N4008526R0072 P200 CNATT FACILITIES MARINE CORPS AIR STATION (MCAS) CHERRY POINT, NORTH CAROLINA
Solicitation number
N4008526R0072_
Issued by

About this file

This is a specification document and contract requirements file for the P-200 CNATT Facility construction project at Marine Corps Air Station (MCAS) Cherry Point, North Carolina. The document outlines comprehensive technical specifications, administrative requirements, and procedural guidelines for constructing a permanent Center for Naval Aviation Technical Training (CNATT) facility and temporary support compound. The facility includes administrative office spaces, five training classrooms, support spaces, a small arms armory, and a low-rise high-bay Ground Support Equipment Storage facility.

Key contract requirements include: mobilization within 60 calendar days of award; preconstruction meeting within 35 days; mandatory formal partnering session within 35 days at an off-base location; regular working hours of 7 a.m. to 3:30 p.m., Monday through Friday, with approval required for outside-hours work; cost-loaded Network Analysis Schedule (NAS) with earned value reporting; monthly invoicing with supporting documentation including progress photographs, certified payrolls, and waste disposal reports. The contractor must maintain a project superintendent with minimum 10 years construction experience and 5 years as superintendent on similar projects, fluent in English. Special requirements include DBIDS credentialing for personnel access, compliance with EM 385-1-1 safety standards, Davis Bacon wage compliance, and comprehensive quality control and commissioning procedures. The contract incorporates an optional AV (audiovisual) system design and installation component with a government estimate of $1,200,007 (excluding contractor handling and administration rate), requiring Best Value Determinations per FAR 8.404 for procurements exceeding $25,000, GSA Multiple Award Schedule compliance, and AVIXA CTS-D certified designer involvement. Final AV submittal is due 10 months prior to beneficial occupancy date.

View the file

Other files

File Type Posted
JA ML-25-03 Class FRCS Cherry Point - Redacted.pdf PDF
Wage Determination.pdf PDF
PPI Form.xlsx XLSX spreadsheet
P200 General Requirements.pdf PDF
Attachment F - PIEE Vendor Access Ins..pdf PDF
1783997 Blank Price Schedule - CNATT_v1.pdf PDF
1783997dwg01of01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

eProjects Work Order Number: 17983997 Appropriation:

P-200 CNATT Facility At the

MARINE CORPS AIR STATION CHERRY POINT, NC

DESIGNED BY:

NAVFAC MID-ATLANTIC

9742 MARYLAND AVENUE

NORFOLK, VIRGINIA 23511-3095

SPECIFICATION PREPARED BY:

Architectural: MBF Architects Civil: Stantec Structural: Kaydos-Daniels Engineering Interior Design: Within Interior Design Mechanical/Plumbing/Electrical: Crenshaw Consulting Eng.

Fire Prot.: Jensen Hughes Audio Video: Thorburn Cybersecurity: White Raven Security, LLC

Specification: Darden J. Eure, III, MBF Architects

Date: 06 June 2026

SPECIFICATION APPROVED BY:

For Commander, NAVFAC MID-ATLANTIC:

Date: 16 JUN 2026

06 June 2026

This page is intentionally left blank.

P-200 CNATT Facility eProjects WO No. 17983997 MCAS Cherry Point, NC 08 June 2026

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 02/24 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 02/24, CHG 1: 05/25 SUMMARY OF WORK

01 14 00 11/22, CHG 5: 05/25 WORK RESTRICTIONS

01 20 00 11/20, CHG 5: 02/25 PRICE AND PAYMENT PROCEDURES

01 30 00 11/20, CHG 5: 02/25 ADMINISTRATIVE REQUIREMENTS

01 30 02.00 22 05/23 DESIGN, PROCUREMENT, AND INSTALLATION

OF AUDIOVISUAL EQUIPMENT

01 31 23.13 20 08/23, CHG 1: 02/24 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

(eCMS)

01 32 17.00 20 05/25 COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

SUBMITTAL REGISTER

01 33 29 02/21, CHG 1: 08/25 SUSTAINABILITY REQUIREMENTS AND

REPORTING

HPSB CHECKLIST

01 35 26 05/24, CHG 1: 05/25 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 08/23 QUALITY CONTROL

SCHEDULE OF FIRE PROTECTION SYSTEM

INSPECTIONS BY FPQC SPECIALIST

01 45 35 11/20 SPECIAL INSPECTIONS

STATEMENT OF SPECIAL INSPECTIONS

SCHEDULE OF SPECIAL INSPECTIONS

01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

PROJECT SIGN DETAILS

01 59 00 04/94 TEMPORARY TRAILERS FOR DISPLACED

TENANTS

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 76 10 06/23 FOREIGN OBJECT PROTECTION REQUIREMENTS

01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS

01 78 23 05/23, CHG 1: 05/25 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 05/23, CHG 1: 11/23 FACILITY DATA WORKBOOK (FDW)

