This document appears to be a set of final drawings related to a federal contract opportunity solicitation issued by the Department of the Navy Naval Facilities Engineering Command.

The solicitation is for a project to replace Circuit E between MW switches 2 and 3, provide a new MW switch to feed the Tacan and Par, and provide a diesel backup generator to the Par, a diesel generator replacement to the Tacan, and a pad mount distribution transformer replacement at the Tacan. The work is to be performed at the NASO facility in Virginia Beach, VA. The solicitation is limited to contractors on the associated MACC contract. The document does not provide details on response deadlines, award dates, pricing terms, or other key information typically found in a full solicitation package.

View the file

Other files

File Type Posted
PROVISION 52.204-24.pdf PDF
Attachment F PPI Spreasheet.xlsx XLSX spreadsheet
1780600_FINAL SPECIFICATIONS.pdf PDF
N4008524F2775 GENERAL REQUIREMENTS.pdf PDF
BASE ACCESS INSTRUCTION.pdf PDF
Oceana IDIQ Front End SPECS - 20220602.pdf PDF
BLANK SPONSOR VERIFICATION SPREADSHEET.xls XLS spreadsheet
SECNAV 5512.pdf PDF
va167 (1).txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

C O

V E

R S

H E

E T

AS NOTED

12910809

G-001

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

VICINITY MAP SYMBOLS LEGEND GENERAL NOTES

NAVAL AIR STATION OCEANA ° VIRGINIA BEACH, VA

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND ~ MIDLANT

PUBLIC WORKS DEPARTMENT NAS OCEANA

FACILITIES ENGINEERING AND ACQUISITION DIVISION

DETAIL, SECTION, OR ELEVATION NUMBER.

NUMBER REFERENCES GRID PLACEMENT ON

SHEET WHICH DETAIL IS DRAWN.

SHEET ON WHICH DETAIL, SECTION, OR

ELEVATION IS CUT

CARET SYMBOLIZES A PHOTOGRAPH OR

INTERIOR ELEVATION.

SHADED ARROW SIGNIFIES A SECTION CUT OR

EXTERIOR ELEVATION.

LOCATION MAP

SHEET(S) ON WHICH DETAIL, SECTION, ELEVATION,

OR PHOTOGRAPH IS CALLED OUT

DETAIL OR SECTION TITLE

SCALE: X/X" = 1'-0" B2G-001, A-00#

LIST OF SHEETS

SHEET NO. DISCIPLINE

SHEET NO.

NAVFAC

DWG.

NO.

SHEET TITLE

GENERAL

1 G-001 12910809 COVER SHEET

CIVIL

2 CU001 12910810 OVERALL SITE AND KEY PLAN

3 CU201 12910811 SITE PLAN & PROFILE, STA. 0+00 (SWITCH 3 MH) TO 11+50

4 CU202 12910812 SITE PLAN & PROFILE, STA. 11+50 TO 23+00

5 CU203 12910813 SITE PLAN & PROFILE, STA. 23+00 TO 34+00

6 CU204 12910814 SITE PLAN & PROFILE, STA. 34+00 TO 39+37.61 (SWITCH 2)

7 CU205 12910815 SITE PLAN & PROFILE, STA. 0+00 (TACAN MH) TO 11+49.61 (NEW MH-10) 8 CU206 12910816 SITE PLAN & PROFILE, STA. 0+00 (NEW MH-07) TO 5+39.25 (EXIST. P.A.R. TRANSFORMER)

9 C-501 12910817 DE-WATERING TREATMENT CONCEPT DIAGRAM

STRUCTURAL

10 S-001 12910818 STRUCTURAL NOTES

11 S-101 12910819 STRUCTURAL SITE PLAN - PAR

12 S-301 12910820 SWITCHGEAR FOUNDATION SECTIONS

ELECTRICAL

13 E-001 12910821 ELECTRICAL LEGEND, NOTES AND ABBREVIATIONS

14 ES100 12910822 OVERALL ELECTRICAL SITE PLAN

15 ES101 12910823 PARTIAL ELECTRICAL SITE PLAN

16 ES102 12910824 PARTIAL ELECTRICAL SITE PLAN

17 ES103 12910825 PARTIAL ELECTRICAL SITE PLAN

18 ES104 12910826 PARTIAL ELECTRICAL SITE PLAN

19 ES105 12910827 PARTIAL ELECTRICAL SITE PLAN

20 ES106 12910828 PARTIAL ELECTRICAL SITE PLAN

21 ES107 12910829 PARTIAL ELECTRICAL SITE PLAN

22 ES201 12910830 ENLARGED ELECTRICAL SITE PLAN - NEW SWITCH-27

23 ES202 12910831 ENLARGED ELECTRICAL SITE PLAN - PAR

24 ES203 12910832 ENLARGED ELECTRICAL SITE PLAN - TACAN

25 E-501 12910833 ELECTRICAL DETAILS - UNDERGROUND DISTRIBUTION

26 E-502 12910834 ELECTRICAL DETAILS - SWITCH FOUNDATION & INSTALLATION

27 E-503 12910835 ELECTRICAL DETAILS - GENERATOR FOUNDATIONS

28 E-504 12910836 ELECTRICAL DETAILS - TRANSFORMER & VARIOUS EQUIPMENT

29 E-505 12910837 ELECTRICAL DETAILS - MISCELLANEOUS

30 E-506 12910838 ELECTRICAL DETAILS - GENERATOR GROUNDING RISER DIAGRAMS

31 E-507 12910839 ELECTRICAL DETAILS - MANHOLE LAYOUT DIAGRAMS

32 E-508 12910840 ELECTRICAL DETAILS - MANHOLE LAYOUT DIAGRAMS

33 E-509 12910841 ELECTRICAL DETAILS - MANHOLE LAYOUT DIAGRAMS

34 E-601 12910842 NAS OCEANA CIRCUIT E PARTIAL ONE-LINE POWER DIAGRAM - EXISTING CONDITIONS

35 E-602 12910843 NAS OCEANA CIRCUIT E PARTIAL ONE-LINE POWER DIAGRAM - NEW WORK

36 E-603 12910844 PAR ONE-LINE POWER DIAGRAM - DEMOLITION & NEW WORK

37 E-604 12910845 TACAN ONE-LINE POWER DIAGRAM - DEMOLITION & NEW WORK

38 E-605 12910846 PANELBOARD SCHEDULES

39 E-901 12910847 PHOTOGRAPHS - EXISTING CONDITIONS

40 E-902 12910848 PHOTOGRAPHS - EXISTING CONDITIONS

BRANCH

SOUTHERN

SHIPYARD

U.S. NAVAL

PORTSMOUTH

NAVY DEPOT

CRANEY ISLAND

ELIZABETH RIVER

SEWELLS POINT

WESTERN

BRANCH

BRANCH

NORFOLK

EASTERN

CHESAPEAKE BAY

CHESAPEAKE

BAY

WILLOUGHBY

U.S. NAVAL

AIR STATION

ST. JULIEN'S CREEK

U.S. NAVAL ANNEX

NANSEMOND RIVER

DISPOSAL AREA

U.S. ARMY CRANEY ISLAND 564

58 460

U.S. NAVAL STATION

VA BEACH

LITTLE CREEK

U.S. NAVAL

AMPHIBIOUS BASE

PROJECT SITE

OCEANA

NAVAL AIR

STATION

ACTIVITY

NAVAL SUPPORT

DAM NECK

ANNEX

REPLACE CIRCUIT E BETWEEN SWITCH 2 & 3

OWL'S CREEK

AND INSTALL FOUR-WAY SWITCH

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

1000'500'0' 1"=500'

GRAPHIC SCALE

FI

LE

N

AM

E:

K:

\V A\

Oc ea na

NA

S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20

_1

_R

EP

LA

CE

C

IR

CU

IT

E

B

TW

S W

2 A

ND

S W

3\B _D es ign

\D W

GS

\S he et\

_C

IV

\20

_1

_C

U0

.dw g

P

LO

TT

ED

: Th ur sd ay

, J un e 1 3, 3:

:42 P

M U

SE

R:

ca rl.s ter zin g

RUNW

AY

5R /2

3L

RUNW

AY

5L /2

3R

TA

XI

W

AY

ALP

HA

RUNW

AY 14R/32L

RUNW

AY 14L/32R

TAXIW

AY BRAVO

CU202

CU201

CU205

CU206

C U

CU204

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

LA

NT

PW

D

O C

EA

N

A

FE

AD

VI

R G

IN

IA

B

EA

C H

, V

IR

G

IN

IA

N

AV

AL

A

IR

S

TA

TI

O N

O C

EA

N

A

VI

R G

IN

IA

B

EA

C H

, V

IR

G

IN

IA

RE

PL

AC

E

C

IR

C U

IT

E

B

ET

W

EE

N S

W

IT

C H

AN

D

IN

ST

AL

L

FO

U R-

W

AY

S W

IT

C

H

CBM/CBS

KPS

1780600

O V

E R

A

LL

S

IT

E A

N D

K E

Y P

LA

N

HRB HRB CBM

AS NOTED

12910810

CU001

CBM

N

FELIX A. PESSIG

10JUN2024

SW

IT

CH

-3

M H

ST

A:

0+

O

FF

:0.

