This is a Project Manual Volume 2 for an Invitation for Bid (IFB #161072) issued by the Virginia Department of Transportation for the Montvale AHQ Phase III - Equipment Storage Building, a construction project located in Forest, Virginia. The project involves construction of approximately 7,080 square feet of equipment storage building including site demolition, site development, utilities, foundations, building envelope, interior finishes, HVAC systems, lighting, grounding, and electrical power. The project manual serves as Volume 2 of the construction specifications and includes detailed technical requirements for multiple building systems and components organized by construction divisions, including gypsum board finishes, exterior and interior painting, fire extinguishers, water distribution piping, sanitary sewers, waste and vent piping, HVAC equipment and supports, equipment identification, and associated materials and installation procedures. The document was prepared by Virginia A&E with project number 24100 and establishes the technical standards and performance requirements that contractors must meet during construction.
The specifications encompass comprehensive requirements for material selection, product quality, installation methods, and field quality control across all building trades. Manufacturers and suppliers are identified for major components including paint, fire extinguishers, valves, pipes, fittings, HVAC equipment, and motors, with preference given to products from listed manufacturers subject to compliance with project requirements. Key specifications establish standards such as maximum moisture content for substrates before painting, hydrostatic testing requirements for plumbing systems, minimum clearances and slopes for drainage piping, hanger and support specifications for HVAC systems, and labeling and identification protocols. The manual references related documents including general contract provisions, supplementary conditions, and Division 01 specification sections, as well as industry standards such as ASTM, NFPA, AWWA, NSF, and MPI standards. Installation requirements emphasize proper handling, storage, protection during construction, coordination with other trades, and compliance with local authority regulations and Virginia Department of Transportation standards throughout the project execution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PC_501-18130-080_FOR_CONSTRUCTION_Drawings_2026-07-01.pdf | ||
| 161072 Project Manual Vol 1 .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB # 161072
FOR CONSTRUCTION
PROJECT MANUAL – VOLUME 2
for
VIRGINIA DEPARTMENT OF TRANSPORTATION
Montvale AHQ Phase III – Equipment Storage Building
Project Code No. 501-18130-080
July 1, 2026
VAE Project No. 24100
1115 Vista Park Drive Forest, Virginia 24551
(434) 316-6001 – Phone
(434) 316-6002 – Facsimile www.virginia-ae.com
VIRGINIA DEPT. OF TRANSPORTATION PROJECT CODE NO. 501-18130-080
MONTVALE AHQ PHASE III – EQUIPMENT STORAGE BUILDING
VIRGINIA A&E 24100 TABLE OF CONTENTS VOLUME 2 / 1
REFER TO PROJECT MANUAL - VOLUME 1
FOR ADDITIONAL SPECIFICATIONS
VIRGINIA A&E 24100 TABLE OF CONTENTS VOLUME 2 / 2
VIRGINIA DEPARTMENT OF TRANSPORTATION
Montvale AHQ Phase III – Equipment Storage Building
Project Code No. 501-18130-080
IFB # 161072
TABLE OF CONTENTS – VOLUME 2
SPECIFICATIONS (Cont’d)
DIVISION 09 – FINISHES
Refer to Drawings for material specifications not included in Project Manual.
092900 Gypsum Painting 092900/1 – 092900/5 099113 Exterior Painting 099113/1 – 099113/5 099123 Interior Painting 099123/1 – 099123/6
DIVISION 10 – SPECIALTIES
Refer to Drawings for material specifications not included in Project Manual.
104416 Fire Extinguishers 104416/1 – 104416/3
DIVISION 11 – EQUIPMENT
Refer to Drawings for material specifications not included in Project Manual.
DIVISION 12 – FURNISHINGS
Refer to Drawings for material specifications not included in Project Manual.
DIVISION 13 - SPECIAL CONSTRUCTION
Refer to Drawings for material specifications not included in Project Manual.
DIVISION 14 - CONVEYING EQUIPMENT
Refer to Drawings for material specifications not included in Project Manual.
VIRGINIA A&E 24100 TABLE OF CONTENTS VOLUME 2 / 3
SPECIFICATIONS (Cont’d)
DIVISION 21 - FIRE SUPPRESSION
Refer to Drawings for material specifications not included in Project Manual.
DIVISION 22 – PLUMBING
Refer to Drawings for material specifications not included in Project Manual.
221113 Facility Water Distribution 221113/1 – 221113/7 221313 Facility Sanitary Sewers 221313/1 – 221313/5 221316 Sanitary Waste and Vent Piping 221316/1 – 221316/6
DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING
Refer to Drawings for material specifications not included in Project Manual.
230500 Common Motor Requirements for HVAC
Equipment 230500/1 – 230500/4
230529 Hangers and Supports for HVAC Piping and Equipment 230529/1 – 230529/6 230553 Identification for HVAC Piping and Equipment 230553/1 – 230553/3 230593 Testing, Adjusting, and Balancing for HVAC 230593/1 – 230593/7 231126 Facility Gas Piping 231126/1 – 231126/7 233113 Metal Ducts 233113/1 – 23113/6 233300 Air Ducts Accessories 233300/1 – 233300/3 233416 Centrifugal HVAC Fans 233416/1 – 233416/4 233713 Diffusers, Registers, and Grilles 233713/1 – 233713/1 233723 HVAC Gravity Ventilators 233723/1 – 233723/3
235523.13 Low-Intensity, Gas-Fired, Radiant Heaters 235523.13/1 – 235523.13/5
DIVISION 26 – ELECTRICAL
Refer to Drawings for material specifications not included in Project Manual.