01 78 30.00 22 02/16 GIS DATA DELIVERABLES

01 91 00.15 05/23, CHG 3: 08/24 BUILDING COMMISSIONING

01 91 19 05/2023 BUILDING ENCLOSURE COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DEMOLITION

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE

03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

PROJECT TABLE OF CONTENTS Page 1

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

06 82 14 DECORATIVE FIBERGLASS REINFORCED

PLASTIC (FRP)

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION

07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM

07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS

07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 05/17, CHG 3: 02/23 SPRAY FOAM AIR BARRIERS

07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS

07 45 00 07/24 ALUMINUM COMPOSITE PANELS

07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 61 14.00 20 08/16, CHG 1: 08/18 CP STEEL STANDING SEAM ROOFING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES

08 14 00 08/16, CHG 1: 08/18 WOOD DOORS

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 33 23 08/20, CHG 1: 02/22 STEEL OVERHEAD COILING DOORS

08 34 59 08/08, CHG 1: 11/12 VAULT DOORS AND DAY GATES

08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS

08 41 60 12/22 TRANSLUCENT FIBERGLASS WALLS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 ALUMINUM LOUVERS

DIVISION 09 - FINISHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC TILING

PROJECT TABLE OF CONTENTS Page 2

09 51 00 08/20 ACOUSTICAL CEILINGS

09 65 00 08/10, CHG 3: 08/18, RESILIENT FLOORING

09 66 23 08/16, CHG 1: 08/18 RESINOUS MATRIX TERRAZZO FLOORING

09 67 23.13 27SEP2018 STANDARD RESINOUS FLOORING

09 68 00 11/17, CHG 2: 08/20 CARPET TILE

09 90 00 02/21 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 08/20 VISUAL DISPLAY UNITS

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

10 51 13 08/24 LOCKERS

DIVISION 12 - FURNISHINGS

12 00 01.00 20 02/23 FURNITURE, FIXTURES AND EQUIPMENT

(FF&E) PACKAGE

12 24 13 08/20 ROLLER WINDOW SHADES

DIVISION 13 - SPECIAL CONSTRUCTION

13 31 33 02/23 FRAME SUPPORTED MEMBRANE STRUCTURES

DIVISION 21 - FIRE SUPPRESSION

21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93.00 22 09/19 TESTING, ADJUSTING, AND BALANCING FOR

MECHANICAL SYSTEMS

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 08 00 05/23 COMMISSIONING OF MECHANICAL AND

PLUMBING SYSTEMS

23 09 00.00 22 08/20, CHG 1: 03/22 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13.00 22 08/20, CHG 1: 03/22 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 22 08/20, CHG 1: 03/22 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 23 00 08/21 REFRIGERANT PIPING

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 82 00.00 20 02/16, CHG 1: 08/18 TERMINAL HEATING UNITS

DIVISION 25 - INTEGRATED AUTOMATION

PROJECT TABLE OF CONTENTS Page 3

25 05 11.01 08/24 CYBERSECURITY FOR MECHANICAL/HVAC

FACILITY-RELATED CONTROL SYSTEMS

25 08 11.00 20 11/20 RISK MANAGEMENT FRAMEWORK FOR

MECHANICAL/HVAC FACILITY-RELATED

CONTROL SYSTEMS

25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM

(UMCS) FRONT END AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 05 73 08/23 POWER SYSTEM STUDIES

26 08 00 11/22 APPARATUS INSPECTION AND TESTING

26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM

26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING

26 35 43 08/21 400-HERTZ (HZ) SOLID STATE FREQUENCY

CONVERTER

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 08/23 EARTHWORK

31 31 16.13 08/22, CHG 1: 11/23 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 16.71 11/22 COLD MILLING ASPHALT PAVING

32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 11 20 05/22 BASE COURSE FOR RIGID PAVEMENT AND

SUBBASE

32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE

PAVING

32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

32 31 13 11/21 CHAIN LINK FENCES AND GATES

32 92 23 04/06, CHG 1: 08/21 SODDING

32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 02/18, CHG 2: 11/23 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

PROJECT TABLE OF CONTENTS Page 4

33 40 00 11/21 STORMWATER UTILITIES

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 5

THIS PAGE INTENTIONALLY LEFT BLANK

PROJECT TABLE OF CONTENTS Page 6 eProjects Work Order Number: 17983997 Appropriation:

P-200 CNATT Facility At the

MARINE CORPS AIR STATION CHERRY POINT, NC

DESIGNED BY:

NAVFAC MID-ATLANTIC

9742 MARYLAND AVENUE

NORFOLK, VIRGINIA 23511-3095

SPECIFICATION PREPARED BY:

Architectural: MBF Architects Civil: Stantec Structural: Kaydos-Daniels Engineering Interior Design: Within Interior Design Mechanical/Plumbing/Electrical: Crenshaw Consulting Eng.

Fire Prot.: Jensen Hughes Audio Video: Thorburn Cybersecurity: White Raven Security, LLC

Specification: Darden J. Eure, III, MBF Architects

Date: 06 June 2026

SPECIFICATION APPROVED BY:

For Commander, NAVFAC MID-ATLANTIC:

Date:

Volume 1 of 2 Division 00 - 13

06 June 2026

This page is intentionally left blank.

