Industry Outreach Briefing 10-1-14.pptx
PPTX presentation 6 MB Posted
- Solicitation number
- 17798
About this file
Industry Outreach Briefing 10-1-14 (pptx)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry Outreach Briefing 10-1-14.pptx | PPTX presentation | |
| Industry Day Q A 10.2.2014.pdf | ||
| Industry Day Q A 10.2.2014.pdf | ||
| FAA Form 1600-78.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FAA Industry Outreach
TFDM & TFMS
October 2, 2014
Federal Aviation Administration <Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Industry Outreach Jim Linney Director, Air Traffic Systems
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Industry Outreach Rebecca Guy Decision Support Manager 3Ts
Traffic Flow Management System – TFMS
Time Based Flow Management – TBFM
Terminal Flight Data Manager - TFDM
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
DSS: Who are we?
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Air Traffic Organization/ Program Management Office
VP of System Operations
VP of Air Traffic Services
VP of Program Management Jim Eck (A)
Director of Air Traffic Systems Jim Linney
Decision Support Rebecca Guy
TBFM
Bob Tyo
TFMS/CATMT
Mark Novak
TFDM
Michael Huffman
Surveillance Services
Terminal Field Operations Support
En Route & Oceanic 2nd Level
Technical Advisor
Business Management
Director of Enterprise Services
VP of Mission Support
VP of Safety and Technical Training
VP of Management Services
Air Traffic Management
DSS Mission: Traffic Flow Management (TFM) NextGen is an ongoing transformation of the NAS.
Incremental implementation of new technologies and procedures is vital to meeting future growth of aviation.
DSS facilitates NextGen vision through TFM – TFDM, TBFM and TFMS Ensures efficient flow of traffic and maximizes system throughput across the NAS Improves the quality of service to NAS users by accommodating user preferences Improves common situational awareness by real-time information sharing
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
DSS Vision: Enabling NextGen Enable NextGen technologies in TFM operations Performance Based Navigation (PBN) –use of RNAV/RNP and Optimized Profile Descent (OPD) technologies in TBFM System Wide Information Management (SWIM) – TFM data exchange with external systems through SWIM System-wide solutions that are able to be tailored for individual aircraft – Surface Routes- Utilizing user preferences Provide integrated, responsive and collaborative TFM solutions that maximize efficiency and reduce delay.
INTEGRATED: Strategic and tactical TFM strategies are modeled and implemented as a single cohesive strategy.
RESPONSIVE: Faster more effective responses to evolving conditions in the NAS.
COLLABORATIVE: Data sharing among stakeholders facilitates solutions that impose no more controls on flights than needed, allowing flight operators to fly their preferred routes at preferred times.
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
DSS components: 3Ts are the engines of DSS Traffic Flow Management System (TFMS) Decision support system for planning and mitigating demand-capacity imbalances in the NAS.
Time-Based Flow Management (TBFM) Decision support system for metering based on time to optimize the flow of aircraft.
Terminal Flight Data Manager (TFDM) A new decision support system for airport surface management and ATC tower functions.
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
TFMS
TBFM
Integrated TFM: 3Ts working together
TFDM / TFMS
TFDM
TBFM
WJHTC
ATCSCC
TFDM/TFMS
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach
Terminal Flight Data Manager (TFDM)
Michael Huffman Program Manager Industry Outreach
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Please note TFDM information in this briefing may be subject to change until the FAA’s Final Investment Decision is complete.
TFDM Program Overview Michael Huffman, TFDM Program Manager
Operational Interdependencies Background Benefits Acquisition Strategy RFI Outcomes Anticipated Approach Timeline Next Steps Program Description Scope Architecture Interdependencies TFDM Notional Timeline Q & A
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Background
Terminal Flight Data Manager (TFDM) is a NextGen program The FAA Joint Resources Council (JRC) approved the initial scope, goals, and schedule of the TFDM program in 2012, made the Initial Investment Decision in early 2014 and will make a Final Investment Decision in early 2016
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Airport Operators
Reduced CO2 Footprint Improved Predictability Reduced Engine Noise Better Information for Tactical Rerouting Fewer Aircraft in the Movement Area and Departure Queue (through departure metering) Better Sector Demand Loading Predictions Improved Surface Situational Awareness Improved Predictability Fewer Restrictions
Air Traffic Control
Improved Predictability Fewer Delays More Reliable Schedule Completion More Time Using Terminal Amenities Passengers Electronic Flight Data (EFD) in the ATCT enables real time data sharing Flight Operators
Improved Predictability Less Taxi Time / Out Fuel Burn Improved Crew Utilization Please note TFDM information in this briefing may be subject to change until the FAA’s Final Investment Decision is complete.