260500 Common Work Results for Electrical 260500/1 – 260500/11 260573 Electrical Coordination Analysis 260573/1 – 260573/6 260923 Lighting Control Devices 260923/1 – 260923/5 262726 Wiring Devices 260726/1 – 260726/2 264113 Lightning Protection 264113/1 – 264113/4 264313 Surge Protection for Low-Voltage Electrical Power
Circuits 264313/1 – 264313/4
265000 Lighting 265000/1 – 265000/3 265219 Emergency and Exit Lighting 265219/1 – 265219/5 265619 LED Exterior Lighting 265619/1 – 265619/8
DIVISION 27 - COMMUNICATIONS
Refer to Drawings for material specifications not included in Project Manual.
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
Refer to Drawings for material specifications not included in Project Manual.
DIVISION 31 - EARTHWORK
Refer to Drawings for material specifications not included in Project Manual.
311000 Site Clearing 311000/1 – 311000/5 312000 Earth Moving 312000/1 – 312000/13
DIVISION 32 - EXTERIOR IMPROVEMENTS
Refer to Drawings for material specifications not included in Project Manual.
321216 Asphalt Paving 321216/1 – 321216/6 321313 Concrete Paving 321313/1 – 321313/15 329200 Turf and Grasses 329200/1 – 329200/11
VIRGINIA A&E 24100 TABLE OF CONTENTS VOLUME 2 / 4
SPECIFICATIONS (Cont’d)
DIVISION 33 - UTILITIES
Refer to Drawings for material specifications not included in Project Manual.
334100 Storm Utility Drainage Piping 334100/1 – 334100/6
APPENDIX A – GEOTECHINICAL ENGINEERING REPORT
APPENDIX B – AHQ PLUMBING FIXTURE CALCULATIONS
APPENDIX C – AHQ PARKING CALCULATIONS
APPENDIX D – UL DESIGN ASSEMBLIES
END OF TABLE OF CONTENTS
VIRGINIA A&E 24100 092900 / 1
SECTION 092900 - GYPSUM BOARD
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Exterior gypsum board for ceilings and soffits.
1.2 ACTION SUBMITTALS
A. Product Data: For the following:
1. Gypsum board, Type X.
2. Exterior gypsum soffit board.
B. Samples: For the following products:
1. Trim Accessories: Full-size Sample in 12-inch- long length for each trim accessory indicated.
1.3 DELIVERY, STORAGE AND HANDLING
A. Store materials inside under cover and keep them dry and protected against weather, condensation, direct sunlight, construction traffic, and other potential causes of damage.
Stack panels flat and supported on risers on a flat platform to prevent sagging.
1.4 FIELD CONDITIONS
A. Environmental Limitations: Comply with ASTM C840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent.
B. Do not install paper-faced gypsum panels until installation areas are enclosed and conditioned.
C. Do not install panels that are wet, moisture damaged, and mold damaged.
1. Indications that panels are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.
2. Indications that panels are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.
PART 2 - PRODUCTS
2.1 SOURCE LIMITATIONS
A. Obtain each type of gypsum panel and joint finishing material from single source with resources to provide products of consistent quality in appearance and physical properties.
VIRGINIA A&E 24100 092900 / 2
2.2 GYPSUM BOARD, GENERAL
A. Size: Provide maximum lengths and widths available that will minimize joints in each area and that correspond with support system indicated.
2.3 EXTERIOR GYPSUM BOARD FOR CEILINGS AND SOFFITS
A. Exterior Gypsum Soffit Board: ASTM C1396/C1396M, with manufacturer's standard edges.
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. American Gypsum
b. CertainTeed; SAINT-GOBAIN
c. Georgia-Pacific Gypsum LLC
d. Gold Bond Building Products, LLC provided by National Gypsum Company
2. Core: 5/8 inch, Type X.
2.4 TRIM ACCESSORIES
A. Exterior Trim: ASTM C1047.
1. Material: Hot-dip galvanized-steel sheet, plastic, or rolled zinc.
2. Shapes:
a. Cornerbead.
b. LC-Bead: J-shaped; exposed long flange receives joint compound.
c. Expansion (Control) Joint: One-piece, rolled zinc with V-shaped slot and removable strip covering slot opening.
2.5 JOINT TREATMENT MATERIALS
A. General: Comply with ASTM C475/C475M.
B. Joint Tape:
1. Exterior Gypsum Soffit Board: Paper.
C. Joint Compound for Exterior Applications:
1. Exterior Gypsum Soffit Board: Use setting-type taping compound and setting-type, sandable topping compound.
2.6 AUXILIARY MATERIALS
A. Provide auxiliary materials that comply with referenced installation standards and manufacturer's written instructions.
B. Steel Drill Screws: ASTM C1002 unless otherwise indicated.
VIRGINIA A&E 24100 092900 / 3
1. Use screws complying with ASTM C954 for fastening panels to steel members from 0.033 to 0.112 inch thick.
C. Thermal Insulation: As specified in Section 072100 "Thermal Insulation."
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas and substrates including welded hollow-metal frames and support framing, with Installer present, for compliance with requirements and other conditions affecting performance of the Work.