MCAS Cherry Point, NC 06 June 2026

VOLUME 1 - PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 02/24 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 02/24, CHG 1: 05/25 SUMMARY OF WORK

01 14 00 11/22, CHG 5: 05/25 WORK RESTRICTIONS

01 20 00 11/20, CHG 5: 02/25 PRICE AND PAYMENT PROCEDURES

01 30 00 11/20, CHG 5: 02/25 ADMINISTRATIVE REQUIREMENTS

01 30 02.00 22 05/23 DESIGN, PROCUREMENT, AND INSTALLATION

OF AUDIOVISUAL EQUIPMENT

01 31 23.13 20 08/23, CHG 1: 02/24 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

(eCMS)

01 32 17.00 20 05/25 COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

SUBMITTAL REGISTER

01 33 29 02/21, CHG 1: 08/25 SUSTAINABILITY REQUIREMENTS AND

REPORTING

HPSB CHECKLIST

01 35 26 05/24, CHG 1: 05/25 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 08/23 QUALITY CONTROL

SCHEDULE OF FIRE PROTECTION SYSTEM

INSPECTIONS BY FPQC SPECIALIST

01 45 35 11/20 SPECIAL INSPECTIONS

STATEMENT OF SPECIAL INSPECTIONS

SCHEDULE OF SPECIAL INSPECTIONS

01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

PROJECT SIGN DETAILS

01 59 00 04/94 TEMPORARY TRAILERS FOR DISPLACED

TENANTS

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 76 10 06/23 FOREIGN OBJECT PROTECTION REQUIREMENTS

01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS

01 78 23 05/23, CHG 1: 05/25 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 05/23, CHG 1: 11/23 FACILITY DATA WORKBOOK (FDW)

01 78 30.00 22 02/16 GIS DATA DELIVERABLES

01 91 00.15 05/23, CHG 3: 08/24 BUILDING COMMISSIONING

01 91 19 05/2023 BUILDING ENCLOSURE COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DEMOLITION

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE

03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE

VOLUME 1 - TABLE OF CONTENTS Page 1

DIVISION 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

06 82 14 DECORATIVE FIBERGLASS REINFORCED

PLASTIC (FRP)

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION

07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM

07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS

07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 05/17, CHG 3: 02/23 SPRAY FOAM AIR BARRIERS

07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS

07 45 00 07/24 ALUMINUM COMPOSITE PANELS

07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 61 14.00 20 08/16, CHG 1: 08/18 CP STEEL STANDING SEAM ROOFING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES

08 14 00 08/16, CHG 1: 08/18 WOOD DOORS

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 33 23 08/20, CHG 1: 02/22 STEEL OVERHEAD COILING DOORS

08 34 59 08/08, CHG 1: 11/12 VAULT DOORS AND DAY GATES

08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS

08 41 60 12/22 TRANSLUCENT FIBERGLASS WALLS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 ALUMINUM LOUVERS

DIVISION 09 - FINISHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

VOLUME 1 - TABLE OF CONTENTS Page 2

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 65 00 08/10, CHG 3: 08/18, RESILIENT FLOORING

09 66 23 08/16, CHG 1: 08/18 RESINOUS MATRIX TERRAZZO FLOORING

09 67 23.13 27SEP2018 STANDARD RESINOUS FLOORING

09 68 00 11/17, CHG 2: 08/20 CARPET TILE

09 90 00 02/21 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 08/20 VISUAL DISPLAY UNITS

