This is a Work Order Information Spreadsheet for exterior sign work across four regions in Oregon, detailing installation, removal, and repair services for lottery signs at various retail locations. The spreadsheet outlines 12 individual jobs distributed across four geographic regions: Region 1 (Portland/Wilsonville area), Region 2 (Lebanon/Scio/Corvallis area), Region 3 (Shady Cove/Klamath Falls/Grants Pass area), and Region 4 (Bend/Hermiston/Redmond area). Each region contains three separate jobs plus a batched option combining all three jobs into a single trip. Jobs involve installation of end projection signs (requiring 3-hour installation times, bucket/boom trucks, and 30-foot power line runs), removal of pole signs (requiring 0.5-hour removal times and bucket/boom trucks), and removal of exterior wall signs (requiring 0.5-hour removal times without specialized equipment). The spreadsheet requires electrician dispatch for each location with travel routing from a central shop and pricing calculations that account for job sequence and route optimization when jobs are batched together.

The spreadsheet includes a pricing column for each individual job and batch operation, with separate overall totals calculated for each of the four regions. Jobs are structured to allow contractors to provide cost proposals reflecting labor, equipment (bucket/boom truck when required), travel time, and material costs. The batching option in each region is designed to evaluate potential cost efficiencies and economies of scale when multiple jobs are completed in a single dispatch trip rather than individually. The document does not specify response deadlines, contract terms, or funding sources, as it functions as a work order template for pricing and scheduling purposes within an existing procurement context.

View the file

Other files

File Type Posted
RFI S-10000-00006768~2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

worktodo

WORK ORDER INFORMATION SPREADSHEET

REGIONJOB #RETAILER NAMEADDRESSCITYITEMQTY.INSTALLREMOVEREPAIRINSTRUCTIONSPRICING
11Daddy’s Mojo Café7901 NE GlisanPortlandEnd Projection Sign1X*One electrician is dispatched to project location

*Travel is from shop to Job #1 and back to shop *Install takes 3 hours *Power is located 30' from where Lottery sign will be installed

*Bucket/Boom truck is required to complete the installation$
12Villebois Market28900 SW Villebois Dr NEWilsonvillePole Sign1X*One electrician is dispatched to project location

*Travel is from shop to Job #2 and back to shop *Removal takes 1/2 hr.

*Bucket/Boom truck is required to complete the removal$
13Jacksons Food Stores #53011290 SW Bull Mountain RdTigardExterior Wall Sign1X*One electrician is dispatched to project location

*Travel is from shop to Job #3 and back to shop

*Removal takes 1/2 hr.$
14Refer to 'INSTRUCTIONS' column.Batch Job #1 - #3. These will all be done on one trip. The idea is to see if there are cost efficiencies by batching. Route the jobs as you seem fit.

*One electrician is dispatched to do all three locations *Travel starts from shop

*Pricing for each job will need to note order of job sequence, i.e., Shop to Job#1, Job #1 to Job #3, etc.$
OVERALL REGION 1 TOTAL$
REGIONJOB #RETAILER NAMEADDRESSCITYITEMQTY.INSTALLREMOVEREPAIRINSTRUCTIONSPRICING
21Crowfoot Grocery115 Central AveLebanonEnd Projection Sign1X*One electrician is dispatched to project location

*Travel is from shop to Job #1 and back to shop *Install takes 3 hours *Power is located 30' from where Lottery sign will be installed

*Bucket/Boom truck is required to complete the installation$
22West Scio Santiam Market38152 Jefferson-Scio DrScioPole Sign1X*One electrician is dispatched to project location

*Travel is from shop to Job #2 and back to shop *Removal takes 1/2 hr.

*Bucket/Boom truck is required to complete the removal$
23Jacksons Food Stores #1111334 NW 9th StreetCorvallisExterior Wall Sign1X*One electrician is dispatched to project location

*Travel is from shop to Job #3 and back to shop

*Removal takes 1/2 hr.$
24Refer to 'INSTRUCTIONS' columnBatch Job #1 - #3. These will all be done on one trip. The idea is to see if there are cost efficiencies by batching. Route the jobs as you seem fit.

*One electrician is dispatched to do all three locations *Travel starts from shop

*Pricing for each job will need to note order of job sequence, i.e., Shop to Job#1, Job #1 to Job #3, etc.$
OVERALL REGION 2 TOTAL$
REGIONJOB #RETAILER NAMEADDRESSCITYITEMQTY.INSTALLREMOVEREPAIRINSTRUCTIONSPRICING
31Shady Cove Station & Country Store21825 Hwy 62Shady CoveEnd Projection Sign1X*One electrician is dispatched to project location

*Travel is from shop to Job #1 and back to shop *Install takes 3 hours *Power is located 30' from where Lottery sign will be installed

*Bucket/Boom truck is required to complete the installation$
32Fast Mart KF4846 S 6th StKlamath FallsPole Sign1X*One electrician is dispatched to project location

*Travel is from shop to Job #2 and back to shop *Removal takes 1/2 hr.

*Bucket/Boom truck is required to complete the removal$
33Sam's Corner6401 Rogue River HwyGrants PassExterior Wall Sign1X*One electrician is dispatched to project location

*Travel is from shop to Job #3 and back to shop

*Removal takes 1/2 hr.$
34Refer to 'INSTRUCTIONS' columnBatch Job #1 - #3. These will all be done on one trip. The idea is to see if there are cost efficiencies by batching. Route the jobs as you seem fit.

*One electrician is disbatched to do all three locations *Travel starts from shop

*Pricing for each job will need to note order of job sequence, i.e., Shop to Job#1, Job #1 to Job #3, etc.$
OVERALL REGION 3 TOTAL$
REGIONJOB #RETAILER NAMEADDRESSCITYITEMQTY.INSTALLREMOVEREPAIRINSTRUCTIONSPRICING
41ARCO Greenwood Bend304 Greenwood Ave. NEBendEnd Projection Sign1X*One electrician is dispatched to project location

*Travel is from shop to Job #1 and back to shop *Install takes 3 hours *Power is located 30' from where Lottery sign will be installed

*Bucket/Boom truck is required to complete the installation$
42Metro Mart1120 W Highland AveHermistonPole Sign1X*One electrician is dispatched to project location

*Travel is from shop to Job #2 and back to shop *Removal takes 1/2 hr.

*Bucket/Boom truck is required to complete the removal$
43BUY2 0211846 S Hwy 97RedmondExterior Wall Sign1X*One electrician is dispatched to project location

*Travel is from shop to Job #3 and back to shop

*Removal takes 1/2 hr.$
44Refer to 'INSTRUCTIONS' columnBatch Job #1 - #3. These will all be done on one trip. The idea is to see if there are cost efficiencies by batching. Route the jobs as you seem fit.

*One electrician is dispatched to do all three locations *Travel starts from shop

*Pricing for each job will need to note order of job sequence, i.e., Shop to Job#1, Job #1 to Job #3, etc.$
OVERALL REGION 4 TOTAL$

Sheet1 image1.jpeg

File details come from the government source that posted it. Updated .