RI

M:

.0

NE

W

M H-

ST

A:

4+

O

FF

:0.

RI

M:

.9

NE

W

M H-

ST

A:

9+

O

FF

:0.

RI

M:

.6

0+00

.0

.95

.2

.24

0+50 1+00

.7

.67

.4

.44

1+50 2+00

.2

.19

.1

.06

2+50 3+00

.1

.12

.4

.43

3+50 4+00

.0

.96

.6

.63

4+50 5+00

.6

.56

.1

.14

5+50 6+00

.9

.87

.6

.62

6+50 7+00

.7

.72

.3

.27

7+50 8+00

.7

.66

.9

.90

8+50 9+00

.1

.10

.6

.63

9+50 10+00

.6

.62

.5

.45

10+50 11+00

.7

.71

.7

.67

11+50

+5

+0

+5

+0

EP: 11+49.61

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00

10+50 11+00

11+50

BP

: 0

+0 0.0

PI

: 4

+6 7.2

PI

: 9

+3 4.8

E=1

9.1

ELE

V.=1

6.8

NE

W

M H-

ST

A.

9+

.88

N3

.6± E1

5.3

RI

M:

.6±

NEW MH-11

STA. 4+67.29

N3470088.1±

E12204406.8±

RIM:16.9±

SWITCH-3 MH

STA. 0+00.00±

N=3470463.9± E=12204129.1±

ELEV.=16.8±

FI

LE

N

AM

E:

K:

\V A\

Oc ea na

NA

S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20

_1

_R

EP

LA

CE

C

IR

CU

IT

E

B

TW

S W

2 A

ND

S W

3\B _D es ign

\D W

GS

\S he et\

_C

IV

\20

_1

_C

U.

dw g P

LO

TT

ED

: Th ur sd ay , J un e 1

3, 3:

:56

P M

U

SE

R:

ca rl.s ter zin g

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

80'0' 1"=40'

40'

GRAPHIC SCALE

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

LA

NT

PW

D

O C

EA

N

A

FE

AD

VI

R G

IN

IA

B

EA

C H

, V

IR

G

IN

IA

N

AV

AL

A

IR

S

TA

TI

O N

O C

EA

N

A

VI

R G

IN

IA

B

EA

C H

, V

IR

G

IN

IA

RE

PL

AC

E

C

IR

C U

IT

E

B

ET

W

EE

N S

W

IT

C H

AN

D

IN

ST

AL

L

FO

U R-

W

AY

S W

IT

C

H

CBM/CBS

KPS

1780600

S

IT

E P

LA

N

P

R O

FI

LE

, S

TA

. 0

S W

IT

C

H

M H

TO

1+

HRB HRB CBM

AS NOTED

12910811

CU201

CBM

TAXIWAY BRAVO

8'0' 1"=4'

4'

M

AT

CH

L

IN

E

- S

HE

ET

C

U2

N

2' (24") MIN. SEPARATION 2' (24") MIN. SEPARATION

RUNWAY 5L/23R

NE

W

M H-

ST

A:

+2 9 O

FF

:0.

RI

M:

.7

NE

W

M H-

ST

A:

+1 6 O

FF

:0.

RI

M:

.3

NE

W

M H-

ST

A:

+3 4 O

FF

:0.

RI

M:

.5

NE

W

M H-

ST

A:

+0 2 O

FF

:0.

RI

M:

.7

.7

.67

11+50 12+00

.6

.63

.6

.56

12+50 13+00

.1

.14

.1

.13

13+50 14+00

.5

.53

.6

.60

14+50 15+00

.0

.00

.7

.67

15+50 16+00

.8

.83

.4

.44

16+50 17+00

.7

.74

.3

.27

17+50 18+00

.3

.34

.7

.72

18+50 19+00

.2

.20

.5

.51

19+50 20+00

.1

.14

.9

.91

20+50 21+00

.1

.14

.0

.99

21+50 22+00

.7

.70

.6

.63

22+50 23+00

.8

.81

0+

0+

1+

1+

2+

BP: 0+00.00

11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50

23+00

PI

: 1

2+

.05

PI

: 1

5+

.49 PI

: 2

0+

.18

PI

: 2

2+

.95

NEW MH-06

STA. 22+01.95

N3468863.2± E12205623.3±

RIM:16.7±

NE

W

M H-

ST

A.

+3 4.1

N3

.1±

E1

4.7

RI

M:

.5±NEW MH-08

STA. 15+16.49

N3469330.9±

E12205124.2±

RIM:17.3±

NEW MH-09

STA. 12+29.01

N3469519.5±

E12204907.3±

RIM:16.7±

FI

LE

N

AM

E:

K:

\V A\

Oc ea na

NA

S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20

_1

_R

EP

LA

CE

C

IR

CU

IT

E

B

TW

S W

2 A

ND

S W

3\B _D es ign

\D W

GS

\S he et\

_C

IV

\20

_1

_C

U.

dw g P

LO

TT

ED

: Th ur sd ay , J un e 1

3, 3:

:02

P M

U

SE

R:

ca rl.s ter zin g

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

80'0' 1"=40'

40'

GRAPHIC SCALE

8'0' 1"=4'

4'

M

AT

CH

L

IN

E

- S

HE

ET

C

U2

M

AT

CH

L

IN

E

- S

HE

ET

C

U2

RUNWAY 5L/23R

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

LA

NT

PW

D

O C

EA

N

A

FE

AD

VI

R G

IN

IA

B

EA

C H

, V

IR

G

IN

IA

N

AV

AL

A

IR

S

TA

TI

O N

O C

EA

N

A

VI

R G

IN

IA

B

EA

C H

, V

IR

G

IN

IA

RE

PL

AC

E

C

IR

C U

IT

E

B

ET

W

EE

N S

W

IT

C H

AN

D

IN

ST

AL

L

FO

U R-

W

AY

S W

IT

C

H

CBM/CBS

KPS

1780600

S

IT

E P

LA

N

P

R O

FI

LE

, S

TA

. 1 1+

T

O

3+

HRB HRB CBM

AS NOTED

12910812

CU202

CBM

N

12' (144") MINIMUM DEPTH

2' (24") MIN. SEPARATION 2' (24") MIN. SEPARATION

2' (24") MIN. SEPARATION

TAXIWAY ALPHARUNWAY 5R/23L

NE

W

M H-

ST

A:

+0 6 O

FF

:0.

RI

M:

.6

NE

W

M H-

ST

A:

+3 6 O

FF

:0.

RI

M:

.2

NE

W

M H-

ST

A:

+5 6 O

FF

:0.

RI

M:

.0

NE

W

M H-

ST

A:

+4 4 O

FF

:0.