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

10 51 13 08/24 LOCKERS

DIVISION 12 - FURNISHINGS

12 00 01.00 20 02/23 FURNITURE, FIXTURES AND EQUIPMENT

(FF&E) PACKAGE

12 24 13 08/20 ROLLER WINDOW SHADES

DIVISION 13 - SPECIAL CONSTRUCTION

13 31 33 02/23 FRAME SUPPORTED MEMBRANE STRUCTURES

-- End of Volume 1 Table of Contents --

VOLUME 1 - TABLE OF CONTENTS Page 3

VOLUME 1 - TABLE OF CONTENTS Page 4

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/24

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

NAVFAC PLATE SHEET

NO NO TITLE

G GENERAL

12933929 G-001 COVER SHEET

12933930 G-002 LOCATION MAPS AND INDEX OF DRAWINGS

12933931 G-003 INDEX OF DRAWINGS

GI LIFE SAFETY

12933932 GI001 LIFE SAFETY GENERAL NOTES AND LEGEND

12933933 GI002 SITE PLAN

12933934 GI101 LIFE SAFETY FIRST FLOOR PLAN

B GEOTECHNICAL

12933935 B-101 SYMBOL LEGEND, ABBREVIATIONS, AND NOTES &

SOIL BORING LOCATION PLANS

12933936 B-601 GEOTECHNICAL BORING LOGS

12933937 B-602 GEOTECHNICAL BORING LOGS

12933938 B-603 GEOTECHNICAL BORING LOGS

12933939 B-604 GEOTECHNICAL BORING LOGS

12933940 B-605 GEOTECHNICAL BORING LOGS

12933941 B-606 GEOTECHNICAL BORING LOGS

12933942 B-607 GEOTECHNICAL BORING LOGS

12933943 B-608 GEOTECHNICAL BORING LOGS

12933944 B-609 GEOTECHNICAL BORING LOGS

12933945 B-610 GEOTECHNICAL BORING LOGS

12933946 B-611 GEOTECHNICAL BORING LOGS

12933947 B-612 GEOTECHNICAL BORING LOGS

12933948 B-701 GEOTECHNICAL OBSERVATION AND LABORATORY TESTING DATA

V SURVEY

12933949 VF001 SURVEY CONTROL POINTS AND NOTES

12933950 VF100 OVERALL EXISTING CONDITIONS

12933951 VF101 EXISTING CONDITIONS - AREA 1

12933952 VF102 EXISTING CONDITIONS - AREA 2

C CIVIL

12933953 C-001 CIVIL ABBREVIATIONS AND LEGENDS

12933954 HS101 ENVIRONMENTAL SITE CONSTRAINTS - CNATT

12933955 HS102 ENVIRONMENTAL SITE CONSTRAINTS - CNATT

12933956 CD100 OVERALL SITE DEMOLITION PLAN

12933957 CD101 PARTIAL DEMOLITION PLAN - AREA 1

DOCUMENT 00 01 15 Page 1

NAVFAC PLATE SHEET

NO NO TITLE

12933958 CD102 PARTIAL DEMOLITION PLAN - AREA 2

12933959 CS100 OVERALL SITE PLAN

12933960 CS101 PARTIAL SITE PLAN - AREA 1

12933961 CS102 PARTIAL SITE PLAN - AREA 2 PHASE 1

12933962 CS103 POST CONSTRUCTION SITE PLAN - AREA 2 PHASE 2

12933963 CG100 OVERALL GRADING AND DRAINAGE PLAN

12933964 CG101 PARTIAL GRADING PLAN - AREA 1

12933965 CG102 PARTIAL DRAINAGE PLAN - AREA 1

12933966 CG103 PARTIAL GRADING AND DRAINAGE PLAN - AREA 2

12933967 CG121 PARTIAL EROSION CONTROL PLAN - AREA 1 PHASE 1

12933968 CG122 PARTIAL EROSION CONTROL PLAN - AREA 2 PHASE 1

12933969 CG131 PARTIAL EROSION CONTROL PLAN - AREA 1 PHASE 2

12933970 CG132 PARTIAL EROSION CONTROL PLAN - AREA 2 PHASE 2

12933971 CU100 OVERALL UTILITY PLAN

12933972 CU101 PARTIAL UTILITY PLAN - AREA 1

12933973 CU102 PARTIAL UTILITY PLAN - AREA 2

12933974 CU200 OVERALL UTILITY ALIGNMENT PLAN

12933975 CU201 WATER AND SEWER PROFILES

12933976 CU202 STORM DRAIN PROFILES

12933977 C-501 EROSION AND SEDIMENT CONTROL DETAILS

12933978 C-502 EROSION AND SEDIMENT CONTROL DETAILS

12933979 C-503 SITE DETAILS

12933980 C-504 SITE DETAILS

12933981 C-505 SITE DETAILS

12933982 C-506 SITE DETAILS

12933983 C-507 SITE DETAILS

12933984 C-508 SITE DETAILS

12933985 C-509 SITE DETAILS

12933986 C-510 SITE UTILITY DETAILS

12933987 C-511 SITE UTILITY DETAILS

12933988 C-512 SITE UTILITY DETAILS

12933989 C-513 SITE UTILITY DETAILS

12933990 C-514 SITE UTILITY DETAILS

12933991 C-515 SITE UTILITY DETAILS

12933992 C-516 SITE UTILITY DETAILS

12933993 C-517 SITE UTILITY DETAILS

12933994 C-518 EROSION AND SEDIMENT CONTROL DETAILS

12933995 C-519 SITE DETAILS

12933996 C-520 NCG01

12933997 C-521 NCG01

S STRUCTURAL

12933998 S-001 COVER SHEET

12933999 S-002 STRUCTURAL NOTES

12934000 S-003 STRUCTURAL NOTES

12934001 S-101 FOUNDATION PLAN

12934002 S-102 ROOF FRAMING PLAN

12934003 S-201 STRUCTURAL SECTIONS

12934004 S-202 STRUCTURAL SECTIONS

12934005 S-501 GENERAL CONSTRUCTION DETAILS

12934006 S-502 GENERAL CONSTRUCTION DETAILS

12934007 S-503 GENERAL CONSTRUCTION DETAILS

12934008 SS101 TEMPORARY TRAILER FOUNDATION

A ARCHITECTURAL

12934009 A-001 SYMBOL LEGEND AND ABBREVIATIONS

