This is a Request for Prequalification (RFPQ) issued by the North Carolina Department of Public Safety, Division of Emergency Management (NCEM), Hazard Mitigation Office, seeking to qualify prime contractors for residential property acquisition and structure demolition services across North Carolina. The RFPQ solicits applications on an ongoing basis until July 20, 2026, at 5:00 PM ET for contractors capable of performing project scoping, pre-construction services, construction and demolition activities, post-construction services, and closeout services. Services include acquisition (property purchase with asbestos and lead-based paint inspection, appraisal, title work, legal fees, and settlement services) and demolition (pre-demolition evaluation, permitting, abatement, utility disconnection, structure demolition, debris removal, site restoration, and inspections). The first wave of individual Requests for Bid (RFBs) is planned for August 2025. Pre-acquisition and pre-demolition conferences will occur after RFB awards, with prime contractors required to achieve settlement within 90 days of the pre-acquisition conference for acquisition projects and mobilize within 90 days of the pre-demolition conference for demolition projects, with demolition work concluding within 60 to 90 days of settlement. Prequalification is valid for three years from the effective date of the first prequalified contractor list, after which contractors must reapply to maintain status.
Applicants must demonstrate financial stability through submission of recent balance sheets and income statements, possess a North Carolina General Contractor license for demolition services and accredited asbestos inspector credentials for acquisition services, provide evidence of surety bonding capacity rated "A" or better by A.M. Best, and maintain minimum insurance coverage including $5,000,000 combined single limit commercial general liability and worker's compensation as required by North Carolina law. Minimum prequalification score is 80 out of 100 based on evaluation criteria including experience with similar projects, financial capacity, references, safety record, and management qualifications. Contract awards will be made based on preferred project timeframes and lowest responsible price or best value methodology, with contracts under $30,000 awarded by assignment, contracts between $30,000 and $499,999 awarded through informal bidding, and contracts at or above $500,000 awarded through formal sealed bidding. All work must comply with Federal Emergency Management Agency (FEMA) Hazard Mitigation Assistance Program guidelines, applicable state and federal regulations, and local codes. No guarantee of work volume is provided, and prequalification may be rescinded for performance issues, material breaches, false claims violations, misrepresentation of experience, or failure to submit responses to RFBs within any six-month period.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF NORTH CAROLINA
DEPARTMENT OF PUBLIC SAFETY – EMERGENCY MANAGEMENT
Hazard Mitigation Assistance (HMA) Program
REQUEST FOR PREQUALIFICATION (RFPQ):
PRIME CONTRACTORS FOR
RESIDENTIAL CONSTRUCTION SERVICES
ACQUISITION AND DEMOLITION
Request for Prequalification (RFPQ) #: 19-RFPQ-1653309857-GSX
Date of Issue: July 21, 2025
Application Opening Date: Applications Accepted on an Ongoing Basis* until July 20, 2026 at 2:00 PM ET
*NOTE: Applications received before the Opening Date will be processed upon receipt.
Direct all inquiries concerning this RFPQ to:
Sherri Garte Contract Specialist
Email: sherri.garte@ncdps.gov
EXECUTION
By executing this Request for Prequalification (RFPQ), the undersigned Vendor understands that False certification is a Class I felony and certifies that:
that none of its officers, directors, or owners of an unincorporated business entity has been convicted of any violations of Chapter 78A of the General Statutes, the Securities Act of 1933, or the Securities Exchange Act of 1934 (G.S. §143-59.2), and it is not an ineligible Vendor as set forth in G.S. §143-59.1.
Furthermore, by executing this RFPQ, the undersigned certifies to the best of Vendor’s knowledge and belief, that:
it and its principals are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered transactions by any Federal or State department or agency.
As required by G.S. §143-48.5, the undersigned Vendor certifies that it, and each of its sub-Contractors for any future Contract awarded as a result of this RFPQ, complies with the requirements of Article 2 of Chapter 64 of the NC General Statutes, including the requirement for each employer with more than 25 employees in North Carolina to verify the work authorization of its employees through the federal E-Verify system.
G.S. §133-32 and Executive Order 24 (2009) prohibit the offer to, or acceptance by, any State Employee associated with the preparing plans, specifications, estimates for public Contract; or awarding or administering public Contracts; or inspecting or supervising delivery of the public Contract of any gift from anyone with a Contract with the State, or from any person seeking to do business with the State. By execution of this RFPQ, the undersigned certifies, for Vendor’s entire organization and its employees or agents, that Vendor are not aware that any such gift has been offered, accepted, or promised by any employees of your organization.
Failure to execute/sign RFPQ prior to submittal shall render Application invalid and it will be REJECTED.
COMPLETE/FORMAL NAME OF VENDOR:
STREET ADDRESS: P.O. BOX: ZIP:
CITY & STATE & ZIP: TELEPHONE NUMBER: TOLL FREE TEL. NO:
PRINCIPAL PLACE OF BUSINESS ADDRESS IF DIFFERENT FROM ABOVE (SEE INSTRUCTIONS TO VENDORS ITEM #12):
PRINT NAME & TITLE OF PERSON SIGNING ON BEHALF OF VENDOR: FAX NUMBER:
VENDOR’S AUTHORIZED SIGNATURE*: DATE: EMAIL:
APPLICATION APPROVED - ADDED TO PREQUALIFIED LIST
This RFPQ by itself is NOT a Contract. It does not guarantee work. This RFPQ in combination with individual Requests for Bid (“RFB”), BAFOs, and other potential documents will constitute the contracts. If prequalification later results in a contract, you will be expected to accept the NORTH CAROLINA GENERAL TERMS AND CONDITIONS as part of the Contract. Any discrepancies or differences between this RFPQ and subsequent RFBs will be resolved in favor of the RFBs.
