This document is a Design Revision (Revision 01) for the CEP-200 & CEP-209 Office Renovations project at Naval Station Norfolk, with the contract number N40085-25-R-2611. The revision includes multiple drawing updates across several disciplines, including structural, general, architectural, mechanical, electrical, and telecommunications plans. Key changes involve adding a new structural framing plan for a roof top unit support at Building CEP-200, revising phasing plans, demolition plans, roof plans, reflected ceiling plans, and updating various technical specifications.
The revision also includes modifications to specifications in multiple divisions, such as removing the firestopping section, updating modular building requirements for floor insulation and wall finishes, and specifying conduit and fiber optic requirements for temporary trailers. Additionally, there are changes to supplemental instructions to offerors, specifically replacing a reference to a design, procurement, and installation section with a new furniture, fixtures, and equipment (FF&E) package reference. The document is dated 25 April 2025 and is issued by PWD Norfolk, Facilities Engineering and Acquisition Division.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25R2622 Amend 0002.pdf | ||
| 25R2622_Gen Req.doc_REV1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWD Norfolk, Facilities Engineering and Acquisition Division Form Version 2023.11.07 Page 1 of 3
Design Revision 01 eProjects Work Order Number: 1637041
Construction Contract Number: N40085-25-R-2611
Buildings: CEP 200 & CEP 209
Project Title: CEP 200 & 209 Office Renovations
Date: 25 April 2025
Design Revision Purpose
1. Response to PPIs
Drawing Revisions
The following drawings, dated 4/25/2025, are added to the list of drawings and accompany this Design Revision:
SHEET NO.
NAVFAC DRAWING NO. SHEET TITLE NO. SHEET
STRUCTURAL
8.1 SF102 12,902,313 FRAMING PLAN FOR RTU SUPPORT – BUILDING CEP 200
The following drawings are revised as of 4/25/2025, and accompany this Design Revision:
SHEET NO.
NAVFAC DRAWING NO. SHEET TITLE NO. SHEET
GENERAL
3 GI003 12,902,238 PHASING PLAN
ARCHITECTURAL
11 AD101 12,902,246 BUILDING CEP 200 - PARTIAL FLOOR PLAN - DEMOLITION
12 AD102 12,902,247 BUILDING CEP 209 - PARTIAL FLOOR PLAN - DEMOLITION
17 AE103 12,902,252 BUILDING CEP 200 ROOF PLAN - NEW
18 AE104 12,902,252 BUILDING CEP 200 ROOF PLAN - NEW
19 AE111 12,902,254 BUILDING CEP 200 – PARTIAL FLOOR PLAN REFLECTED CEILING PLAN - NEW
21 AE121 12,902,256 TRAILER GENERAL NOTES
22 AE122 12,902,257 TEMPORARY TRAILER FLOOR PLAN - NEW
23 AE123 12,902,258 ENLARGED TRAILER PLANS - NEW
MECHANICAL
46 MH101 12,902,281 PARTIAL FIRST FLOOR PLAN – DUCTWORK BLDG CEP 200
49 MI601 12,902,284 MECHANICAL SCHEDULES
ELECTRICAL
56 EL102 12,902,291 BLDG CEP 209 – PARTIAL LIGHTING PLAN – NEW WORK
57 EL501 12,902,292 LIGHTING DIAGRAMS AND DETAILS
58 EL601 12,902,293 LUMINAIRE SCHEDULE
TELECOM
72 TD102 12,902,307 BLDG CEP-209 – PARTIAL TELEOMMUNICATIONS PLAN - DEMOLITION
Form Version 2023.11.07 Page 2 of 3
Specification Revisions
The following specifications, dated 4/25/2025, are added accompany this Design Revision:
DIVISION 05 – METALS
05 52 00.00 27 – NON PENETRATING PERMANENT PERSONNEL GUARDRAIL
The following specifications, dated 4/25/2025, are revised accompany this Design Revision:
DIVISION 01 – GENERAL REQUIREMENTS
01 32 17.00 20 – COST-LOADED NETWORK ANALYSIS SCHEDULE
Noted Revisions
Drawings:
Noted Revisions are not included in sheets & specification sections that have been added or re-issued.
Please make the following modifications to the drawing set:
On NAVFAC Drawing No. - 12,902.237 (GI002) LIST OF SHEETS: In response to PPI – add sheet SF101 to drawing list of sheets.
On NAVFAC Drawing No. – 12,902,291 (EL102)
BLDG CEP-209 – PARTIAL LIGHTING PLAN – NEW WORK: Show locations of emergency lighting fixtures.
On NAVFAC Drawing No. – 12,902,292 (EL501)
Delete Lighting Schedule and Lighting Schedule Notes.
On NAVFAC Drawing No. – 12,902,293 (EL601)
Add Lighting Schedule Notes.
On NAVFAC Drawing No. – 12,902,307 (TD102)
Keynotes: Keynote 1 changed to “Disconnect existing systems furniture telecommunications connection from systems furniture. Demolish data telephone cabling back to source. Demolish associated surface raceway and conduit back to nearest upstream junction box.”
Keynote 2 changed to “Disconnect and demolish existing power pole for systems furniture and data and telephone cabling back to source.”
Keynote 3 changed to “Demolish existing surface mounted data port, data cabling, and surface mounted raceway and conduit back to source.”
Form Version 2023.11.07 Page 3 of 3
Specifications:
Noted Revisions are not included in sheets & specification sections that have been added or re-issued.
Please make the following modifications to the specifications:
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 84 00 – FIRESTOPPING: In Response to PPI – remove section 07 84 00 from specification.
DIVISION 13 – SPECIAL CONSTRUCTION
13 12 00 – MODULAR BUILDINGS, SECTION 2.4: In response to PPI - Modify Floor Insulation to say:
“SPRAY FOAM OR KRAFT BACKED INSULATION”, Modify Finish to say “Seamless resilient floor with continuous 6” base – restroom and janitor, LVT or VCT – all other rooms.”
13 12 00 – MODULAR BUILDINGS, SECTION 2.4 (EXTERIOR WALLS – MISC.): In response to PPI – modify to say: Misc: stagger panel seams- top layer gypsum is held back at mate lines possible & finished on site mud-taped-painted-LEVEL 4 interior wall finish-at factory or vinyl covered gypsum wall finish at factory & finished on site by SMM
13 12 00 – MODULAR BUILDINGS, SECTION 2.8: In response to PPI – Modify paragraph to say “Provide empty 4" conduit from Trailer Comm Room to 6" by 6" NEMA 4 J-Box mounted approximately 6 feet above finished floor of temporary trailers on outside wall of temporary building for telephone services.
Provide 4" conduit with 24 strand single-mode fiber from Trailer Comm Room to 6" by 6" NEMA 4 J-box mounted approximately 6 feet above finished floor of temporary trailers on outside wall of temporary building for NMCI network. Coordinate outside plant connection with NMCI and NCTAMS.”
00 22 13.00 20 Supplemental Instructions to Offerors Revisions
CLIN 0002
Planned Modification Bid Notes 1.3 a – Replace reference to Section 01 30 01.00 22 DESIGN, PROCUREMENT AND INSTALLATION OF FURNITURE, FIXTURES, AND EQUIPMENT with 12 00
01.00 20 FURNITURE, FIXTURES AND EQUIPMENT (FF&E) PACKAGE.
CEP-200
CEP-209
CEP-156
CEP-198
CEP-161
CEP-178
Z-312
ADMIRAL TAUSSIG BLVD
Z-309
COLD STORAGE ROAD
ESCORT AVENUE
A AVENUE
3RD STREET
VIRGINIA AVENUE
VIRGINIA AVENUE
VIRGINIA AVENUE
2ND STREET
2ND STREET
2ND STREET
PHASE I
PHASE II
PHASE III
PHASE IV
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
4/
/2
3:
:5
PM
C :\R ev it
L oc al M od el s\ C
EP
0.
9_
1_ A_
R
_s ar ah .g ilp in
1.
rv t
GI003
BU
IL
DI
NG
S
CE
P-
CE
P-
PH
AS
IN
G
P
LA
N
ALP
12,902,238
SLG SLG
5/6/24
NAVSEA
FM
B
O
FF
IC
E
RE
NO
VA
TI
O N
SLG
1637041
N/A
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
JOHN MILLER, P.E.
ALP
M
ID
LA
N
T
PW
D N
O R
FO
LK
G I0
SCALE: 1" = 10'-0"A1 PHASING PLAN
PHASE DESCRIPTIONS
PHASE I
TRAILER SITE IMPROVEMENTS AND
DELIVERY/INSTALLATION OF TEMPORARY TRAILERS
INSTALLATION OF 2 CONNEX BOXES FOR CUSTOMER
USE. (COMMAND TO INDICATE LOCATION)
PHASE II
CEP-209 OFFICE RENOVATION (ROOM 120)
PHASE III
CEP-200 OFFICE RENOVATION (ROOM D16) &
CEP-209 OFFICE RENOVATION (ROOM D13)
PHASE IV
REMOVAL OF TEMPORARY TRAILERS AND SITE
RESTORATION
GENERAL SHEET NOTES
A THE BUILDING WILL REMAIN OCCUPIED AT ALL PHASES OF CONSTRUCTION.
PROVIDE TEMPORARY DUSTPROOF BARRIERS BETWEEN CONSTRUCTION
AREA AND ADJACENT OCCUPIED AREAS. CONDUCT SELECTIVE DEMOLITION
TO MINIMIZE DISRUPTION OF THE BUILDING OPERATIONS.
B PERFORM SELECTIVE DEMOLITION IN A MANNER AND USING EQUIPMENT THAT
WILL MINIMIZE NOISE AND VIBRATIONS IN THE EXISTING BUILDING, INCLUDING
BUT NOT LIMITED TO PROPER SHORING AND SEPARATION.
C COORDINATE ANY TEMPORARY DISRUPTIONS IN SERVICE WITH CONTRACTING
OFFICER. ALL UTILITY OUTAGES EFFECTING THE OCCUPIED PORTIONS OF THE
EXISTING BUILDING MUST BE PLANNED AND EXECUTED AFTER NORMAL
BUSINESS HOURS.
D MAINTAIN BUILDING OCCUPANT LIFE SAFETY PER NFPA 101 AT ALL TIMES.
