This is an Advertisement for Bids document issued by Barton Malow Builders on behalf of Utica Community Schools, with architectural support from Integrated Design Solutions, LLC. The project involves hard tile construction work at two school locations: Bemis Junior High School and Eppler (project details referenced with drawings dated October 2, 2020 and August 28, 2020, respectively, and specifications dated November 6, 2020). Sealed bid proposals must be received by 1:00 p.m. local standard time on January 26, 2021, either electronically via Building Connected or by physical delivery/mail to the Gibbings Administrative Service Center at 11303 Greendale Drive, Sterling Heights, Michigan 48312, directed to Mrs. Denyeal Nesovski. A mandatory pre-bid conference and site visit will be held on January 14, 2021 at 1:00 p.m. at Bemis Junior High School Front Office, with attendance required for all bidders. Pre-bid conference minutes will be distributed as Addendum 1 and become part of the binding contract documents. Bidders may not withdraw their proposals for 60 days following the bid submission deadline.

Bid proposals must include a 5% bid security from a qualified surety and must incorporate state sales and/or use taxes in the pricing. Bidders with an Experience Modification Rate (EMR) greater than 1.0 are ineligible for contract award. The successful bidder will be required to maintain prequalification status with Barton Malow Builders and enter into an AIA Document A132 Standard Form of Agreement with Utica Community Schools. Bidders are prohibited from publishing or disclosing their work for the District without advance written permission from the Superintendent. The Owner reserves the right to accept or reject any or all offers. Proposal forms will be furnished via Building Connected and the Project Manual, with all bidding requirements detailed in Document 002113 - Instructions to Bidders and Document 003100 - Available Project Information.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Advertisement for Bids 1 of 2 001113

SECTION 001113

ADVERTISEMENT FOR BIDS

FROM:

1.01 BARTON MALOW BUILDERS (HEREINAFTER REFERRED TO AS BARTON MALOW

BUILDERS)

A. Barton Malow Builders

B. Address:

1. 6600 18 Mile Road

a. Sterling Heights, Michigan 48314

1.02 AND INTEGRATED DESIGN SOLUTIONS, LLC (HEREINAFTER REFERRED TO AS

ARCHITECT):

A. Integrated Design Solutions, LLC

B. Address:

1. 888 West Big Beaver, Suite 200

a. Troy, MI 48084

1.03 AND UTICA COMMUNITY SCHOOLS (HEREINAFTER REFERRED TO AS OWNER):

A. Utica Community Schools

B. Address:

1. 11303 Greendale Drive

2. Sterling Heights, MI 48312

1.04 DATE: JANUARY 8, 2021

1.05 TO: POTENTIAL BIDDERS

A. Barton Malow Builders requests Bid Proposals on behalf of Owner for the construction of 18-5-2021 Bemis & Eppler Hard Tile - R for Sealed Bid No. 18-5-2021 work. Bid Proposals will be received:

1. Bidder’s may, but shall not be obligated to, submit bids electronically via Building

Connected by 1:00 p.m. local standard time on January 26, 2021. If a Bidder chooses to submit an electronic bid, it assumes any and all risk related to software, connectivity, or any other issues related to the electronic bidding process. It is further recommended, but not required, that any electronic bids be submitted at least two hours before the deadline for bid submission to confirm that the bid has been timely, accurately, and completely received.

a. A livestream bid opening will be held via livestream and a physical bid opening will still be available.

1) Livestream can be viewed at:

https://teams.microsoft.com/l/meetup-join/19%3ameeting_MGI5YzAzMjYtNDVhYi00NmZlLTk1ZDAtNmQyYjIwZD g5ODZk%40thread.v2/0?context=%7b%22Tid%22%3a%223229604e-859b- 4594-853b-c66d15b8dd80%22%2c%22Oid%22%3a%2259adef03-eb6b- 467b-81b4-2a32aaff2722%22%2c%22IsBroadcastMeeting%22%3atrue%7d

2) Physical Bid Opening will be at:

(a) Gibbings Administrative Service Center

(b) 11303 Greendale Drive

(c) Sterling Heights, Michigan, 48312

2. Alternatively, bid proposals must be received by delivery or mail by 1:00 p.m. local standard time on the January 26, 2021.

a. To the attention of:

1) Utica Community Schools

2) Attention: Mrs. Denyeal Nesovski

3) 11303 Greendale Drive

4) Sterling Heights, Michigan, 48312

b. Proposals must be sealed with Bidder's name on the outside of the envelope and designated as follows:

Advertisement for Bids 2 of 2 001113

i. 1) Sealed Proposal Bid # 18-5-2021

i. 3) Bid Package: 18-5-2021 Bemis & Eppler Hard Tile - R

i. 4) Subcontractor/Vendor Name, Address, Phone Number

B. Proposals shall be based on the requirements set forth in the Barton Malow Builders project manual dated January 8, 2021 and construction bidding documents prepared by Integrated Design Solutions, LLC Bemis project drawings dated October 2, 2020 and specifications dated November 6, 2020 and Eppler project drawings dated August 28, 2020 and specifications dated November 6, 2020 for:

1. Tile

C. Building Connected Link to copy & paste:

https://app.buildingconnected.com/public/55a1292ff1a96708004a19dc

D. Project is subject to state sales and/or use taxes and Bidder is required to include such taxes in its Bid Proposal.

E. Barton Malow Builders has been contracted by the Owner in the capacity of Construction Manager for the Project and shall act as representative of the Owner to the extent required/allowed under its Owner contract.

F. A pre-bid conference and site visit/tour will be held for all trades at 1:00 p.m. local standard time on the January 14, 2021 beginning at Bemis Junior High School, Front Office.

All Bidders are responsible for attendance at the pre-bid conference. Pre-bid conference minutes will be distributed to all attendees and invited bidders. Information disclosed in the pre-bid conference minutes will be considered part of the Bidding and Contract Documents.

G. All Bidders are responsible for attendance at the pre-bid conference. Pre-bid conference minutes will be distributed to all attendees and invited bidders in addendum 1. Information disclosed in the pre-bid conference minutes will be considered part of the Bidding and Contract Documents.

H. Refer to other bidding requirements described in Document 002113 - Instructions to Bidders and Document 003100 - Available Project Information.

I. Bid Proposals shall be on forms furnished by Barton Malow Builders via Building Connected and/or the Project Manual. Bidders shall not withdraw or revoke Bid Proposals for a period of 60 Days after date for receipt of Bid Proposals.

J. Bidders will be required to submit with their Bid Proposals a Bid Security, in the amount of 5% of base bid, by a qualified surety authorized to do business in the state where the Project is located.

K. The successful Bidder(s) will be required to enter into an agreement with Utica Community Schools on the Agreement Form identified in the Project Manual and maintain its prequalification status with Barton Malow until the work is completed.

L. Bidders with an Experience Modification Rate (EMR) greater than 1.0 may not be considered for contract award.

M. The successful bidder will be required to enter into a contract with Utica Community Schools on the AIA Document A132 Standard Form of Agreement between Owner and Contractor, Construction Manager as Adviser, 2009 Edition.

N. Contractor agrees that he/she/they will not publish or otherwise mention, refer to or disclose his/her/their work for or with the Utica Community Schools for any reason without the advance written permission of the District’s Superintendent.

O. The Owner reserves the right to accept or reject any or all offers.

1.06 SIGNATURE

END OF SECTION