FOR STATE USE ONLY: Vendor added to the Prequalified List this ________ day of __________________, 20______, as indicated on
The attached notification, by ____________________________________________________________________.
(Authorized Representative of Department of Public Safety)
STATE OF NORTH CAROLINA
Department of Public Safety
Refer ALL Inquiries regarding this RFPQ to:
Sherri Garte at sherri.garte@ncdps.gov
Request for Prequalification # 19-RFPQ-1653309857-GSX Applications Accepted Ongoing Basis Until: July 20, 2026 at 5:00 pm ET
Using Agency: NCEM, Hazard Mitigation Commodity No. and Description: 721110, Residential Construction Services in the state of North Carolina Requisition No: NA https://files.nc.gov/ncdoa/pandc/OnlineForms/Form_North-Carolina-General-Terms-and-Conditions_09.2020.pdf mailto:sherri.garte@ncdps.gov
CONTENTS
1.0 PURPOSE AND BACKGROUND
1.1 PREQUALIFICATION
2.0 GENERAL INFORMATION
2.1 REQUEST FOR PREQUALIFICATION SCHEDULE
2.2 QUESTIONS
2.3 RFPQ SUBMITTAL
2.4 PREQUALIFIED CONTENTS
2.5 DEFINITIONS, ACRONYMS, AND ABBREVIATIONS
3.0 METHOD OF PREQUALIFICATION AND EVALUATION PROCESS
3.1 METHOD OF PREQUALIFICATION
3.2 CONTRACT AWARD METHODOLOGY
3.3 CONFIDENTIALITY AND PROHIBITED COMMUNICATIONS DURING EVALUATION
3.4 INTERPRETATION OF TERMS AND PHRASES
4.0 REQUIREMENTS
4.1 PROJECT PRICING AND CHANGE ORDERS
4.2 INVOICES
4.3 FINANCIAL STABILITY
4.4 PRIME CONTRACTOR EXPERIENCE
4.5 REFERENCES
4.6 BACKGROUND CHECKS
4.7 PERSONNEL
5.0 SCOPE OF WORK
5.1 GENERAL
5.2 ACQUISITION PROCESS
5.3 DEMOLITION PROCESS
5.4 PROJECTS/DELIVERABLES
5.5 ADDITIONAL REQUIREMENTS
6.0 SCOPE OF PREQUALIFICATION
6.1 PREQUALIFICATION TERMS
6.2 PREQUALIFICATION ONGOING PERFORMANCE EVALUATION/RECISSION
6.3 NO GUARANTEE OF VOLUME OR USAGE
6.4 SCOPE OF WORK AUTHORIZATION AND COMPENSATION
7.0 PROJECT ADMINISTRATION
7.1 PROJECT ADMINISTRATION AND WORK FORCES
7.2 CONSTRUCTION SERVICES MANAGER
7.3 SAFETY OFFICER
7.4 REPORTING REQUIREMENTS
ATTACHMENT A: LOCATION OF WORKERS UTILIZED BY VENDOR
ATTACHMENT B: PREQUALIFICATION QUESTIONNAIRE
SECTION 2: GENERAL REQUIREMENTS
SECTION 3: ACQUISITON AND DEMOLOTION SERVICES SPECIFIC QUALIFICATIONS
ATTACHMENT C: PREQUALIFICATION POLICY
ATTACHMENT D: CUSTOMER REFERENCE
ATTACHMENT E: HUB SUPPLEMENTAL INFORMATION
ATTACHMENT F: ALCOHOL/DRUG-FREE WORK PLACE POLICY
ATTACHMENT G: REQUIRED ELEMENTS FOR UTILIZATION OF FEDERAL FUNDS
ATTACHMENT H: CERTIFICATION REGARDING LOBBYING
Bid Number: 19-RFPQ-1653309857-GSX Vendor: ___________________________________
1.0 PURPOSE AND BACKGROUND
The North Carolina Department of Public Safety (DPS), Division of Emergency Management (NCEM), Hazard Mitigation Office is seeking to qualify highly skilled Prime Contractors to perform residential property acquisition and structure demolition services located across North Carolina. This work will be completed through the NCEM Hazard Mitigation program and includes, but is not limited to, project scoping, pre-construction services, construction/demolition activities, post-construction services, and closeout services of eligible structures.
1.1 PREQUALIFICATION
This RFPQ, by itself, is not a contract. It is merely the first part of a potential contract that will also include the individual Requests for Bid (RFB), potential BAFOs (Best and Final Offers), and any other additional documents or amendments. Prequalified Prime Contractors will have the ability to bid upon residential construction services for projects administered by NCEM as the need arises.
The intent of the RFPQ is to accept applications on an ongoing basis to establish a list of prequalified Prime Contractors. Applications shall be submitted in accordance with this RFPQ, and any addenda issued hereto.
Vendors that have previously submitted applications and for Prime Contractors for Residential Construction Services, and have previously been qualified for acquisition and demolition services will have to re-qualify under this RFPQ.
THE REST OF THIS PAGE HAS INTENTIONALLY BEEN LEFT BLANK
2.0 GENERAL INFORMATION
2.1 REQUEST FOR PREQUALIFICATION SCHEDULE
The table below shows the intended schedule of this RFPQ. It is the intent of NCEM to distribute the first wave of RFBs in August of 2025 It is highly recommended to have applications submitted as soon as possible to be considered for the first round of RFBs.
EVENT RESPONSIBILITY DATE AND TIME
Issue Request for Prequalification State July 21, 2025 Submit Written Questions Vendor Ongoing through June 20, 2026 by 2:00 pm ET Provide Response to Questions State Ongoing within 2 weeks of receipt of questions Submit Applications Vendor Applications Accepted on an Ongoing Basis until July
20, 2026 at 5:00 pm ET.
