This is a Work Order Information Spreadsheet for exterior sign work across four regions in Oregon, detailing installation, removal, and repair services for lottery signs at various retail locations. The spreadsheet outlines 12 individual jobs distributed across four geographic regions: Region 1 (Portland/Wilsonville area), Region 2 (Lebanon/Scio/Corvallis area), Region 3 (Shady Cove/Klamath Falls/Grants Pass area), and Region 4 (Bend/Hermiston/Redmond area). Each region contains three separate jobs plus a batched option combining all three jobs into a single trip. Jobs involve installation of end projection signs (requiring 3-hour installation times, bucket/boom trucks, and 30-foot power line runs), removal of pole signs (requiring 0.5-hour removal times and bucket/boom trucks), and removal of exterior wall signs (requiring 0.5-hour removal times without specialized equipment). The spreadsheet requires electrician dispatch for each location with travel routing from a central shop and pricing calculations that account for job sequence and route optimization when jobs are batched together.
The spreadsheet includes a pricing column for each individual job and batch operation, with separate overall totals calculated for each of the four regions. Jobs are structured to allow contractors to provide cost proposals reflecting labor, equipment (bucket/boom truck when required), travel time, and material costs. The batching option in each region is designed to evaluate potential cost efficiencies and economies of scale when multiple jobs are completed in a single dispatch trip rather than individually. The document does not specify response deadlines, contract terms, or funding sources, as it functions as a work order template for pricing and scheduling purposes within an existing procurement context.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI S-10000-00006768~2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
worktodo
WORK ORDER INFORMATION SPREADSHEET
| REGION | JOB # | RETAILER NAME | ADDRESS | CITY | ITEM | QTY. | INSTALL | REMOVE | REPAIR | INSTRUCTIONS | PRICING |
| 1 | 1 | Daddy’s Mojo Café | 7901 NE Glisan | Portland | End Projection Sign | 1 | X | *One electrician is dispatched to project location |
*Travel is from shop to Job #1 and back to shop *Install takes 3 hours *Power is located 30' from where Lottery sign will be installed
| *Bucket/Boom truck is required to complete the installation | $ | ||||||||
| 1 | 2 | Villebois Market | 28900 SW Villebois Dr NE | Wilsonville | Pole Sign | 1 | X | *One electrician is dispatched to project location |
*Travel is from shop to Job #2 and back to shop *Removal takes 1/2 hr.
| *Bucket/Boom truck is required to complete the removal | $ | ||||||||
| 1 | 3 | Jacksons Food Stores #530 | 11290 SW Bull Mountain Rd | Tigard | Exterior Wall Sign | 1 | X | *One electrician is dispatched to project location |
*Travel is from shop to Job #3 and back to shop
| *Removal takes 1/2 hr. | $ | |||
| 1 | 4 | Refer to 'INSTRUCTIONS' column. | Batch Job #1 - #3. These will all be done on one trip. The idea is to see if there are cost efficiencies by batching. Route the jobs as you seem fit. |
*One electrician is dispatched to do all three locations *Travel starts from shop
| *Pricing for each job will need to note order of job sequence, i.e., Shop to Job#1, Job #1 to Job #3, etc. | $ | |||||||||||
| OVERALL REGION 1 TOTAL | $ | |||||||||||
| REGION | JOB # | RETAILER NAME | ADDRESS | CITY | ITEM | QTY. | INSTALL | REMOVE | REPAIR | INSTRUCTIONS | PRICING | |
| 2 | 1 | Crowfoot Grocery | 115 Central Ave | Lebanon | End Projection Sign | 1 | X | *One electrician is dispatched to project location |
*Travel is from shop to Job #1 and back to shop *Install takes 3 hours *Power is located 30' from where Lottery sign will be installed
| *Bucket/Boom truck is required to complete the installation | $ | ||||||||
| 2 | 2 | West Scio Santiam Market | 38152 Jefferson-Scio Dr | Scio | Pole Sign | 1 | X | *One electrician is dispatched to project location |
*Travel is from shop to Job #2 and back to shop *Removal takes 1/2 hr.
