171.24438.JBB_EscanabaRTUReplacement_Addendum1_Issued_250815.pdf

PDF 2 MB Posted

Attached to
171/24438. JBB; Escanaba State Office Bldg. - RTU Replacement
Solicitation number
RFQ 171 250000000582 3
Issued by
Clinton County, Edmore Village, Michigan

About this file

This is an Addendum No. 1 issued August 15, 2025, by the Michigan Department of Technology, Management & Budget (DTMB) and Michigan Department of Corrections (MDOC) for the Escanaba State Office Building Rooftop Unit Replacement project (DTMB File No. 171/24438.JBB). The project involves replacement of rooftop mechanical units at the state office building located at 305 Ludington Street in Escanaba, Michigan. The bid date remains Wednesday, August 27, 2025, with no changes to the original bidding schedule. The contract duration has been extended to 240 calendar days. All bidders must provide proof of State Project Registration from the Department of Labor and Economic Opportunity. The contractor must provide three weeks' advance notification for any electrical or HVAC system shutdowns, and the awarded contractor must have electrical utility representation at the pre-construction meeting. A mandatory pre-bid meeting was held, with an attendance sign-in sheet attached to the addendum.

A limited asbestos and lead survey was conducted on May 21, 2025, by TriMedia Environmental & Engineering Services, Inc., with results included in the addendum. The survey analyzed 24 samples (32 sample layers) from suspect asbestos-containing materials and lead-based paint in areas scheduled for renovation. Laboratory analysis by EMSL Analytical, Inc. using EPA Method 600/R-93/116 and polarized light microscopy determined that asbestos was not detected at regulated levels in any sampled materials and no suspect lead-based paint was identified in areas to be disturbed. The addendum clarifies that air balance testing does not need to be completed within seven days as previously listed, and requires that all new and existing roof piping be painted safety yellow in accordance with exterior painting specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

DATE: August 15, 2025

PROJECT: Escanaba State Office Building Rooftop Unit Replacement

DTMB File No.: 171/24438.JBB

OWNER: MI DTMB/MDOC

BID DATE: Wednesday, August 27, 2025 ** THIS ADDENDUM DOES NOT CHANGE THE BID

DATE**

The following shall be incorporated into the Contract Documents dated 2025 AUG 01.

GENERAL

The sign-in sheet for the Mandatory pre-bid meeting is attached.

All bid responses require proof of State Project Registration from the Department of Labor and Economic Opportunity.

For scheduling purposes of the State building the contractor must provide a 3 week notification of shutdown of the electrical or HVAC system.

The awarded contractor shall have representation from the electrical utility at the pre-construction meeting.

PROJECT MANUAL

APPENDIX III- SPECIAL PROJECT PROCEURES

Added TRIMEDIA – SUMMARY REPORT – LIMITED ASBESTOS AND LEAD SURVEY

00100 – INSTRUCTIONS TO BIDDERS

Revision – Contract time shall be lengthened to 240 calendar days.

00800 – SUPPLEMENTARY WORKING CONDITIONS

Clarification – It shall be noted that the air balance does not need to be completed within the 7 days listed within this section.

230593 – FACILITY NATURAL GAS PIPING

Clarification – The project will require new and existing piping on the roof to be painted safety yellow in accordance with section 099113 EXTERIOR PAINTING.

DRAWINGS

End of Addendum No. 1

830 W. Washington Street Marquette, MI 49855

906.228.5125

906.228.5126 Fax

www.trimediaee.com

Sent Via Electronic Mail June 6, 2025 Mr. Louis Meyette, PE, Senior Project Manager OHM Advisors 424 Hancock Street Hancock, Michigan 49930

Re: Summary Report – Limited Asbestos and Lead Survey at the State Office Building in Escanaba, Michigan TriMedia Project Number 2025-1810

Dear Mr. Meyette:

TriMedia Environmental & Engineering Services, Inc. (TriMedia) has prepared this correspondence to summarize the results of the limited hazardous materials sampling at the Escanaba State Office Building located at 305 Ludington Street Escanaba, Michigan. The intent of this information and data is to assist OHM Advisors in identifying hazardous materials related to proposed renovation activities at the site, with scope limited to the renovation areas. This correspondence also includes a summary of analytical laboratory results.

TriMedia was on-site on May 21, 2025 to conduct sampling to identify the presence of asbestos-containing materials (ACM) and lead-containing paint within the areas of the identified building where renovations will occur as provided in the drawings dated April 30th, 2025. Renovations are planned to occur to the mechanical system on the roof of the building which is powered by the electrical system in the first-floor mechanical room. The assessment is intended to identify building contaminants that, if mismanaged during renovation activities, could pose an environmental or health and safety concern.