Prequalification Award State Open-Decisions on Applications will be as soon as applicable after submission Prequalification Effective Date State Date Prime Contractor receives notice that application was approved
2.2 QUESTIONS
PURPOSE: Upon review of the RFPQ documents, Vendors may have questions to clarify or interpret the RFPQ in order to submit the best application possible. To accommodate the Prequalification Question process, Vendors shall submit any such questions by the above due date. Thereafter, questions may be submitted anytime, but NCEM will answer them via posting an addendum in the Sourcing Tool (evp.nc.gov) once every 30 days until the prequalification period for this RFPQ is closed. Questions received after the above date will be aggregated the last day of each month and an addendum posted to the Sourcing Tool as soon as possible thereafter.
INSTRUCTIONS: Written questions shall be emailed to sherri.garte@ncdps.gov by the date and time specified above. Vendors should enter “Request for Prequalification #19-RFPQ-1653309857-GSX Questions” as the subject for the email. Question submittals should include a reference to the applicable RFPQ section and be submitted in a format shown below:
REFERENCE VENDOR QUESTION
RFPQ Section, Page Number Vendor question …?
Questions received prior to the submission deadline date and the State’s response will be posted in the form of an addendum in the Sourcing Tool and shall become an Addendum to this RFPQ . No information, instructions, or advice provided orally or informally by any State personnel, whether made in response to a question or otherwise in connection with this RFPQ, shall be considered authoritative or binding. Vendors shall rely only on written material contained in an Addendum to this RFPQ.
mailto:sherri.garte@ncdps.gov
2.3 RFPQ SUBMITTAL
Vendors shall provide responses by email to sherri.garte@ncdps.gov . It is the Vendor’s sole responsibility to ensure its application has been received as described in the RFPQ on an ongoing basis.
Submit one (1) signed, electronic application, one (1) redacted electronic (confidential and proprietary information removed shall be submitted simultaneously with the application to the email address(es) identified above.
The North Carolina Department of Public Safety, in responding to public records requests, will release the contents of the Redacted file provided by the Vendor. It is the sole responsibility of the Vendor to ensure that the Redacted file complies with the requirements in the Instructions to Vendors and ALL proprietary and confidential information, including Personal Identifiable Information (PII) has been removed.
2.4 PREQUALIFIED CONTENTS
The below items are required to be submitted by the Vendor in order to be considered for prequalification.
Vendor shall populate all attachments of this RFPQ that require the Vendor to provide information and include an authorized signature where requested, as outlined below. Vendor responses shall include the following items:
1) Per Section 4.4 Demonstration of Vendor Experience
2) ATTACHMENT A: LOCATION OF WORKERS UTILIZED BY VENDOR
3) ATTACHMENT B: PREQUALIFICATION QUESTIONNAIRE
• SECTION 1: GENERAL COMPANY INFORMATION
• SECTION 2: GENERAL REQUIREMENTS
• SECTION 3: CONSTRUCTION SERVICES AND AREA OF CONSTRUCTION
4) ATTACHMENT D: CUSTOMER REFERENCE
5) ATTACHMENT E: HUB SUPPLEMENTAL INFORMATION
6) ATTACHMENT H: CERTIFICATION REGARDING LOBBYING
2.5 DEFINITIONS, ACRONYMS, AND ABBREVIATIONS
a) ACQUISITION: The process of purchasing property from their owners to permanently eliminate the risk of flood damage to buildings in a floodplain. Existing structures will be demolished and/or relocated and the acquired land converted to open “green” space. Green space includes all primary structures, outbuildings and debris that may be on the property. The property shall be deed-restricted in perpetuity, having land-use restrictions consistent with 44 C.F.R. part 80.
b) APPLICATION: This Request for Prequalification and Prime Contractor’s Application.
c) AUDIT: The contract(s) awarded pursuant to this RFPQ are subject to audits by state and federal agencies and/or their authorized independent auditors. The auditors may conduct contract performance, financial and/or forensic/fraud audits.
d) CONSTRUCTION SERIVCES MANAGER (CM): A North Carolina licensed General Contractor (GC) with construction management experience that will provide NCEM construction/demolition management services.
e) DEMOLITION: The process of demolishing any building or structure in order to convert the land to open “green” space.
f) DESIGN FLOOD ELEVATION (DFE): The regulatory flood elevation adopted by the local community which is equal to the base flood elevation plus freeboard and wave action, if applicable.
g) FREEBOARD: Freeboard is a factor of safety usually expressed in feet above a flood level for purposes of floodplain management. “Freeboard” tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization of the watershed. The amount of freeboard required each project shall be verified with the local jurisdictions.
h) GC: General Contractor, licensed in the State of North Carolina.
i) LOCAL: Any town, city, county, or other local jurisdiction including any of its sub-units and political subdivision recognized under local and North Carolina law.
j) PRIME CONTRACTOR: The person or firm responsible for daily oversight of the project. This includes providing construction management, subcontracting construction services, managing timelines and budgets, acquiring the necessary designs and permits, as well as ensuring all inspections and certificates are acquired by completion of the project. Prime Contractor will be used interchangeably with Vendor throughout this RFPQ and subsequent documents.
k) RFB: Request for Bid.
l) RFPQ: Request for Prequalification.
m) SCOPE OF WORK: The agreed upon duties and responsibilities of the Prime Contractor for each project site.