RI

M:

.3

23+00

.8

.81

.3

.33

23+50 24+00

.0

.01

.6

.56

24+50 25+00

.1

.14

.8

.76

25+50 26+00

.3

.30

.9

.87

26+50 27+00

.1

.12

.8

.82

27+50 28+00

.6

.64

.7

.68

28+50 29+00

.0

.00

.4

.41

29+50 30+00

.1

.07

.6

.60

30+50 31+00

.5

.50

.1

.12

31+50 32+00

.3

.25

.2

.24

32+50 33+00

.3

.29

.4

.42

33+50 34+00

.2

.19

.0

.00

34+50

23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50

PI

: 2

8+

.69

PI

: 2

9+

.97

PI

: 3

1+

.97

PI

: 3

4+

.47

NEW MH-03

STA. 31+43.97

N3468029.8± E12206061.6±

RIM:17.3±

NEW MH-04

STA. 29+35.97

N3468209.9± E12205957.6±

RIM:17.2±

NEW MH-05

STA. 28+05.69

N3468322.6± E12205892.1±

RIM:16.6±

FI

LE

N

AM

E:

K:

\V A\

Oc ea na

NA

S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20

_1

_R

EP

LA

CE

C

IR

CU

IT

E

B

TW

S W

2 A

ND

S W

3\B _D es ign

\D W

GS

\S he et\

_C

IV

\20

_1

_C

U.

dw g P

LO

TT

ED

: Th ur sd ay , J un e 1

3, 3:

:08

P M

U

SE

R:

ca rl.s ter zin g

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

80'0' 1"=40'

40'

GRAPHIC SCALE

8'0' 1"=4'

4'

M

AT

CH

L

IN

E

- S

HE

ET

C

U2

M

AT

CH

L

IN

E

- S

HE

ET

C

U2

RUNWAY 5R/23L TAXIWAY ALPHA

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

LA

NT

PW

D

O C

EA

N

A

FE

AD

VI

R G

IN

IA

B

EA

C H

, V

IR

G

IN

IA

N

AV

AL

A

IR

S

TA

TI

O N

O C

EA

N

A

VI

R G

IN

IA

B

EA

C H

, V

IR

G

IN

IA

RE

PL

AC

E

C

IR

C U

IT

E

B

ET

W

EE

N S

W

IT

C H

AN

D

IN

ST

AL

L

FO

U R-

W

AY

S W

IT

C

H

CBM/CBS

KPS

1780600

S

IT

E P

LA

N

P

R O

FI

LE

, S

TA

. 2 3+

T

O

4+

HRB HRB CBM

AS NOTED

12910813

CU203

CBM

N

12' (144") MINIMUM DEPTH

2' (24") MIN. SEPARATION 2' (24") MIN. SEPARATION

12' (144") MINIMUM DEPTH

2' (24") MIN. SEPARATION

NE

W

M H-

ST

A:

+5 6 O

FF

:0.

RI

M:

.0

NE

W

M H-

ST

A:

+8 2 O

FF

:0.

RI

M:

.4 SW

IT

CH

-2

ST

A:

+3

8 O

FF

:0.

RI

M:

.4

.0

.00

34+50 35+00

.2

.17

.5

.54

35+50 36+00

.6

.59

.5

.50

36+50 37+00

.6

.60

.5

.53

37+50 38+00

.3

.31

.6

.63

38+50 39+00

.4

.43

39+37.61

.4

.41

34+50 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+38

PI

: 3

4+

.47

PI

: 3

7+

.05

EP

: 3

9+

.61

SWITC

H 2

STA

. 39 +3

7.6 1±

N=3

.70

E=1

1.9

ELE

V.=1

8.4

SWITCH 2

STA. 39+37.61

N=3467401.7±

E=12206541.9±

ELEV.=18.4±

NEW MH-01

STA. 37+82.05

N3467508.7± E12206429.1±

RIM:16.4±

NEW MH-02

STA. 34+56.47

N3467767.6± E12206231.6±

RIM:16.0±

FI

LE

N

AM

E:

K:

\V A\

Oc ea na

NA

S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20

_1

_R

EP

LA

CE

C

IR

CU

IT

E

B

TW

S W

2 A

ND

S W

3\B _D es ign

\D W

GS

\S he et\

_C

IV

\20

_1

_C

U.

dw g P

LO

TT

ED

: Th ur sd ay , J un e 1

3, 3:

:14

P M

U

SE

R:

ca rl.s ter zin g

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

80'0' 1"=40'

40'

GRAPHIC SCALE

8'0' 1"=4'

4'

M

AT

CH

L

IN

E

- S

HE

ET

C

U2

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

LA

NT

PW

D

O C

EA

N

A

FE

AD

VI

R G

IN

IA

B

EA

C H

, V

IR

G

IN

IA

N

AV

AL

A

IR

S

TA

TI

O N

O C

EA

N

A

VI

R G

IN

IA

B

EA

C H

, V

IR

G

IN

IA

RE

PL

AC

E

C

IR

C U

IT

E

B

ET

W

EE

N S

W

IT

C H

AN

D

IN

ST

AL

L

FO

U R-

W

AY

S W

IT

C

H

CBM/CBS

KPS

1780600

S

IT

E P

LA

N

P

R O

FI

LE

, S

TA

. 3 4+

T

O

9+

.6

(S W

IT

C

H

HRB HRB CBM

AS NOTED

12910814

CU204

CBM

N

2' (24") MIN. SEPARATION

2' (24") MIN. SEPARATION

0+00

.9

.92

.8

.82

0+50 1+00

.2

.23

.0

.01

1+50 2+00

.1

.06

.8

.77

2+50 3+00

.0

.96

.2

.17

3+50 4+00

.0

.00

.7

.67

4+50 5+00

.8

.84

.7

.73

5+50 6+00

.4

.36

.5

.54

6+50 7+00

.6

.59

.7

.69

7+50 8+00

.7

.67

.7

.72

8+50 9+00

.9

.93

.9

.93

9+50 10+00

.2

.18

.2

.18

10+50 11+00

.2

.16

11+49.61

.6

.60

TA

CA

N

MH

ST

A:

0+

O

FF

:0.

RI

M:

.3

NE

W

M H-

ST

A:

9+

O

FF

:0.

RI

M:

.6NE

W

M H-

ST

A:

3+

O

FF

:0.

RI

M:

.2

NE

W

M H-

ST

A:

7+

O

FF

:0.

RI

M:

.9

11+500+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00

BP

: 0

+0 0.0

EP

: 1

1+

.61

PI

: 3

+7 1.4

PI

: 7

+6 0.6

7+

8+

8+

9+

9+

+0

PI: 9+34.88

TACAN MH

STA. 0+00.00±

N=3469017.8±

E=12203769.3±

ELEV.=16.3±

NEW MH-10

STA. 9+34.88

N3469712.6±

E12204685.3±

RIM:16.6±

TACAN MH

STA. 0+00.00±

N=3469017.8± E=12203769.3±

ELEV.=16.3±

NEW MH-12

STA. 7+60.64

N3469480.2±

E12204373.4±

RIM:15.7±

NEW MH-13

STA. 3+71.47

N3469246.6±

E12204062.2±

RIM:18.2±

FI

LE

N

AM

E:

K:

\V A\

Oc ea na

NA

S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20

_1

_R

EP

LA

CE

C

IR

CU

IT

E

B

TW

S W

2 A

ND

S W

3\B _D es ign

\D W

GS

\S he et\

_C

IV

\20

_1

_C

U.

dw g P

LO

TT

ED

: Th ur sd ay , J un e 1

3, 3:

:21

P M

U

SE

R:

ca rl.s ter zin g

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

80'0' 1"=40'

40'

GRAPHIC SCALE

8'0' 1"=4'

4'

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

LA

NT

PW

D

O C

EA

N

A

FE

AD

VI

R G

IN

IA

B

EA

C H

, V

IR

G

IN

IA

N

AV

AL

A

IR

S

TA

TI

O N

O C

EA

N

A

VI

R G

IN

IA

B

EA

C H

, V

IR

G

IN

IA

RE

PL

AC

E

C

IR

C U

IT

E

B

ET

W

EE

N S

W

IT

C H

AN

D

IN

ST

AL

L

FO

U R-

W

AY

S W

IT

C

H

CBM/CBS

KPS

1780600

SI

TE

P

LA

N

P R

O

FI

LE

, S

TA

. 0

+0

(T

AC

AN

M

H ) T

O

1+

.6

(N

EW

M H

-1 0)

HRB HRB CBM

AS NOTED

12910815

CU205

CBM

N

2' (24") MIN. SEPARATION

0+00

.5

.49

.3

.33

0+50 1+00

.9

.90

.2

.18

1+50 2+00

.3

.25

.4

.40

2+50 3+00

.1

.14

.5

.46

3+50 4+00

.4

.42

.6

.56

4+50 5+00

.0

.97

5+39.25

.9

.93

NE

W

M H-

ST

A:

+3 4 O

FF

:0.

RI

M:

.5

PA

R

TR

AN

S.

ST

A:

5+

O

FF

:0.