B. Examine panels before installation. Reject panels that are wet, moisture damaged, and mold damaged.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION AND FINISHING OF PANELS, GENERAL
A. Comply with ASTM C840.
B. Install ceiling panels across framing to minimize the number of abutting end joints and to avoid abutting end joints in central area of each ceiling. Stagger abutting end joints of adjacent panels not less than one framing member.
C. Install panels with face side out. Butt panels together for a light contact at edges and ends with not more than 1/16 inch of open space between panels. Do not force into place.
D. Locate edge and end joints over supports, except in ceiling applications where intermediate supports or gypsum board back-blocking is provided behind end joints. Do not place tapered edges against cut edges or ends. Stagger vertical joints on opposite sides of partitions. Do not make joints other than control joints at corners of framed openings.
E. Form control and expansion joints with space between edges of adjoining gypsum panels.
F. Cover both faces of support framing with gypsum panels in concealed spaces (above ceilings, etc.), except in chases braced internally.
1. Unless concealed application is indicated or required for sound, fire, air, or smoke ratings, coverage may be accomplished with scraps of not less than 8 sq. ft. in area.
2. Fit gypsum panels around ducts, pipes, and conduits.
3. Where partitions intersect structural members projecting below underside of floor/roof slabs and decks, cut gypsum panels to fit profile formed by structural members; allow 1/4- to 3/8-inch- wide joints to install sealant.
G. Isolate perimeter of gypsum board applied to non-load-bearing partitions at structural
VIRGINIA A&E 24100 092900 / 4
abutments. Provide 1/4- to 1/2-inch- wide spaces at these locations and trim edges with edge trim where edges of panels are exposed. Seal joints between edges and abutting structural surfaces with acoustical sealant.
H. Wood Framing: Install gypsum panels over wood framing, with floating internal corner construction. Do not attach gypsum panels across the flat grain of wide-dimension lumber, including floor joists and headers. Float gypsum panels over these members or provide control joints to counteract wood shrinkage.
I. Install sound attenuation blankets before installing gypsum panels unless blankets are readily installed after panels have been installed on one side.
3.3 INSTALLATION OF EXTERIOR GYPSUM PANELS FOR CEILINGS AND SOFFITS
A. Apply panels perpendicular to supports, with end joints staggered and located over supports.
1. Install with 1/4-inch open space where panels abut other construction or structural penetrations.
2. Fasten with corrosion-resistant screws.
3.4 INSTALLATION OF TRIM ACCESSORIES
A. General: For trim with back flanges intended for fasteners, attach to framing with same fasteners used for panels. Otherwise, attach trim according to manufacturer's written instructions.
B. Control Joints: Install control joints at locations indicated on Drawings.
C. Exterior Trim: Install in the following locations:
1. Cornerbead: Use at outside corners.
2. LC-Bead: Use at exposed panel edges.
3.5 FINISHING OF GYPSUM BOARD
A. General: Treat gypsum board joints, interior angles, edge trim, control joints, penetrations, fastener heads, surface defects, and elsewhere as required to prepare gypsum board surfaces for decoration. Promptly remove residual joint compound from adjacent surfaces.
B. Prefill open joints, rounded or beveled edges, and damaged surface areas.
C. Apply joint tape over gypsum board joints, except for trim products specifically indicated as not intended to receive tape.
D. Gypsum Board Finish Levels: Finish panels to levels indicated below and in accordance with ASTM C840:
1. Level 1: Concealed areas.
2. Level 5: All exposed locations.
VIRGINIA A&E 24100 092900 / 5
3.6 PROTECTION
A. Protect adjacent surfaces from drywall compound and promptly remove from floors and other non-drywall surfaces. Repair surfaces stained, marred, or otherwise damaged during drywall application.
B. Protect installed products from damage from weather, condensation, direct sunlight, construction, and other causes during remainder of the construction period.
C. Remove and replace panels that are wet, moisture damaged, and mold damaged.
1. Indications that panels are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.
2. Indications that panels are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.
END OF SECTION 092900
VIRGINIA A&E 24100 099113 / 1
SECTION 099113 - EXTERIOR PAINTING
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes surface preparation and the application of paint systems on the following exterior substrates:
1. Steel.
2. Fiber-cement.
3. Galvanized metal.
4. Gypsum Board.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product. Include preparation requirements and application instructions.
B. Samples for Initial Selection: For each type of topcoat product.
C. Product List: For each product indicated, include the following:
1. Cross-reference to paint system and locations of application areas. Use same designations indicated on Drawings and in schedules.
1.3 MAINTENANCE MATERIALS SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Paint: 5 percent, but not less that 1 gal. of each material and color applied.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F.
1. Maintain containers in clean condition, free of foreign materials and residue.
2. Remove rags and waste from storage areas daily.
1.5 FIELD CONDITIONS
A. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F.
B. Do not apply paints in snow, rain, fog, or mist; when relative humidity exceeds 85 percent; at temperatures less than 5 deg F above the dew point; or to damp or wet surfaces.
VIRGINIA A&E 24100 099113 / 2
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufactures offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Benjamin Moore & Co.
2. Duron, Inc.
3. PPG Paints.
4. Sherwin-Williams Company (The).
2.2 PAINT, GENERAL
A. Material Compatibility:
1. Materials for use within each paint system shall be compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.
2. For each coat in a paint system, products shall be recommended in writing by topcoat manufacturers for use in paint system and on substrate indicated.
B. Colors: As selected by Owner from manufacturer’s full range.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of work.