12934010 AS101 TEMPORARY FACILITY FLOOR PLANS

DOCUMENT 00 01 15 Page 2

NAVFAC PLATE SHEET

NO NO TITLE

12934011 A-101 FLOOR PLAN

12934012 A-102 REFLECTED CEILING PLAN

12934013 A-103 ROOF PLAN

12934014 A-104 AIR AND MOISTURE BARRIER PLANS

12934015 A-201 ELEVATIONS

12934016 A-202 ELEVATIONS

12934017 A-301 BUILDING SECTIONS

12934018 A-302 WALL SECTIONS

12934019 A-401 TYPICAL TOILET DETAILS AND ACCESSORIES LEGEND

12934020 A-402 ENLARGED PLANS

12934021 A-403 INTERIOR ELEVATIONS

12934022 A-501 WALL TYPE DETAILS

12934023 A-502 MASONRY DETAILS

12934024 A-503 ROOFING DETAILS

12934025 A-504 ROOFING DETAILS

12934026 A-505 MISCELLANEOUS DETAILS

12934027 A-506 MISCELLANEOUS DETAILS

12934028 A-507 MISCELLANEOUS DETAILS

12934029 A-508 SIGNAGE DETAILS

12934030 A-509 ALUMINUM COMPOSITE PANEL DETAILS

12934031 A-601 DOOR AND FRAME SCHEDULE

12934032 A-602 DOOR AND FRAME DETAILS

12934033 A-603 DOOR DETAILS

12934034 A-604 DOOR DETAILS

12934035 A-605 WINDOW SCHEDULE AND DETAILS

12934036 A-606 EXTERIOR MATERIALS FINISH COLOR SCHEDULE

I INTERIOR DESIGN

12934037 I-101 FURNITURE PLAN

12934038 I-102 FINISH PLAN

12934039 I-103 SIGNAGE PLAN

12934040 I-201 INTERIOR ELEVATIONS

12934041 I-301 CASEWORK SECTIONS

12934042 I-501 SIGNAGE DETAILS

12934043 I-502 INTERIOR DETAILS

12934044 I-601 SCHEDULES & LEGENDS

FA FIRE ALARM

12934045 FA001 FIRE ALARM GENERAL NOTES AND LEGEND

12934046 FA101 FIRE ALARM FLOOR PLAN

12934047 FA501 FIRE ALARM DETAILS

12934048 FA502 FIRE ALARM DETAILS CONTINUED

FX FIRE SUPPRESSION

12934049 FX001 FIRE SUPPRESSION GENERAL NOTES AND LEGEND

12934050 FX101 FIRE SUPPRESSION FLOOR PLAN

12934051 FX501 FIRE SPRINKLER DETAILS

P PLUMBING

12934052 P-001 PLUMBING COVER SHEET

12934053 P-101 FIRST FLOOR PLAN - WASTE AND VENT

12934054 P-102 FIRST FLOOR PLAN - WATER

12934055 P-401 ENLARGED PLANS - PLUMBING

12934056 P-501 PLUMBING DETAILS

12934057 P-601 PLUMBING SCHEDULES

12934058 P-701 RISER DIAGRAM - WASTE AND VENT

12934059 P-702 RISER DIAGRAM - WATER

DOCUMENT 00 01 15 Page 3

NAVFAC PLATE SHEET

NO NO TITLE

M MECHANICAL

12934060 M-001 MECHANICAL NOTES, LEGEND AND ABBREVIATIONS

12934061 MH101 FIRST FLOOR PLAN - MECHANICAL HVAC - OVERALL

12934062 M-301 MECHANICAL SECTIONS VIEWS

12934063 MH401 ENLARGED FLOOR PLAN - MECHANICAL HVAC - 117 MECH

12934064 MP401 ENLARGED FLOOR PLAN - MECHANICAL PIPING - 117 MECH

12934065 M-501 MECHANICAL DETAILS

12934066 M-502 MECHANICAL DETAILS

12934067 M-503 MECHANICAL DETAILS

12934068 M-504 MECHANICAL DETAILS

12934069 M-505 MECHANICAL DETAILS

12934070 M-506 MECHANICAL DETAILS

12934071 M-601 MECHANICAL SCHEDULES

12934072 M-602 MECHANICAL SCHEDULES

12934073 M-701 MECHANICAL CONTROLS

12934074 M-702 MECHANICAL CONTROLS

12934075 M-703 MECHANICAL CONTROLS

12934076 M-704 MECHANICAL CONTROLS

12934077 M-705 MECHANICAL CONTROLS

ES ELECTRICAL SITE

12934078 ES001 SITE ELECTRICAL LEGEND

12934079 ES101 SITE PLAN - ELECTRICAL

12934080 ES102 SITE PLAN - ELECTRICAL

12934081 ES501 SITE ELECTRICAL DETAILS

12934082 ES502 SITE ELECTRICAL DETAILS

12934083 ES601 SITE ELECTRICAL SCHEDULES

12934084 ES602 SITE ELECTRICAL SCHEDULES

12934085 ES603 SITE ELECTRICAL SCHEDULES

E ELECTRICAL

12934086 E-001 ELECTRICAL NOTES AND LEGEND

12934087 EG101 ROOF PLAN - LIGHTNING PROTECTION

12934088 EL101 FLOOR PLAN - LIGHTING

12934089 EP101 FLOOR PLAN - POWER

12934090 EP102 FLOOR PLAN - EQUIPMENT CONNECTIONS

12934091 EP401 ENLARGED PLAN - ELECTRICAL

12934092 EG501 ELECTRICAL GROUNDING DETAILS

12934093 E-501 ELECTRICAL DETAILS

12934094 E-502 ELECTRICAL DETAILS

12934095 E-503 ELECTRICAL DETAILS

12934096 E-601 ELECTRICAL SCHEDULES

12934097 E-602 ELECTRICAL SCHEDULES

12934098 E-603 ELECTRICAL SCHEDULES

12934099 E-604 ELECTRICAL SCHEDULES

12934100 E-701 ELECTRICAL RISER DIAGRAM

T TELECOMMUNICATIONS

12934101 T-001 TELECOMMUNICATIONS NOTES AND LEGENDS

12934102 T-101 FLOOR PLAN - TELECOMMUNICATIONS

12934103 T-102 FLOOR PLAN - A/V INFRASTRUCTURE

12934104 T-401 ENLARGED PLAN - TELECOMMUNICATIONS

12934105 T-501 TELECOMMUNICATIONS DETAILS

12934106 T-502 TELECOMMUNICATIONS DETAILS

12934107 T-503 TELECOMMUNICATIONS DETAILS

12934108 T-504 TELECOMMUNICATIONS DETAILS

DOCUMENT 00 01 15 Page 4