| *Bucket/Boom truck is required to complete the removal | $ | ||||||||
| 2 | 3 | Jacksons Food Stores #111 | 1334 NW 9th Street | Corvallis | Exterior Wall Sign | 1 | X | *One electrician is dispatched to project location |
*Travel is from shop to Job #3 and back to shop
| *Removal takes 1/2 hr. | $ | |||
| 2 | 4 | Refer to 'INSTRUCTIONS' column | Batch Job #1 - #3. These will all be done on one trip. The idea is to see if there are cost efficiencies by batching. Route the jobs as you seem fit. |
*One electrician is dispatched to do all three locations *Travel starts from shop
| *Pricing for each job will need to note order of job sequence, i.e., Shop to Job#1, Job #1 to Job #3, etc. | $ | |||||||||||
| OVERALL REGION 2 TOTAL | $ | |||||||||||
| REGION | JOB # | RETAILER NAME | ADDRESS | CITY | ITEM | QTY. | INSTALL | REMOVE | REPAIR | INSTRUCTIONS | PRICING | |
| 3 | 1 | Shady Cove Station & Country Store | 21825 Hwy 62 | Shady Cove | End Projection Sign | 1 | X | *One electrician is dispatched to project location |
*Travel is from shop to Job #1 and back to shop *Install takes 3 hours *Power is located 30' from where Lottery sign will be installed
| *Bucket/Boom truck is required to complete the installation | $ | ||||||||
| 3 | 2 | Fast Mart KF | 4846 S 6th St | Klamath Falls | Pole Sign | 1 | X | *One electrician is dispatched to project location |
*Travel is from shop to Job #2 and back to shop *Removal takes 1/2 hr.
| *Bucket/Boom truck is required to complete the removal | $ | ||||||||
| 3 | 3 | Sam's Corner | 6401 Rogue River Hwy | Grants Pass | Exterior Wall Sign | 1 | X | *One electrician is dispatched to project location |
*Travel is from shop to Job #3 and back to shop
| *Removal takes 1/2 hr. | $ | |||
| 3 | 4 | Refer to 'INSTRUCTIONS' column | Batch Job #1 - #3. These will all be done on one trip. The idea is to see if there are cost efficiencies by batching. Route the jobs as you seem fit. |
*One electrician is disbatched to do all three locations *Travel starts from shop
| *Pricing for each job will need to note order of job sequence, i.e., Shop to Job#1, Job #1 to Job #3, etc. | $ | |||||||||||
| OVERALL REGION 3 TOTAL | $ | |||||||||||
| REGION | JOB # | RETAILER NAME | ADDRESS | CITY | ITEM | QTY. | INSTALL | REMOVE | REPAIR | INSTRUCTIONS | PRICING | |
| 4 | 1 | ARCO Greenwood Bend | 304 Greenwood Ave. NE | Bend | End Projection Sign | 1 | X | *One electrician is dispatched to project location |
*Travel is from shop to Job #1 and back to shop *Install takes 3 hours *Power is located 30' from where Lottery sign will be installed
| *Bucket/Boom truck is required to complete the installation | $ | ||||||||
| 4 | 2 | Metro Mart | 1120 W Highland Ave | Hermiston | Pole Sign | 1 | X | *One electrician is dispatched to project location |
*Travel is from shop to Job #2 and back to shop *Removal takes 1/2 hr.
| *Bucket/Boom truck is required to complete the removal | $ | ||||||||
| 4 | 3 | BUY2 021 | 1846 S Hwy 97 | Redmond | Exterior Wall Sign | 1 | X | *One electrician is dispatched to project location |
*Travel is from shop to Job #3 and back to shop
| *Removal takes 1/2 hr. | $ | |||
| 4 | 4 | Refer to 'INSTRUCTIONS' column | Batch Job #1 - #3. These will all be done on one trip. The idea is to see if there are cost efficiencies by batching. Route the jobs as you seem fit. |
*One electrician is dispatched to do all three locations *Travel starts from shop
| *Pricing for each job will need to note order of job sequence, i.e., Shop to Job#1, Job #1 to Job #3, etc. | $ | ||
| OVERALL REGION 4 TOTAL | $ |