The Scope of Work may only be altered by a change order.
n) STATE: The State of North Carolina, including any of its sub-units and political subdivision recognized under
North Carolina law.
o) STATE AGENCY: For purposes of this RFPQ, any sub-unit within the executive branch of the State, State
Officials or Council of State Agencies that may have statutory, managerial or regulatory duties arising from or related to this RFPQ, State Disaster Recovery Acts of 2016, 2017 and 2018, and subsequent acts, and/or Hazard Mitigation Grant Program (HMGP) and these sub-units include but are not limited to: North Carolina Emergency Management (NCEM), Governor’s Office, Department of Public Safety (including NCEM and Division of Purchase & Logistics), Department of Administration (including State Construction Office and Purchase and Contract), State Building Commission, Department of Insurance, Department of Labor, Department of Insurance, Office of State Auditor, Office of the State Controller, Office of State Budget and Management, State Treasurer, Office of the Attorney General, and State licensing boards.
p) VENDOR: The person or firm responsible for daily oversight of the project. This includes providing construction management, subcontracting construction services, managing timelines and budgets, acquiring the necessary designs and permits, as well as ensuring all inspections and certificates are acquired by completion of the project. Prime Contractor will be used interchangeably with Vendor throughout this RFPQ and subsequent documents.
q) WORK ORDER: Specific, written authorization to perform the task(s) listed therein.
3.0 METHOD OF PREQUALIFICATION AND EVALUATION PROCESS
3.1 METHOD OF PREQUALIFICATION
In addition to the requirements below, Prime Contractors shall complete the Prequalification Questionnaire at Attachment B. The Prime Contractor’s qualifications will be scored and evaluated as reflected in the Prequalification Form. The minimum scoring for prequalification as to a Prime Contractor’s ability shall be 80 out of 100.
All Prime Contractors that receive a total combined score of 80 or above will be prequalified for bidding on contracts. Prime Contractors not qualified will be informed of the reasons and scores that resulted in the decision.
Prime Contractors shall follow the policy in Attachment C if they desire further review of the prequalification decision or want to protest the decision. Prime Contractors denied prequalification can seek prequalification after rectifying deficiencies of this RFPQ.
3.2 CONTRACT AWARD METHODOLOGY
Due to the nature of these projects, only Prime Contractors prequalified for residential construction services through the RFPQ process will have the ability to bid upon subsequent RFBs. All qualified bids will be evaluated, and award(s) will be made based on the qualified bid(s) offering the preferred project timeframes with the lowest responsible price, best value or other methodology that meets the best interest of the State. The individual RFBs will indicate the particular evaluation methodology that will be used for that RFB.
While the intent of subsequent RFBs will be to award Contract(s) to a single Prime Contractor for each line item, the State reserves the right to make separate awards to different Prime Contractors for one or more-line items, to not award any portion of the goods or Services, or to cancel an RFB in its entirety without awarding a contract, if it is considered to be most advantageous to the State to do so. NCEM will award projects in a process that is in the best interest of the Hazard Mitigation program and/or specific areas and communities.
There will be three different methods of awarding construction service contracts, further defined below:
1. Contracts up to $29,999.99 may be awarded via assignment to a Prime Contractor pursuant to N.C.G.S. § 143-131.
2. Contracts between $30,000.00 and $499,999.00 will be awarded via informal bidding pursuant to N.C.G.S. § 143-131.
3. Contracts at or above $500,000.00 will be awarded via formal bidding pursuant to N.C.G.S. § 143-129.
AWARDING OF PROJECTS UNDER $30,000.00:
As defined in N.C.G.S. § 143-131, contracts under $30,000.00 do not require competitive bidding or award to the lowest, responsive, responsible bidder.
INFORMAL BIDS FOR PROJECTS BETWEEN $30,000.00 and $499,999.00:
For contracts between $30,000.00 and $ 499,999.00, N.C.G.S. § 143-131 requires competitive bidding and awarding of the contract to the lowest, responsive, responsible bidder. For all of these contracts, NCEM requires additional contractual requirements of N.C.G.S. § 143-128, even if they fall under an exception. NCEM will issue an informal Request for Bid (RFB). These bids will be batched by geographical location and have a similar project type. Those bids will be disseminated in an RFB with the Application Number for those projects. The Prime Contractor(s) shall bid on all projects within the RFB in order to be considered for award. They will submit a fixed price, lump sum, or price per square footage for each task as specified in the RFB. In order for the Prime Contractor to win a bid, they shall provide pricing for all projects within the RFB.
The RFBs will be sent to the email address of record for the prequalified Prime Contractors and will include a date and time for the completed RFB to be sent back to NCEM at the same email address which it was sent from.
Any additional costs which arise as a change order will be negotiated between the Prime Contractor and NCEM.
These Change Orders will have to be approved by NCEM and/or be required by the Authority Having Jurisdiction.
Prime Contractor(s) shall provide NCEM with documentation of these required changes.
FORMAL SEALED BIDS FOR BATCHES OF PROJECTS ABOVE $499,999.99:
Construction service contracts at or above $500,000.00 will need to go through the formal sealed bid process pursuant to N.C.G.S. § 143-129. These contracts will require the additional contractual requirements of N.C.G.S. § 143-128. These contracts will be assembled into groupings by NCEM to allow for the most efficient delivery of construction services for NCEM and the Prime Contractors. RFBs for these sealed bids will be substantially the same as the RFBs in the informal bidding process. The bids will be sent to the email address of record for each Prime Contractor. The Prime Contractors must return their completed RFBs in a sealed envelope to an identified location by the date and time requested in the email sent out by NCEM. NCEM will open the RFBs in public, as required by State law.
Prime Contractor(s) and NCEM will agree upon cost benchmarks for payment before construction services begins which will constitute the draw payment schedule.