RI

M:

.9

TAXIWAY BRAVO

5+39 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00

BP

: 0

+0 0.0

EP

: 5

+3 9.2

+0

+5

+0

+5

+0

+5

+0

+5

+0

PI: 20+34.18

PI: 22+01.95

17.2317.28

16.95

17.02

BM

16.09

NEW

MH-06

STA. 22+01.95

N3468863.2±

E12205623.3±

RIM:16.7±

NEW MH-07

STA. 20+34.18

N3468991.1± E12205514.7±

RIM:16.5±

P.A.R. TRANSFORMER

STA. 5+39.25

N=3469313.5± E=12205947.0±

ELEV.=17.2±

FI

LE

N

AM

E:

K:

\V A\

Oc ea na

NA

S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20

_1

_R

EP

LA

CE

C

IR

CU

IT

E

B

TW

S W

2 A

ND

S W

3\B _D es ign

\D W

GS

\S he et\

_C

IV

\20

_1

_C

U.

dw g P

LO

TT

ED

: Th ur sd ay , J un e 1

3, 3:

:28

P M

U

SE

R:

ca rl.s ter zin g

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

80'0' 1"=40'

40'

GRAPHIC SCALE

RUNWAY 5L/23R

8'0' 1"=4'

4'

TA

XIW

A Y B

R A

VO

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

LA

NT

PW

D

O C

EA

N

A

FE

AD

VI

R G

IN

IA

B

EA

C H

, V

IR

G

IN

IA

N

AV

AL

A

IR

S

TA

TI

O N

O C

EA

N

A

VI

R G

IN

IA

B

EA

C H

, V

IR

G

IN

IA

RE

PL

AC

E

C

IR

C U

IT

E

B

ET

W

EE

N S

W

IT

C H

AN

D

IN

ST

AL

L

FO

U R-

W

AY

S W

IT

C

H

CBM/CBS

KPS

1780600

SI

TE

P

LA

N

P R

O

FI

LE

, S

TA

. 0

+0

(N

EW

M H

-0 7)

T O

5+

.2

(E

XI

ST

. P

.A .R

. T R

AN

SF

O R

M

ER

HRB HRB CBM

AS NOTED

12910816

CU206

CBM

N

R U

N W

A Y 14R

/32L

12' (144") MINIMUM DEPTH

2' (24") MIN. SEPARATION

2' (24") MIN. SEPARATION

FI

LE

N

AM

E:

K

:\V A\

Oc ea na

NA

S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20

_1

_R

EP

LA

CE

C

IR

CU

IT

E

B

TW

S W

2 A

ND

S W

3\B _D es ign

\D W

GS

\S he et\

_C

IV

\17

0_

SI

TE

W

OR

K_

C-

1.d wg

L

AY

OU

T

NA

ME

: C -5

P

LO

TT

ED

: T ue sd ay , J un e 1

8, 2:1 1p m

US

ER

: c ar l.s ter zin g

DE-WATERING AND TREATMENT GENERAL NOTES

TREATMENT WATER RELEASE CRITERIA

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

D E-

W

AT

ER

IN

G T

R

EA

TM

EN

T C

O N

C

EP

T D

IA

G

R

AM

HRB JS CBM

NONE

12910817

C-501

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SCALE: N.T.S.

DE-WATERING TREATMENT CONCEPT DIAGRAM

1. COORDINATE ALL ENVIRONMENTAL WORK WITH NAVAL AIR STATION OCEANA AND NAVFAC ENVIRONMENTAL.

2. SEE CIVIL DRAWINGS FOR COORDINATION.

3. DE-WATER IN ACCORDANCE WITH SPECIFICATION SECTIONS 015719 AND 312300.00.20. PROVIDE DE-WATERING NECESSARY TO KEEP THE CONSTRUCTION AND WORK AREAS DRY. DESIGN, PROVIDE, INSTALL, OPERATE AND MAINTAIN AN ADEQUATE SYSTEM. THE SYSTEM MUST BE OF SUFFICIENT SIZE AND CAPACITY TO MAINTAIN A DRY CONDITION WITHOUT DELAYS TO CONSTRUCTION OPERATIONS. DE-WATERING SYSTEM DESIGN MUST BE PERFORMED BY A PROFESSIONAL ENGINEER, PERFORM ADDITIONAL TEST BORINGS AND OTHER EXPLORATORY OPERATIONS NECESSARY

FOR DE-WATERING DESIGN.

4. THE GROUNDWATER IN THIS AREA IS KNOWN TO CONTAIN PFAS OVER RISK SCREENING LEVELS. DE-WATERED GROUNDWATER SHOULD NOT BE ALLOWED TO LEAVE THE SITE WITHOUT TREATMENT UNLESS CONCENTRATIONS HAVE BEEN CONFIRMED TO BE NON-DETECT LEVELS FOR PFOS+PFOA. PROVIDE TREATMENT EQUIPMENT TO TREAT EFFLUENT FROM DE-WATERING OPERATIONS ON THE CONSTRUCTION SITE. DESIGN, PROVIDE, INSTALL, OPERATE AND MAINTAIN AN ADEQUATE SYSTEM. ALL TREATED DE-WATERING EFFLUENT MUST BE DISCHARGED AND ALLOWED TO SHEET FLOW

ACROSS GRASSY AREAS WHILE MAINTAINING POSITIVE DRAINAGE.

5. SUBMIT AN EXCAVATION, DE-WATERING, TREATMENT AND DISPOSAL PLAN FOR APPROVAL OF THE CONTRACTING OFFICER PRIOR TO INITIATION OF ANY CONSTRUCTION OR EXCAVATION OPERATIONS. THE PLAN MUST SHOW ALL FACILITIES AND EQUIPMENT AND ADDRESS THE DISPOSAL OF SPENT MEDIA AND DECONTAMINATION OF TREATMENT

SYSTEM.

6. THE CONCEPT DIAGRAM SHOWN IN THIS SHEET IS AN EXAMPLE OF A TYPICAL PETROLEUM AND PFOA/PFOS GROUNDWATER TREATMENT SYSTEM. PROVIDE A TREATMENT SYSTEM CAPABLE OF TREATING PETROLEUM, PFOA/PFOS AND OTHER CONTAMINANTS IDENTIFIED IN THE GROUNDWATER. THE SYSTEM MUST BE CAPABLE OF TREATING THE CONTAMINATED GROUNDWATER TO CONCENTRATIONS BELOW THE LABORATORY DETECTION LIMIT OR REGULATORY

THRESHOLD. TOTAL TREATED PFOA/PFOS CONCENTRATIONS MUST BE NON-DETECT LEVELS.

7. EXCAVATED SOIL AND TREATED GROUNDWATER MUST BE SAMPLED AND ANALYZED IN ACCORDANCE WITH

SPECIFICATION SECTION 015719.

8. MANAGE WASTE IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS INCLUDING 40 CFR 261 AND 40 CFR 262. COMPLY WITH ALL INSTALLATION, DEQ AND NAVFAC ENVIRONMENTAL REQUIREMENTS.

6" FEMALE

HIGH LEVEL SHUTOFF

18,000 GAL

WEIR TANK

AUTO-START AUTO-STOP CONTROLS

4" FLOW METER

4" FxMxM

TEE

4" DIESEL

PUMP

4" MALE

MANIFOLD

NUMBER OF TANKS TO BE

DETERMINED BY THE

CONTRACTOR

CONTAMINATED WATER

INPUT FROM OTHER KTR

OPERATIONS

DE-WATERING PUMP

6" HOSE

DE-WATERING WELLPOINT

SYSTEM

(2) MULTI-ROUND BAG FILTER HOUSINGS

4" HOSE

4" HOSE

4" HOSE

4" HOSE 4" HOSE

4" HOSE

4" HOSE

4" HOSE

LAY FLAT

4" FxMxM

TEE

PERFORM TESTING

FOR CONFORMANCE

TO SPECIFICATIONS

(2) GRANULAR

ACTIVATED CARBON

(GAC) EACH VESSEL,

SIZE TO SUIT

(2) PFAS/PFOS RESIN

EACH VESSEL, SIZE

TO SUIT

TREATED WATER

21,000 GAL

FRAC TANK

TREATED WATER

21,000 GAL

FRAC TANK

TREATED WATER

21,000 GAL

FRAC TANK

NUMBER OF TANKS

TO BE DETERMINED

BY THE CONTRACTOR

4" HOSE

4" LAY FLAT HOSE TO DISCHARGE POINT

4" FLOW METER

TREATED WATER MAY NOT PASS THIS

POINT UNTIL IT MEETS THE DEQ

GENERAL PERMIT CRITERIA FOR

RELEASE TO STORMWATER

YES NODOES THE TREATED WATER MEET

THE CURRENT DEQ GENERAL

PERMIT CRITERIA?