Benefits
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
TFDM Acquisition Strategy
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Common Theme of Responses: Want Flexibility TFDM Central/Local architecture too rigid to allow alternatives Software Build Plan allocation of functionality should be more flexible Implementation deployment waterfall has room for improvement
TFDM Program Office Actions Modify SIR documentation to address what is absolutely required for TFDM architecture and SW Build functionality and let Vendors propose their solutions to meet those requirements Modify SIR documentation to address instructions to vendors (Section L) and evaluation criteria (Section M) to achieve solution flexibility Analyze implementation/deployment strategy to identify specific drivers and allow vendors to propose their solutions for implementation and deployment of TFDM systems that meet those drivers
We Heard You: RFI Outcomes
Common Theme of Responses More flexibility needed to provide optimal solutions Architecture Software Build Plan Implementation Deployment Waterfall
TFDM Program Office Modified Draft SIR to:
Improve solution flexibility through “notional” architecture, software build plan, and implementation deployment waterfall requirements with limited constraints Address instructions to vendors (Section L) and evaluation criteria (Section M) to enable solution flexibility in proposal
Please note TFDM information in this briefing may be subject to change until the FAA’s Final Investment Decision is complete.
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Common Theme of Responses: Want Flexibility TFDM Central/Local architecture too rigid to allow alternatives Software Build Plan allocation of functionality should be more flexible Implementation deployment waterfall has room for improvement
TFDM Program Office Actions Modify SIR documentation to address what is absolutely required for TFDM architecture and SW Build functionality and let Vendors propose their solutions to meet those requirements Modify SIR documentation to address instructions to vendors (Section L) and evaluation criteria (Section M) to achieve solution flexibility Analyze implementation/deployment strategy to identify specific drivers and allow vendors to propose their solutions for implementation and deployment of TFDM systems that meet those drivers
Anticipated Approach
TFDM Contract Use of Full & Open Competition POP: (5) Year Base with (7) 1-Year Options Prime contract to include CPFF, CPIF, FFP, T&M CLINs Small Business Sub-contracting Plan Requirements Interested small businesses will be listed on FAACO
Please note TFDM information in this briefing may be subject to change until the FAA’s Final Investment Decision is complete.
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Request for Information Contract Timeline Nondisclosure Agreement Guidelines
TFDM Revised Acquisition Timeline (FY)
Negotiations Complete (10/15) RFI#3 Release (4/14) Draft SIR Release (12/14)
Industry 1 on 1’s (1/15) SIR Release (3/15)
Proposals Due from Industry (5/15)
FID
(3/16) Contract Award (3/16)
=New Activities Revised Program Strategy/ Schedule - JRC (8/20)
Please note TFDM information in this briefing may be subject to change until the FAA’s Final Investment Decision is complete.
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Draft SIR 12/14 One-on-one meetings Details will be posted on FAACO Registration required (access will be on TFDM Web Page) Meetings will occur January, 2015 Q&A’s posted from Draft SIR and one-on-ones will be posted on FAACO SIR posted 3/15 Proposals due 5/15 Next steps Please note TFDM information in this briefing may be subject to change until the FAA’s Final Investment Decision is complete.
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Based on attendance today and 1 on 1’s, Update list of interested vendors
TFDM will provide efficiencies in the airport surface and terminal airspace by providing new integrated surface traffic control and management capabilities, including:
Collaborative Decision-Making on the Surface
EFD
Electronic Flight Data (EFD) and Electronic Flight Strips (EFS) in the tower Electronic Flight Data Traffic Flow Management Enhanced Air Traffic Control Tower (ATCT) Traffic Flow Management Systems Consolidation Replacement of multiple systems in the National Airspace System (NAS) Collaborative decision-making (CDM) on the surface, including departure scheduler, departure metering, and other airport decision tools
Please note TFDM information in this briefing may be subject to change until the FAA’s Final Investment Decision is complete.
TFDM Description
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Please note TFDM information in this briefing may be subject to change until the FAA’s Final Investment Decision is complete.