B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:
1. Fiber-Cement Board: 12 percent.
2. Gypsum Board: 12 percent.
C. Exterior Gypsum Board Substrates: Verify that finishing compound is sanded smooth.
D. Verify suitability of substrates, including surface conditions and compatibility, with existing finishes and primers.
E. Proceed with coating application only after unsatisfactory conditions have been corrected.
1. Application of coating indicates Contractor’s acceptance of surfaces and conditions.
http://www.specagent.com/Lookup?ulid=11634 http://www.specagent.com/Lookup?uid=123457108626 http://www.specagent.com/Lookup?uid=123457108640 http://www.specagent.com/Lookup?uid=123457108644
VIRGINIA A&E 24100 099113 / 3
3.2 PREPARATION
A. Comply with manufacturer's written instructions and recommendations in "MPI Architectural Painting Specification Manual" applicable to substrates and paint systems indicated.
B. Remove hardware, covers, plates, and similar items already in place that are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.
1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection.
2. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.
C. Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, and incompatible paints and encapsulants.
1. Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as required to produce paint systems indicated.
D. Shop-Primed Steel Substrates: Clean field welds, bolted connections, and areas where shop paint is abraded. Paint exposed areas with the same material as used for shop priming to comply with SSPC-PA 1 for touching up shop-primed surfaces.
3.3 APPLICATION
A. Apply paints according to manufacturer's written instructions.
1. Use applicators and techniques suited for paint and substrate indicated.
2. Paint surfaces behind movable items same as similar exposed surfaces. Before final installation, paint surfaces behind permanently fixed items with prime coat only.
3. Paint both sides and edges of exterior doors and entire exposed surface of exterior door frames.
4. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.
5. Primers specified in painting schedules may be omitted on items that are factory primed or factory finished if acceptable to topcoat manufacturers.
B. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.
C. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.
D. Painting Plumbing, HVAC, Electrical, Communication, and Electronic Safety and Security Work:
1. Paint the following work where exposed to view:
a. Uninsulated metal piping.
VIRGINIA A&E 24100 099113 / 4
b. Pipe hangers and supports.
c. Metal conduit.
3.4 CLEANING AND PROTECTION
A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.
B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.
C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect/Engineer, and leave in an undamaged condition.
D. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces. Dispose of all remaining paining products and application materials in a manner approved by the authority having jurisdiction.
3.5 EXTERIOR PAINTING SCHEDULE
A. Contractor shall provide schedule of colors and formulations used on interior and exterior areas.
B. Factory-Primed Steel Substrates:
1. Alkyd System (MPI EXT 5.1D):
a. Prime Coat: Shop primer provided by material manufacturer.
b. Intermediate Coat: Exterior, alkyd enamel, matching topcoat.
c. Topcoat: Alkyd, exterior, semi-gloss (MPI Gloss Level 5), MPI #94.
C. Exterior Gypsum Board Substrates:
1. Latex System (MPI EXT 9.2A):
a. Prime Coat: Latex, interior / exterior, MPI #6.
b. Intermediate Coat: Latex, exterior, matching topcoat.
c. Topcoat: Latex, exterior, semi-gloss (MPI Gloss Level 5), MPI #11.
D. Fiber-Cement Substrates:
1. Latex System (MPI EXT 3.3A):
VIRGINIA A&E 24100 099113 / 5
a. Prime Coat: Latex, interior / exterior, MPI #11.
b. Intermediate Coat: Latex, exterior, matching topcoat.
c. Topcoat: Latex, exterior, semi-gloss (MPI Gloss Level 5), MPI #11.
E. Galvanized-Metal Substrates:
1. Latex System (MPI EXT 5.3A):
a. Prime Coat: Primer, galvanized, water-based, MPI #134.
b. Intermediate Coat: Latex, exterior, matching topcoat.
c. Topcoat: Latex, exterior, (MPI Gloss Level 1), MPI #10.
END OF SECTION 099113
VIRGINIA A&E 24100 099123 / 1
SECTION 099123 - INTERIOR PAINTING
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes surface preparation and the application of paint systems on the following interior substrates:
1. Steel.
2. Galvanized metal.
3. Gypsum board.
1.2 DEFINITIONS
A. Gloss Level 2: Not more than 10 units at 60 degrees and 10 to 35 units at 85 degrees, according to ASTM D 523.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product. Include preparation requirements and application instructions. Submit manufacturer’s full range of color samples for color selection by Owner.
B. Samples for Verification: For each type of paint system and in each color and gloss of topcoat.
1. Submit Samples on rigid backing, 8 inches square.
2. Step coats on Samples to show each coat required for system.
3. Label each coat of each Sample.
4. Label each Sample for location and application area.
C. Product List: For each product indicated, include the following:
1. Cross-reference to paint system and locations of application areas. Use same designations indicated on Drawings and in schedules.
2. VOC content.
1.4 MAINTENANCE MATERIALS SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Paint: 5 percent, but not less than 5 gal. of each material and color applied.
1.5 QUALITY ASSURANCE
A. Mockups: Apply mockups of each paint system indicated and each color and finish selected to verify preliminary selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.
1. Owner will select one surface to represent surfaces and conditions for application of each paint system.
a. Vertical and Horizontal Surfaces: Provide samples of at least 100 sq. ft.
VIRGINIA A&E 24100 099123 / 2
b. Other Items: Owner will designate items or areas required.