ACCEPTABLE TREATED WATER MAY

BE DISCHARGED AS DIRECTED BY

THE CONTRACTING OFFICER

TREATMENT SYSTEM MUST BE

MODIFIED. WATER MUST BE

RE-TREATED UNTIL GENERAL

PERMIT CRITERIA IS MET.

MODIFICATIONS AT

CONTRACTOR'S EXPENSE

STRUCTURAL STEEL NOTES

1. STRUCTURAL STEEL MUST COMPLY WITH THE FOLLOWING

SPECIFICATIONS:

A) STRUCTURAL STEEL SHAPES, PLATES AND BARS

(EXCEPT AS NOTED BELOW)- ASTM A36, Fy=36 KSI

B) ROUND HSS-SHAPES - ASTM A500, GRADE C, FY=46 KSI

C) BOLTS - ASTM F3125, GRADE A325

2. ALL NUTS MUST CONFORM TO ASTM A563, GRADE AND

STYLE FOR APPLICABLE ASTM BOLT STANDARD. ALL

WASHERS MUST CONFORM TO ASTM F436. BOLTS MUST

BE FULLY TENSIONED TO 70 % OF THEIR MINIMUM

TENSILE STRENGTH. ALL BOLTS AND HARDWARE MUST BE

HOT DIPPED GALVANIZED IN ACCORDANCE WITH ASTM

A153.

3. ALL HOLES IN STEEL MUST BE STANDARD SIZE (116"

LARGER THAN BOLT DIAMETER) UNLESS OTHERWISE

NOTED. ALL HOLES MUST BE DRILLED OR PUNCHED.

BURNING IS NOT PERMITTED.

4. TORCH CUTTING OF STEEL IS NOT PERMITTED.

5. ALL STEEL MUST BE HOT DIPPED GALVANIZED IN

ACCORDANCE WITH ASTM A123 OR ASTM A153 AS

APPLICABLE. REPAIR DAMAGE TO GALVANIZED COATINGS

USING ASTM A780 ZINC RICH PAINT FOR GALVANIZING

DAMAGED BY HANDLING, TRANSPORTING, CUTTING,

WELDING, OR BOLTING. DO NOT HEAT SURFACES TO

WHICH REPAIR PAINT HAS BEEN APPLIED. ZINC RICH

COMPOUND MUST BE 95% METALLIC ZINC, BY WEIGHT IN

DRIED FILM CONFORMING TO FED. SPEC. DOD-P-21035A

AND MEETING MIL SPEC. MIL-P-26915A. PROVIDE TWO

COATS WITH 2 MIL THICKNESS PER COAT FOR A TOTAL OF

4 MILS.

ST

R

U C

TU

R

AL

N

O

TE

S

JLP JLP CBM

AS NOTED

12910818

S-001

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

PW

D O

C

EA

N A

N

AS

O C

EA

N

A

VI

R G

IN

IA

B

EA

C H

, V A

N

AS

O C

EA

N

A

VI

R G

IN

IA

B

EA

C H

, V A

RE

PL

AC

E

CI

RC

UI

T

E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S

W

IT

CH

CBM/CBS

KPS

1780600

FI

LE

N

AM

E:

K

:\V A\

Oc ea na

NA

S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20

_1

_R

EP

LA

CE

C

IR

CU

IT

E

B

TW

S W

2 A

ND

S W

3\B _D es ign

\D W

GS

\S he et\

_S

TR

UC

T\

0_

ST

RU

CT

UR

AL

N

OT

ES

_S

-0

.dw g

LA

YO

UT

N

AM

E:

S -0

P

LO

TT

ED

: T hu rsd ay , J un e 1

3, 3:5 5p m

US

ER

: c ar l.s ter zin g

CONCRETE NOTES

1. DO NOT PLACE CONCRETE WHEN AMBIENT TEMP IS

BELOW 40°F.

2. WATER CURE ALL CONCRETE FOR 7 DAYS BEGINNING

IMMEDIATELY AFTER PLACEMENT. CURING MUST BE WITH

FORMS REMAINING IN PLACE AND BY WETTING THE

EXPOSED NON-FORMED SURFACES THOROUGHLY AND

COVERING WITH ASTM C171 POLYETHYLENE FILM.

EXPOSED CONCRETE MUST BE MAINTAINED AS

CONSTANTLY WET.

3. REINFORCING MUST BE ASTM 615, GRADE 60, DEFORMED.

4. LAP CONTINUOUS REINFORCING STEEL A MINIMUM

LENGTH OF 48X BAR DIAMETERS OF THE SMALLER BAR

BEING LAPPED.

5. CONCRETE COVER TO REINFORCING STEEL MUST

CONFORM TO THE MINIMUM COVER RECOMMENDATIONS

IN ACI 318-14 UNLESS THE DRAWINGS SHOW GREATER

COVER REQUIREMENTS.

6. CONCRETE WORK MUST BE PERFORMED IN ACCORDANCE

WITH ACI 301, UNLESS OTHERWISE NOTED.

7. CONCRETE SPECIFICATION:

7.1. CEMENT MUST CONFORM TO ASTM C150, TYPE I OR II

7.2. f'c = 4,500 PSI AT 28 DAYS

7.3. 1" MAXIMUM COARSE AGGREGATE

7.4. W/C RATIO = 0.45 MAXIMUM

7.5. AIR ENTRAINMENT = 6%, ±1.5%

8. PERFORM COMPRESSIVE TESTS PER ASTM C39. OBTAIN

ONE SET OF FIVE (5) CYLINDERS PER TRUCK. TEST 2

CYLINDERS AT 7-DAYS, 2 CYLINDERS AT 28-DAYS, AND

HOLD ONE IN RESERVE.

9. PERFORM SLUMP TESTS PER ASTM C143. PERFORM

TESTS AT COMMENCEMENT OF CONCRETE PLACEMENT,

WHEN TEST CYLINDERS ARE MADE, AND FOR EACH BATCH

OF CONCRETE.

10. CONSOLIDATE CONCRETE PLACEMENT USING VIBRATORS

PER SPECIFICATIONS. MAINTAIN SPARE VIBRATORS ON

SITE AS BACKUP.

11. JOINT SEALANT FOR CONCRETE MUST BE A 2

COMPONENT, NON SAG, POLYURETHYANE BASED,

ELASTOMERIC SEALANT CAPABLE OF 50% JOINT

MOVEMENT.

12. PREFORMED JOINT FILLER MUST CONFORM TO ASTM

D1751.

13. JOINTS MUST BE PREPARED AND SEALANT MUST BE

APPLIED PER MANUFACTURER'S RECOMMENDATIONS.

PROVIDE CLOSED-CELL BACKING AS REQUIRED BY

SEALANT MANUFACTURER.

EXCAVATION AND FILL NOTES

1. EXERCISE EXTREME CAUTION DURING

DEMOLITION/EXCAVATION. LOCATION OF THE KNOWN

EXISTING UTILITIES IS APPROXIMATE. PHYSICALLY

VERIFY THE LOCATION AND ELEVATION OF ALL INDICATED

EXISTING UTILITIES TO THE GREATEST EXTENT POSSIBLE

PRIOR TO STARTING THE DEMOLITION AND/OR

EXCAVATION PROCESS. SCAN THE CONSTRUCTION SITE

WITHIN THE NECESSARY LIMITS OF

DEMOLITION/EXCAVATION WITH ELECTROMAGNETIC AND

SONIC EQUIPMENT IN ORDER TO IDENTIFY THE PRESENCE

AND LOCATION OF ALL KNOWN AND UNKNOWN EXISTING

UTILITIES PRIOR TO STARTING THE

DEMOLITION/EXCAVATION PROCESS. MARK THE

SURFACE OF THE GROUND WHERE SUBSURFACE

UTILITIES ARE LOCATED. IF ADDITIONAL SUBSURFACE

UTILITIES OTHER THAN THOSE INDICATED ARE

DISCOVERED AT ANY TIME DURING THE EXECUTION OF

WORK, IT MUST IMMEDIATELY BE BROUGHT TO THE

ATTENTION OF THE CONTRACTING OFFICER.