NAVFAC PLATE SHEET

NO NO TITLE

12934109 TY101 FLOOR PLAN - SECURITY INFRASTRUCTURE

12934110 TY501 SECURITY INFRASTRUCTURE DETAILS

TA AUDIO VISUAL

12934111 TA001 SHEET INDEX AND NOTES

12934112 TA002 ABBREVIATIONS AND SYMBOLS

12934113 TA101 AV FLOOR PLAN

12934114 TA201 AV REFLECTED CEILING PLAN

12934115 TA401 TYPICAL CLASSROOM ENLARGED AV PLAN

12934116 TA402 TYPICAL OFFICE ENLARGED AV PLAN

12934117 TA600 FUNCTIONAL LEGEND AND CABLING DETAILS

12934118 TA601 SCHEDULES

12934119 TA602 AV FUNCTIONALS

12934120 TA701 COORDINATION DETAILS

12934121 TA702 COORDINATION DETAILS

-- End of Document --

DOCUMENT 00 01 15 Page 5

DOCUMENT 00 01 15 Page 6

SECTION 01 11 00

SUMMARY OF WORK

02/24, CHG 1: 05/25

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Salvage Plan ; G

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes the construction of the CNATT permanent facility, temporary CNATT compound and incidental related work.

1.2.2 Location

The work is located at the MCAS Cherry Point , approximately as indicated.

The exact location will be shown by the Contracting Officer.

1.3 EXISTING WORK

Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.4 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on Contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with dual frequency Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be

SECTION 01 11 00 Page 1 conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.4.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 days prior to starting excavation work.

1.5 NAVY AND MARINE CORPS INTRANET (NMCI) COORDINATION REQUIREMENTS

1.5.1 NMCI Contractor Access

Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections.

Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NMCI Contractor into the construction schedule to demonstrate a plan for maintaining the Contract duration.

1.6 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within 5 miles of the construction site.

All scrap metal shall remain the Government's property, and will be recycled by the Environmental Affairs Department's Qualified Recycling Program (QRP). Upon contract award, notify the Contracting Officer and QRP personnel of the planned mobilization date and the estimated amount of scrap metal. Metal will be separated as ferrous and non-ferrous in containers provided by QRP personnel. Coordinate with QRP personnel at

(252) 466-5376/5798/4421.

Provide a salvage plan , listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Provide a system for property control in the salvage plan. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 2

SECTION 01 14 00

WORK RESTRICTIONS

11/22, CHG 5: 05/25

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel

SD-07 Certificates

1.3 SPECIAL SCHEDULING REQUIREMENTS

a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work. Specific items of work to which this requirement applies include:

b. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

1.4 CONTRACTOR ACCESS AND USE OF PREMISES

1.4.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, including delivery vehicles, are clearly identified with their company name.

1.4.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors

SECTION 01 14 00 Page 1 including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.4.1.2 Installation Access

Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.

1.4.1.2.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

Procedure includes:

a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.4.1.2.2 DBIDS Eligibility Requirements

Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.

The Government is the final authority.

SECTION 01 14 00 Page 2

1.4.1.2.3 DBIDS Notification Requirements

a. Immediately report instances of lost or stolen badges to the Contracting Officer.

b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

1.4.1.2.4 One-Day Passes

Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.4.1.3 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.4.2 Working Hours

Regular working hours will consist of an 8 1/2 hour period , between 7 a.m. and 3:30 p.m., Monday through Friday , , excluding Government holidays.