2. Final approval of color selections will be based on mockups.
a. If preliminary color selections are not approved, apply additional mockups of additional colors selected by Owner at no added cost to Owner.
3. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Owner specifically approves such deviations in writing.
4. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F.
1. Maintain containers in clean condition, free of foreign materials and residue.
2. Remove rags and waste from storage areas daily.
1.7 FIELD CONDITIONS
A. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F.
B. Do not apply paints when relative humidity exceeds 85 percent; at temperatures less than 5 deg F above the dew point; or to damp or wet surfaces.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Benjamin Moore & Co.
2. Duron, Inc.
3. Euclid Chemical Company.
4. ICI Paints.
5. PPG Paints.
6. Pratt & Lambert.
7. Sherwin-Williams Company (The).
8. Zinsser.
B. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to products listed in the Interior Painting Schedule for the paint category indicated.
2.2 PAINT, GENERAL
A. MPI Standards: Provide products that comply with MPI standards indicated and that are listed in its "MPI Approved Products List."
VIRGINIA A&E 24100 099123 / 3
B. Material Compatibility:
1. Provide materials for use within each paint system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.
2. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.
C. Colors: As selected by Owner from manufacturer's full range.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.
B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:
1. Gypsum Board: 12 percent.
C. Gypsum Board Substrates: Verify that finishing compound is sanded smooth.
D. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.
E. Proceed with coating application only after unsatisfactory conditions have been corrected.
1. Application of coating indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. Comply with manufacturer's written instructions and recommendations in "MPI Architectural Painting Specification Manual" applicable to substrates indicated.
B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.
1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection if any.
C. Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, and incompatible paints and encapsulants.
1. Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as required to produce paint systems indicated.
VIRGINIA A&E 24100 099123 / 4
D. Shop-Primed Steel Substrates: Clean field welds, bolted connections, and abraded areas of shop paint, and paint exposed areas with the same material as used for shop priming to comply with SSPC-PA 1 for touching up shop-primed surfaces.
3.3 APPLICATION
A. Apply paints according to manufacturer's written instructions and to recommendations in "MPI Manual."
1. Use applicators and techniques suited for paint and substrate indicated.
2. Paint surfaces behind movable equipment and furniture same as similar exposed surfaces. Before final installation, paint surfaces behind permanently fixed equipment or furniture with prime coat only.
3. Paint front and backsides of access panels, removable or hinged covers, and similar hinged items to match exposed surfaces.
4. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.
5. Primers specified in painting schedules may be omitted on items that are factory primed or factory finished if acceptable to topcoat manufacturers.
B. Tint each undercoat a lighter shade to facilitate identification of each coat if multiple coats of same material are to be applied. Tint undercoats to match color of topcoat but provide sufficient difference in shade of undercoats to distinguish each separate coat.
C. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.
D. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.
E. Painting Plumbing, HVAC, Electrical, and Communication:
1. Paint the following work where exposed in equipment rooms:
a. Uninsulated metal piping.
b. Uninsulated plastic piping.
c. Pipe hangers and supports.
d. Metal conduit.
e. Plastic conduit.
f. Tanks that do not have factory-applied final finishes.
2. Paint the following work where exposed in occupied spaces:
a. Uninsulated metal piping.
b. Uninsulated plastic piping.
c. Pipe hangers and supports.
d. Metal conduit.
e. Plastic conduit.
3. Paint portions of internal surfaces of metal ducts, without liner, behind air inlets and outlets that are visible from occupied spaces.
VIRGINIA A&E 24100 099123 / 5
3.4 FIELD QUALITY CONTROL
A. Dry Film Thickness Testing: Owner may engage the services of a qualified testing and inspecting agency to inspect and test paint for dry film thickness.
1. Contractor shall touch up and restore painted surfaces damaged by testing.
2. If test results show that dry film thickness of applied paint does not comply with paint manufacturer's written recommendations, Contractor shall pay for testing and apply additional coats as needed to provide dry film thickness that complies with paint manufacturer's written recommendations.
3.5 CLEANING AND PROTECTION
A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.
B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.
C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect/Engineer, and leave in an undamaged condition.
D. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces. Dispose of all remaining painting products and application materials in a manner approved by the authority having jurisdiction.
E. Contractor shall provide schedule of colors and formulations used on interior and exterior areas.
3.6 INTERIOR PAINTING SCHEDULE
A. Steel Substrates:
1. Institutional Low-Odor/VOC Latex System (MPI INT 5.1S):
a. Prime Coat: Primer, rust inhibitive, water based MPI #107.
b. Intermediate Coat: Latex, interior, institutional low odor/VOC, matching topcoat.
c. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss
Level 2), MPI #144.
B. Galvanized-Metal Substrates:
1. Institutional Low-Odor/VOC Latex System (MPI INT 5.3N):
a. Prime Coat: Primer, galvanized, water based, MPI #134.
b. Intermediate Coat: Latex, interior, institutional low odor/VOC, matching topcoat.
c. Topcoat: Latex, interior, institutional low odor/VOC, (MPI Gloss
Level 2), MPI #144.
VIRGINIA A&E 24100 099123 / 6
C. Gypsum Board Substrates:
1. Institutional Low-Odor/VOC Latex System (MPI INT 9.2M):
a. Prime Coat: Primer sealer, interior, institutional low odor/VOC, MPI #149.
b. Intermediate Coat: Latex, interior, institutional low odor/VOC, matching topcoat.
c. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss
Level 2), MPI #144.
