Statement_of_Work.doc

DOC document 52 KB Posted

Attached to
Roadway Sinkhole Repair - Construction Federal contract opportunity
Solicitation number
17-277PCV181
Issued by
Department of Homeland Security US Coast Guard

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Roadway Sinkhole Repair - Construction, newest first.
File Type Posted
Sink_Hole-_Technical_Question_Review.doc DOC document
Wage_Rates.pdf PDF
Sinkhole_Print-Encl1.pdf PDF
RFQ_17-277PCV181.pdf PDF
RFQ_FAR_Clauses_and_Instructions.doc DOC document
Location-Encl_2.png PNG image

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SFO Fort Macon, Repair Roadway

SCOPE OF WORK FOR CEU WO: 33-16-3030

1. GENERAL REQUIREMENTS: Current condition: A sinkhole has developed which has been caused by a failed joint(s) in the two 18 inch diameter drainage culvert pipe. The work consists of providing all labor, materials and equipment as required to conduct repairs to the Roadway as per the Scope of Work in section 3 at USCG SFO Fort Macon: 2301 E. Fort Macon Rd. Atlantic Beach, NC. 28512.

2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance, the contractor shall commence work no later than 14 days after notice to proceed and work diligently to complete the entire work and have equipment ready for use by 28 working days after contract has been awarded. Deviations from this timeline due to materials must be documented in the estimate.

3. SCOPE OF WORK:

The Offeror shall:

3.1: Make 60 foot X 12 foot road cut and excavate the area beneath to expose the two 18” inch concrete culvert pipes.

3.2: Demolish and remove the concrete culvert pipes between the storm drain box and the manhole cover box, approximately 60 feet. Enclosure 1, in location Enclosure 2.

3.3: Grade the exposed area beneath the removed culvert pipe level and install two new 18” DOT approved polyethylene culvert pipes. Connect the new pipe into the storm drain box at one end and the manhole covered box at the other using the manufacturers recommend method to connect poly pipe to concrete drain boxes. (Generally 50/50 mix of hydraulic cement and concrete).

3.4: Use fill removed from 3.1 to fill the area around the haunch of the polyethylene pipes to a height no more than 12 from finished rough grade, compact after lift.

3.5: Use aggregate base course (ABC) to fill the remaining area to 2 inches below the top of the existing asphalt layer, (approximately 12 inches of ABC) compact every 6 inches.

3.6: Conduct compaction test to at least 95% or current industry standard for asphalt roadway. Notify QAE of the results.

3.7: Apply asphalt surface course to a depth matching neighboring asphalt depths in two lifts.

3.8: Remove all remaining debris, (dirt, asphalt, demoed piping, etc.) to offsite disposal location IAW. any/all applicable local, state, or federal regulation.

3.9: Restripe parking IAW current configuration.

4. SITE VISIT: All bidders are strongly encouraged to visit the site to verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with Mr. Guy Brunell @ 252-240-8494 (O) or 252-269-9829 (C).

5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project is Mr. Guy Brunell. Inquiries concerning any phase of the specification before or after award shall be made to the QAE.

6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.

7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.

8. ORAL MODIFICATION: No oral statement of any person, other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.

9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.

10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.

11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.

12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the unit’s regular hours (0800-1600), he/she must submit their request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.

13. UPON COMPLETION OF WORK: Contact the Contracting Officer’s QAE Representative to arrange for inspection/acceptance of work.

14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and driver’s license number. The SFO Fort Macon Officer of the Day (OOD) will be given a copy of the employee list and a pass will be issued for entry. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.

15. SAFETY REQUIREMENTS:

1. Responsibilities:

a. All contractors working on SFO Fort Macon shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.

b. Written notification must be provided to SFO Fort Macon Safety Officer, Chief Warrant Officer Randy Seltzer, in their capacity as Fire Marshal of any activity that could potentially cause fire or explosion or that change or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the unit, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.

c. Copies of the following must be provided to the Base Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work. A facility dig chit is required in addition to a Miss Utility dig chit.

d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on SFO Fort Macon property. A Facilities Division representative is required for all contractor Lock Out/Tag Out needs.

2. Rights:

a. Every employee working on SFO Fort Macon has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.

16. ENVIRONMENTAL PROTECTION REQUIREMENTS:

a. All contractors working on SFO Fort Macon shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist, Mr. Todd Ogle, prior to starting work and must be in accordance with the Unit Environmental Guide.

b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on SFO Fort Macon. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.

d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.

File details come from the government source that posted it. Updated .