ASBESTOS SURVEY

TriMedia collected a total of 24 samples (consisting of 32 sample layers) of suspect asbestos-containing materials to be submitted for laboratory analysis. Each suspect asbestos-containing material sampled was containerized in a laboratory-supplied sealable bag; labeled with a material description, sample location, and a unique sample number; and, shipped under chain of custody to EMSL Analytical, Inc., (EMSL) in Indianapolis, Indiana for analysis under EPA Method 600/R-93/116 utilizing polarized light microscopy techniques.

ASBESTOS RESULTS

Asbestos was not detected at regulated levels in the materials sampled.

Complete analytical laboratory results have been enclosed for your records. Sampled materials, locations, and analytical results have been summarized in Table 1: Materials Sampled and Found to Not Contain Asbestos.

Mr. Louis Meyette, PE, Senior Project Manager

LEAD CONTAINING PAINT SURVEY

No suspect lead-based paint was identified by TriMedia that will be disturbed as outlined in the renovation plans.

SUMMARY OF FINDINGS AND RECOMMENDATIONS

Asbestos or lead based paint was not found in the materials sampled that will be disturbed as part of planned roof top mechanical system upgrades.

TriMedia made every reasonable attempt to access all areas of the planned renovations. However, as with all inspections, there exists the potential for discovering additional suspect materials not addressed by this report during renovation/demolition activities. In the event suspect materials are identified during on-site activities, they must be sampled before being disturbed.

It is hoped this Summary Report meets your needs and expectations. Should you have any questions regarding this correspondence, or the project in general, please do not hesitate to contact the undersigned at (906) 228-5125 or via email at tsorensen@trimediaee.com. On behalf of the professional staff at TriMedia, thank you for the opportunity to be of service to OHM Advisors.

Sincerely, TriMedia Environmental & Engineering Services, LLC

Kelly Levely, ASP Tim Sorensen, ASP Project Scientist Senior Industrial Hygienist Asbestos Inspector A43125 Asbestos Inspector A43037

TRS/jet

Enclosures: Table 1: Materials Sampled and Found to Not Contain Asbestos Photo Log EMSL Analytical Report – Asbestos cc: TriMedia Project File 2025-1810

Limitations: Information presented in this Summary Report was prepared for OHM Advisors and its authorized parties only.

Any use a third party makes of this report, or any reliance on or decisions to be made based upon, are the responsibility of such third party.

mailto:tsorensen@trimediaee.com

Table 1 Materials Sampled and Found to Not Contain Asbestos

OHM

State Office Building

Escanaba, MI TriMedia 2025-1810

Sample Date: May 21, 2025

Sample #

(Layers) Material/Description

001 A&B Roof Curb Patch Seal

002 A&B Roof Side pan Rubber Roofing

003 A&B Roof Curb Insulation / Felt

004 A&B Roof Curb Caulk / Rubber Roof

005 A&B Roof Side Pan Rubber Roof

006 A&B Roof Curb Rubber Roofing

007 A&B Roof Heating Unit Base Corner Silicon

008 A&B Roof Top of Curb Under Heating Unit Caulk

009 A&B Roof Heating Unit Penetration Caulk

010 A&B Roof Heating Unit Penetration Caulk

011 A&B Roof Heating Unit Penetration Caulk

012 A&B Roof Thread Seal Thread Seal

Location Details

PHOTO LOG

OHM – ASBESTOS SAMPLING

ESCANABA STATE BUILDING

TriMedia Project # 2025-1810

Description: State Building

Date: 05/21/2025 Taken By: KDL

Description: Electric Panel Mechanical East Wall

Description: 001 A&B Roof Curb Patch Seal

Description: 001 A&B Roof Curb Patch Seal

Description: 002 A&B Roof Side Pan Rubber Roofing

Description: 007 A&B Roof Heating Unit Base Corner Silicon

Description: 008 A&B Roof Top of Curb Under Heating Unit Caulk

Description: 008 A&B Roof Top of Curb Under Heating Unit Caulk

Description: 009 A&B Roof Heating Unit Penetration Caulk

Description: 009 A&B Roof Heating Unit

Description: 010 A&B Roof Heating Unit

Description: 010 A&B Roof Heating Unit

Description: 011 A&B Roof Heating Unit

Description: 011 A&B Roof Heating Unit

Description: 012 A&B Roof Thread Seal Thread Seal

Description: 012 A&B Roof Thread Seal Thread Seal

EMSL Analytical, Inc.