PROVIDE CODE COMPLIANT LIFE SAFETY EGRESS PATHWAYS. THESE
PATHWAYS MUST BE KEPT CLEAR AND FREE OF DEBRIS AT ALL TIMES.
E PROVIDE TEMPORARY ENCLOSURES AS REQUIRED TO MAINTAIN THE EXISTING
BUILDING IN A WEATHERTITE CONDITION. PRIOR TO BEGINNING WORK,
PROTECT ALL WALLS, CEILINGS, FLOORS AND OHER EXISTING FINISH WORK
TO REMAIN.
F UNLESS OTHERWISDE NOTED, FURNITURE AND FIXTURES THAT THE
COMMAND WISHES TO KEEP WILL BE REMOVED BY THE COMMAND PRIOR TO
THE START OF EACH PHASE. COORDINATE SCHEDULING OF PHASING AND
PREPATION WITH THE CONTRACTING OFFICER. PERSONNEL WILL REMOVE
ALL PERSONAL ITEMS AND ELECTRONICS FROM WORK STATIONS.
G DEVELOP AND SUBMIT A DETAILED CONSTRUCTION PHASING PLAN FOR
REVIEW AND APPROVAL PER SPECIFICATION 01 14 00 – WORK RESTRICTIONS.
THE PLAN MUST ADDRESS HAZMAT ABATEMENT, DEMOLITION AND NEW WORK.
IDENTIFY LIFE SAFETY EGRESS PATHWAYS, OCCUPANT & CONTRACTOR
ENTRANCES AND EXITS, DEVELOP AND SUBMIT A “WORK AREA SCHEDULE” AS
PART OF, OR AS AN APPENDIX, TO THE PHASING PLAN.
H ALL WORK PERTINENT TO A SPECIFIC PHASE MUST BE COMPLETED PRIOR TO
COMMENCING WORK ON THE NEXT PHASE.
I AIR DISTRIBUTION SYSTEMS SERVING THE SEPARATED PHASES MUST BE KEPT
SEPARATE AT ALL TIMES TO PREVENT THE MIGRATION OF HAZMAT, DUST, AND
DEBRIS TO UN-RENOVATED SPACES.
J REFER TO SHEET GI002 FOR ADDITIONAL GENERAL PROJECT NOTES.
K REFER TO CIVIL, GEOTECHNICAL, STRUCTURAL, ARCHITECTURAL, FIRE
PROTECTION, PLUMBING, MECHANICAL, ELECTRICAL, AND
TELECOMMUNICATION DRAWINGS FOR ADDITIONAL PHASING INFORMATION.
NORTH
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
RE
VI
SI
ON
4/2 5/2
A
C
7 8 9
R S
4' - 2 3/8"
7'
- 0
1/ 2"
3'
- 7
1/ 2"
24H9
24H9
24H9
24H9
W16x26 W16x26
W x
W x
W x
24H9 24H9
24H9 24H9
24H6
24H6
24H6
24H6
24H6
24H6
24H6
24H6
± 4 1'-
9"
36' - 0" 36' - 0"
A1
SF102
OPENING OPENING
3/16
3/16TYP
(E) W24 x 62
(E ) 2
4H 6 J
OI
ST
(E ) 2
4H 9 J
OI
ST
(E ) 2
4H 9 J
OI
ST
5' - 4"
A3
SF102
REFER TO PLAN FOR SPAN
5' - 4"
(E) = EXISTING
L4 x
4 x 1/
L4 x
4 x 1/
L4 x
4 x 1/
L4 x
4 x 1/
L4 x 4 x 1/4 L4 x 4 x 1/4
4"SQ.x1/4" SHEAR TAB
B3
SF102
3/16 3TYP L TO L
L4 x 4 x 1/4 L4 x 4 x 1/4
S R
(E) 24H9 JOIST
L4x4x1/4 FRAME
AROUND OPENINGS, TYPICAL
(E) 1-1/2 " DEEP 22 GA.
STEEL ROOF DECK
L5x5x5/16x0'-5" LONG END OF L4x4x1/4, TYPICAL
NOTE:
COORDINATE LOCATIONS OF
ALL OPENINGS WITH OTHER
TRADES.
10' - 8"
5' - 4"
3' - 10"
1' - 6 1/2"1' - 4 3/4" 8"
(E) 24H6 JOIST
L5x5x5/16x0'-10" LONG
W24x62 BEAM LINE
NOT SHOWN FOR CLARITY
AT
RTU
LOAD
JOIST BOTTOM
CHORD
JOIST TOP
CHORD
NOTE 'A & B'
NOTES:
A. WHERE CONCENTRATED RTU LOADS ARE APPLIED TO TOP
CHORDS BETWEEN PANEL POINTS, REINFORCE JOIST WITH
DOUBLE ANGLES 2x2x1/4 AS INDICATED.
B. THIS DETAIL OCCURS WHERE APPLIED RTU LOADS EXCEED
50 POUNDS, BUT LIMITED TO 300 POUNDS MAXIMUM.
3/16 1
3/16 1 FS NS
EACH
END, TYPICAL
(E) STEEL JOIST
1/2" MAX.
3/16 3
L4X4X1/44" SQ. X 1/4"
SHEAR TAB
3/16 1
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 14 SEP 2023
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
MS
C
OM
MA
ND
MI
D-
AT
LA
NT
IC
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
4/
/2
2:
:0
PM
C :\R ev it
L oc al M od el s\ C
EP
0-
1- S-
R
_b im al .s hr es th a.
rv t
SF102
BU
IL
D
IN
G S
C
EP
-2
C
EP
-2
FM
B O
FF
IC
E R
EN
O
VA
TI
O N
FR
AM
IN
G
P
LA
N F
O R
R
TU
S U
PP
O
R T
DSG
12,902,313
BSH BSH
5/6/24
SLG
1637041
N/A
N O
R
FO
LK
, V
IR
G
IN
IA
N
AV
AL
S
TA
TI
O N
N O
R
FO
LK
J. MILLER, P.E.
J. M. SMITH, RA
M
ID
LA
N
T D
C C
O R
E
SF
NAVSEA
SCALE: 1/8" = 1'-0"C1 ROOF FRAMING PLAN FOR ADDED ROOF TOP UNIT
PLAN
NORTH
1" = 1' - 0" 0 6" 1' 3'2'
3/4" = 1' - 0" 0 1' 5'6" 2' 3' 4'
1/8" = 1' - 0" 0 5' 10' 15' 30'
GENERAL SHEET NOTES
GRAPHIC SCALE(S)
KEY PLAN
BUILDING CEP-200
D16
AREA OF WORK
SCALE: 1" = 1'-0"
C1
SF102 A1 ENLARGED FRAMING AT RTU OPENING (8.A - 7.C) (ROTATED 90 DEGREE FROM PLAN)
SCALE: 3/4" = 1'-0"
A1
SF102 A3 RTU SUPPORT FRAMING SECTION
1. NEW FRAMING MEMBERS AND DIMENSIONS SHOWN ARE BASED ON RTU TRANE
WHC -060. IF DIFFERENT UNIT IS SELECTED, CONTRACTOR WILL NEED TO
ADJUST FRAMING TO FIT APPPROVED EQUAL RTU.
2. RTU AND CURB SHALL NOT EXCEED 1000 POUNDS.
3. CUT AND REMOVE EXISTING ROOF DECK AFTER RTU FRAMING IS INSTALLED,
IMMEDIATELY PRIOR TO INSTALLING EQUIPMENT. CUT OPENING FOR DUCT
PENETRATIONS ONLY.
4. COORDINATE ALL CURB AND FRAMING AROUND PACKAGED ROOF TOP UNITS
WITH MANUFACTURER TO INSURE PROPER CLEARANCES FOR DUCT OPENINGS.
5. SEE JOIST LOAD STRUT DETAIL BETWEEN PANEL POINT BELOW :
SCALE: 1" = 1'-0"B5 JOIST LOAD STRUT
SCALE: 3/4" = 1'-0"
A1
SF102 B3 ANGLE TO JOIST SHEAR TAB CONNECTION
.1
MA
RK
D
ES
CR
IP
TI
ON
DA
TE
RE
VI
SI
ON
4/2 5/2
ABBREVIATIONS:
(E) EXISTING
TYP TYPICAL
SQ SQUARE
MAX MAXIMUM
FS FAR SIDE
NS NEAR SIDE
RTU ROOF TOP UNIT
S SUPPLY
R RETURN
L ANGLE
C
7 8 9
OFFICE
D16A
OPEN OFFICE
D16
OFFICE
D16B
2 3 5
4 3 5
2 3 5
TYP
'-0
5/ 8"
14'-3 5/8"
56'-6 3/8"
'-4
3/ 8"
9'-10 3/4"
'-5
31'-6 1/4"
'-1
0"
'-5
3'-
5"
36'-0 1/2" 20'-5 7/8"
10'-2"
'-8
OUTSIDE OF ARCHITECTURAL SCOPE
6'- 2"
'-3 1/
4"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
4/
/2
4:
:4
PM
C :\R ev it
L oc al M od el s\ C
EP
0.
9_
1_ A_
R
_s ar ah .g ilp in
1.
rv t
AD101
BU
IL
DI
NG
S
CE
P-
CE
P-
BL
DG
C
EP
-2
PA
RT
IA
L
FL
O O
R
PL
AN
DE
M
O
LI
TI
O
N
ALP
12,902,246
SLG SLG
5/6/24
NAVSEA
FM
B
O
FF
IC
E
RE
NO
VA
TI
O N
SLG
1637041
N/A
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
JOHN MILLER, P.E.