2. EXCAVATE TO CONTOURS, ELEVATIONS, AND DIMENSIONS

INDICATED. REUSE EXCAVATED MATERIALS THAT MEET

THE SPECIFIED REQUIREMENTS FOR THE MATERIAL TYPE

REQUIRED AT THE INTENDED LOCATION. KEEP

EXCAVATIONS FREE FROM WATER. EXCAVATE SOIL

DISTURBED OR WEAKENED BY CONTRACTOR'S

OPERATIONS. REFILL WITH BACKFILL MATERIAL AS

INDICATED.

3. PROVIDE STRUCTURAL FILL AND BACKFILL TO CONTOURS,

ELEVATIONS AND DIMENSIONS INDICATED. COMPACT

EACH LIFT BEFORE PLACING OVERLAYING LIFT.

4. PLACE ALL STRUCTURAL FILL AND BACKFILL IN 12"

(MAXIMUM) LIFTS WITH EACH LIFT COMPACTED TO 95% OF

ASTM D698. PERFORM DENSITY TESTS ON EACH LIFT AT

TWO RANDOMLY SELECTED LOCATIONS, OR AS DIRECTED

BY THE CONTRACTING OFFICER. SUBMIT RESULTS OF

ALL COMPACTION/DENSITY TESTS TO THE CONTRACTING

OFFICER.

5. STRUCTURAL FILL AND BACKFILL MATERIAL MUST

CONFORM TO ASTM D2487 CLASSIFICATION GW, GP, GC,

SW, SP, SC WITH A MAXIMUM OF 10 PERCENT BY WEIGHT

PASSING ASTM D1140, No. 200 SIEVE. IF EXISTING

BACKFILL MATERIAL IS TO BE REUSED, IT MUST BE

TESTED FOR CONFORMANCE PRIOR TO REUSE.

6. TOP 12 INCHES OF EXISTING SUBGRADE MUST BE

COMPACTED TO 95% OF ASTM D698.

DESIGN CRITERIA

1. THE STRUCTURES HAVE BEEN DESIGNED IN

ACCORDANCE WITH THE PROVISIONS OF THE

INTERNATIONAL BUILDING CODE (IBC) 2021 EDITION.

2. ALLOWABLE NET SOIL BEARING CAPACITY = 1,500 PSF

3. WIND LOAD PARAMETERS IN ACCORDANCE WITH ASCE

7-16:

RISK CATEGORY II

V = 123 MPH

EXPOSURE CATEGORY C

4. SEISMIC LOAD PARAMETERS IN ACCORDANCE WITH ASCE

7-16:

RISK CATEGORY II

SITE CLASS E

S = 0.038g S = 0.08g

5. GROUND SNOW LOAD...........10 PSF

S

2'-2"

2'-2"±

'-1

1'- 0"

1'- 0"

SE

E

NO

TE

A

2'-0" 1'-0"SEE NOTE A

4'-8"

10"

2'- 0"

2'-0" MIN., TYP.

5'- 6"

M

AX

9" 2'-

0" 9"

CL

C L

C L

C L

CL

C1 E-503

A5 E-504

NOTE A:

OUT-TO-OUT DIMENSION

OF GENERATOR

OUTLINE OF

EXISTING CONC.

EQUIPMENT PAD

OUTLINE OF

GENERATOR

OUTLINE OF CONC.

GENERATOR PAD

FI

LE

N

AM

E:

K

:\V A\

Oc ea na

NA

S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20

_1

_R

EP

LA

CE

C

IR

CU

IT

E

B

TW

S W

2 A

ND

S W

3\B _D es ign

\D W

GS

\S he et\

_S

TR

UC

T\

0_

SI

TE

W

OR

K_

S-

1.d wg

L

AY

OU

T

NA

ME

: S -1

P

LO

TT

ED

: T hu rsd ay , J un e 1

3, 3:5 5p m

US

ER

: c ar l.s ter zin g

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYNOTES

10'0' 1"=5'

5'

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

ST

R

U C

TU

R

AL

S

IT

E

PL

AN

PA

R

JLP JS CBM

AS NOTED

12910819

S-101

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

1. EXISTING ELECTRICAL EQUIPMENT RACK, TO REMAIN.

2. CENTERLINE EXISTING 4" Ø ALLUMINUM PIPE AND NEW GALVANIZED

HSS 4.500 X 0.237

3. CENTERLINE NEW GALVANIZED HSS 4.500 X 0.237 AND NEW BOLLARDS.

4. CENTERLINE NEW BOLLARD.

5. CENTERLINE EXISTING 4" Ø ALUMINUM PIPE.

6. OUTLINE OF CONCRETE ENCASEMENT BELOW.

7. SAWCUT AND REMOVE EXISTING BITUMINOUS PAVEMENT AS

REQUIRED TO PLACE FOUNDATIONS AND PATCH WITH NEW PAVEMENT

AS SHOWN IN SECTION A1/E-505.

1. TOP OF CONCRETE GENERATOR PAD MUST BE LEVEL, WITH ELEVATION

MATCHING TOP OF ADJACENT EXISTING SLAB ELEVATION WHERE NEW

CONCRETE MEETS EXISTING.

SCALE: 1" = 5'

PLAN SHOWING GENERATOR CONCRETE SUPPORT PAD AND COLUMN FOUNDATION

SCALE:C1 SECTION THROUGH SWITCHGEAR FOUNDATION

1" = 1'-0" E-502

SCALE:B1 SECTION THROUGH SWITCHGEAR FOUNDATION

1" = 1'-0" E-502

SCALE:A1 SECTION AT SIDE WALL OF CONC STAIRS

1" = 1'-0" E-502 SCALE:A2 TYPICAL PLAN DETAIL OF REINFORCING AT CORNERS

1" = 1'-0"

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

FI

LE

N

AM

E:

K

:\V A\

Oc ea na

NA

S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20

_1

_R

EP

LA

CE

C

IR

CU

IT

E

B

TW

S W

2 A

ND

S W

3\B _D es ign

\D W

GS

\S he et\

_S

TR

UC

T\

0_

SW

IT

CH

GE

AR

F

OU

ND

AT

IO

N

SE

CT

IO

NS

_S -3

.dw g

LA

YO

UT

N

AM

E:

S

-3

P

LO

TT

ED

: T ue sd ay

, J un e 1 8, 1:3

0p m

US

ER

: c ar l.s ter zin g

.GENERAL SHEET NOTES

1. ON THIS SHEET ONLY, DATUM IS TOP OF EXISTING GRADE

ELEVATION, INDICATED AS (+0'-0"). THIS ELEVATION IS

THE HIGHEST ELEVATION OF THE EXISTING GRADE

ADJACENT TO THE SWITCHGEAR FOUNDATION.

2. ELEVATIONS NOTED THUS: (±X'-X") ON THIS SHEET

INDICATE DISTANCE ABOVE OR BELOW THE DATUM.

3. TOP OF SWITCHGEAR FOUNDATION SLAB MUST BE LEVEL.

4. FOR ABBREVIATIONS, SEE SHEET E-001.

GRAPHIC SCALE

0' 1"=1'-0"

1/2' 1' 2'

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

SW

IT

C H

G

EA

R F

O U

N D

AT

IO

N S

EC

TI

O N

S

JLP JS CBM

AS NOTED

12910820

S-301

CBM

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

E

LE

C

TR

IC

A

L

LE

G E

N D

, N O

TE

S

A N

D A

B B

R E

V

IA

TI

O

N S

AS NOTED

12910821

E-001

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL NOTES

GENERAL DEMOLITION NOTES

ABBREVIATIONS

ONE-LINE/RISER DIAGRAMDISTRIBUTION

EXISTING UNDERGROUND COMMUNICATIONS CIRCUIT.

DESCRIPTION UNKNOWN.

EXISTING UNDERGROUND ELECTRICAL CIRCUIT

DESCRIPTION UNKNOWN .

LEGEND

EXISTING STORM DRAIN SYSTEM.

EXISTING UNDERGROUND FIBER OPTIC CIRCUIT.

DESCRIPTION UNKNOWN.

GROUNDING

EXTERIOR UNDERGROUND

NEW UNDERGROUND PRIMARY DUCTBANK,

CONCRETE ENCASED. DESCRIPTION AS INDICATED.

NEW ELECTRICAL MANHOLE

EXIST ELECTRICAL MANHOLE OR HANDHOLE

EXISTING UNDERGROUND PRIMARY DUCTBANK,

CONCRETE ENCASED. EXISTING TO REMAIN.