3.3 CONFIDENTIALITY AND PROHIBITED COMMUNICATIONS DURING EVALUATION
During the evaluation period and prior to granting prequalification, all information concerning the Application and evaluation is confidential, and possession of the Application and accompanying information is limited to personnel of the issuing agency and any third parties involved in this procurement process, and to the committee responsible for participating in the evaluation. Any attempt on behalf of a Vendor to gain such confidential information, or to influence the evaluation process (e.g., contact anyone involved in the evaluation, criticize another Vendor, offer any benefit or information not contained in the Application) in any way is a violation of North Carolina purchasing law and regulations and shall constitute sufficient grounds for disqualification of Vendor’s application from further evaluation or consideration in the discretion of the State.
3.4 INTERPRETATION OF TERMS AND PHRASES
This Request for Prequalification serves two functions: (1) to advise potential Prime Contractors of the parameters of the solution being sought by NCEM; and (2) to provide a pool of qualified Prime Contractors to NCEM.
As such, all terms in this RFPQ, its addenda, and any subsequent RFB shall be enforceable in accordance with the General Contract Terms and Conditions. The use of phrases such as “shall,” “must,” and “requirements” are intended to create enforceable conditions. In determining whether bids should be evaluated or rejected, the State will take into consideration the degree to which Vendors have proposed or failed to propose solutions that will satisfy the State’s needs as described in the RFB. However, failure to comply with any single requirement may result in the State exercising its discretion to reject a bid in its entirety.
4.0 REQUIREMENTS
This section lists the requirements related to this RFPQ and any subsequent RFBs. By applying for prequalification through this RFPQ, the Prime Contractor agrees to meet all the stated requirements in this Section as well as any other specifications, requirements, and terms and conditions stated in this RFPQ. If the Prime Contractor is unclear about a requirement or specification or believes a change to a requirement would allow for the State to receive a better bid, the Prime Contractor is urged and cautioned to submit these items in the form of a question during the question-and-answer period in accordance with Section 2.1.
4.1 PROJECT PRICING AND CHANGE ORDERS
PROJECTS UNDER $30,000 may be awarded to Prime Contractor(s) based upon its application score and/or performance scorecard or best interests to the State.
PROJECTS AT OR ABOVE $30,000 will be bid out, whether formally of informally, to prequalified Prime Contractors.
Prime Contractors that wish to participate in the program will have to submit bids for desired services that may include, but are not limited to, the following tasks: Acquisition, Demolition, and Administration Services.
CHANGE ORDERS: No additional changes outside the fixed priced will be allowed, unless approved by NCEM in writing. Pricing units for each task will be further discussed in subsequent RFBs. It is the responsibility of the Prime Contractor to assess each property prior to bid submittal. No Change Orders will be approved on the claim of site condition changes of the structure and/or property. Prime Contractors shall only invoice for the amounts specifically allowed for this RFPQ and/or subsequent RFB, that is, the Prime Contractors may not bill NCEM or any other State agency for any costs in putting together the requested application.
4.2 INVOICES
Prime Contractors will be instructed in the subsequent RFBs how to invoice for payment. Unless otherwise instructed, Prime Contractors will only submit invoices to NCEM through EM Grants.
The standard format for invoicing shall be single invoice, meaning that the Prime Contractor shall provide NCEM with an invoice for each task or Work Order for each project site. Each task will only be permitted to be invoiced once, unless extenuating circumstances occur and are approved, in writing, by NCEM. Invoices shall include detailed information, supporting documentation, and/or deliverables requested in a Work Order to allow NCEM or their designee to verify fees, costs, and/or expenses. At a minimum, the following fields shall be included on all invoices:
Prime Contractor’s Contact Information, NC Contract Number, Work Order (Project) Number, Work Order (Project) Date, Site Address, Item Description, Price, Quantity, and Unit of Measure.
Proof of payment to subcontractors will be accepted in the following formats: copy of cancelled check, copy of CC/Cash receipt, copy of electronic funds transfer, and/or copy of wire transfer.
4.3 FINANCIAL STABILITY
As a condition of prequalification, the Prime Contractor must certify that they have the financial capacity to perform and to continue performing its obligations under any resulting Contract; that Prime Contractor has no constructive or actual knowledge of an actual or potential legal proceeding being brought against Prime Contractor that could materially adversely affect performance of any resulting Contract; and that entering into a Contract is not prohibited by any contract, or order by any court of competent jurisdiction.
Each Prime Contractor shall submit the following financial documentation with its Application: most recent annual balance sheet, income statement/statement of retained earnings and cash flow statement, or most recent statement of financial condition by an independent auditor. Financial information, statements, and/or documents submitted with an Application shall be evaluated to determine: whether the Prime Contractor has sufficient ability to perform the Contract; whether the Prime Contractor is able to meet its short-term obligations, debts, liabilities, payroll, and expenses; whether the Prime Contractor has provided complete, reliable, and accurate financial information regarding its business operation; whether the Prime Contractor is financially solvent; and whether the Prime Contractor has sufficient cash flow and/or available financing from a financial institution to perform a contract for 60 days without receiving payment from the State. Financial information of non-public entities may be marked as confidential.
4.4 PRIME CONTRACTOR EXPERIENCE
In its Application, the Prime Contractor shall demonstrate experience with the acquisition, demolition, and environmental mitigation (e.g., abatement of lead and asbestos). Prime Contractors should state experience with Local, State, and Federal statutory requirements for grants, especially Federal Emergency Management Administration grant programs, and State or Local government disaster recovery programs. Lack of disaster recovery experience, experience with certain types of environmental mitigation, or certain types of construction services will not, by themselves, preclude Prime Contractors from being prequalified for all subsequent areas but may affect qualification for some areas. However, lack of experience may be used by NCEM and/or its PM(s) in assigning contracts and/or allowing Prime Contractors to competitively bid on certain types of Contracts.