Flight operator substitutions Electronic Flight Data
Electronic flight strips in the towers Systems interfaces with EFD ERAM data exchange via FDIO (Flight Plan amendment) ASDE-X/ASSC – integration of surface surveillance STARS interface Limited TDLS data exchange TFMS/TBFM data exchange via SWIM CDM data exchange with flight operations systems via SWIM
Traffic Flow Management Integration with TBFM and TFMS Improved demand predictions Enhanced Tactical Departure Scheduling (TDS) Limited runway balancing decision support capabilities Surface Situational Awareness capability in ATCTs, TRACONs, ARTCCs, & ATCSCC
Real time and forecasted flight data information sharing Flight specific schedule data exchange e.g. Gate, Earliest Off-Block Time, Target Movement Area Time Departure queue management (departure metering) Collaborative Decision-Making on the Surface Systems Consolidation EFSTS replacement Departure Spacing Program (DSP) system replacement (requires EFD, Departure Scheduler, and TBFM/IDAC integration) Airport Resource Management Tool (ARMT) system replacement SMA system replacement FDIO monitors, keyboards, and printer replacement
TFDM Program Overview (Current)
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
CDM on Surface
Traffic Flow Management
Systems Consolidation
Please note TFDM information in this briefing may be subject to change until the FAA’s Final Investment Decision is complete.
Eliminated Requirements
Collaborative Decision-Making on the Surface
The majority of “what-if” modeling available to stakeholders De-icing resource metering The majority of ASDE-X/ASSC to EFS integration (surface surveillance remains), but we are not integrating: Display functions, e.g. safety alerts, Flight plan data, Airport/Runway configuration The majority of the TDLS functions at other operational positions (2 way integration with DataComm and incorporating full TDLS functionality within Electronic Flight Strips) STARS two-way data exchange
Terminal Data Link Services, Pre-Departure Clearance / Departure Clearance / Departure Clearance display replacement TMI Compliance prediction Automated delay reporting What-if modelling:
Airport configuration Runway load balancing Resource use prediction
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Tower Cab
TDLS
ARTCC
Time Based Flow Management (TBFM)
WJHTC
Hub Tower Base
TMU
TRACON
TMU
TMU
ERAM
LC/GC/FD-CD/GH-
GM/FLM Displays
Airport Surface Surveillance Systems (ASDE-X or ASSC)
External Comm Gateways Flight Operator Systems (FOSs) including, Airlines, Airport Authorities, Ramp Operators, De-Icing Operations
Traffic Flow Management System (TFMS)
Tower Data Link Service
(TDLS)
STARS
FDD
FMD/SMD
SMD
TBFM TMA
SWIM NEMS
Surface Surv
PDC/DCL
&FDIO-E
FDIO
PC-RCU Refresh
STDDS
TFDM Allocations
FDIO
PC-RCU Refresh From ATCT
ASDE & RVR
TFDM EFSTS Strip Printer Replacement
STARS
TDW LAN
TDW
Area Surv
FDD
TFMS w/SSA TFMS w/SSA
TBFM TMA
TBFM TMA
TFDM Local Processing TFDM Allocations TFDM User Displays
TFDM S-CDM Capabilities TFDM EFD Capabilities
TFDM TFM Capabilities
TFDM Allocations TFDM Allocated to TFMS Displays
ATCSCC
TMU
SLC/ATL
Tower Data Link Service (TDLS) External Comm Gateways Flight Operations Centers (FOCs) and Data link Service Providers (DLSPs)
SWIM NEMS
FDD – Flight Data Display w/PDC-DCL FMD – Front Line Manager Display NEMS – Network Enterprise Msg .Sys.
SMD – Surface Management Display SSA – Surface Situational Awareness TDW – Terminal Display Workstation TMA – Traffic Management Advisor TMU – Traffic Management Unit TSD – Tactical Situation Display Acronyms Communications Lines New LAN Connections Existing FTI WAN Connection Existing LAN Connection Enhanced TFMS WAN Connects New FTI SWIM Connection Existing/Planned FTI SWIM Existing SWIM Backbone
TFDM Central Processing Non-TFDM FAA Systems and Displays Non-FAA Systems
FDPS
SWIM NEMS
To FDPS TFDM Notional Architecture
DATIS
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
ASDE-X/ASSC
STARS/TAMR
SWIM
ERAM via FDIO
TDLS
RMLS
Time-Based Flow Management (TBFM), including IDAC integration Traffic Flow Management System (TFMS) Internal Interfaces
Airport Authorities Flight Op Centers (FOCs)
External Interfaces
CDM Community Policies, Procedure, and Process (P3) development Flying Public Outreach Training Development
Non-System Interdependency
ATCTs (84) TRACONs (58) ARTCCs (18)
ATCSCC
WJHTC
Disaster Recovery Center
MMAC
Facilities Affected Please note TFDM information in this briefing may be subject to change until the FAA’s Final Investment Decision is complete.