EXISTING UNDERGROUND PRIMARY DUCTBANK,

CONCRETE ENCASED. DEMOLISH CIRCUITS ONLY, UON.

NEW UNDERGROUND PRIMARY DUCTBANK,

HDPE VIA HDD. DESCRIPTION AS INDICATED.

DUCTBANK SECTION LOOKING IN DIRECTION OF

ARROWS.

SPARE DUCT (TYPICAL).

HEAVY LINE INDICATES BOTTOM OF DUCT.

EXIST. CABLE DESIGNATION (TYPICAL) DESCRIPTION

PER CABLE SCHEDULE.

CAPPED, ABANDONED DUCT OR UNKNOWN CIRCUIT.

NEW CABLE DESIGNATION (TYPICAL) DESCRIPTION

PER CABLE SCHEDULE.

EXISTING UNDERGROUND SECONDARY DUCTBANK

NON-CONCRETE ENCASED. EXISTING TO REMAIN.

E

EXIST COMMUNICATIONS MANHOLE OR HANDHOLE.

EXISTING UNDERGROUND SECONDARY DUCTGBANK, NON-

CONCRETE ENCASED. DEMOLISH CIRCUITS ONLY, UON. * * * *

NEW UNDERGROUND SECONDARY DUCTBANK, NON-

CONCRETE ENCASED. DESCRIPTION AS INDICATED.

DESCRIPTION UNKNOWN .

E

E

E

E

E

E

E

E

E

E

E

E

GENERAL SHEET NOTES

GRAPHIC SCALE

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

O

VE

R

AL

L

EL

EC

TR

IC

AL

S

IT

E

PL

AN

CBS CBS CBM

AS NOTED

12910822

ES100

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

C U

I

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SCALE: 1"=250'

OVERALL ELECTRICAL SITE PLAN

T

S1 1

E

E

S1 1

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYPLAN

DEMOLITION KEYNOTES#

MATCH LINE ES102

SCALE: 1"=40'

PARTIAL ELECTRICAL SITE PLAN

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

PA

R

TI

AL

E

LE

C

TR

IC

AL

S

IT

E

PL

AN

CBS CBS CBM

AS NOTED

12910823

ES101

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

C U

I

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NEW WORK KEYNOTES#

DESCRIPTION SIZE

CONDUITCABLE

ID

1 6"

2 5"

3 5"

S1 SPARE DUCT W/PULL WIRE 6"

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

S2 SPARE DUCT W/PULL WIRE 5"

(3)-#500 CU 15KV MV105

(1)-#1/0 CU GND, 600V THWN

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

NEW

E

S1 1

S1 1

S1 1

HOLD SHORT LINE

S1 1

TAXIWAY ALPHA

TA

XI

W

AY

B

RA

VO

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYPLAN

MATCH LINE ES101

MATCH LINE ES103

SCALE: 1"=40'

PARTIAL ELECTRICAL SITE PLAN

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

PA

R

TI

AL

E

LE

C

TR

IC

AL

S

IT

E

PL

AN

CBS CBS CBM

AS NOTED

12910824

ES102

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

C U

I

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DESCRIPTION SIZE

CONDUITCABLE

ID

1 6"

2 5"

3 5"

S1 SPARE DUCT W/PULL WIRE 6"

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

S2 SPARE DUCT W/PULL WIRE 5"

(3)-#500 CU 15KV MV105

(1)-#1/0 CU GND, 600V THWN

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

NEW

DEMOLITION KEYNOTES#

NEW WORK KEYNOTES#

S1 1

S1 1

S2

S1 1

HOLD SHORT LINE

HOLD SHORT LINE

S2

RUNWAY 5R/23L

TA

XI

W

AY

B

RA

VO

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYPLAN

MATCH LINE ES102

MATCH LINE ES104

SCALE: 1"=40'

PARTIAL ELECTRICAL SITE PLAN

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

PA

R

TI

AL

E

LE

C

TR

IC

AL

S

IT

E

PL

AN

CBS CBS CBM

AS NOTED

12910825

ES103

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

C U

I

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DESCRIPTION SIZE

CONDUITCABLE

ID

1 6"

2 5"

3 5"

S1 SPARE DUCT W/PULL WIRE 6"

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

S2 SPARE DUCT W/PULL WIRE 5"

(3)-#500 CU 15KV MV105

(1)-#1/0 CU GND, 600V THWN

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

NEW

DEMOLITION KEYNOTES#

S1 1

HOLD SHORT LINE

S1 1

S1 1

RUNWAY 5L/23R

TA

XI

W

AY

B

RA

VO

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYPLAN

MATCH LINE ES103

MATCH LINE ES105

SCALE: 1"=40'

PARTIAL ELECTRICAL SITE PLAN

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

PA

R

TI

AL

E

LE

C

TR

IC

AL

S

IT

E

PL

AN

CBS CBS CBM

AS NOTED

12910826

ES104

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

C U

I

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DESCRIPTION SIZE

CONDUITCABLE

ID

1 6"

2 5"

3 5"

S1 SPARE DUCT W/PULL WIRE 6"

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

S2 SPARE DUCT W/PULL WIRE 5"

(3)-#500 CU 15KV MV105

(1)-#1/0 CU GND, 600V THWN

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

NEW

DEMOLITION KEYNOTES#

S1 1

S1 1

S1 1 S2

TA

XI

W

AY

B

RA

VO

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYPLAN

MATCH LINE ES104

MATCH LINE ES106

MA

TC

H

LIN

E

ES

SCALE: 1"=40'

PARTIAL ELECTRICAL SITE PLAN

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

PA

R

TI

AL

E

LE

C

TR

IC

AL

S

IT

E

PL

AN

CBS CBS CBM

AS NOTED

12910827

ES105

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

C U

I

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DESCRIPTION SIZE

CONDUITCABLE

ID

1 6"

2 5"

3 5"

S1 SPARE DUCT W/PULL WIRE 6"

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

S2 SPARE DUCT W/PULL WIRE 5"

(3)-#500 CU 15KV MV105

(1)-#1/0 CU GND, 600V THWN

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

NEW

DEMOLITION KEYNOTES#

T

S1 1

TA

XI

W

AY

B

RA

VO

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYPLAN

MATCH LINE ES105

SCALE: 1"=40'

PARTIAL ELECTRICAL SITE PLAN

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

PA

R

TI

AL

E

LE

C

TR

IC

AL

S

IT

E

PL

AN

CBS CBS CBM

AS NOTED

12910828

ES106

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

C U

I

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DESCRIPTION SIZE

CONDUITCABLE

ID

1 6"

2 5"

3 5"

S1 SPARE DUCT W/PULL WIRE 6"

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

S2 SPARE DUCT W/PULL WIRE 5"

(3)-#500 CU 15KV MV105

(1)-#1/0 CU GND, 600V THWN

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

NEW

DEMOLITION KEYNOTES#

S2

S2

S2

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYPLAN

MA

TC

H

LIN

E

ES

SCALE: 1"=40'

PARTIAL ELECTRICAL SITE PLAN

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

PA

R

TI

AL

E

LE

C

TR

IC

AL

S

IT

E

PL

AN

CBS CBS CBM

AS NOTED

12910829

ES107

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

C U

I

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DESCRIPTION SIZE

CONDUITCABLE

ID

1 6"

2 5"

3 5"

S1 SPARE DUCT W/PULL WIRE 6"

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

S2 SPARE DUCT W/PULL WIRE 5"

(3)-#500 CU 15KV MV105

(1)-#1/0 CU GND, 600V THWN

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

NEW

DEMOLITION KEYNOTES#

S2

S1 1

S1 1

S1

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYPLAN

SCALE: 1"=5'

ENLARGED ELECTRICAL SITE PLAN - NEW SWITCH-27

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

EN

LA

R G

ED

E

LE

C

TR

IC

AL

S

IT

E

PL

AN

N

EW

S

W

IT

C H

-2

CBS CBS CBM

AS NOTED

12910830

ES201

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

C U

I

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DEMOLITION KEYNOTES#

NEW WORK KEYNOTES#

DESCRIPTION SIZE

CONDUITCABLE

ID

1 6"

2 5"

3 5"

S1 SPARE DUCT W/PULL WIRE 6"

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

S2 SPARE DUCT W/PULL WIRE 5"

(3)-#500 CU 15KV MV105

(1)-#1/0 CU GND, 600V THWN

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

S2

S2

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYPLAN

SCALE: 1"=5'

ENLARGED ELECTRICAL SITE PLAN - PAR

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

E N

LA

R

G E

D E

LE

C

TR

IC

A L

S

IT

E P

LA

N

P

A R

CBS CBS CBM

AS NOTED

12910831

ES202

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

C U

I

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

DEMOLITION KEYNOTES#

NEW WORK KEYNOTES#

DESCRIPTION SIZE

CONDUITCABLE

ID

1 6"

2 5"

3 5"

S1 SPARE DUCT W/PULL WIRE 6"

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

S2 SPARE DUCT W/PULL WIRE 5"

(3)-#500 CU 15KV MV105

(1)-#1/0 CU GND, 600V THWN

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

WIRE TROUGH, ETR.