Prime Contractors should state their experience (e.g., a Prime Contractor has not abated asbestos should not represent experience in performing such work because of the safety health risks involved in not properly performing that work, etc.). Prime Contractors are further warned that misrepresenting experience may result in State and Federal False Claims Act violations. Prime Contractors shall provide information as to that qualifications and experience of all executive, managerial, legal, and professional personnel to be assigned to this project, including resumes citing experience with similar projects and the responsibilities to be assigned to each person.
4.5 REFERENCES
Prime Contractors shall provide at least three (3) references, using ATTACHMENT D: CUSTOMER REFERENCE, for which your company has provided Services of similar size and scope to that proposed herein. The State may contact these references to determine the Services provided are substantially similar in scope to those proposed herein and Prime Contractor’s performance has been satisfactory as part of the evaluation of the Application and/or prior to the award or assignment of a Contract.
4.6 BACKGROUND CHECKS
Prime Contractor and/or subcontractors to be assigned to any contract may be required to undergo background checks at Prime Contractor’s expense prior to beginning work or at any time during the performance of a Contract.
The State of North Carolina, as described in Executive Order 158, Furthering Fair Chance Policies in State Government Employment (August 18, 2020), is committed to eliminating the limitation of opportunity against persons who have criminal records. The State will not disqualify a Prime Contractor from participating in a contract merely based on the criminal history of the Prime Contractor, including its officers or directors, or any of its employees or other personnel providing Services on a project, unless that criminal history impedes the Prime Contractor’s ability to perform the contract, or if State or federal law prohibits contracting with Prime Contractors with certain criminal convictions. The Prime Contractor is encouraged to extend these considerations to employees, subcontractors, and suppliers.
If a background check is requested, the Prime Contractor must provide NCEM with information for:
a) Any criminal felony conviction or conviction of any crime involving moral turpitude, including, but not limited to fraud, misappropriation or deception, of Prime Contractor, its officers or directions, or any of its employees or other personnel to provide services on this project, of which Prime Contractor has knowledge or a statement that it is aware of none;
b) Any criminal investigation for any offense involving moral turpitude, including, but not limited to fraud, misappropriation, falsification or deception pending against Prime Contractor of which it has knowledge or a statement it is aware of none;
c) Any regulatory sanctions levied against Prime Contractor or any of its officers, directors or its professional employees expected to provide services on this project by any State or Federal regulatory agencies within the past three (3) years or a statement that there is none. As used herein, the term “regulatory sanctions” includes the revocation or suspension of any license or certification, the levying of any monetary penalties or fines, and the issuance of any written warnings;
d) Any regulatory investigations pending against Prime Contractor or any of its officers, directors, or its professional employees expected to provide services on this project by any State or Federal regulatory agencies of which Prime Contractor has knowledge or a statement that there are none;
e) Any civil litigation, arbitration, proceeding, or judgements pending against Prime Contractor during the three (3) years preceding submission of its application herein or a statement that there are none.
Prime Contractor’s responses to these requests shall be considered to be continuing representations, and Prime Contractor’s failure to notify NCEM within thirty (30) days of any criminal litigation, investigation, or proceeding involving Prime Contractor or its then current officers, directors or persons providing services under this Contract during its term shall constitute a material breach of Contract. The provisions of this paragraph shall also apply to any subcontractor utilized by Prime Contractor to perform services under this Contract.
4.7 PERSONNEL
Prime Contractor warrants that qualified personnel shall provide Services under any Contract awarded in a professional manner. “Professional manner” means that the personnel performing the Services will possess the skill and competence consistent with the prevailing business standards in the industry. Prime Contractor will serve as the primary contact under any awarded Contract and shall be responsible for the performance and payment of all subcontractor(s) that may be approved by the State.
Names of any third-party Prime Contractors or subcontractors of Prime Contractor may appear for purposes of convenience in Contract document; and shall not limit Prime Contractor’s obligations hereunder. Prime Contractor will retain executive representation for functional and technical expertise as needed in order to incorporate any work by third party subcontractor(s).
Should the Prime Contractor’s application result in a prequalification award, the Prime Contractor shall be required to agree that it will not substitute key personnel assigned to the performance of any Contract without prior written approval by NCEM. Prime Contractor shall further agree that it will notify the NCEM Contract Administrator of any desired substitution, including the name(s) and references of Prime Contractor’s recommended substitute personnel. The State will agree to approve or disapprove the requested substitution in a timely manner. The State may, in its sole discretion, terminate the services of any person providing services under any Contract. Upon such termination, the State may request acceptable substitute personnel or terminate the contract services provided by such personnel.
5.0 SCOPE OF WORK
NCEM is seeking to prequalify skilled Prime Contractors to oversee several aspects of the implementation process for acquisition and demolition services in North Carolina. It is the responsibility of the selected Prime Contractor(s) to manage the overall residential construction services throughout the lifespan and scope of the awarded project.
Upon completion, the site shall be in compliance with the Local, State, and Federal requirements.
The Prime Contractor shall select a Construction Services Manager for acquisition and demolition projects who shall be licensed in the State of North Carolina as a General Contractor. Should the Prime Contractor allocate work to subcontractors, those subcontractors shall have the appropriate registrations and/or licenses to work in the State of North Carolina, verified by the Prime Contractor, and shall be provided to the State as requested. A list of subcontractors to be used should be included in the subsequent RFB submission(s). As much as possible, laborers and subcontractors should be local to the community in which the work is being completed, unless locally contracted crews are substantially more expensive or unavailable to complete work within the deadlines. Each subcontractor shall be able to provide a comprehensive list of positions and laborers utilized.
A pre-construction conference shall take place after RFBs have been awarded to discuss the initial project schedule and Scope of Work with the Prime Contractor(s) and Hazard Mitigation leadership. Within 14 days following this conference, the Prime Contractor(s) shall provide a final project schedule and Scope of Work for all awarded projects.