6340 CastlePlace Dr. Indianapolis, IN 46250

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162506703EMSL Order:

Customer ID: TRIC50

Customer PO:

Project ID:

Attention: Phone:Kelly Levely (906) 228-5125

Fax:TriMedia Environmental & Engineering Svs (906) 228-5126

Received Date:830 W. Washington St 05/23/2025 9:55 AM

Analysis Date:Marquette, MI 49855 06/02/2025

Collected Date:

Project: 2025-18180 OHM ESKY

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

001A

162506703-0001

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

PATCH SEAL

001B

162506703-0002

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

PATCH SEAL

002A-Rubber

Membrane

162506703-0003

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

RUBBER ROOF

002A-Mastic

162506703-0003A

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

RUBBER ROOF

002B-Rubber

Membrane

162506703-0004

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

RUBBER ROOF

002B-Mastic

162506703-0004A

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

RUBBER ROOF

003A-Insulation

162506703-0005

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

INSULATION / FELT

003A-Felt

162506703-0005A

None DetectedNon-fibrous (Other)20%Synthetic80%Gray/Black

Fibrous

Homogeneous

INSULATION / FELT

003B-Insulation

162506703-0006

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

INSULATION / FELT

003B-Felt

162506703-0006A

None DetectedNon-fibrous (Other)30%Synthetic70%Gray/Black

Fibrous

Homogeneous

INSULATION / FELT

004A-Caulk

162506703-0007

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

CAULK / RUBBER

ROOF

004A-Rubber

Membrane

162506703-0007A

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

CAULK / RUBBER

ROOF

004B-Caulk

162506703-0008

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

CAULK / RUBBER

ROOF

004B-Rubber

Membrane

162506703-0008A

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

CAULK / RUBBER

ROOF

005A

162506703-0009

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

RUBBER ROOF

Initial report from: 06/02/2025 12:42:36

Page 1 of 3ASB_PLM_0008_0002 - 2.31 Printed: 6/2/2025 12:42 PM

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162506703EMSL Order:

Customer ID: TRIC50

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

005B

162506703-0010

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

RUBBER ROOF

006A

162506703-0011

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

RUBBER ROOF

006B

162506703-0012

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

RUBBER ROOF

007A

162506703-0013

None DetectedNon-fibrous (Other)100%Gray/Clear

Non-Fibrous

Homogeneous

SILICON

007B

162506703-0014

None DetectedNon-fibrous (Other)100%Gray/Clear

Non-Fibrous

Homogeneous

SILICON

008A

162506703-0015

None DetectedNon-fibrous (Other)100%Gray/Black

Non-Fibrous

Homogeneous

CAULK

008B

162506703-0016

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

CAULK

009A

162506703-0017

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

CAULK

009B

162506703-0018

None DetectedNon-fibrous (Other)100%Gray/White

Non-Fibrous

Homogeneous

CAULK

010A

162506703-0019

None DetectedNon-fibrous (Other)98%Cellulose2%Gray

Non-Fibrous

Homogeneous

CAULK

010B

162506703-0020

None DetectedNon-fibrous (Other)95%Cellulose5%Gray

Non-Fibrous

Homogeneous

CAULK

011A

162506703-0021

None DetectedNon-fibrous (Other)100%White/Black

Non-Fibrous

Homogeneous

CAULK

011B

162506703-0022

None DetectedNon-fibrous (Other)100%White/Black

Non-Fibrous

Homogeneous

CAULK

012A-Thread Seal

162506703-0023

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

THREAD SEAL

012A-Tape

162506703-0023A

None DetectedNon-fibrous (Other)100%Blue

Non-Fibrous

Homogeneous

THREAD SEAL

012B-Thread Seal

162506703-0024

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

THREAD SEAL

012B-Tape

162506703-0024A

None DetectedNon-fibrous (Other)100%Blue

Non-Fibrous

Homogeneous

THREAD SEAL

Page 2 of 3ASB_PLM_0008_0002 - 2.31 Printed: 6/2/2025 12:42 PM

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162506703EMSL Order:

Customer ID: TRIC50

Customer PO:

Project ID:

Analyst(s)

Hilary Jarvis (16)

Ross Matlock (16)

Asbestos Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non- friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis . Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. Indianapolis, IN NVLAP Lab Code 200188-0, AZ0939, CA 2575, CO AL-15132, TX 300262, A2LA Accredited - Certificate #2845.25

Page 3 of 3ASB_PLM_0008_0002 - 2.31 Printed: 6/2/2025 12:42 PM

OrderID: 162506703

OrderID: 162506703

ADDENDUM NO. 1
GENERAL
The sign-in sheet for the Mandatory pre-bid meeting is attached.
All bid responses require proof of State Project Registration from the Department of Labor and Economic Opportunity.
PROJECT MANUAL