END OF SECTION 099123
VIRGINIA A&E 24100 104416 / 1
SECTION 104416 - FIRE EXTINGUISHERS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes portable, hand-carried fire extinguishers and mounting brackets for fire extinguishers.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product. Include rating and classification, material descriptions, dimensions of individual components and profiles, and finishes for fire extinguisher and mounting brackets.
1.3 INFORMATIONAL SUBMITTALS
A. Warranty: Sample of special warranty.
1.4 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For fire extinguishers to include in maintenance manuals.
1.5 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace fire extinguishers that fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Failure of hydrostatic test according to NFPA 10 when testing interval required by NFPA 10 is within the warranty period.
b. Faulty operation of valves or release levers.
2. Warranty Period: Six years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. NFPA Compliance: Fabricate and label fire extinguishers to comply with NFPA 10, "Portable Fire Extinguishers."
B. Fire Extinguishers: Listed and labeled for type, rating, and classification by an independent testing agency acceptable to authorities having jurisdiction.
2.2 PORTABLE, HAND-CARRIED FIRE EXTINGUISHERS
A. Fire Extinguishers: Type, size, and capacity for each mounting bracket indicated.
VIRGINIA A&E 24100 104416 / 2
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. Amerex Corporation
b. Guardian Fire Equipment, Inc
c. Kidde; Carrier Global Corporation
d. Larsen's Manufacturing Company
e. Nystrom, Inc.
f. Potter Roemer LLC; a Division of Morris Group International
g. Pyro-Chem; brand of Johnson Controls International plc, Building Solutions
North America
2. Source Limitations: Obtain fire extinguishers and mounting brackets from single source from single manufacturer.
3. Valves: Manufacturer's standard.
4. Handles and Levers: Manufacturer's standard.
5. Instruction Labels: Include pictorial marking system complying with NFPA 10, Appendix B, and bar coding for documenting fire extinguisher location, inspections, maintenance, and recharging.
B. Multipurpose Dry-Chemical Type in Steel Container: UL-rated 4-A:80-B:C, 10-lb nominal capacity, with monoammonium phosphate-based dry chemical in enameled-steel container.
2.3 MOUNTING BRACKETS
A. Mounting Brackets: Manufacturer's standard galvanized steel, designed to secure fire extinguisher to wall or structure, of sizes required for types and capacities of fire extinguishers indicated, with plated or red baked-enamel finish.
1. Source Limitations: Obtain mounting brackets and fire extinguishers from single source from single manufacturer.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine fire extinguishers for proper charging and tagging.
1. Remove and replace damaged, defective, or undercharged fire extinguishers.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION
A. General: Install fire extinguishers and mounting brackets in locations indicated and in compliance with requirements of authorities having jurisdiction.
B. Mounting Brackets: Fasten mounting brackets to surfaces, square and plumb, at locations indicated.
VIRGINIA A&E 24100 104416 / 3
1. Mounting Height: Top of fire extinguisher to be at 48 inches above finished floor.
END OF SECTION 104416
VIRGINIA A&E / HURT & PROFFITT 24100 221113 / 1
SECTION 221113 - FACILITY WATER DISTRIBUTION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes water-distribution piping and related components outside the building for water service.
B. Utility-furnished products include water meters that will be furnished to the site, ready for installation.
1.3 DEFINITIONS
A. PE: Polyethylene plastic.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
1.5 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: For piping and specialties including relation to other services in same area, drawn to scale. Show piping and specialty sizes and valves, meter and specialty locations, and elevations.
B. Field quality-control test reports.
1.6 QUALITY ASSURANCE
A. Regulatory Requirements:
1. Comply with requirements of utility company supplying water. Include tapping of water mains and backflow prevention.
2. Comply with standards of authorities having jurisdiction for potable-water-service piping, including materials, installation, testing, and disinfection.
3. Comply with standards of authorities having jurisdiction for fire-suppression water-service piping, including materials, hose threads, installation, and testing.
B. Piping materials shall bear label, stamp, or other markings of specified testing agency.
C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
VIRGINIA A&E / HURT & PROFFITT 24100 221113 / 2
D. Comply with ASTM F 645 for selection, design, and installation of thermoplastic water piping.
E. NSF Compliance:
1. Comply with NSF 14 for plastic potable-water-service piping.
2. Comply with NSF 61 for materials for water-service piping and specialties for domestic water.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Preparation for Transport: Prepare valves, including fire hydrants, according to the following:
1. Ensure that valves are dry and internally protected against rust and corrosion.
2. Protect valves against damage to threaded ends and flange faces.
3. Set valves in best position for handling. Set valves closed to prevent rattling.
B. During Storage: Use precautions for valves, including fire hydrants, according to the following:
1. Do not remove end protectors unless necessary for inspection; then reinstall for storage.
2. Protect from weather. Store indoors and maintain temperature higher than ambient dew-point temperature. Support off the ground or pavement in watertight enclosures when outdoor storage is necessary.
C. Handling: Use sling to handle valves and fire hydrants if size requires handling by crane or lift. Rig valves to avoid damage to exposed parts. Do not use handwheels or stems as lifting or rigging points.
D. Deliver piping with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe-end damage and to prevent entrance of dirt, debris, and moisture.
E. Protect stored piping from moisture and dirt. Elevate above grade. Do not exceed structural capacity of floor when storing inside.