The Prime Contractor(s) must have the financial ability to undertake the work and assume the liability. Each selected Prime Contractor will be required to furnish proof of sufficient Liability Insurance coverage and must have an accounting system in place to identify costs chargeable to each project.
Prime Contractor(s) will be bound to specific terms and conditions which are subject to change prior to the execution of any contract that may result from subsequent RFB solicitations. It is the intent and goal of NCEM and the State of North Carolina to ensure every project is successful, so qualified Prime Contractor(s) are encouraged to work proactively to identify and resolve all issues and problems immediately to minimize delays in completing projects.
In order to accomplish the required tasks for any of the acquisition and demolition service projects awarded , Prime Contractor(s) must provide administrative services. When applicable, administrative services may include, but are not limited to, the following: construction management, legal closeout services, and any expenses associated with the scope of work not specifically requested elsewhere in an RFB.
In its response, the Vendor may apply to one or more of the following tasks:
ACQUISITION:
Includes - Asbestos and lead-based paint inspection, appraisal, title work, legal fees, settlement fees, and title transfer fees.
For acquisition projects, the Prime Contractor(s) shall conclude settlement with the homeowner(s) on the first project site within 90 days of the pre-acquisition conference. Prior to settlement, the Prime Contractor(s) shall collect all the necessary documentation to facilitate the acquisition of the property (e.g., appraisal(s), duplication of benefits (DOB), etc.), as well as obtaining the homeowner(s) approval of these documents. Deed ownership shall be transferred to the subgrantee, and the programmatic deed restrictions will be recorded within 14 days of settlement. Surveys will be provided by NCEM.
DEMOLITION:
Includes - Pre-demolition evaluation, demolition documents, permitting, asbestos and lead-based paint abatement, mobilization to project site, preparatory site work, utility disconnect, demolition of structure, removal of underground improvements and secondary structures, debris removal, removal of utilities, inspections, final site work (e.g., grading, seeding, etc.) and demobilization from the project site.
For demolition projects, the Prime Contractor(s) shall mobilize to the first project site within 90 days of the pre-demolition conference. In order to mobilize, the Prime Contractor(s) shall collect all the necessary documentation to begin demolition on their first project site (e.g., demolition documents, permits, etc.). Once demolition of all buildings and structures are complete, site restoration and stabilization shall occur to revert the property to open “green” space. All demolition work shall conclude on each project site within 60 days of settlement, in most cases, not to exceed 90 days.
5.1 GENERAL
ENVIRONMENTAL/HISTORIC CONCERNS: During the Federal grant application submittal process, each project undergoes an Environmental and Historic Preservation review by FEMA. Should the review find an environmental or historical concern, the residential construction services must consider the necessary adjustments. The Prime Contractor must have a complete understanding of any environmental and historic issues as well as the necessary construction service requirements relative to the project.
Rights of way and access to the structure as well as site management must also be considered prior to beginning construction services. The necessary means must be taken to minimize environmental impacts imposed by construction services at the site. The Prime Contractor shall be responsible for dust control and all other environmental safeguards and protections as necessary. All such safeguards and protections shall comply with Local, State, and Federal laws and regulations regarding the same. The appropriate disposal of debris must follow environmental regulations and must be disposed of or recycled at an approved facility.
The Prime Contractor is responsible for obtaining all necessary and applicable environmental and regulatory permits prior to commencing any construction service activities. Copies of all documentation evidencing proper permitting and approval shall be provided to NCEM before any activities begin.
RESPONSIBILITY FOR DAMAGE AND VIOLATIONS: The Prime Contractor shall exercise due care in the performance of all activities to minimize any damages to trees, shrubs, landscaping on public or private property. The Prime Contractor shall be responsible for damages to any property caused by its equipment or workers. NCEM shall be notified immediately of any damages which occur during construction service activities conducted by the Prime Contractor or its subcontractors.
The Prime Contractor shall be responsible for any and all corrective action required in response to any notices of violations issues by any Local, State, or Federal agency as a result of the Prime Contractor’s actions. All corrective actions shall be taken at the Prime Contractor’s expense. Additionally, the Prime Contractor shall be solely responsible for the payment of any fines or penalties resulting from any such violations.
EQUIPMENT: All equipment to be utilized by the Prime Contractor shall comply with all applicable Federal, State, and Local rules and regulations and shall be inspected and approved prior to use. The Prime Contractor shall provide all labor and materials necessary to fully operate and maintain all equipment to be utilized.
TEMPORARY LODGING: During the acquisition process, the Prime Contractor may be responsible for providing relocation assistance for tenants under the Uniform Relocation Act (URA). If a tenant qualifies for URA assistance, a Change Order shall be submitted, and pricing shall be negotiated with the State prior to proceeding. More information on URA assistance may be obtained by contacting NCEM or found in FEMA’s Hazard Mitigation Assistance Guidance and the Hazard Mitigation Assistance Guidance Addendum.