1.4.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in accordance with requirements of EM 385-1-1 . Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.4.4 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

SECTION 01 14 00 Page 3

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and fire suppression are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.

d. Operation of Station Utilities: Do not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. Notify the Contracting Officer giving reasonable advance notice when such operation is required.

e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain. Obtain Installation's Sanitary Sewer Connection Permit 2 weeks prior to connection and in accordance with Section 33 30 00 SANITARY SEWERAGE.

1.5 SECURITY REQUIREMENTS

Contract Clause FAR 52.204-2 Security Requirements and Alternate II and the following apply:

1.5.1 MCAS Cherry Point Regulations

No employee or representative of the contractor will be admitted to the work site without an Identification Badge or is specifically authorized admittance to the work site by the FEAD, Facilities Engineering & Acquisition Division.

IMPORTANT NOTE: FEAD personnel (Construction Managers, Engineers/Architects, Engineering Technicians, Contract Specialists, or Contract Surveillance Representatives) will not receive, process, re-transmit, or otherwise handle IN ANY WAY Personally Identifiable Information (PII) related to the badging process. Do NOT forward any of this information to the FEAD.

1.5.2 Contractor Access to MCAS Cherry Point and Outlying Areas

1. Documentation requirements for granting access to MCAS Cherry Point for commercial and contract employers and employees. This document is an aid in meeting ASO 5560.6C requirements and is not a substitute for the order.

2. The Pass & Identification Office at Building 251 will issue credentials to authorized contractors. Sub-Contractors and suppliers must coordinate through the Prime-Contractor.

3. Criminal Activity. In accordance with ASO 5560.6C, the below list of criminal activities within an applicant's record are considered not in the best interest of the Marine Corps and will be grounds for automatic denial of access aboard the Installation:

a. Conviction for espionage, sabotage, sedition, treason, terrorism, armed robbery, or murder.

b. Felony conviction for a firearms or explosives violation, SECTION 01 14 00 Page 4 regardless of the date of conviction.

c. Conviction of crimes encompassing sexual assault or rape.

d. Conviction of crimes encompassing child molestation, or the possession or production of child pornography.

e. Conviction of trafficking in persons.

f. Conviction of drug possession with intent to sell or distribute.

g. Convicted of three or more misdemeanor violations, or attempted violations, within the previous 10 years of the following offenses:

(1) Sex crime

(2) Assault

(3) Larceny

(4) Drugs

(5) Weapons

4. Persons requesting access to MCAS Cherry Point will be denied access based on the following:

a. The individual is a registered sex offender.

b. The individual has an active arrest warrant from Federal, State, local, or other civil law enforecement authorities, regardless of offense or violation.

c. The individual has a felony conviction within the last 10 years, regardless of the offense or violation.

d. The individual's name appears on any Federal or State agency watch list for criminal behavior or terrorist activity.

e. The individual is debarred entry or access to a Marine Corps site, other DoD installations or facilities, or other Federal site or facility.

f. The individual engaged in acts or activities designed to overthrow the U.S. Government by force.

g. The individual is known to be or reasonably suspected of being a terrorist or belongs to an organization with known terrorism links/support.

h. The individual is identified in the National Crime Information Center (NCIC) known suspected terrorist (KST) file, or the Terrorist Screening Database (TSDB) report as known to be, or suspected of being, a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity. If an individual is identified on the NCIC KST files or TSDB, the Provost Marshal's Office (PMO) will immediately call the NCIS Multiple Threat Alert Center (MTAC) for further coordination. The MTAC will coordinate with the Department of Justice (DOJ) or Federal Bureau of Investigation (FBI) and provide handling instructions to MCAS Cherry Point Police, Criminal Investigations Division (CID), or NCIS.

i. The individual is illegally present in the U.S.

SECTION 01 14 00 Page 5

j. The individual has knowingly submitted an employment questionnaire with false or fraudulent information.

k. The individual is a prisoner on a work-release program or currently on felony probation or parole.

l. The individual is pending any felony charge.

m. The individual has criminal arrest information that the site commander determines the person presents a threat to good order, discipline, or health and safety on the Marine Corps site.

n. Any reason the Installation Commander deems reasonable for good order and discipline.

1.5.3 Staging Area

As indicated on the plans, the Contractor staging area will be (Construction Manager to coordinate). Amount of material on site shall be kept to a minimum and shall only be material that is pertinent to the work currently being performed. All stockpiling of equipment and materials shall be closely coordinated with the Government and shall not disrupt activities at the site.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

SECTION 01 14 00 Page 6

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

11/20, CHG 5: 02/25

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP 1110-1-8 (2021) Engineering and Design -- Construction Equipment Ownership and Operating Expense Schedule

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Earned Value Report ; G

1.3 EARNED VALUE REPORT

1.3.1 Data Required

This Contract requires the use of a cost-loaded Network Analysis Schedule (NAS). Schedule of Prices must not be used with cost-loaded Network Analysis Schedule (NAS). Use Earned Value Report derived from cost-loaded NAS. Within 15 calendar days of Contract Award, prepare and deliver to the Contracting Officer a Earned Value Report (construction Contract) as directed by the Contracting Officer. Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices. Indirect activities (e.g., meetings, presentations, submittals, surveys, haul road or storage yard maintenance, dust control, security) will not be cost loaded. Evenly distribute the costs across the associated construction activities. Contractor overhead and profit including salaries for field office personnel, if applicable, must be proportionately spread over all pay items and not included as individual pay items.