F. Protect flanges, fittings, and specialties from moisture and dirt.
G. Store plastic piping protected from direct sunlight. Support to prevent sagging and bending.
1.8 PROJECT CONDITIONS
A. Interruption of Existing Water-Distribution Service: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary water-distribution service according to requirements indicated:
1. Notify Owner no fewer than two days in advance of proposed interruption of service.
VIRGINIA A&E / HURT & PROFFITT 24100 221113 / 3
2. Do not proceed with interruption of water-distribution service without Owner's written permission.
PART 2 - PRODUCTS
2.1 PE PIPE AND FITTINGS
A. PE, ASTM Pipe: ASTM D 2239, SIDR No. 5.3, 7, or 9; with PE compound number required to give pressure rating not less than 200 psig.
1. Insert Fittings for PE Pipe: ASTM D 2609, made of PA, PP, or PVC with serrated male insert ends matching inside of pipe. Include bands or crimp rings.
2. Molded PE Fittings: ASTM D 3350, PE resin, socket- or butt-fusion type, made to match PE pipe dimensions and class.
2.2 COPPER TUBE AND FITTINGS
A. Soft Copper Tube: ASTM B 88, Type K, water tube, annealed temper.
1. Fittings: In accordance with ASTM B-62.
2.3 JOINING MATERIALS
A. Plastic Pipe-Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system manufacturer, unless otherwise indicated.
2.4 PIPING SPECIALTIES
A. Transition Fittings: Manufactured fitting or coupling same size as, with pressure rating at least equal to and ends compatible with, piping to be joined.
2.5 GATE VALVES
A. AWWA, Cast-Iron Gate Valves:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. American Cast Iron Pipe Co.; American Flow Control Div.
b. Crane Co.; Crane Valve Group; Stockham Div.
c. East Jordan Iron Works, Inc.
d. McWane, Inc.
e. Mueller Co.; Water Products Div.
f. NIBCO INC.
g. U.S. Pipe and Foundry Company.
2. Nonrising-Stem, Resilient-Seated Gate Valves:
a. Description: Gray- or ductile-iron body and bonnet; with bronze or gray- or ductile-iron gate, resilient seats, bronze stem, and stem nut.
1) Standard: AWWA C509.
http://www.specagent.com/LookUp/?uid=123456822642&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456822644&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456808713&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456822646&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456822655&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456808714&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456808715&mf=04&src=wd
VIRGINIA A&E / HURT & PROFFITT 24100 221113 / 4
2) Minimum Pressure Rating: 200 psig.
3) End Connections: Mechanical joint.
4) Interior Coating: Complying with AWWA C550.
2.6 GATE VALVE ACCESSORIES AND SPECIALTIES
A. Valve Boxes: Comply with AWWA M44 for cast-iron valve boxes. Include top section, adjustable extension of length required for depth of burial of valve, plug with lettering "WATER," and bottom section with base that fits over valve. Operating wrenches shall be steel, tee-handle with one pointed end, stem of length to operate deepest buried valve, and socket matching valve operating nut.
B. Indicator Posts: UL 789, FMG-approved, vertical-type, cast-iron body with operating wrench, extension rod, and adjustable cast-iron barrel of length required for depth of burial of valve.
2.7 CURB VALVES
A. Manufacturers:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Amcast Industrial Corporation; Lee Brass Co.
b. Ford Meter Box Company, Inc. (The); Pipe Products Div.
c. Jones, James Company.
d. Master Meter, Inc.
e. McDonald, A. Y. Mfg. Co.
f. Mueller Co.; Water Products Div.
g. Red Hed Manufacturing & Supply.
B. Curb Valves: Comply with AWWA C800. Include bronze body, ground-key plug or ball, and wide tee head, with inlet and outlet matching service piping material.
C. Service Boxes for Curb Valves: Similar to AWWA M44 requirements for cast-iron valve boxes. Include cast-iron telescoping top section of length required for depth of burial of valve, plug with lettering "WATER," and bottom section with base that fits over curb valve and with a barrel approximately 5 inches in diameter.
1. Shutoff Rods: Steel, tee-handle with one pointed end, stem of length to operate deepest buried valve, and slotted end matching curb valve.
2.8 BACKFLOW PREVENTERS
A. Reduced-Pressure-Principle Backflow Preventers:
1. Basis-of-Design Product: Subject to compliance with requirements, provide Wilkins model 975XL2 or a comparable product by one of the following:
a. Ames Fire & Waterworks; a division of Watts Regulator Co.
b. FEBCO; SPX Valves & Controls.
c. Watts Water Technologies, Inc.
http://www.specagent.com/LookUp/?ulid=1953&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456822746&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456822747&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456808597&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456808598&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456808599&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456822748&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456808600&mf=04&src=wd http://www.specagent.com/LookUp/?ulid=1966&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456822775&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456822778&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456808667&mf=04&src=wd
VIRGINIA A&E / HURT & PROFFITT 24100 221113 / 5
d. Wilkins; a Zurn company.
2. Standard: ASSE 1013.
3. Operation: Continuous-pressure applications.
4. Pressure Loss: 15 psig maximum, through middle 1/3 of flow range.
5. Size: As indicated on drawings.
6. Configuration: Designed for horizontal, straight through flow.
PART 3 - EXECUTION
3.1 EARTHWORK
A. Refer to Section 312000 "Earth Moving" for excavating, trenching, and backfilling.
3.2 PIPING APPLICATIONS
A. General: Use pipe, fittings, and joining methods for piping systems according to the Drawings.
B. Transition couplings and special fittings with pressure ratings at least equal to piping pressure rating may be used, unless otherwise indicated.