ALP
M
ID
LA
N
T
PW
D N
O R
FO
LK
AD
0 4' 8' 16'
PLAN
NORTH
SCALE: 1/8" = 1'-0"
BLDG CEP-200 - PARTIAL FLOOR PLAN - DEMOLITIONB1
PLAN
NORTH
BUILDING CEP-200
D16
AREA OF WORK
GENERAL SHEET NOTES
KEYNOTES#
1 DEMOLISH EXISTING WALL COMPLETE (+/- 52 LINEAR FEET OF WALL IN OFFICE
D16)
2 DEMOLISH EXISTING MULTI-LAYER (CARPET AND ACT) FLOORING ALL THE WAY
DOWN TO EXISTING CONCRETE SUBFLOOR. PREPARE FLOOR TO RECEIVE
NEW FINISH. PROVIDE SELF LEVELING COMPOUND IF NECESSARY TO ACHIEVE
A FLAT SURFACE. REFER TO SPECIFICATION 09 65 00 FOR MORE INFORMATION
ABOUT REQUIRED FLOOR PREPARATION. (+/-1,800 SF TOTAL IN OFFICE D16)
3 DEMOLISH RESILIENT WALLBASE (+/- 309 LINEAR FEET IN RM D16)
4 DEMOLISH VCT FLOORING ALL THE WAY DOWN TO EXISTING SUBFLOOR.
PROVIDE SELF LEVELING COMPOUND IF NECESSARY TO ACHIEVE A FLAT
SURFACE. REFER TO SPECIFICATION 09 65 00 FOR MORE INFORMATION
ABOUT REQUIRED FLOOR PREPARATION. (+/-155 SF TOTAL IN OFFICE D16)
5 ALL SYSTEMS FURNITURE IN ROOM D16 TO BE RELOCATED. CONTRACTOR IS
TO DISSASSEMBLE SYSTEMS FURNITURE AND RE-ASSEMBLE IN AN
ALTERNATIVE LOCATION AS INDICATED BY THE CONTRACTING OFFICER.
6 PATCH AND REPAIR ALL EXISTING TO REMAIN WALLS. REFER TO ELECTRICAL
DEMOLITION PLAN FOR MORE INFORMATION REGARDING DEMOLITION THAT
WILL EFFECT WALLS. PREPARE WALLS FOR NEW FINISH. REFER TO FINISH
SCHEDULE.
7 DEMOLISH EXISTING DOOR AND FRAME COMPLETE.
8 EXISTING DOOR TO REMAIN. PROTECT DURING DEMOLITION.
9 ASBESTOS TESTING INDICATES ASBESTOS IS PRESENT - REFER TO
ABATEMENT PLAN ON HM101
10 DEMOLISH PORTION OF EXISTING WALL TO ALLOW FOR NEW 4'-0" W X 6'-8"
CASED OPENING. (+/- 20 SF TOTAL IN OFFICE D16)
A A REFER TO SHEET A-001 FOR ADDITIONAL GENERAL ARCHITECTURAL NOTES
B THE WORK INCLUDES THE DEMOLITION AND REMOVAL OF ALL CONSTRUCTION
INDICATED, NOTED, OR NECESSARY TO ACCOMPLISH THE WORK AS
INDICATED OR SPECIFIED. IT IS THE GENERAL INTENT OF THE DEMOLITION
WORK TO COMPLETELY REMOVE ALL ITEMS OF EXISTING CONSTRUCTION,
WHERE NOTED OR INDICATED IN THE DRAWINGS, INCLUDING, BUT NOT
LIMITED TO: ANCHORS, FASTENERS, BRACKETS, CLIPS, RODS, HANGERS, AND
SUPPORTS COMPLETE.
C EXISTING DIMENSIONS ARE BASED ON EXISTING DRAWINGS AND FIELD WORK.
VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOPR TO
PERFORMING ANY WORK. BRING ANY DISCREPANCIES TO THE ATTENTION OF
THE CONTRACTING OFFICER PRIOR TO PERFORMING ANY WORK.
D ALL INTERIOR FINISHED SURFACES WHICH ARE DAMAGED WHILE PERFORMING
WORK UNDER THIS CONTRACT MUST BE PATCHED AND/OR REPLACED AND
FINISHED TO MATCH ADJACENT AREAS AT NO COST TO THE GOVERNMENT.
E DEMOLITION OF CIVIL, STRUCTURAL, FIRE PROTECTION, PLUMBING,
MECHANICAL, ELECTRICAL, AND TELECOMMUNICATION ITEMS INDICATED ON
THE ARCHITECTURAL DRAWINGS IS NOT INTENDED TO INCLUDE ALL
NECESSARY DEMOLITION WORK FOR THESE ITEMS. REFER TO CIVIL,
STRUCTURAL, FIRE PROTECTION, PLUMBING, MECHANICAL, ELECTRICAL, AND
TELECOMMUNICATION DRAWINGS FOR ADDITIONAL INFORMATION.
F DEMOLITION PLANS, INCLUDING EQUIPMENT SHOWN, IS A VISUAL
REPRESENTATION OF THE CONDITION OF THE BUILDING AT THE TIME FIELD
WORK WAS CONDUCTED.
G REPAIR ALL DAMAGED CONCRETE SURFACES TO MATCH EXISTING ADJACENT
CONSTRUCTION.
H REMOVE AND SALVAGE ALL SIGNAGE AS REQUIRED FOR RENOVATION,
UNLESS OTHERWISE NOTED. REINSTALL EXISTING SIGNAGE IN ORIGINAL
LOCATION, UNLESS OTHERWISE NOTED. ALL DAMAGED SIGNAGE MUST BE
REPLACED IN KIND.
I REFER TO HAZARDOUS MATERIALS ABATEMENT PLAN ON HM-101.
J REFER TO PHASING PLAN ON GI003 - OFFICE D16 TO BE RENOVATED IN PHASE
III.
K CONTRACTOR IS TO PATCH AND REPAIR ALL WALLS.
(THIS SHEET ONLY)
ROOM D16 RENOVATION IS PHASE III
KEY PLAN
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
RE
VI
SI
ON
4/2 5/2
R
EF
B
B.1
C
C.2
D
E
E.1
E.2
F.1
H
H.1
H.2
J.1
654.143.132.12
C.1
F
OFFICES
D13
OFFICES
LAN ROOM
1 2
TYP
TYP
TYP
1 2
'-4
1/ 4"
25'-10 1/8" ±
35'-10 5/8" ±
10'-0 1/2" ±
'-4
3/ 4"
'-7
1/ 4"
'-0 1/
4"
2'- 4 1
/2"
1690 SF
4827 SF
'-0
1/ 2"
'-7
1/ 2"
3'-
3 1 /4"
9'-9 3/8" ±16'-4" ±
24'-9 1/8" ± 46'-10 1/2" ±
10'-9" ± 40'-4" ± 21'-7 3/4" ± 7'-9 1/2" ±
'-5
1/ 4"
'-8 1/
2"
8'-1" ±
'-4
1/ 8"
'-6
5'-
'-6 1/
4"
'-4
1/ 8"
'-4 1/
4"
'-5
3/ 8"
'-1 0 3
/4"
OUTSIDE OF ARCHITECTURAL SCOPE
OUTSIDE OF
ARCHITECTURAL SCOPE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
4/
/2
4:
:4
PM
C :\R ev it
L oc al M od el s\ C
EP
0.
9_
1_ A_
R
_s ar ah .g ilp in
1.
rv t
AD102
BU
IL
DI
NG
S
CE
P-
CE
P-
BL
DG
C
EP
-2
PA
RT
IA
L
FL
O O
R
PL
AN
DE
M
O
LI
TI
O
N
ALP
12,902,247
SLG SLG
5/6/24
NAVSEA
FM
B
O
FF
IC
E
RE
NO
VA
TI
O N
SLG
1637041
N/A
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
JOHN MILLER, P.E.
ALP
M
ID
LA
N
T
PW
D N
O R
FO
LK
AD
0 4' 8' 16'
PLAN
NORTH
SCALE: 1/8" = 1'-0"
BLDG CEP-209 - PARTIAL FLOOR PLAN - DEMOLITIONA1
PLAN
NORTH
BUILDING CEP-209
D13
AREA OF
WORK
GENERAL SHEET NOTES
KEY PLAN
KEYNOTES#
A REFER TO SHEET A-001 FOR ADDITIONAL GENERAL ARCHITECTURAL NOTES
B THE WORK INCLUDES THE DEMOLITION AND REMOVAL OF ALL CONSTRUCTION
INDICATED, NOTED, OR NECESSARY TO ACCOMPLISH THE WORK AS
INDICATED OR SPECIFIED. IT IS THE GENERAL INTENT OF THE DEMOLITION
WORK TO COMPLETELY REMOVE ALL ITEMS OF EXISTING CONSTRUCTION,
WHERE NOTED OR INDICATED IN THE DRAWINGS, INCLUDING, BUT NOT
LIMITED TO: ANCHORS, FASTENERS, BRACKETS, CLIPS, RODS, HANGERS, AND
SUPPORTS COMPLETE.
C EXISTING DIMENSIONS ARE BASED ON EXISTING DRAWINGS AND FIELD WORK.
VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOPR TO
PERFORMING ANY WORK. BRING ANY DISCREPANCIES TO THE ATTENTION OF
THE CONTRACTING OFFICER PRIOR TO PERFORMING ANY WORK.
D ALL INTERIOR FINISHED SURFACES WHICH ARE DAMAGED WHILE PERFORMING
WORK UNDER THIS CONTRACT MUST BE PATCHED AND/OR REPLACED AND
FINISHED TO MATCH ADJACENT AREAS AT NO COST TO THE GOVERNMENT.
E DEMOLITION OF CIVIL, STRUCTURAL, FIRE PROTECTION, PLUMBING,
MECHANICAL, ELECTRICAL, AND TELECOMMUNICATION ITEMS INDICATED ON
THE ARCHITECTURAL DRAWINGS IS NOT INTENDED TO INCLUDE ALL
NECESSARY DEMOLITION WORK FOR THESE ITEMS. REFER TO CIVIL,
STRUCTURAL, FIRE PROTECTION, PLUMBING, MECHANICAL, ELECTRICAL, AND
TELECOMMUNICATION DRAWINGS FOR ADDITIONAL INFORMATION.
F DEMOLITION PLANS, INCLUDING EQUIPMENT SHOWN, IS A VISUAL
REPRESENTATION OF THE CONDITION OF THE BUILDING AT THE TIME FIELD
WORK WAS CONDUCTED.
G REPAIR ALL DAMAGED CMU AND CONCRETE FOUNDATION SURFACES TO
MATCH EXISTING ADJACENT CONSTRUCTION. REFER TO STRUCTURAL
DRAWINGS FOR ADDITIONAL INFORMATION.
H REMOVE AND SALVAGE ALL SIGNAGE AS REQUIRED FOR RENOVATION,
UNLESS OTHERWISE NOTED. REINSTALL EXISTING SIGNAGE IN ORIGINAL
LOCATION, UNLESS OTHERWISE NOTED. ALL DAMAGED SIGNAGE MUST BE
REPLACED IN KIND.
I REFER TO PHASING PLAN ON GI003. ROOM 120 RENOVATION TO BE
COMPLETED DURING PHASE II. ROOM D13 RENOVATION TO BE COMPLETED
DURING PHASE IV.
J CONTRACTOR IS TO PATCH AND REPAIR ALL WALLS.
(THIS SHEET ONLY)
1 DEMOLISH EXISTING VCT FLOORING ALL THE WAY DOWN TO EXISTING
CONCRETE SUBFLOOR. PREPARE SUBFLOOR TO RECEIVE NEW FLOORING.
PROVIDE SELF LEVELING COMPOUND IF NECESSARY TO ACHIEVE A FLAT
SURFACE. REFER TO SPECIFICATION SECTION 09 65 00 FOR MORE
INFORMATION ABOUT FLOOR PREPARATION. (+/-6,517 SF TOTAL IN BLDG
CEP-209)
2 REMOVE RESILIENT WALLBASE (+/- 627 SF IN BUILDING CEP-209)
3 REMOVE AND DISPOSE OF ALL SYSTEMS FURNITURE COMPLETE
4 PROTECT EXISTING SERVER RACK DURING CONSTRUCTION, REFER TO
ELECTRICAL DRAWINGS
5 REFER TO ELECTRICAL DRAWINGS REGARDING PROTECTION OF CABLES AND
EQUIPMENT DURING DEMOLITION. ALL FINISHES IN LAN ROOM ARE TO
REMAIN. NO NEW ARCHITECTURAL WORK IN LAN ROOM.
6 PATCH AND REPAIR ALL EXISTING TO REMAIN WALLS. REFER TO ELECTRICAL
DEMOLITION PLAN FOR MORE INFORMATION REGARDING DEMOLITION THAT
WILL EFFECT WALLS. PREPARE WALLS FOR NEW FINISH. REFER TO FINISH
SCHEDULE.
7 DOOR TO REMAIN, PROTECT DURING DEMOLITION
8 DEMOLISH PORTION OF CMU/GYPSUM WALL AS NECESSARY TO ALLOW FOR
PLUMBING TIE IN, REFER TO PLUMBING DRAWINGS FOR PLUMBING LINE
PLACEMENT
ROOM 120 RENOVATION IS PHASE II
ROOM D13 RENOVATION IS PHASE III
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
RE
VI
SI
ON
4/2 5/2
OUTSIDE OF ARCHITECTURAL SCOPE
C
7 8 9
SL
OP
E 1/2
":1 2"
± 3 '-1
1 3 /8"
± 7 '-0
1/ 2"
10'-0"
EQ EQ
CL
EQ EQ
± 4'-2 3/8"
4" 4"
NEW ROOF CURB, ROOF CURB TO BE SUPPLIED BY AHU MANUFACURER.
SYSTEM TO BE COMPATIBLE WITH SELECTED AHU.
NEW COUNTER FLASHING FASTENED AT 18" OC.
NEW COVER BOARD, FULLY ADHERED.
NEW RIGID INSULATION,
FULLY ADHERED.
NEW MODIFIED BITUMEN ROOFING
SYSTEM WITH GRANULAR SURFACE.
EXISTING METAL ROOF DECK TO REMAIN.
NEW CANT STRIP.
NEW EXTENDED PLIES ABOVE HEAD OF CANT AND SECURE.
NEW METAL CLAD FLASHING.
NEW GLASS MAT SHEATHING,
MECHANICALLY FASTENED.
8"
EXISTING ROOFING MATERIAL
TO REMAIN
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
4/
/2
4:
:5
PM
C :\R ev it
L oc al M od el s\ C
EP
0.
9_
1_ A_
R
_s ar ah .g ilp in
1.
rv t
AE103
BU
IL
DI
NG
S
CE
P-
CE
P-
BL
DG
C
EP
R O
O F
PL
AN
NE
W
ALP
12,902,252
SLG SLG
5/6/24
NAVSEA
FM
B
O
FF
IC
E
RE
NO
VA
TI
O N
SLG
1637041
N/A
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
JOHN MILLER, P.E.
ALP
M
ID
LA
N
T
PW
D N
O R
FO
LK
AE
GENERAL SHEET NOTES
KEY PLAN
KEYNOTES# (THIS SHEET ONLY)
A REFER TO SHEET GI003 FOR PHASING PLAN.
B REFER TO SHEET A-001 FOR GENERAL ARCHITECTURAL SHEET NOTES.
C REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
0 4' 8' 16'
PLAN
NORTH
SCALE: 1/8" = 1'-0"
BLDG CEP-200 - PARTIAL ROOF PLAN - NEW WORKC1
1 EXISTING MODIFIED BITUMEN ROOF - TOP OF ROOF ABOVE PROJECT SPACE IS
± 19'-4" AFF.
2 EXISTING PARAPET WALL
3 CONTRACTOR TO INSTALL NEW MECHANICAL UNIT ROOF CURB AND NEW
MECHANICAL UNIT. NEW OPENING IN ROOF IS REQUIRED. REFER TO
MECHANICAL AND STRUCTURAL DRAWINGS. REFER TO EQUIPMENT CURB
DETAIL A3/AE103
4 CONTRACTOR TO PROVIDE DEMOUNTABLE RAILING SYSTEM THAT IS IN
ACCORDANCE WITH EMC 304.11 AND OSHA CFR 1926.502.
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
RE
VI
SI
ON
4/2 5/2
SCALE: 3" = 1'-0"A3 EQUIPMENT CURB DETAIL
PROJECT AREA
CEP 200 KEYPLAN
SCALE: 12" = 1'-0"A1 CEP200 ROOF IMAGE
STAIR ACCESS TO ROOF
PROJECT AREA
A.2
B
B.1
C
C.2
D
E
E.1
E.2
F.1
H
H.1
H.2
J.1
654.143.132.12
A.1
C.1
J
G
F
UPPER ROOF
UPPER ROOF
LOWER ROOF
LOWER ROOF
SL
OP
E 1/2
":1 2"
SL
OP
E 1/2
":1 2"
SL
OP
E 1/2
":1 2"
SL
OP
E 1/2
":1 2"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
4/
/2
4:
:5
PM
C :\R ev it
L oc al M od el s\ C
EP
0.
9_
1_ A_
R
_s ar ah .g ilp in
1.
rv t
AE104
BU
IL
DI
NG
S
CE
P-
CE
P-
BL
DG
C
EP
R O
O F
PL
AN
NE
W
ALP
12,902,253
SLG SLG
5/6/24
NAVSEA
FM
B
O
FF
IC
E
RE
NO
VA
TI
O N
SLG
1637041
N/A
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
JOHN MILLER, P.E.
ALP
M
ID
LA
N
T
PW
D N
O R
FO
LK
AE
SCALE: 3/32" = 1'-0"A1 BLDG CEP209 - OVERALL ROOF PLAN
A REFER TO SHEET GI003 FOR PHASING PLAN.
B REFER TO SHEET A-001 FOR GENERAL ARCHITECTURAL SHEET NOTES.
C REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
1 UPPER ROOF OUTSIDE OF SCOPE OF WORK
2 MINI SPLIT CONDENSER UNIT - REFER TO MECHANICAL DRAWINGS FOR ROOF
MOUNTING DETAILS
3 EXISTING MODIFIED BITUMEN ROOF - TOP OF ROOF IS ± 24'-0" AFF
4 EXISTING ROOF HATCH
(THIS SHEET ONLY)
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
RE
VI
SI
ON
4/2 5/2
SCALE: 1" = 1'-0"A4 BLDG CEP 209 - EXISTING ROOF PHOTOS
VIEW FROM UPPER ROOF TO LOWER ROOF - TOWARDS
EXISTING ROOF HATCH
VIEW FROM UPPER ROOF - INTERSECTION OF LOWER AND UPPER ROOF
GENERAL SHEET NOTES
KEYNOTES
S
NEW REFLECTED CEILING PLAN LEGEND
SYMBOL DESCRIPTION
2' - 0" X 2' - 0" NEW ACOUSTICAL CEILING TILE
2' - 0" X 2' - 0" NEW LIGHT FIXTURE - REFER TO
ELECTRICAL DRAWINGS
NEW SUPPLY DIFFUSER. REFER TO MECHANICAL
DRAWINGS.
NEW CEILING RETURN OR EXHAUST. REFER TO
MECHANICAL DRAWINGS.
AREA NOT IN CONTRACT
NEW EXIT SIGNS. REFER TO ELECTRICAL DRAWINGS.
NEW OCCUPANCY SENSOR. REFER TO ELECTRICAL
DRAWINGS.
OS
FINISHED CEILING HEIGHT ABOVE FINISHED FLOORX'-X" A.F.F.
NEW SPEAKER. REFER TO ELECTRICAL DRAWINGS.S
OR
A
C
7 8 9
A.F.F.9' - 11"
1 2 3
OS
OS OS OS
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
4/
/2
4:
:5
PM
C :\R ev it
L oc al M od el s\ C
EP
0.
9_
1_ A_
R
_s ar ah .g ilp in
1.
rv t
AE111
BU
IL
DI
NG
S
CE
P-
CE
P-
BL
DG
C
EP
PA
RT
IA
L
FL
O O
R
PL
AN
R
EF
LE
CT
ED
C
EI
LI
NG
P
LA
N -N
EW
ALP
12,902,254
SLG SLG
5/6/24
NAVSEA
FM
B
O
FF
IC
E
RE
NO
VA
TI
O N
SLG
1637041
N/A
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
JOHN MILLER, P.E.
ALP
M
ID
LA
N
T
PW
D N
O R
FO
LK
AE
GENERAL SHEET NOTES
KEY PLAN
KEYNOTES#
0 4' 8' 16'
PLAN
NORTH
SCALE: 1/8" = 1'-0"
BLDG CEP200 - PARTIAL REFLECTED CEILING PLAN - NEWB1
PLAN
NORTH
BUILDING CEP-200
D16
AREA OF WORK
A UNLESS OTHERWISE NOTED, CEILING TILE MUST BE CENTERED IN EACH
ROOM, IN ACCORDANCE WITH THE LAYOUTS SHOWN.
B MAKE ADJUSTMENTS NECESSARY TO ELIMINATE SMALL OR ODD PIECES OF
CEILING TILE
C REFER TO FIRE PROTECTION, MECHANCIAL AND ELECTRICAL DRAWINGS FOR
LIGHT FIXTURES, EXIT LIGHT LOCATIONS, AIR DIFFUSERS, EXHAUST FANS,
ETC.
D WHERE TILES ARE CUT, COPE AND FINISH EDGES TO MATCH UNCUT TILE.
E CENTER ALL LIGHTS, DIFFUSERS, FIXTURES, SPRINKLER HEADS ETC IN
CEILING TILES UNLESS OTHERWISE NOTED.
F DAMP CLEAN AND HAND DRY ALL FIXTURES AND LAMPS JUST PRIOR TO FINAL
INSPECTION.
(THIS SHEET ONLY)
1 NEW ACOUSTIC CEILING TILE AND SUPPORTING GRID SYSTEM (± 1,955 SF IN
BLDG CEP 200)
2 REFER TO MECHANICAL, ELECTRICAL, AND FIRE PROTECTION DRAWINGS FOR
ADDITIONAL INFORMATION
3 NEW LIGHTING AND AIR TERMINAL DEVICES, REFER TO ELECTRICAL AND
MECHANICAL DRAWINGS
4 PROVIDE EXTRUDED ALUMINUM TRIM PIECE AT PERIMETER OF CEILING GRID -
AT INTERSECTION OF WALL AND CEILING (±225 LF ALUMINUM TRIM ANGLE 1" X
1 1/2")
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
RE
VI
SI
ON
4/2 5/2
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
4/
/2
4:
:0
PM
C :\R ev it
L oc al M od el s\ C
EP
0.
9_
1_ A_
R
_s ar ah .g ilp in
1.
rv t
AE121
BU
IL
DI
NG
S
CE
P-
CE
P-
TR
AI
LE
R
G
EN
ER
AL
N O
TE
S
ALP
12,902,256
SLG SLG
5/6/24
NAVSEA
FM
B
O
FF
IC
E
RE
NO
VA
TI
O N
SLG
1637041
N/A
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
JOHN MILLER, P.E.
ALP
M
ID
LA
N
T
PW
D N
O R
FO
LK
AE
1. THE CONTRACTOR SHALL RETAIN THE SERVICES OF A
PROFESSIONAL STRUCTURAL/GEOTECHNICAL ENGINEER, WHO WILL
CONFER WITH THE SELECTED TRAILER MANUFACTURER TO DESIGN A
FOUNDATION AND TIE-DOWN SYSTEM FOR EACH TRAILER. THE
SELECTED ENGINEER SHALL POSSESS A VALID LICENSE TO PRACTICE
IN THE COMMONWEALTH OF VIRGINIA, AND SHALL HAVE A MINIMUM OF 5
YEARS' EXPERIENCE DESIGNING FOUNDATIONS IN COASTAL VIRGINIA.
THE SELECTED ENGINEER SHALL PROVIDE A STAMPED/SEALED
FOUNDATION DESIGN CONSISTING OF LOAD CALCULATIONS AND
PERTINENT DRAWINGS AND/OR SKETCHES TO THE CONTRACTING
OFFICER FOR REVIEW AND APPROVAL. GOVERNMENT APPROVAL OF
THE CONTRACTOR'S FOUNDATION DESIGN IS REQUIRED PRIOR TO
INSTALLING THE PROPOSED FOUNDATION SYSTEM.
2. ALL TRAILERS/FOUNDATIONS WILL BE DESIGNED ASSUMING AN
OCCUPANCY/RISK CATEGORY OF II.
3. TRAILER FOUNDATIONS SHALL BE DESIGNED USING THE FOLLOWING
PARAMETERS:
a. BEARING CAPACITY OF EXISTING SOILS MAY NOT EXCEED AN
ALLOWABLE BEARING PRESSURE OF 1,500 PSF.
b. FACTOR OF SAFETY AGAINST SLIDING: 2.0.
c. FACTOR OF SAFETY AGAINST OVERTURNING: 2.0.
4. LOADS TO BE USED FOR BEARING CAPACITY DESIGN OF ALL
FOUNDATIONS ARE AS FOLLOWS:
DEAD LOAD - FURNISHED TRAILER (UON BY TRAILER MFR) -----------50 PSF
FLOOR LIVE LOAD (OFFICE/CLASSROOM DESIGNATION) ---------------50 PSF
ROOF LIVE LOAD -------------------------------------------------------------------------20 PSF
SNOW DESIGN CRITERIA: GROUND SNOW LOAD (PG) ---------------------------
---------------------------------------------------------------------------------(ASCE 7-16) 10 PSF ---------------------------------------------------------------------------------- (ASCE 22) 36 PSF
SNOW EXPOSURE FACTOR (CE) -------------------------------------------------------1.0
SNOW LOAD IMPORTANCE FACTOR (IS) -------------------------------------------1.0
5. LOADS TO BE USED FOR SLIDING, UPLIFT AND OVERTURNING
CAPACITY OF ALL FOUNDATIONS ARE AS FOLLOWS:
DEAD LOAD - UNFURNISHED TRAILER (UON BY TRAILER MFR)--------30 PSF
WIND DESIGN CRITERIA (PER ASCE 7-16 OR 22):
BASIC WIND SPEED (VULT) ------------------------------------------------------119 MPH
BASIC WIND SPEED (VASD) ---------------------------------------------------- 92.2 MPH
WIND LOAD IMPORTANCE FACTOR (IW) --------------------------------------------1.0
WIND EXPOSURE CATEGORY ------------------------------------------------------------C
ENCLOSURE CLASSIFICATION -----------------N/A FOR FOUNDATION DESIGN
IN ADDITIONAL TO THE APPLICATION OF HORIZONTAL WIND PRESSURES
ACTING ON THE SIDE OF ANY GIVEN TRAILER, WIND UPLIFT PRESSURES
MUST ALSO BE APPLIED TO THE ENTIRE BOTTOM SURFACE OF EACH
TRAILER USING A RATIONAL METHODOLOGY, IN THE SAME FASHION
THAT UPLIFT WOULD BE APPLIED TO EITHER A STAND-ALONE OPEN
CANOPY STRUCTURE, OR TO A FREESTANDING TANK OR PIECE OF
EQUIPMENT.
6. IN ORDER TO MINIMIZE THE AMOUNT OF GROUND
DISTURBANCE/EXCAVATION ASSOCIATED WITH THIS PROJECT, THE USE
OF EXCAVATED FOOTINGS OR CAST-IN-PLACE CONCRETE FOOTINGS IS
PROHIBITED. ALL FOUNDATIONS MUST CONSIST OF EITHER PRECAST
CONCRETE ELEMENTS, MASONRY PIERS, SLAB ON GRADE OR LIFTED
CONCRETE STEM WALL FOUNDATION, HOT-DIP-GALVANIZED STEEL
CRIBBING, OR MFR'S PROPRIETARY FOUNDATION SYSTEM INSTALLED
DIRECTLY UPON EXISTING GRADE.
7. MANUFACTURER'S LITERATURE REGARDING THE PULLOUT
CAPACITY/STRENGTH OF ANY TIE-DOWN ANCHORS PROPOSED FOR USE
ON THIS PROJECT MUST BE SUPPORTED BY THE RESULTS OF
MANUFACTURER FIELD TESTING WHICH INDICATES PROVEN STRENGTH
CAPABILITIES UNDER SIMILAR LOADING CONDITIONS, AND IN SIMILAR
SOIL CONDITIONS, AS THOSE PRESENT HEREIN; OR SHALL OTHERWISE
BE BASED UPON THE SUCCESSFUL TESTING OF SIMILAR/IDENTICAL SOIL
ANCHORAGE SYSTEMS WHERE SUCH TEST RESULTS HAVE BEEN
PUBLISHED IN A REPUTABLE COMMERCIAL ENGINEERING JOURNAL, OR
GOVERNMENT OR UNIVERSITY PUBLICATION. UNTESTED, UNPROVEN
SYSTEMS WILL NOT BE ACCEPTED.
GENERAL STRUCTURAL NOTES GENERAL MECHANICAL NOTES
1. ALL PLUMBING WORK SHALL BE ACCOMPLISHED IN ACCORDANCE
WITH THE INTERNATIONAL PLUMBING CODE 2009 EDITION.
2. ALL MECHANICAL WORK SHALL BE ACCOMPLISHED IN ACCORDANCE
WITH THE INTERNATIONAL MECHANICAL CODE 2009 EDITION AND THE
LATEST ASHRAE 62.1.
3. PROVIDE A COMPLETE AND OPERABLE AIR CONDITIONING/ HEATING
SYSTEM WITH SUPPLY/RETURN DUCTWORK, CEILING DEVICES, AND
THERMOSTATS. DO NOT RETURN AIR FROM ROOMS BEING EXHAUSTED.
PROVIDE EXHAUST FOR KITCHENS RESTROOMS AND JANITORS CLOSET.
4. PROVIDE DEDICATED A/C UNIT FOR NMCI CLOSET AND SERVER
ROOMS.
5. DOMESTIC COLD WATER AND HOT WATER PIPING SHALL BE EITHER
CPVC PLASTIC PIPE OR COPPER TYPE "L" PROVIDE WITH 1" FIBERGLASS
INSULATION WITH ALL SERVICE JACKET. SUPPORT PIPING FROM
STRUCTURE WITH MANUFACUURED TYPE HANGERS AND INSULATION
SHIELDS.
6. BUILDING WASTE, VENT AND DRAIN PIPING SHALL BE DWV SCHEDULE
40 PLASTIC PIPING. SUPPORT PIPING FROM STRUCTURE WITH
MANUFACTURED TYPE HANGERS.
7. PROVIDE A/C UNITS WITH DUCTED RETURNS IN SERVER ROOMS.
8. BUILDING WASTE MAINS MUST BE A MINIMUM OF 4" AND BE
PROVIDED WITH LONG RADIUS ELBOWS. URINALS AND WATER
CLOSETS MUST BE COMMERCIAL GRADE FLUSH VALVE TYPE. FLUSH
TANKS ARE NOT PERMITTED.
9. PROVIDE PLACARD ABOVE EACH THERMOSTAT LABELLING ITS
CORRESPONDING HVAC UNIT.
GENERAL SIGNAGE NOTES
1. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS
BEFORE PROCEEDING.
2. THE CONTRACTOR IS RESPONSIBLE FOR SITE VERIFICATION PRIOR
TO ORDERING AND INSTALLATION OF ALL ITEMS DESCRIBED ON THE
PLANS AND IN THE SPECIFICATIONS AND ANY ADDITIONAL HARDWARE
OR SIMILAR ITEMS TO COMPLETE INSTALLATION OF SIGNAGE.
3. THE WORK SHALL CONFORM TO ALL APPLICABLE CODES AND
REGULATIONS.
4. WORK SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR
A COMPLETE AND FINISHED INSTALLATION READY FOR THE INTENDED
USE.
5. TYPICAL SIGNAGE IS BASED ON "ESSENTIALS" SIGNAGE FROM 2/90
SIGN SYSTEMS. FINISHES ARE LISTED ON IN601.
6. ALL SIGN TYPES SHALL MEET AMERICANS WITH DISABILITIES ACT
(ADA) REQUIREMENTS.
7. SIGN MOUNTING INFORMATION IS SHOWN ON AG601.
8. USE D-SCREW MOUNTING METHOD ON SIGNS MOUNTED ON WALLS.
USE PRESSURE SENSITIVE TAPE ON SIGNS MOUNTED ON DOORS.
GENERAL SHEET NOTES
1. CONTRACTOR TO MAKE ALL UTILITY CONNECTIONS INCLUDING:
WATER, SANITARY, ELECTRICAL AND TELEPHONE- COORDINATE WITH
SITE PLAN.
2. CONTRACTOR TO INCLUDE TRAILER ANCHORING, SKIRTING, RAISED
WALKWAY BETWEEN TRAILERS, STEP ASSEMBLIES AND IBC COMPLIANT
RAMP SYSTEM.
3. NOT USED.
4. THE PLANS SHOWN ON THIS SHEET ARE FOR DIAGRAMMATIC
ILLUSTRATION REFLECTING THE PROGRAM FOR DESIGN. SHOWING THE
FURNITURE AND FLOOR PLAN LAYOUT ONLY. MODULAR BUILDING
MANUFACTURER TO SUPPLY FURNITURE.
5. THE FINAL DESIGN OF THE TEMPORARY MODULAR BUILDINGS SHALL
BE THE RESPONSIBILITY OF THE MODULAR BUILDING MANUFACTURER.
6. THE PLAN FOR THE TEMPORARY MODULAR BUILDINGS ARE BASED
ON TRAILERS 11'-9" X 36'-0" AND 11'-9" X 48'-0".
7. FINAL LAYOUT FROM THE CONTRACTOR SHALL MAINTAIN THE AREAS
AND ROOM PROPORTIONS SHOWN.
8. REFER TO CIVIL DRAWINGS FOR TEMPORARY MODULAR BUILDING
LOCATION, ACCESS, AND SITE UTILITY DETAILS.
9. FOUNDATION DESIGN SHALL BE THE RESPONSIBILITY OF THE
MODULAR BUILDING MANUFACTURER AND COORDINATED WITH THE
GENERAL CONTRACTOR.
10. REFER TO SPECIFICATION SECTION 13 12 00 FOR FURTHER
INFORMATION.
NOTE: ACTUAL MANUFACTURED TRAILER MAY HAVE SLIGHTLY
DIFFERENT OVERALL AND INTERIOR DIMENSIONS.
OCCUPANCY/FIXTURE COUNT
LIFE SAFETY OCCUPANCY
TRAILERS ARE A "BUSINESS OCCUPANCY" THEREFORE 150
GSF/PERSON.
TOTAL = 6,345 GSF/150 GSF = 43
PLUMBING FIXTURE COUNT
43 OCCUPANTS
FIXTURES PER CODE - 1 PER 25 FOR THE FIRST 50 AND 1
PER 50 FOR THE REMAINDER EXCEEDING 50
NUMBER OF REQUIRED TOILET FIXTURES
MALE: 1 FIXTURES; 1 LAVATORIES
FEMALE: 1 FIXTURES; 1 LAVATORIES
1 DRINKING FOUNTAINS
1 MOP SINK
GENERAL ELECTRICAL NOTES
1. ALL ELECTRICAL WORK SHALL BE ACCOMPLISHED IN ACCORDANCE
WITH THE NFPA 70 NATIONAL ELECTRICAL CODE 2023.
2. CONTRACTOR MUST COORDINATE CONNECTIONS TO POWER, DATA,
AND TELEPHONE DISTRIBUTION SYSTEMS WITH CONTRACING OFFICE
PRIOR TO BEGINNING WORK.
3. PROVIDE 208Y/120V FOR DISTRIBUTION POWER TO TRAILER PANELS.
PROVIDE MAIN DISTRIBUTION PANEL SIZED 800A FOR BOTH TRAILERS IN
MAIN ELECTRICAL ROOM OF TRAILER A AND CONNECT TO 225KVA PAD
MOUNTED TRANSFORMER. PROVIDE MAIN DISTRIBUTION PANEL IN
TRAILER B, SIZED 400A AND CONNECT TO MAIN PANEL IN TRAILER A.
ALL DISTRIBUTION PANELS MUST BE FED FROM MAIN DISTRIBUTION
PANELS. MAIN DISTRIBUTION PANELS IN TRAILERS A AND B MUST HAVE
AN APPRORPRIATELY SIZED DISCONNECT SWITCH OR MAIN CIRCUIT
BREAKER ON INCOMING FEEDER LOCATED WITHIN THE SAME ROOM AS
THE PANEL.
4. PROVIDE LED RECESSED TROFFER LIGHT FIXTURES IN OPEN OFFICE
AREA. PROVIDE MINIMUM OF 30 FC AT 2'-6" AFF. PROVIDE MANUAL
LIGHTING CONTROLS AND OCCUPANCY SENSORS. PROVIDE SURFACE
MOUNTED LED LINEAR WRAP FIXTURES IN ALL ELECTRICAL AND
TELECOM ROOMS TO PROVIDE A MINIMUM OF 50 FC AT 2'-6" AFF.
PROVIDE MANUAL LIGHTING CONTROLS ONLY IN THESE SPACES.
PROVIDE 3 LED DOWNLIGHT FIXTURES CENTERED ABOVE RESTROOM
SINKS WITH LIGHT CONTROL SWITCH LOCATED NEXT TO SINK.
5. PROVIDE GENERAL PURPOSE RECEPTACLES MOUNTED AROUND THE
TRAILER INTERIOR WALLS SO NO POINT ALONG THE WALL IS MORE
THAN 12' APART. LOCATE RECEPTACLES TO AVOID BEING COVERED BY
FURNITURE SYSTEMS. PROVIDE QUAD RECEPTACLES ON EACH
INTERIOR WALL OF TELECOMMUNICATIONS AND ELECTRICAL ROOMS.
PROVIDE
5. PROVIDE POWER FOR SYSTEMS FURNITURE VIA FURNITURE WHIP OR
POWER POLE. SYSTEMS FURNITURE IS A 4-2-2 CIRCUIT
CONFIGURATION, 4 HOT WIRES, 2 NEUTRAL, AND 2 GROUND, RUN FROM
2-2 POLE CIRCUIT BREAKERS WITH HANDLE TIE. NO MORE THAN 4
WORKSTATIONS CAN BE FED FROM 1 CIRCUIT. PROVIDE GENERAL
PURPOSE RECEPTACLES ON OPEN WALLS WHERE NOT CONCEALED BY
SYSTEMS FURNITURE, SPACED NO MORE THAN 15' FROM THE NEXT
NEAREST RECEPTACLE OR SYSTEMS FURNITURE, MINIMUM OF 3
RECEPTACLES PER TRAILER.
6. PROVIDE POWER TO MECHANICAL UNITS AS PER MANUFACTURER'S
REQUIREMENTS. COORDINATE WITH MECHANICAL PRIOR TO
INSTALLATION.
7. PROVIDE 2-JACK DATA OUTLET AT EACH WORKSTATION. PROVIDE
CAT6 CABLE FROM OUTLET TO TELECOM ROOM VIA FURNITURE WHIP
OR POWER POLE. PROVIDE ADDITIONAL 6' SLACK OF CABLE IN
TELECOMMUNICATIONS ROOM, COIL, AND LABEL FOR CONNECTION BY
OTHER.
8. PROVIDE 1-JACK TELEPHONE OUTLET AT EACH WORKSTATION.
PROVIDE CAT6 CABLE FROM OUTLET TO TELECOM ROOM VIA
FURNITURE WHIP OR POWER POLE. PROVIDE ADDITIONAL 6' SLACK OF
CABLE IN TELECOMMUNICATIONS ROOM, COIL, AND LABEL FOR
CONNECTION BY OTHER.
9. PROVIDE POWER FOR RESTROOM HAND DRYERS AS PER
MANUFACTURER'S REQUIREMENTS. COORDINATE PRIOR TO
INSTALLATION.
10. PROVIDE EWC RECEPTACLE FOR ELECTRIC WATER COOLER.
COORDINATE EXACT LOCATION PRIOR TO INSTALLATION.
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
RE
VI
SI
ON
4/2 5/2
82'-3" 94'-0"
'-0
'-0
"TRAILER A TRAILER B
20'-0" 10'-6"1'-0"10'-6" 1'-0"
5'-0" 6"
5'-0"
5'- 0"
'-0
UP
1:1 2 S
LO
PE
UP
1:1 2 S
LO
PE
UP UP
'-6
1/ 4"
6'- 1"
'-0
5'-
0"
82'-3"
11'-9" 11'-9" 11'-9" 11'-9" 11'-9" 11'-9" 11'-9"
EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ
OPEN OFFICE SPACE
T-101
TELECOM
T-102
ELECTRICAL
T-103
1'- 6 3
/4"
'-0
8'- 3 3
/4" 5'-
1'- 6 3
/4"
EQ EQ1'-
2"
DN
1:1 2 S
LO
PE
DN
+ 3'-0"
+ 3'-0"
4'-
'-0
5/ 8"
3'-6" 7'-5 7/8"
EQEQEQEQEQEQEQEQEQEQEQEQ EQEQEQEQ
OPEN OFFICE SPACE
T-108
RESTROOM
T-105
RESTROOM
T-104
ELECTRICAL
T-106
TELECOM
T-107
94'-0"
11'-9" 11'-9" 11'-9" 11'-9" 11'-9" 11'-9" 11'-9" 11'-9"
'-0
AE123
C1
1'- 2"
DN
1:1 2 S
LO
PE
DN
T-109
+ 3'-0"
+ 3'-0"
TELECOM
T-107
3'- 6"
2'-6" 2'-6"
3'- 6"
4'- 9 3
/4"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
4/
/2
4:
:4
PM
C :\R ev it
L oc al M od el s\ C
EP
0.
9_
1_ A_
R
_s ar ah .g ilp in
1.
rv t
AE122
BU
IL
DI
NG
S
CE
P-
CE
P-
TE
M
PO
RA
RY
T
RA
IL
ER
F
LO
O
R
PL
AN
NE
W
ALP
12,902,257
SLG SLG
5/6/24
NAVSEA
FM
B
O
FF
IC
E
RE
NO
VA
TI
O N
SLG
1637041
N/A
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
JOHN MILLER, P.E.
ALP
M
ID
LA
N
T
PW
D N
O R
FO
LK
AE
GENERAL SHEET NOTES
KEYNOTES#
0 8' 16' 32'
PLAN
NORTH
SCALE: 1/16" = 1'-0"
OVERALL TRAILER LAYOUTC1
0 4' 8' 16'
PLAN
NORTH
SCALE: 1/8" = 1'-0"
TRAILER A - ENLARGED PLANB2
0 4' 8' 16'
PLAN
NORTH
SCALE: 1/8" = 1'-0"
TRAILER B - ENLARGED PLANA2
A CONTRACTOR TO MAKE ALL UTILITY CONNECTIONS INCLUDING WATER,
SANITARY, ELECTRICAL AND TELEPHONE – COORDINATE WITH SITE PLAN.
B CONTRACTOR TO INCLUDE TRAILER ANCHORING, SKIRTING, RAISED WALKWAY
BETWEEN TRAILERS, STEP ASSEMBLIES AND IBC COMPLIANT RAMP SYSTEM.
C NOT USED.
D THE PLANS SHOWN ON THIS SHEET ARE FOR DIAGRAMATIC ILLUSTRATION
REFLECTING THE PROGRAM FOR DESIGN, SHOWING THE FURNITURE AND
FLOOR PLAN LAYOUT ONLY.
E THE FINAL DESIGN OF THE TEMPORARY MODULAR BUILDINGS SHALL BE THE
RESPONSIBILITY OF THE MODULAR BUILDING MANUFACTURER.
F THE PLAN FOR TEMPORARY TRAILER A IS BASED ON 7 CONNECTED TRAILERS
THAT ARE 11’-9” W X 36’-0”L EACH. THE PLAN FOR TEMPORARY TRAILER B IS
BASED ON 8 CONNECED TRAILERS THAT ARE 11’-9” W X 36’-0”L EACH.
G THE FINAL LAYOUT FROM THE CONTRACTOR SHALL MAINTAIN THE AREAS AND
ROOM PROPORTIONS SHOWN.
H REFER TO CIVIL DRAWINGS FOR TEMPORARY MODULAR BUILDING LOCATION,
ACCESS AND SITE UTILITY DETAILS.
I FOUNDATION DESIGN SHALL BE THE RESPONSIBILITY OF THE MODULAR
BUILDING MANUFACTURER AND COORDINATED WITH THE GENERAL
CONTRACTOR.
J REFER TO SPECIFICATION SECTION 13 12 00 FOR FURTHER INFORMATION
K FOR ELECTRICAL, DATA AND TELECOM SITE WORK, REFER TO THE
ELECTRICAL SHEETS
L CONTRACTOR IS TO MAINTAIN TRAILERS THROUGHOUT ALL PHASES OF
CONSTRUCTION - FROM INSTALLATION TO REMOVAL.
1 FURNITURE AND EQUIPMENT AT TRAILERS TO BE PROVIDED BY THE
TEMPORARY MODULAR BUILDING MFR.
2 L – SHAPE WORKSTATION TO BE PROVIDED BY AND INSTALLED BY MODULAR
BUILDING MFR. L – SHAPE WORK STATION IS TO BE 5’-6” X 7’-0” AND IS TO HAVE
66” HIGH BACK AND SIDE PANELS. EACH STATION IS TO BE PROVIDED WITH
ONE 30” WIDE OVERHEAD STORAGE CABINET AND ONE 15” WIDE PEDESTAL
FILE CABINET. EACH WORK STATION IS TO HAVE 1 FULLY ADJUSTABLE MESH
BACK TASK CHAIR.
3 RAMPS, STAIRS AND ELEVATED WALKWAYS TO BE PROVIDED AND INSTALLED
BY THE TEMPORARY MODULAR BUILDING MFR.
4 REFER TO CIVIL FOR SIDEWALK PLAN.
5 BARD HVAC UNIT, REFER TO MECHANICAL
6 18"x25"x52"T TOP SECRET SAFE TO BE SUPPLIED BY THE COMMAND.
COORDINATE INSTALLATION WITH COMMAND SAFETY OFFICER - MIKE O'TOOL.
STRUCTURALLY REINFORCE FLOOR AT SAFE LOCATIONS AS REQUIRED. EACH
SAFE IS +/- 520 LBS WITH FLAT BOTTOM.
7 ALL TRAILER DOORS TO BE SUPPLIED BY MODULAR BUILDING
MANUFACTURER. DOOR HARDWARE TO INCLUDE CYPHER LOCK.
COORDINATE SECURITY REQUIREMENTS WITH COMMAND SECURITY OFFICER.
(THIS SHEET ONLY)
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
RE
VI
SI
ON
4/2 5/2
RESTROOM
T-104
RESTROOM
T-105
5'-0"5'-0"
5'- 6"
'-4
5'- 6"
'-4
5'-0"
5'- 0"
3'- 0"
5'-0"
5'- 0"
3'- 0"
5'- 2" 5'- 2"
10'-3" 10'-3"2'-2 5/8"
2 13 2 13
JANITOR CLOSET
T-109 2
2'-1" 2'-1"7'-11 3/8"
3'- 0"
9 9
1 2
LO
S
PO
UT
O
UT
LE
T
IS
3'
-0 " M
AX
A
FF
HI
S
PO
UT
O
UT
LE
T
IS
3'
-2 " M
IN
3'- 7"
M
AX
A
FF
2'-
4"
1'-11"
3'- 0"
FINISHED FLOOR
COMBINATION
HOOK AND BUMPER
COMBINATION HOOK AND
BUMPER - HC STALL
" CL
EQ EQ
CL 60
EQ EQ
EQ EQ
CL
FINISHED FLOOR
FINISHED FLOOR
36" GRAB BAR
CL
MIN
12" 6"
MAX
12"
42" GRAB BAR
SANITARY NAPKIN DISPOSAL
DOOR BUMPER
9"
CL
TOILET TISSUE DISPENSER
HC STALL
9"
CL
TOILET TISSUE DISPENSER
SOAP
DISPENSER
STAINLESS STEEL FRAME
MIRROR (18" W x 36" H)
MA
X
WASTE RECEPTACLE
CL
PAPER TOWEL DISPENSER
CL
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
4/
/2
4:
:0
PM
C :\R ev it
L oc al M od el s\ C
EP
0.
9_
1_ A_
R
_s ar ah .g ilp in
1.
rv t
AE123
BU
IL
DI
NG
S
CE
P-
CE
P-
EN
LA
RG
ED
T
RA
IL
ER
P
LA
NS
NE
W
ALP
12,902,258
SLG SLG
5/6/24
NAVSEA
FM
B
O
FF
IC
E
RE
NO
VA
TI
O N
SLG
1637041
N/A
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
JOHN MILLER, P.E.
ALP
M
ID
LA
N
T
PW
D N
O R
FO
LK
AE
GENERAL SHEET NOTES
KEYNOTES#
A CONTRACTOR TO MAKE ALL UTILITY CONNECTIONS INCLUDING WATER,
SANITARY, ELECTRICAL AND TELEPHONE – COORDINATE WITH SITE PLAN.
B CONTRACTOR TO INCLUDE TRAILER ANCHORING, SKIRTING, RAISED WALKWAY
BETWEEN TRAILERS, STEP ASSEMBLIES AND IBC COMPLIANT RAMP SYSTEM.
C NOT USED.
D THE PLANS SHOWN ON THIS SHEET ARE FOR DIAGRAMATIC ILLUSTRATION
REFLECTING THE PROGRAM FOR DESIGN, SHOWING THE FURNITURE AND
FLOOR PLAN LAYOUT ONLY.
E THE FINAL DESIGN OF THE TEMPORARY MODULAR BUILDINGS SHALL BE THE
RESPONSIBILITY OF THE MODULAR BUILDING MANUFACTURER.
F THE PLAN FOR THE TEMPORARY MODULAR BUILDINGS ARE BASED ON
TRAILERS 11’-9” X 36’-0”.
G THE FINAL LAYOUT FROM THE CONTRACTOR SHALL MAINTAIN THE AREAS AND
ROOM PROPORTIONS SHOWN.
H REFER TO CIVIL DRAWINGS FOR TEMPORARY MODULAR BUILDING LOCATION,
ACCESS AND SITE UTILITY DETAILS.
I FOUNDATION DESIGN SHALL BE THE RESPONSIBILITY OF THE MODULAR
BUILDING MANUFACTURER AND COORDINATED WITH THE GENERAL
CONTRACTOR.
J REFER TO SPECIFICATION SECTION 13 12 00 FOR FURTHER INFORMATION.
K MANUFACTURER’S TRADE NAMES AND NUMBERS LISTED ARE NOT INTENDED
TO BE PROPRIETARY. PRODUCTS OF OTHER MANUFACTURERS WILL BE
ACCEPTABLE, PROVIDED THEY MATCH THE COLORS, FINISHES, TEXTURES AND
PATTERNS OF THE MANUFACTURERS LISTED, AND MEET THE TECHNICAL
REQUIREMENTS OF THE SPECIFICATIONS.