1.3.2 Payment Schedule Instructions

Payments will not be made until the Earned Value Report from the cost-loaded NAS has been submitted to and accepted by the Contracting Officer.

Additionally, the Earned Value Report must be separated as follows:

a. Primary Facilities Cost Breakdown:

SECTION 01 20 00 Page 1

Defined as work on the primary facilities out to the 5 foot line.

Work out to the 5 foot line includes construction encompassed within a theoretical line 5 foot from the face of exterior walls and includes attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 foot line.

b. Supporting Facilities Cost Breakdown:

Defined as site work, including incidental work, outside the 5 foot line.

1.3.3 Schedule Requirements for HVAC TAB

The field work requirements in Section 23 05 93.00 22 TESTING, ADJUSTING, AND BALANCING FOR MECHANICAL SYSTEMS must be broken down in the Earned Value Report from the cost-loaded NAS by separate line items which reflect measurable deliverables. The value for each pay item listed below will be established on a case by case basis for each Contract. The line items are as follows:

a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. Submit the resulting findings to the Government to allow correction of the design. The progress payment will not be issued until the report is reviewed and approved.

b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report must contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results and a quality control checklist of work items that must be completed before TABS field work commences.

c. Season I field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational data must be collected for one seasonal condition (either summer or winter depending on project timing).

d. Approval of Season I report: On completion of the Season I field work, the data is compiled into a report and submitted to the Government. The report is reviewed, and approved, after ensuring compliance with the pre-field engineering report scope of work.

e. Completion of Season I field QA check: Contract QC and Government representatives meet the TABS Agency at the jobsite to retest portions of the systems reported in the Season I report. The purpose of these tests are to validate the accuracy and completeness of the previously submitted Season I report.

f. Approval of Season II report: The TABS Agency completes all Season II field work, which is normally comprised mainly of taking heat transfer temperature readings, in the season opposite of that under which Season I performance data was compiled. Compile this data into a report and submit to the Government. On completion of submittal

SECTION 01 20 00 Page 2 review to ensure compliance with the pre-field engineering report scope, progress payment is issued. Progress payment is less than that issued for the Season I report since most of the water and air balancing work effort is completed under Season I.

1.4 CONTRACT MODIFICATIONS

In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, base equipment use rates upon the applicable provisions of the

EP 1110-1-8 .

1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT

1.5.1 Content of Invoice

Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies. Include the documents listed below in the requests for payment.

a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 must include certification by Quality Control (QC) Manager as required by the Contract.

b. The Earned Value Report from the cost-loaded NAS.

c. Contractor's Monthly Estimate for Voucher and Contractors Certification (NAVFAC Form 4330) with Subcontractor and supplier payment certification. Other documents, including but not limited to, that need to be received prior to processing payment include the following submittals as required. These items are still required monthly even when a pay voucher is not submitted.

d. Monthly Work-hour report.

e. Updated Construction Progress Schedule and tabular reports required by the contract.

f. Contractor Safety Self Evaluation Checklist.

g. Updated submittal register.

h. Solid Waste Disposal Report.

i. Certified payrolls.

j. Updated testing logs.

k. Other supporting documents as requested.

1.5.2 Submission of Invoices

If DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions is included in the Contract, provide the documents listed in above paragraph

SECTION 01 20 00 Page 3

CONTENT OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.

Monthly invoices and supporting forms for work performed through the anniversary award date of the Contract must be submitted to the Contracting Officer within 5 calendar days of the date of invoice. For example, if Contract award date is the 7th of the month, the date of each monthly invoice must be the 7th and the invoice must be submitted by the 12th of the month.

1.5.3 Final Invoice

a. A final invoice must be accompanied by the certification required by DFARS 252.247.7023 Transportation of Supplies by Sea, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release must contain the corporate seal. An officer of the corporation must sign and the corporate secretary must certify the Final Release.

b. For final invoices being submitted via WAWF, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor must then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.

c. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.

1.6 PAYMENTS TO THE CONTRACTOR

Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.

1.6.1 Obligation of Government Payments

The obligation of the Government to make payments required under the provisions of this Contract will, at the discretion of the Contracting Officer, be subject to reductions and suspensions permitted under the FAR and agency regulations including the following in accordance with FAR

32.103 Progress Payments Under Construction Contracts:

a. Reasonable deductions due to defects in material or workmanship;

b. Claims which the Government may have against the Contractor under or in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .