, TX 77056, USA

Available upon request

Dimensions

Rated Voltage

Weight

Rated Capacity

Internal Resistance

LiFePO4 BATTERY MAIN CHARACTERISTICS

Shell Material

Charge Voltage

Charge Current

Operating Temperature

Passive Protection

Type

Self-Consumption - Load On/Off

Nominal PV Power, 12 V

Model

Max. PV Short Circuit Current

Battery Voltage (auto select)

Rated Charge Current

Max. PV Open Circuit Voltage

Peak Efficiency

CHARGER CONTROLLER MODEL CHARACTERISTICS

Charge Voltage 'Absorption'

Charge Voltage 'Float'

Operating Temperature

Dimensions

Color

Protection Category

Weight

Safety Standards

*varies based on specific requirements

Black – RAL 9005 or RAL color of customer's choosing

9m / 30ft Exposed (36ft total pole height)

90° approx. 4mm / 8 gauge*

Inside Pole

15 A

440 W

15 A

75 V

24 V: 15 mA

98%

12 V

27.6 V (Adjustable)

28.8 V (Adjustable)

0.5 kg / 1.1 lbs

100 x 113 x 40 mm / 3.9 x 4.5 x 1.6 in

EN/IEC 62109-1, UL 1741, CSA C22.2

Blue (RAL 5012)

IP43 (electronic components), IP22 (connection area)

VICTRON ENERGY SmartSolar MPPT 75/15 or EnGoPlanet MPPT Controller

-30°C ↔ + 60°C / -22°F ↔ + 140°F

12.8 V

≤ 45 Ohm

Poly Vinyl Chloride (PVC)

14.4 +/- 0.15 V

52 Ah

≤ 5 A

Over–charge Protection Over–discharge Protection Temperature Protection Balanced Function

LiFePO4

-15 °C ↔ +70 °C / 5 °F ↔ +158 °F

4.2 kg / 9.25 lbs (with housing)

936 mm 82 mm 42 mm

36.9 in 3.2 in 1.7 in

Zora.Zaharieva Image

Zora.Zaharieva Callout

SOLAR PANEL AND BATTERY AT 30' ABOVE GRADE

LUMINAIRE AT 16' ABOVE GRADE

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CK'D BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

ENGINEER:

AutoCAD SHX Text P.E. SERIAL No.

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NO.

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NAME

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text X

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text Y

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text

FOR INTERIM REVIEW ONLY

AutoCAD SHX Text

PROJECT TITLE:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HARRIS COUNTY

AutoCAD SHX Text

ENGINEERING DEPARTMENT

AutoCAD SHX Text

DOCUMENT INCOMPLETE: NOT INTENDED FOR CONSTRUCTION, BIDDING, OR PERMIT PURPOSES

AutoCAD SHX Text

NAME

AutoCAD SHX Text

NUMBER

AutoCAD SHX Text

AutoCAD SHX Text

SHEET DESCRIPTION:

AutoCAD SHX Text

SHEET NO:

AutoCAD SHX Text

BRIDGE

AutoCAD SHX Text

STANDARD

AutoCAD SHX Text C:\Users\Nick.klyzhko\Downloads\drilled shaft for light poles.dwg

AutoCAD SHX Text

PEDESTRIAN SOLAR LIGHTING INSTALLATION

AutoCAD SHX Text

PRECINCT 2 - SIDEWALK IMPROVEMENTS

AutoCAD SHX Text

DRILLED SHAFT DETAILS

AutoCAD SHX Text

(1 OF 1)