SCALE: 3/8" = 1'-0" (AE122)C1 TRAILER B - ENLARGED BATHROOM PLAN
MARK DESCRIPTION MANUFACTURER MODEL NO. REMARKS
1 36" GRAB BAR BOBRICK B-6806 SERIES 1, 4, 5, 6, 7, 8
2 42" GRAB BAR BOBRICK B-6806 SERIES 1, 4, 5, 6, 7, 8
3 SURFACE-MOUNTED TWIN JUMBO- ROLL TOILET
PAPER DISPENSER
BOBRICK B-2892 1, 5, 8
4 NAPKIN DISPOSAL BOBRICK B-353 1, 4, 8
5 SOAP DISPENSER BOBRICK B-2111 3, 8
6 24 X 36 STAINLESS STEEL FRAME MIRROR BOBRICK B-165-2436 2, 4, 8
7 PAPER TOWEL DISPENSER (GFCI) KIMBERLY-CLARK KCC-09990 1, 4, 8
8 WASTE RECEPTACLE BOBRICK B-277 CONTURA
SERIES
1, 4, 8
9 COMBINATION HOOK AND BUMPER BOBRICK B-9541 1,4,8
10 COMBINATION HOOK AND BUMPER BOBRICK B-9541 1,4,8
11 COMBINATION HOOK AND BUMPER BOBRICK B-9541 1,4,8
T 2/90 FIRE EXTINGUISHER SAFETY SIGN
SPECIALTY EQUIPMENT SCHEDULE
SPECIALTY EQUIPMENT SCHEDULE REMARKS
1 SATIN FINISH
2 CENTER MIRROR OVER THE SINK, ALIIGN BOTTOM OF MIRROR WITH TOP OF BACKSPLASH
3 CENTER BETWEEN MIRRORS
4 REFER TO AE122 FOR MOUNTING TYPICAL MOUNTING HEIGHTS
5 PROVIDE WOOD BLOCKING OR 18 GA X 6' WIDE METAL PLATE IN WALL AS REQUIRED TO SECURE SPECIALTY EQUIPMENT
6 GRAB BAR MUST HAVE PEENED (NON-SLIP) GRIPPING SURFACE
7 MOUNT WITH LONG DIMENSION VERTICAL
8 SPECIALTY EQUIPMENT TO BE PROVIDED BY THE MODULAR TRAILER MFR.
SCALE: 1 1/2" = 1'-0"A1 TRAILER DETAILS
(THIS SHEET ONLY)
1 TRAILER SUB-FLOOR
2 CONTINUOUS RESILIENT FINISH FLOOR
3 SOLID SURFACE COUNTERTOP WITH INTEGRAL BACKSPLASH
4 UNDER COUNTER MOUNTED SINK, REFER TO PLUMBING
5 CONTINUOUS TREATED WOOD BLOCKING
6 NOTCH PANEL FOR SINK PLACEMENT
7 WALL AS SCHEDULED
8 MIRROR, REFER TO SPECIALTY EQUIPMENT SCHEDULE
9 PLASTIC LAMINATE ON ALL EXPOSED SURFACES
10 PLASTIC LAMINATE DOOR
11 SLOTTED QUARTER-TURN LATCH, CLEAR ALUMINUM FINISH
12 HI-LOW ACCESSIBLE WATER FOUNTAIN
13 FRP PANEL, MARLITE SYMMETRIX. SELECT FROM MANUFACTURER STANDARD
COLOR SELECTION. FRP ON ALL WALL, RUN FRP FULL HEIGHT FROM FINISH
FLOOR TO CEILING
14 THRESHOLD AT RESTROOMS
15 MOP SINK
SCALE: 3/8" = 1'-0"A2
SPECIALTY EQUIPMENT ELEVATIONS &
MOUNTING HEIGHTS
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
RE
VI
SI
ON
4/2 5/2
REF REF
24"x10" RA 24"x10" RA
10"x12" SA 16"x12" SA
18"x14" SA
"x
" S
A
10"x12" SA
A
A
A
A
A
A
A
A
A
A 230Z
Z
T
14"x14" SA
S
TYP
TYP
20"x20" SA
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
4/
/2
4:
:2
PM
C :\R ev it
L oc al M od el s\
_1
_M
_R
_s ar ah .g ilp in
1.
rv t
MH101
BU
IL
DI
NG
S
CE
P-
CE
P-
PA
RT
IA
L
FI
RS
T
FL
O O
R
PL
AN
DU
CT
W O
RK
BL
DG
C
EP
-2
SCS
12,902,281
RSK RLC
5/6/24
NAVSEA
FM
B
O
FF
IC
E
RE
NO
VA
TI
O N
SLG
1637041
N/A
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
JOHN MILLER, P.E.
ALP
M
ID
LA
N
T
PW
D N
O R
FO
LK
M H
SCALE: 1/8" = 1'-0"
PARTIAL FIRST FLOOR PLAN - DUCTWORK - BLDG CEP-200
PLAN
NORTH
GRAPHIC SCALE(S)
KEY PLAN
KEYNOTES#
1/8" = 1' - 0" 0 5' 10' 15' 30'
1 ROOF MOUNTED AHU-1 MAINTAIN 10'-0" CLEARANCE FROM EDGE OF BUILDING
AND ALL EXHAUST VENTS.
2 ROUTE 1 1/4" CONDENSATE TO NEAREST ROOF DRAIN.
3 20x20 UP TO AHU-1.
4 HVAC SYSTEMS KILL SWITCH. KILL SWITCH IS AN ALARM BOX WITH PUSH BUTTON,
HINGED COVER, AUDIBLE ALARM WHEN THE COVER IS RAISED, AND AN
INSCRIPTION ON THE COVER "ALARM SOUNDS, WHEN COVER IS RAISED." DESIGN
BASED ON PILLA ELECTRICAL PRODUCTS MODEL NUMBER PILCLH COVA.
PROVIDE PLACARD BELOW SWITCH WITH INSCRIPTION "EMERGENCY KILL
SWITCH." PROVIDE A SHUNT TRIP RELAY ON THE BREAKER.
5 COORDINATE NEW DUCTWORK WITH EXISTING TO REMAIN.
PLAN
NORTH
BUILDING CEP-200
D16
AREA OF WORK
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
Re vis ion
4/2
5/2
227791OUTSIDE
68INSIDE 68 62.4
°FDB
WINTER
DESIGN CONDITIONS
SUMMER
°FDB °FWB SERVICE
GRILLE, REGISTER, AND DIFFUSER SCHEDULE
MARK
A
THROW FT.
(AT 50 FPM TERMINAL VEL.)
MAX.CFM RANGE
(IN. WG)NC SP
MAX.
SHELL
SIZE
NECK
SIZE
TYPE REMARKS
SUPPLY 185 - 275 25 .10 8"∅ 24 x 24 1 1,3,5,7
NOTES:
1. HIGH CAPACITY LOUVER FACE WITH ROUND NECK DIFFUSER CONSTRUCTED ALUMINUM.
2. EGGCRATE FILTER GRILLE WITH 1"X1"X1" CORE CONSTRUCTED OF ALUMINUM.
3. SUITABLE FOR LAY-IN APPLICATION.
4. SUITABLE FOR SURFACE MOUNTING.
5. DESIGN BASED ON TITUS TMS-AA.
6. DESIGN BASED ON TITUS 50FF.
7. PROVIDE WITH STANDARD OFF-WHITE FINISH.
8. PROVIDE WITH 1" THROWAWAY FILTER (MERV 8).
9. EGGCRATE GRILLE WITH 1"x1"x1" CORE CONSTRUCTED OF ALUMINUM.
DUCT CONSTRUCTION AND LEAK TEST SCHEDULE
MARK
DUCT PRESSURE CLASS (IN WC.)
SUPPLY/EXHAUST
RETURN/OUTSIDE AIR DUCT
TEST
PRESSURE
(IN WC.)
NOTESROUND/OVAL RECTANGLE
SUPPLY
DUCT
RETURN
DUCT
EXHAUST
DUCT
OA
DUCT
SEAL
CLASS
LEAK
CLASS
SEAL
CLASS
LEAK
CLASS
SEAL
CLASS
LEAK
CLASS
NOTES:
1. SEAL CLASS AND LEAK CLASS PER SMACNA.
AHU'S +1" - - -1/2" - - A 1"12 A 12 1
AIR HANDLING UNIT SCHEDULE
MARK LOCATION
SUPPLY FAN DATA
SA CFM
ESP
(IN WG.) HP
HEATING DX COOLING COIL DATA
TOTAL
(MBH)
SENSIBLE
(MBH)
EAT
°FDB °FWB
REMARKS
AHU-1 ROOF 2400 300 0.7 1.5 65.5 51.4 80.0 67.0
FILTER TYPE
N/A
NOTES:
2,3,4,5
1. NOT USED.
2. PROVIDE WITH UNIT MANUFACTURER'S INTEGRAL DISCONNECT, MANUFACTURER'S PROGRAMMABLE TEMPERATURE CONTROLLER W/ADJUSTABLE CYCLE RATE DIFFERENTIAL, SINGLE POINT CONNECTION
PROVISIONS FOR LOW AMBIENT COOLING, AND MANUFACTURER'S ROOF CURB.
3. PROVIDE WITH MANUFACTURER'S POLYMER E-COATING ON EVAPORATOR COILS.
4. PROVIDE UNIT TO ROOF CURB CONNECTION WITH HURRICANE CLIPS SPACED NO MORE THAN 24" ON CENTER AND SIZED TO WITHSTAND UPLIFTING WIND FORCES OF 150 LBS. EACH.
OA CFM
LAT
°FDB °FWB
59.2 58.2
REFRIGERANT
R-410A
ELECTRICAL DATA
MCA MOCP
32 45
VOLTS PHASE HERTZ
208 3 60
CAP.(MBH)
60 33.7 81.3
HEAT PUMP ELEC. COILEAT
(°FDB) LAT (°FDB)
CFM
Z RETURN 1050 25 .05 20 x 20 24 x 24 2 2,3,6,7
KW
15.0
SEQUENCE OF OPERATION
AHU-1
COOLING:
WHEN THE SYSTEM IS INDEXED TO COOLING AND THE SPACE TEMPERATURE RISES ABOVE
THE SPACE TEMPERATURE SETPOINT, INITIALLY SET AT 68°F (ADJUSTABLE), THE COMPRESSOR
SHALL BE ENERGIZED AND STAGE ON MECHANICAL COOLING. ON A FALL IN SPACE
TEMPERATURE THE REVERSE SHALL OCCUR.
HEATING:
WHEN THE SYSTEM IS INDEXED TO HEATING AND THE SPACE TEMPERATURE FALLS BELOW
THE SPACE TEMPERATURE SETPOINT, INITIALLY SET AT 70°F (ADJUSTABLE), THE REVERSING VALVE SHALL BE ENERGIZED AND STAGE ON HEATING.