LOAD CENTER, ETR.

BOLLARD, ETR (TYP.)

EQP. PAD, ETR

E

GENERAL SHEET NOTES

GRAPHIC SCALE

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

EN

LA

R G

ED

E

LE

C

TR

IC

AL

P

LA

N

TA

C

AN

CBS CBS CBM

AS NOTED

12910832

ES203

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SCALE:1/4"=1'-0"

B3003 AND TACAN SITE - DEMOLITION

SCALE:1/4"=1'-0"

B3003 AND TACAN SITE - NEW WORK

1. REFERENCE TACAN POWER RISER DIAGRAM (EXISTING CONDITIONS &

DEMOLITION) ON E-604 FOR FURTHER INFORMATION.

2. REFERENCE TACAN RISER DIAGRAM (NEW WORK) ON E-604 FOR

FURTHER INFORMATION INCLUDING CIRCUIT SIZING INFORMATION AND

TERMINATION DETAILS.

3. ALL PAINTED SURFACES MUST BE ASSUMED TO TB LEAD, CADMIUM, AND

CHROMIUM CONTAINING FOR RENOVATION PURPOSES. APPROPRIATE

PRECAUTIONS MUST BE TAKEN DURING THE DISTURBANCE OF ALL

PAINTED SURFACES TO ENSURE PROTECTION OF WORKERS AND THE

ENVIRONMENT.

KEYPLAN

DEMOLITION KEYNOTES

NEW WORK KEYNOTES

1 2

TACAN TOWER GUY WIRE, ETR.TACAN TOWER GUY WIRE, ETR.

PRIMARY CABLE SCHEDULE

DESCRIPTION SIZE

CONDUITCABLE

ID

1 6"

2 5"

3 5"

S1 SPARE DUCT W/PULL WIRE 6"

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

S2 SPARE DUCT W/PULL WIRE 5"

(3)-#500 CU 15KV MV105

(1)-#1/0 CU GND, 600V THWN

(3)-#2 CU 15KV MV105

(1)-#8 CU GND, 600V THWN

NEW

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

12910833

E-501

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HDPE-TO-MANHOLE NON-PAVEMENT COVERED AREA TRANSITION

EARTH COVER - CONCRETE ENCASED PRIMARY DUCTBANK

A1ES101, ES102, ES103, ES105, ES106, ES107, ES201

D5ES102, ES103, ES104, ES107, ES202

HDPE-TO-DUCTBANK NON-PAVEMENT COVERED AREA TRANSITION

A5ES103

EARTH COVER - CONCRETE ENCASED PRIMARY DUCTBANK

B1ES104, ES105, ES201

EARTH COVER - CONCRETE ENCASED PRIMARY DUCTBANK

D1ES201

ASPHALT COVER - CONCRETE ENCASED PRIMARY DUCTBANK

A3ES202

B3ES202

ASPHALT COVER - DIRECT BURY SECONDARY TRENCH

D3ES203

EARTH COVER - DIRECT BURY SECONDARY TRENCH

HDPE-TO-DUCTBANK PAVEMENT COVERED AREA TRANSITION

B5ES103, ES107

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

E-502

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

PAD MOUNT SWITCHGEAR CONCRETE FOUNDATION

NOT TO SCALE A1ES201

SWITCH PAD GROUNDING RING

D1ES201

SECTION - PAD MOUNT SWITCHGEAR LAYOUT

NOT TO SCALE C3ES201

PAD MOUNT SWITCHGEAR LAYOUT

NOT TO SCALE A3ES201

CONDUIT STUB-UP

SF6 SWITCHGEAR

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

E-503

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

PAR GENERATOR CONCRETE FOUNDATION

NOT TO SCALE A1ES202

CONDUIT STUB-UP

SECTION - PAR GENERATOR CONCRETE FOUNDATION

NOT TO SCALE C1E-503-A1

TACAN GENERATOR CONCRETE FOUNDATION

NOT TO SCALE A3ES203

CONDUIT STUB-UP

SECTION - TACAN GENERATOR CONCRETE FOUNDATION

NOT TO SCALE C3E-503-A3

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

E-504

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

BOLLARD

A3ES202, ES203

ELECTRICAL EQUIPMENT RACK EXTENSION

NOT TO SCALE A5ES202

PAD-MOUNTED TRANSFORMER DETAIL

NO SCALE C3ES203

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

E-505

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

CIRCUIT IDENTIFICATION TAG

NOT TO SCALE A4

TOPSOIL AND SEED

HEAVY DUTY PAVEMENT SECTION (ASPHALT) WITH PATCH

NOT TO SCALE A1E-505

ARC FLASH WARNING LABEL

C4C1E-505

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

E-506

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

ɸ

Φ Φ

PAR - GROUNDING ONE LINE DIAGRAM

A1

Φ ɸ ɸ ɸ

Φ Φ

TACAN - GROUNDING ONE LINE DIAGRAM

A4

Φ ɸ

Φ ɸ

Φ ɸ

TO NEW MH-133

S2

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

E-507

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

EXISTING SWITCH-3 MANHOLE LAYOUT

TO EXISTING SWITCH-3

TO EXISTING SWITCH-02

TO MH-02

U

1S1

1S1

EXISTING TACAN MANHOLE LAYOUT

NEW MANHOLE 01 LAYOUT

TO TACAN XFMR

E U

X X

U U

TO NEW MH-11

U

U

X

U

X

X

X

U

X

X X

X

X

U

U

X U

X

X

S1

ES106 ES107, ES203

ES101

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

E-508

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NEW MANHOLE 02 LAYOUT

TO MH-01

TO MH-03

TO MH-02

TO MH-04

TO MH-03

TO MH-05

TO MH-04

TO MH-06

TO MH-05

TO MH-07

TO MH-06

TO MH-08

TO PAR XFMR

S1

1S1

1S1

1S1

1S1

1S1

1S1

1S1

1S1

1S1 1

S1

S2

1S1

NEW MANHOLE 03 LAYOUT NEW MANHOLE 04 LAYOUT

NEW MANHOLE 05 LAYOUT NEW MANHOLE 06 LAYOUT NEW MANHOLE 07 LAYOUT

ES101 ES102 ES102

ES102 ES103 ES103

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

E-509

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

TO MH-10

TO SWITCH-3 MH

TO MH-08

TO MH-10

TO NEW SWITCH 27

TO MH-11

TO MH-09

TO MH-12

TO MH-10

TO MH-13

TO MH-12

TO TACAN

MH

TO MH-07

TO MH-09

1S1

S1 1S1

1S1

S2

1S1

1S1

S2

S2 3

S2

S2

NEW MANHOLE 08 LAYOUT NEW MANHOLE 09 LAYOUT NEW MANHOLE 10 LAYOUT

NEW MANHOLE 11 LAYOUT NEW MANHOLE 12 LAYOUT NEW MANHOLE 13 LAYOUT

S1

1S1

S1

ES104 ES104 ES105, ES201

ES105 ES107 ES107

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

ST

AL

L

FO

UR

-W

AY

S W

IT

CH

FELIX A. PESSIG

10JUN2024

CBM/CBS

KPS

1780600

E-601

CBM

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NAS OCEANA CIRCUIT E PARTIAL ONE-LINE POWER DIAGRAM - EXISTING CONDITIONS

1 2 3 4 5

1 2 3

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

PW

D

OC

EA

NA

NA

S

OC

EA

NA

V

IR

GI

NI

A

BE

AC

H, V A

NA

S

O

CE

AN

A

VI

RG

IN

IA

B

EA

CH

, V

A

RE

PL

AC

E

CI

RC

UI

T E

BE

TW

EE

N

SW

IT

CH

AN

D

IN

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .