Amendment_0001-Gainesville.pdf
PDF 721 KB Posted
- Solicitation number
- 1630DC-19-Q-00028
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Gainesville_-_1630DC-19-R-00028_Remedial_Action_Plan_Implementation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1630DC-19-Q-00028
X
X
5. PROJECT NO.
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NO.
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning ____1_____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 10-83)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. June 11, 2019 at 2:00 pm Eastern Time
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(No., street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(If applicable)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
(X)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 6
0001 5/28/2019 4040
ETA OCM JOB CORPS bramso
U.S. Department of Labor ETA/OCM/Division of Job Corps Procurement 200 Constitution Avenue, NW Room N-4643 Washington DC 20210
4/29/2019
N/A
Project Title: Remedial Action Plan Implementation at the Gainesville Job Corps Center located in Gainesville, Florida
a. The purpose of this Amendment is as follows:
1) INCORPRATE the attached questions and answers into the solicitation.
2) Attached is the Pre-Bid Attendance Sheet, dated May 14, 2019
Maria J. Pizarro, CPCM CFCM Branch Chief, Contracting Officer
Division of Job Corps Procurement/ A/E & Construction Eastern Branch
1630DC-19-Q-00028 PAGE 2 OF 6
QUESTIONS AND ANSWERS
REMEDIAL ACTION PLAN IMPLEMENTATION
GAINESVILLE JOB CORPS CENTER
SOLICITATION NUMBER 1630DC-19-Q-00028
1. The 1st page of the RFP states “Alternate Payment Protection is required for this project as specified in FAR 52.228-13”. Page A-11 states: (a) The Contractor shall submit one of the following payment protections:
b) The amount of the payment protection shall be 100 percent of the contract price. (c) The submission of the payment protection is required within _________ days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
The offer guarantee box on the 1st page is not checked. Please let us know what type of Alternate Payment protection is required for proposal submission.
Answer: Alternate Payment Protection can be a payment bond, irrevocable letter of credit, a tripartite escrow agreement or a certificate of deposit. The alternate payment protection would have to be submitted within 14 days after date of award.
2. I do not see a Section L, Instructions to Offerors, in the RFP. What items do you want included in proposal submission?
Answer: There is no Section L and the wording in Block 8 on Page 1 should read “See Block 7”. All you need to do is submit Pages 1 and 2 of the solicitation with a price, company information, amendment acknowledgement and make sure the form is signed.
3. Please confirm the center is closed and no students will be onsite during construction.
Answer: The Job Corps Center is closed and there are no students onsite.
4. What is the anticipated award and commencement date for this project?
Answer: To be determined
5. Are there specific superintendence/safety personnel requirements for this project (number/qualifications)?
Answer: See FDEP Standard Operating Procedures for Field Activities and 29 CFR 1910.120
6. Has the RAP been approved by FDEP?
1630DC-19-Q-00028 PAGE 3 OF 6
Answer: Yes in accordance with the Response to RAP Comments in the Reference Documents.
7. Is preparing an Engineering Control Management Plan part of the scope?
Answer: No
8. Will Sunshine State One Call clear underground utilities on site? Are there any maps or figures showing underground utilities?
Answer: No. The Contract requires the installation of a soil cap with minimal digging of the existing top soil. Underground utility lines will not be disturbed.
9. Will there be a bid sheet with all the units required so all parties will be bidding on the same scope of work?
Answer: Please refer to Question 2.
10. The RAP says to remove the top foot of soil in Area A (as it is 75% clean) and use as clean backfill. Sample DS-30 inside of Area A has a PCB concentration of 24,000 ug/kg and was collected from 0.5-1.0 feet below land surface (bls). How far beyond soil sample DS-30 within Area A from 0-1 foot bls is considered clean and can be used as clean fill?
Answer: Do not use Area A as clean fill.
11. How many feet of curbing and to what height will have to be installed? What are the design specifications for the curbing?
Answer: Provide 1.5’ and 2.5’ small retaining walls as per Figure 2 in the Soil Testing Update.
12. Six inches of topsoil is to be placed over the clean fill. Is this in addition to the two feet of clean fill required as a soil cap? If so, the curb height may need to be increased six inches. Does the topsoil need to be certified as clean the same way the clean fill described in the RAP will have to be with specific analytical parameters?
Answer: Topsoil is in addition to soil cap. Slope soil to curb. Provide prepared 6” Soil Layer per Florida DOT Section 162 and hydro-seed grass per Florida DOT Section 570.
13. Soil sample DS-9 (1’-2’) has a PCB concentration of 1,000 ug/kg and is not included in the soil fill area. Should it and the area around it be covered with 1-foot of clean fill?
Answer: Yes
14. What type of grass seed should be used for hydro-seeding?
1630DC-19-Q-00028 PAGE 4 OF 6
Answer: Provide prepared 6” Soil Layer per Florida DOT Section 162 and hydroseed grass per Florida DOT Section 570.
15. How long should we use for costing of the temporary irrigation measures to ensure germination and establishment of grass?
Answer: Sufficient to meet ensure germination and establishment of grass.
16. Several drains, manhole covers, hydrants, etc. are within the area to be capped with clean fill. How should these areas be addressed to keep them functional?
Answer: Raise all existing surface utility covers, hydrants, manhole cover drains, etc.
to new finish grade elevation.
17. Soil samples CSB-1,2,3 and 4 were collected to better define the extent of contamination around soil sample location SBP-1 so the area can be capped with clean fill. The sample locations for CSB-1,2,3 and 4 are not shown on any Figures. Can a Figure with their locations be provided?
Answer: Soil Sample location is attached.
18. There appears to be 2 different remediation plans for the site created by the same consultant. One is clearly a cap only plan, the other is to remove the existing cap and remove material and replace the cap. Which plan are we to price?
Answer: Price as written. The Soil Testing Update is an update to the Remedial Action Plan and does require material removal and replacement.
19. Three small retaining walls are shown, these are not existing. Is the contractor to build these as part of this scope? If so, will a detail be given, or is the contractor responsible for the design as well as the construction? What is the length and height of these new walls?
Answer: Provide 1.5’ and 2.5’ small retaining walls as per Figure 2 in the Soil Testing Update.
20. If the Grass area labeled as area M is raised up one foot or more, will the existing fire hydrant need to be raised?
Answer: Yes - hydrant(s) are to be raised to comply with all fire hydrants per federal, state and local jurisdiction requirements.
21. During the walk through it was noticed that there are existing yard drains in the grassed area next to the sidewalk. What would need to be done with these drains?
Answer: The drains are to remain at the current elevations to drain existing adjacent sidewalks.
1630DC-19-Q-00028 PAGE 5 OF 6
22. Most of the existing sidewalks have a great deal of cracking in them. With the proposed elevation changes and the existing damage, will these sidewalks be replaced under this contract?
Answer: No – repair of existing concrete sidewalk conditions is required. However, new damage caused by Contractor to existing adjacent sidewalks shall require repair and/or replacement.
23. Is the existing grass and top soil to be removed from site or reused as top soil?
Answer: Do not reuse material from the site.
24. We operate under several NAICS code identified on our SAMS profile of which 562910 is one of them. We are also biding on different opportunities. Can you clarify if you intended that NAICS code must be listed as one of our NAICS codes on SAMS or it has to be the primary one listed?
Answer: The NAICS code just has to be listed on the SAM profile of the successful offeror at time of award. It doesn’t have to be the primary code.
25. At the end of paragraph 4.3, there is an estimated total quantity of clean fill soil of 848 cubic yards. Does this total include the Metal Shavings Area, and does it also include the areas requiring removal and disposal of soil (E, G, H, I, J, K)?
Answer: See Figure 2 Legend in the Soil Testing Update Letter for estimated quantities.
1630DC-19-Q-00028 PAGE 6 OF 6
ATTACHMENT 1
| Amendment 0001-Gainesville |
| Amendment 0001-Gainesville |
| Q&A Gainesville Binder1 - 5-28-2019 |
| Q&A Gainesville Binder2 - 5-28-2019 |
| CBP sample locations |