TFDM Interdependencies
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27
Segment 1 (S1)
JRC/FID (S1) & Contract Award 3/16 Segment 2 (S2)
IOA/ISD #1 (B1)
(All HW & Training)
IOC (B1)
JRC/FID (S2) FY20
Build 1 (B1) and full H/W Development
OT/ DT
IOA/ISD #2 (B2)
IOC (B2)
Build 2 (B2) Development
OT/ DT
IOC (B3)
Build 3 (B3) Development
(DSP)
OT/ DT
Segment 1 Program Milestones (Prior to Segment 2 JRC FID) DT\OT completed for software build 1 & full hardware configuration Key Site IOC IOA & ISD #1 Completed Interfaces developed and implemented 8 Systems IOC’d
# IOCs: 1 # IOCs: 12 # IOCs: 6 # IOCs: 12 # IOCs: 12 # IOCs: 12 # IOCs: 12 # IOCs: 12 # IOCs: 2
PDR
CDR
PDR
CDR
PDR
CDR
TFDM Notional Timeline
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
10/6/2014
TFDM Question and Answer Session
Additional industry questions must be submitted through TFDM Web Page or FAA Opportunity (FAACO) Web Sites.
Q&A responses from today’s event will be posted on FAACO
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
TFDM Backup
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
| FY16 | Requirements Review |
| FY16-FY17 | System Design |
- Build 1 and Hardware Development FY17-FY19 System Development, Integration & Testing
- Build 1 and Hardware Development FY18-FY19 System Design
- Build 2 FY19-FY21 System Development, Integration & Testing
- Build 2 FY20 System Design
- Build 3 FY21-22 System Development, Integration and Testing
- Build 3
Program Development and Implementation Activities (Notional)
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
TFDM System – Operational View
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Omar Baradi, TFM Deputy Program Manager
Sharonda Holmes, Contracting Officer Industry Outreach Traffic Flow Management System (TFMS)
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Agenda TFMS Overview Omar Baradi, TFM Deputy Program Manager
TFM2 Acquisition Status Sharonda Holmes, Contracting Officer
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Monitors demand and capacity for primary NAS resources
Implements the NAS strategic plan to balance demand with available capacity Assesses the impact of NAS disruptions and provides alerts
Receives updates from other NAS systems and makes adjustments to this plan as needed Focusing on efficiently improving the “greater NAS”
TFMS:
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Traffic Flow Management Traffic Flow Management (TFM) predicts system constraints and facilitates the collaboration and execution of mitigation initiatives with stakeholders, using common information displays and tools to minimize NAS delays.
Traffic Flow Management System (TFMS) is:
A major NAS system and primary tool suite for the Traffic Management Unit (TMU) Backbone for Collaborative Decision Making (CDM) at the FAA TFMS architecture is composed of:
COTS hardware and software infrastructure TFMS Processing Center (TPC) at WJHTC and field sites at all TMU locations, called TFMS Remote Site (TRS) Classified as Mission Efficiency Critical Designed for 99.9% service availability
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
TFMS Infrastructure
ATCSCC
ARTCC
TRACON /Towers Other
ATCSCC – Vint Hill, VA TFM TPC – Technical Center – FAA Disaster Recovery Center (DRC) FAA HQ and Academy Contractor Sites (3) R&D (4) Traffic Management Units at:
ARTCCs (21) TRACONs (35) CERAPs (3) Regional Offices (5) Towers (19) Airlines (24) & AOCs Military (9) International Sites (17) U.S. Government Locations (7) TFMS Operational Locations and Service Delivery Points TFMS Users
- Supports 800 FAA users (200 web-based) Installed at 88 FAA sites and 125 total sites
Collaborative Decision Making (CDM Tools)
- Traffic Situation Display (TSD)
- Flight Schedule Monitor (FSM)
- Flight Schedule Analyzer (FSA)
- National Traffic Management Log (NTML) TFM Processing Center (TPC)
London Control
NAVCANADA
Honduras COCESNA Mexico Control
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
TFMS Continued
Enhanced Status Info System fly.faa.gov Flight Schedule Monitor Traffic Situation Display
National Traffic Management Log
Operational Info System 30+ user/data interfaces
Departure Spacing Program Playbook
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
CATMT Work Package History CATMT WP4 is the fourth in a series of work packages that provides beneficial capabilities and enhancements to the Traffic Flow Management System (TFMS)
TFM 1st Useful Segment JRC approved August 2005 Infrastructure (TFM-M) Modernized and relocated the TFM central processing hub from Volpe to WJHTC Software Enhancements (CATMT WP1) Added beneficial capabilities to the system such as:
Airspace Flow Program (AFP) Adaptive Compression (AC)
RRIA
XFS
CATMT WP3
JRC approved January 2010 SW Infrastructure Modernizes SW infrastructure of the decision support tool suite used by Traffic Managers in the field (remote site) Software Enhancements Collaborative Information Exchange (CIX)
CATMT WP2
JRC approved September 2008 Software Enhancements Adds new, beneficial capabilities to the system Unified Delay Program (UDP) Wx Integration Collaborative Airspace Congestion Resolution (CACR) Airborne Reroute (ABRR)
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
TFM2 Acquisition Status
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
TFM2 Scope Operations & Maintenance of all TFMS Products & Services System monitoring & control Helpdesk and ATCSCC onsite support Continuity of ops and security assurance 2nd-level engineering (e.g. PTR analysis, 56-day and weekly adaptation) Logistics support Deploy software releases and patches Program Management Resource allocation and tracking, scheduling, metrics, EVM, CM, QA
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
TFM2 Scope (cont.)
Systems Engineering Analysis, estimates, requirements, design
Implementation of TFMS Enhancements Detailed design Software code & test Formal acceptance testing support (WSAT, OT, KSAT) Transition planning and site surveys Training material and conduct Deployment support
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
TFM2 Anticipated Acquisition Approach New 12 Year Contract (current ends June 2016) Award decision based on best-value proposal Three-year base with remaining sub-CLINs optional CPFF for operations CPIF for development T&M for engineering services Market Survey released March 20, 2013 Draft SIR/RFP Final SIR/RFP Contract award by November 2015
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
For More TFM2 Information FAA Contract Opportunities https://faaco.faa.gov May subscribe to email announcements
Please Direct Questions on TFM2 in Writing to:
Sharonda.Holmes@faa.gov
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Questions & Answers
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
FAA Industry Outreach
TFDM & TFMS
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Acronyms
| Acronym | Description |
| AAR | Airport Arrival Rate |
| AARDS | AAR Decision Support |
| ABRR | Airborne Rerouting |
| AFP | Airspace Flow Program |
| AIM | Aeronautical Information Manual |
| AJE | En Route and Oceanic Services |
| AJM | Program Management Office |
| AJV | Mission Support Services |
| ARMT | Airport Resource Management Tool |
| ARSI | Arrival Route Status and Impact |
| ARTCC | Air Route Traffic Control Center |
| ASDE-X | Airport Surface Detection Equipment Model X |
| ASDI | Aircraft Situation Display to Industry |
| ATC | Air Traffic Control |
| ATCSCC | ATC System Command Center |
| ATCT | Air Traffic Control Tower |
| ATS | Air Traffic Systems |
| CACR | Collaborative Airspace Constraint Resolution |
| CATM | Collaborative Air Traffic Management |
| CATMT | CATM Technologies |
| CCFP | Collaborative Convective Forecast Product |
| CDM | Collaborative Decision Making |
| CIWS | Corridor Integrated Weather Systems |
| CSG | CDM Stakeholder Group |
| CTOP | Collaborative Trajectory Options Program |
| DCC | ATCSCC |
| DEN | Denver International Airport |
| DFW | Dallas Fort Worth International Airport |
| DLC | Departure Clearance Request |
| DSP | Departure Spacing Program |
| DSS | Decision Support Systems |
| EA | Enterprise Architecture |
| eCVRS | Electronic Computerized Voice Reservation System |
| EDC | En Route Departure Capability |
| EDCT | Expect Departure Clearance Time |
| EFSTS | Electronic Flight Strip Transfer System |
| EIS | Enterprise Infrastructures Services |
| EOBT | Estimated Off Block Time |
| ERAM | En Route Automation Modernization |
| Acronym | Description |
| ETA | Estimated Time of Arrival |
| ETD | Estimated Time of Departure |
| ETMS | Enhanced Traffic Management System |
| Eval. | Evaluation |
| EVM | Earned Value Management |
| F&E | Facilities and Equipment |
| FAA | Federal Aviation Administration |
| FADE | FAA Airline Data Exchange |
| FCA | Flow Constraint Area |
| FEA | Flow Evaluation Area |
| FID | Final Investment Decision |
| FSM | Flight Schedule Monitor |
| FXA | FCA & FEA |
| FY | Fiscal Year |
| GDPE | Ground Delay Program Enhancements |
| GIM-S | Ground Based Interval Management for Spacing |
| GUI | Graphical User Interface |
| HITL | Human-in-the-loop |
| IAD | Washington Dulles |
| IARD | Investment Analysis Readiness Decision |
| ICR | Integrated Collaborative Routing |
| IDAC | Integrated Departure Arrival Capability |
| IDP | Improved Demand Prediction |
| IDRP | Integrated Departure Route Planning |
| IDRP | Integrated Departure Route Planning |
| IID | Initial Investment Decision |
| Info. | Information |
| Infrast. | Infrastructure |
| IPRD | Initial Program Requirements Document |
| ISD | In-Service Decision |
| ISPD | Implementation Strategy Plan Document |
| ITM | Integrated TMI Modeling |
| JPDO | Joint Planning and Development Office |
| JRC | Joint Resources Council |
| MTG | Meeting |
| NAS | National Airspace System |
| NEMS | NAS Enterprise Messaging Service |
| NTML | National Traffic Management Log |
| OIS | Operational Information System |
| OT&E | Operational Test & Evaluation |
| P1/2 | Phase 1/2 |
| PDC | Pre-Departure Clearance |
| PDMP | Pre-Determined Meter Point |
| Acronym | Description |
| PDRC | Precision Departure Release Capability |
| PDRR | Pre-Departure Reroute |
| PMO | Program Management Office |
| RAPT | Route Availability Planning Tool |
| RNAV | Area Navigation |
| RNP | Required Navigation Performance |
| RRIA | Reroute Impact Assessment |
| S-CDM | Surface CDM |
| SCT | Surface CDM System Sub-Team |
| Seg. | Segment |
| SIR | Screening Information Request |
| SLE | Second Level Engineering |
| SMA | Surface Movement Advisor |
| SRM | Safety Risk Management |
| STA | Scheduled Time of Arrival |
| STARS | Standard Terminal Automation Replacement System |
| STD | Scheduled Time of Departure |
| STDDS | SWIM Terminal Data Distribution System |
| SWIM | System Wide Information Management |
| TBFM | Time Based Flow Management |
| TCA | Tactical Consumer Advocate |
| Tech Ops | Technical Operations |
| TFDM | Terminal Flight Data Manager |
| TFM | Traffic Flow Management |
| TFM-M | Traffic Flow Management Modernization |
| TFMS | Traffic Flow Management System |
| TMA | Traffic Management Advisor |
| TMI | Traffic Management Initiative |
| TMU | Traffic Management Unit |
| TPC | TFMS Production Center |
| TRACON | Terminal Radar Approach Control |
| TRS-R | TFM Remote Site Re-engineering (Field site software) |
| TSD | Traffic Situation Display |
| UDP | Unified Delay Program |
| VP | Vice President |
| WP | Work Package |
| XFS | Execution of Flow Strategies |
| ZHU | Houston Air Route Traffic Control Center |
| ZLA | Los Angeles Air Route Traffic Control Center |
| ZMA | Miami Air Route Traffic Control Center |
| ZNY | New York Air Route Traffic Control Center |
| ZOB | Cleveland Air Route Traffic Control Center |
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014
Acronym List
| 3T | |
| Referrs to the 3 "Traffic" systems: TFMS, TBFM, TFDM | |
| AAR | Airport Arrival Rate |
| AARDS | AAR Decision Support |
| ABRR | Airborne Rerouting |
| AFP | Airspace Flow Program |
| AIM | Aeronautical Information Manual |
| AJE | En Route and Oceanic Services |
| AJM | Program Management Office |
| AJV | Mission Support Services |
| ARMT | Airport Resource Management Tool |
| ARSI | Arrival Route Status and Impact |
| ARTCC | Air Route Traffic Control Center |
| ASDE-X | Airport Surface Detection Equipment Model X |
| ASDI | Aircraft Situation Display to Industry |
| ASSC | Airport Surface Surveillance Capability |
| ATC | Air Traffic Control |
| ATCSCC | ATC System Command Center |
| ATCT | Air Traffic Control Tower |
| ATS | Air Traffic Systems |
| ATSCC | Air Traffic Control System Command Center |
| CACR | Collaborative Airspace Constraint Resolution |
| CATM | Collaborative Air Traffic Management |
| CATMT | CATM Technologies |
| CCFP | Collaborative Convective Forecast Product |
| CDM | Collaborative Decision Making |
| CIWS | Corridor Integrated Weather Systems |
| CLIN | Contract Line Item Number |
| CPFF | Cost Plus Fixed Fee |
| CPIF | Cost Plus Incentive Fee |
| CSG | CDM Stakeholder Group |
| CTOP | Collaborative Trajectory Options Program |
| DCC | ATCSCC |
| DEN | Denver International Airport |
| DFW | Dallas Fort Worth International Airport |
| DLC | Departure Clearance Request |
| DSP | Departure Spacing Program |
| DSS | Decision Support Systems |
| DSS | Decision Support Systems |
| DT/OT | Development and Operational Test |
| EA | Enterprise Architecture |
| eCVRS | Electronic Computerized Voice Reservation System |
| EDC | En Route Departure Capability |
| EDCT | Expect Departure Clearance Time |
| EFD | Electronic Flight Data |
| EFS | Electronic Flight Strips |
| EFSTS | Electronic Flight Strip Transfer System |
| EIS | Enterprise Infrastructures Services |
| EOBT | Estimated Off Block Time |
| ERAM | En Route Automation Modernization |
| ETA | Estimated Time of Arrival |
| ETD | Estimated Time of Departure |
| ETMS | Enhanced Traffic Management System |
| Eval. | Evaluation |
| EVM | Earned Value Management |
| F&E | Facilities and Equipment |
| FAA | Federal Aviation Administration |
| FAACO | |
| Federal Aviation Administration Contract Opportunities | |
| FADE | FAA Airline Data Exchange |
| FCA | Flow Constraint Area |
| FDIO | Flight Data Input/Output system |
| FDPS | Flight Data Publication Service |
| FEA | Flow Evaluation Area |
| FFP | Fit-For-Purpose |
| FID | Final Investment Decision |
| FOC | Flight Operations Centers |
| FSM | Flight Schedule Monitor |
| FXA | FCA & FEA |
| FY | Fiscal Year |
| GDPE | Ground Delay Program Enhancements |
| GIM-S | Ground Based Interval Management for Spacing |
| GUI | Graphical User Interface |
| H/W | Hardware |
| HITL | Human-in-the-loop |
| IAD | Washington Dulles |
| IARD | Investment Analysis Readiness Decision |
| ICR | Integrated Collaborative Routing |
| IDAC | Integrated Departure Arrival Capability |
| IDP | Improved Demand Prediction |
| IDRP | Integrated Departure Route Planning |
| IDRP | Integrated Departure Route Planning |
| IID | Initial Investment Decision |
| Info. | Information |
| Infrast. | Infrastructure |
| IOA | Interim Operating Authority |
| IOC | Initial Operating Capability |
| IPRD | Initial Program Requirements Document |
| ISD | In-Service Decision |
| ISPD | Implementation Strategy Plan Document |
| ITM | Integrated TMI Modeling |
| JPDO | Joint Planning and Development Office |
| JRC | FAA Joint Resources Council |
| MMAC | Mike Monroney Aeronautical Center |
<Presentation Title – Change on Master Slide> <Date of Presentation – Change on Master Slide> FAA Industry Outreach October 2, 2014 image3.png image4.png image2.jpeg image1.wmf image5.png image6.jpeg image7.png image8.jpeg image9.jpeg image10.png image11.png image12.png image13.png image14.png image15.png image16.jpeg image17.png image18.png image19.jpeg image20.jpeg image21.PNG image22.jpeg image23.png image24.png image25.png image26.png image27.png image28.png image29.png image30.wmf image38.png image31.png image32.png image33.png image34.png image35.png image36.png image37.png image39.jpeg image40.jpeg image41.jpeg
File details come from the government source that posted it. Updated .