C. Do not use flanges or unions for underground piping.
3.3 VALVE APPLICATIONS
A. General Application: Use mechanical-joint-end valves for NPS 3 and larger underground installation. Use threaded- or flanged-end valves for installation in vaults.
Use UL/FMG, nonrising-stem gate valves for installation with indicator posts. Use corporation valves and curb valves with ends compatible with piping, for NPS 2 and smaller installation.
3.4 PIPING INSTALLATION
A. Water-Main Connection: Arrange with utility company for tap of size and in location indicated in water main.
B. Install PE pipe according to ASTM D 2774 and ASTM F 645.
C. Bury piping with depth of cover over top in accordance with the Drawings.
D. Install piping by tunneling or jacking, or combination of both, under streets and other obstructions that cannot be disturbed.
E. Extend water-service piping and connect to water-supply source and building-water-piping systems at outside face of building wall in locations and pipe sizes indicated.
1. Terminate water-service piping at building wall until building-water-piping systems are installed. Terminate piping with caps, plugs, or flanges as required for piping material. Make connections to building-water-piping systems when those systems are installed.
http://www.specagent.com/LookUp/?uid=123456822781&mf=04&src=wd
VIRGINIA A&E / HURT & PROFFITT 24100 221113 / 6
F. Install underground piping with restrained joints at horizontal and vertical changes in direction. Use restrained-joint piping, thrust blocks, anchors, tie-rods and clamps, and other supports.
3.5 JOINT CONSTRUCTION
A. Make pipe joints according to the following:
1. PE Piping Insert-Fitting Joints: Use plastic insert fittings and fasteners according to fitting manufacturer's written instructions.
2. Concrete thrust blocks.
3. Locking mechanical joints.
4. Set-screw mechanical retainer glands.
5. Bolted flanged joints.
6. Heat-fused joints.
7. Pipe clamps and tie rods.
B. Apply full coat of asphalt or other acceptable corrosion-resistant material to surfaces of installed ferrous anchorage devices.
3.6 VALVE INSTALLATION
A. AWWA Gate Valves: Comply with AWWA C600 and AWWA M44. Install each underground valve with stem pointing up and with valve box.
B. UL/FMG, Gate Valves: Comply with NFPA 24. Install each underground valve and valves in vaults with stem pointing up and with vertical cast-iron indicator post.
C. Corporation Valves and Curb Valves: Install each underground curb valve with head pointed up and with service box.
3.7 FIELD QUALITY CONTROL
A. Piping Tests: Conduct piping tests before joints are covered and after concrete thrust blocks have hardened sufficiently. Fill pipeline 24 hours before testing and apply test pressure to stabilize system. Use only potable water.
B. Hydrostatic Tests: In accordance with VDOT Road and Bridge Specification Section 520.04.
C. Prepare reports of testing activities.
3.8 IDENTIFICATION
A. Install continuous underground detectable warning tape during backfilling of trench for underground water-distribution piping. Locate below finished grade, directly over piping. Underground warning tapes are specified in Section 312000 "Earth Moving."
3.9 CLEANING
A. Clean and disinfect water-distribution piping as follows:
VIRGINIA A&E / HURT & PROFFITT 24100 221113 / 7
1. Purge new water-distribution piping systems and parts of existing systems that have been altered, extended, or repaired before use.
2. Use purging and disinfecting procedure prescribed by authorities having jurisdiction or, if method is not prescribed by authorities having jurisdiction, use procedure described in NFPA 24 for flushing of piping. Flush piping system with clean, potable water until dirty water does not appear at points of outlet.
3. Use purging and disinfecting procedure prescribed by authorities having jurisdiction or, if method is not prescribed by authorities having jurisdiction, use procedure described in AWWA C651 or do as follows:
a. Fill system or part of system with water/chlorine solution containing at least 50 ppm of chlorine; isolate and allow to stand for 24 hours.
b. Drain system or part of system of previous solution and refill with water/chlorine solution containing at least 200 ppm of chlorine; isolate and allow to stand for 3 hours.
c. After standing time, flush system with clean, potable water until no chlorine remains in water coming from system.
d. Submit water samples in sterile bottles to authorities having jurisdiction.
Repeat procedure if biological examination shows evidence of contamination.
B. Prepare reports of purging and disinfecting activities.
END OF SECTION 221113
VIRGINIA A&E / HURT & PROFFITT 24100 221313 / 1
SECTION 221313 - FACILITY SANITARY SEWERS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Pipe and fittings.
2. Nonpressure and pressure couplings.
3. Cleanouts.
4. Manholes.
1.3 ACTION SUBMITTALS
A. Product Data: For pipe and fittings.
B. Shop Drawings: For manholes. Include plans, elevations, sections, details, and frames and covers.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Do not store plastic manholes, pipe, and fittings in direct sunlight.
B. Protect pipe, pipe fittings, and seals from dirt and damage.
C. Handle manholes according to manufacturer's written rigging instructions.
PART 2 - PRODUCTS
2.1 PVC PIPE AND FITTINGS
A. PVC Gravity Sewer Piping:
1. Pipe: ASTM D 3034, PVC sewer pipe with bell-and-spigot ends for gasketed joints.
2. Fittings:…