AutoCAD SHX Text

NK

AutoCAD SHX Text

AR

AutoCAD SHX Text S1.01

AutoCAD SHX Text 04/25/25

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text GENERAL NOTES: A. GOVERNING STANDARDS: ALL WORK SHALL CONFORM TO THE LATEST EDITIONS OF THE HARRIS COUNTY ENGINEERING DEPARTMENT'S STANDARD SPECIFICATIONS FOR CONSTRUCTION OF HIGHWAYS, STREETS, AND BRIDGES, THE CITY OF HOUSTON'S STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (IF APPLICABLE), AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. IN CASE OF CONFLICT, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN. B. THE DRILLED SHAFT FOR SOLAR LIGHT POLES WERE DESIGNED FOR A BASIC WIND SPEED OF 134 MPH. THE MAXIMUM HEIGHT OF THE POLE WAS CONSIDERED TO BE 30 FEET HAVING A MAXIMUM LENGHT OF MAST ARM OF 8 FEET. C. THE SOIL TYPE AT THE PROJECT SITE WAS ASSUMED TO BE BASICALLY A MEDIUM TO LOW PLASTIC CLAY TYPE WITH A MINIMUM VALUE OF TEXAS CONE PENETRATION (TCP) NUMBER OF 10. CONTRACTORS OR OTHER STOCKHOLDERS SHALL CAREFULLY REVIEW THE SUBSURFACE CONDITIONS ENSURING THIS MINIMUM CRITERIA TO BE MET AT THE PROJECT SITE. ANY VARIATIONS ENCOUNTERED DURING CONSTRUCTION THAT DIFFER FROM THIS ASSUMED SOIL CONDITION SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER. D. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND APPROVALS FROM HARRIS COUNTY AND ANY OTHER RELEVANT AUTHORITIES PRIOR TO COMMENCING WORK. E. THE LOCATION AND DIMENSIONS OF THE DRILLED SHAFT SHALL BE AS SHOWN ON THE PLANS. ANY FIELD ADJUSTMENTS MUST BE APPROVED IN WRITING BY THE ENGINEER. VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO DRILLING. F. DRILLING SHALL BE PERFORMED USING EQUIPMENT AND METHODS THAT WILL MINIMIZE DISTURBANCE TO THE SURROUNDING SOIL. THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT CAVING, SLOUGHING, AND NECKING OF THE SHAFT. G. TEMPORARY CASING MAY BE REQUIRED DEPENDING ON SUBSURFACE CONDITIONS. IF USED, THE CASING SHALL BE INSTALLED AND REMOVED IN A MANNER THAT DOES NOT DISTURB THE SURROUNDING SOIL OR THE CONCRETE PLACEMENT. THE CONTRACTOR SHALL SUBMIT A DETAILED PLAN FOR CASING INSTALLATION AND REMOVAL FOR THE ENGINEER'S APPROVAL. H. CONCRETE SHALL BE PLACED IN A CONTINUOUS OPERATION FROM THE BOTTOM OF THE SHAFT TO THE TOP. CONCRETE SHALL BE PLACED USING A TREMIE PIPE OR OTHER APPROVED METHOD TO PREVENT SEGREGATION AND ENSURE PROPER CONSOLIDATION. FREE-FALL PLACEMENT WILL NOT BE PERMITTED UNLESS SPECIFICALLY APPROVED BY THE ENGINEER FOR DRY, STABLE HOLES. I. CONCRETE MIX DESIGN: CONCRETE SHALL CONFORM TO THE REQUIREMENTS SPECIFIED IN ITEM 416 OF THE HARRIS COUNTY ENGINEERING DISTRICT'S STANDARD SPECIFICATIONS. THE MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS SHALL BE 4000 PSI. J. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60, UNLESS OTHERWISE SPECIFIED. REINFORCEMENT SHALL BE INSTALLED AS SHOWN ON THE PLANS AND SECURELY TIED TO MAINTAIN PROPER POSITION DURING CONCRETE PLACEMENT. MINIMUM CONCRETE COVER SHALL BE MAINTAINED AS SPECIFIED ON THE PLANS. K. ANCHOR BOLTS FOR THE LIGHT POLE SHALL BE SET ACCURATELY AND SECURELY IN ACCORDANCE WITH THE LIGHT POLE MANUFACTURER'S RECOMMENDATIONS AND AS DETAILED ON THE PLANS. A TEMPLATE SHALL BE USED TO ENSURE PROPER BOLT ALIGNMENT AND SPACING. THE TOP PROJECTION OF THE ANCHOR BOLTS SHALL BE AS SPECIFIED ON THE PLANS. L. THE ENGINEER OR THEIR REPRESENTATIVE SHALL BE PRESENT DURING DRILLING, REINFORCEMENT PLACEMENT, AND CONCRETE PLACEMENT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AT LEAST 24 HOURS PRIOR TO EACH OF THESE CRITICAL OPERATIONS. M. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MAINTAINING A SAFE WORK ENVIRONMENT IN ACCORDANCE WITH ALL APPLICABLE SAFETY REGULATIONS. N. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL REMOVE ALL DEBRIS AND RESTORE THE SITE TO ITS ORIGINAL OR BETTER CONDITION. O. ALL DIMENSIONS RELATING TO REINFORCING STEEL ARE TO CENTERS OF BARS.

AutoCAD SHX Text

6" ABOVE GROUND

AutoCAD SHX Text

6" ABOVE GROUND

AutoCAD SHX Text

2' ABOVE GROUND EXTENSION, AS NEEDED

AutoCAD SHX Text

FOR GUIDANCE ONLY, NOT FOR CONSTRUCTION

AutoCAD SHX Text NOTE: THIS DETAIL IS FOR GUIDANCE ONLY. VENDOR IS RESPONSIBLE FOR THE FINAL DESIGN OF THE FOUNDATION AND ANCHOR BOLTS. SUBMIT SIGNED AND SEALED DRAWINGS FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION.

Preparer's Certification
Scope of Work
General Notice to Contractors
General Notes
Notice to Contractors - TBPE Policy
Notice to Contractors - Material Hauling
Notice to Contractors - SWQ and Env Issues
Notice to Contractors Bidding Traffic Signal Installations
Notice of Specifications
Special Specs
BOD: EnGo Planet
BOD: Rendering
Pole Foundation

File details come from the government source that posted it. Updated .