5.2 ACQUISITION PROCESS
Each acquisition shall consist of several marked steps to be approved by the local authority having jurisdiction in order to initiate, execute, and closeout each project. Additional requirements will be included in the subsequent RFB for the specific projects. These steps may require multiple site visits by various professionals along with meetings between the Prime Contractor, State, subgrantee representative and/or homeowner. The Prime Contractor(s) and/or licensed professional shall schedule or provide services that include, but are not limited to, the following:
a) PRE-ACQUISITION CONFERENCE: A meeting between NCEM and the Prime Contractor to discuss the initial project schedule and Scope of Work after the award of the Contract.
b) HOMEOWNER CONSULTATION: Prime Contractor meets with homeowner(s) to provide project timeline, conduct a review for Duplication of Benefits (DOB) and eligibility for Uniform Relocation Act (URA) assistance.
c) SITE SURVEY: As part of the Hazard Mitigation Assistance program, a site survey will be provided by NCEM and will not be a part of the Prime Contractor’s scope of work.
d) APPRAISAL: An appraisal of the structure shall be obtained by a licensed professional in order to determine the value of the structure. If the homeowner(s) are dissatisfied with the appraisal, they reserve the right to have a second appraisal, at their expense, conducted. It is at the discretion of the State if a third appraisal is warranted. The average of these appraisals shall be used in determining the value of the structure.
e) LEAD-BASED PAINT AND ASBESTOS: Inspections shall be conducted on the structure for signs of lead-based paint and asbestos. Should any of these be discovered in the work area, the necessary abatement(s) shall be performed during the demolition process. An inspection report or letter from a qualified person providing documentation for the necessary abatement(s) shall be submitted to NCEM.
f) FINAL OFFER AND SETTLEMENT: Once the appraisal(s) are complete, settlement between all necessary parties shall take place in order to purchase the property.
g) TITLE TRANSFER: The Prime Contractor facilitates the transfer of the property title to the subgrantee, typically the city or county. The deed shall be restricted in perpetuity to open space uses to restore and/or conserve the natural floodplain functions.
The Prime Contractor shall endeavor to coordinate all pre-settlement site visits between various subcontractor(s) as to lessen timeframes and inconvenience for the homeowner. The Prime Contractor shall also maintain photo evidence, interior and exterior, of the structure’s condition until the settlement occurs.
5.3 DEMOLITION PROCESS
Each demolition shall consist of several marked steps to be approved by the local authority having jurisdiction in order to initiate, execute, and closeout each project. These steps may require multiple site visits by various professionals along with meetings between the Prime Contractor, State, subgrantee representative and/or homeowner. The Prime Contractor(s) and/or licensed professional shall schedule or provide services that include, but are not limited to, the following:
a) PRE-DEMOLITION CONFERENCE: A meeting between NCEM and the Prime Contractor to discuss the initial project schedule and Scope of Work after the award of the Contract.
b) PRE-DEMOLITION EVALUATION: The Prime Contractor and construction manager shall perform an initial assessment of the structure to determine the required course of action during the demolition process.
Should lead-based paint and asbestos be discovered during the acquisition process, additional precautions shall be taken to ensure these items are disposed of or recycled at an approved facility, following environmental regulations. The Prime Contractor shall provide NCEM with an affidavit stating that any lead-based paint or asbestos containing materials have been disposed of at an approved facility.
c) PERMITS: The Prime Contractor shall obtain all required permits with the local authority having jurisdiction prior to beginning demolition. A copy of any permits shall be provided to NCEM as well as clearly displayed on site.
d) MOBILIZATION: Prime Contractor to complete preparatory work and operations necessary to facilitate the movement of personnel, equipment, supplies and incidentals to the project site.
e) PREPARATORY SITEWORK: All preparatory sitework necessary to ready the site for demolition (e.g., access, grading, excavating, etc.). The Prime Contractor shall protect all trees and shrubs designated to remain in the vicinity of the operations. Additionally, the Prime Contractor is responsible for the entire site and shall provide all the necessary protections as required by laws or ordinances governing such conditions.
f) DEACTIVIATION AND DISCONNECTING UTILITIES: All exterior utilities shall be deactivated and disconnected prior to the demolition process.
g) DEMOLITION: The systematic dismantling, razing, destroying and/or wrecking of the structure.
h) REMOVAL OF UNDERGROUND IMPROVEMENTS AND SECONDARY STRUCTURES: All underground storage tanks, septic tanks, wells, etc., shall be removed or filled/capped per Local, State, and Federal regulations.
Additionally, any secondary structures (e.g., sheds, garages, etc.) shall be removed.
i) REMOVAL OF UTILITIES: All underground utilities shall be capped and excess remains shall be removed from the site and disposed of or recycled at an approved facility, following environmental regulations.
j) DEBRIS REMOVAL: All debris generated by the demolition process shall be removed from the site and disposed of or recycled at an approved facility, following environmental regulations.
k) LAND RESTORATION: All grading, sitework, and seeding done to return the site to open “green” space. Any additional provisions for conversion of the property shall be included in subsequent RFB’s Scope of Work.
l) POST-DEMOLITION EVALUATION: The Prime Contractor and representative(s) from the State shall complete a post-demolition evaluation at each site prior to demobilization. The primary focus of this inspection is to assess the post-demolition condition of the site and compliance with the Scope of Work, all construction service documents, FEMA standards, and Local and State codes. If it is found that the site does not meet expected conditions or comply with FEMA standards, or Local and State codes, the Prime Contractor is responsible for making the additional changes or completing the necessary work to bring the site into compliance. It is at the discretion of the State to determine what work is reimbursable should the construction services fall outside the Scope of Work at any point.
m) DEMOBILIZATION: Prime Contractor to complete post-work and operations necessary to facilitate the removal of personnel, equipment, supplies and incidentals from the project site.
The Prime Contractor shall also maintain photo evidence, interior and exterior, of the structure’s condition until the demolition occurs. Final site condition photos shall be provided to the State prior to demobilization. At any point during the demolition process, if the Scope of Work changes, a Change Order shall be submitted and reviewed by the State prior to continuing work.
If applicable, the EOR shall be notified immediately if any unforeseen site conditions are encountered once demolition has begun. Additionally, any modified design requests due to site conditions shall be submitted to the EOR for review and approval prior to deviating from any sealed demolition documents. All letters and revisions shall be provided to the State within 7 days of issuance and copies shall be available on site for the jurisdictional officials.
5.4 PROJECTS/DELIVERABLES
PROJECT…