1605JW-21-R-00007_Amend_0001.pdf
PDF 330 KB Posted
- Attached to
- Excelsior Springs Job Corps Center with OACTS
- Solicitation number
- 1605JW-21-R-00007
- Issued by
- Not on record
About this file
This solicitation is for operation of the Excelsior Springs Job Corps Center located in Excelsior Springs, Missouri. The contractor shall provide academic, career technical, and career success training to 436 students, with 168 residential male students, 100 residential female students, 65 nonresidential male students, and 103 nonresidential female students. Outreach and admissions services must ensure arrival of at least 920 students to Excelsior Springs and 270 students to the Mingo Job Corps Center annually. Career transition services are required for graduates and former enrollees of both centers. The contractor must maintain 100% of the planned on-board strength for Excelsior Springs. This is a total small business set-aside solicitation from the Department of Labor for NAICS code 611519 with a size standard of $41.5M.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1605JW-21-R-00007_Amend_0001.pdf | ||
| How to View RFP Attachments.pdf | ||
| Solicitation 1605JW-21-R-00007.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1605JW-21-R-00007
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Chicago IL 60604
ETA/OJC IL OCM ADMIN
ATTN: PAUL SEIVERT
Suite 1588 230 S. Dearborn Street
US DEPARTMENT OF LABOR
ETA/OJC IL OCM ISSUE
Chicago IL 60604 Suite 1588 230 S. Dearborn Street
US DEPARTMENT OF LABOR
07/27/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/30/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is to change the terms & conditions of this RFP as follows:
1) Responses to Request for Clarification questions received are attached to this amendment and incorporated into this solicitation. This attachment can be viewed by opening the amendment in Adobe and clicking on the paperclip icon.
2) Revise and incorporate Attachment J-1 Price Detail.
3) Incorporate Attachment J-28 Staff Compensation Plan.
4) Incorporate the updated version of the Service Contract Labor Standards as follows: Wage
Determination No. 2015-5105 Dated July 14, 2021.
5) The proposal due date is extended. Offerors must submit proposals no later than August
6, 2021, at 2:00pm (EDT).
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Paul M. Seivert
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
TEL: EMAIL: 312-596-5589 SEIVERT.PAUL.M@DOL.GOV
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1605JW-21-R-00007/0001
All other terms and conditions remain unchanged.
Period of Performance: 05/01/2022 to 05/31/2027
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
RFP 1605JW-21-R-00007 Excelsior Springs JCC Questions for Clarification - JCAS
Solicitation Section (when cited by contractor) Question(s) Answer(s)
I am hoping to find out if there is an incumbent contractor currently performing these services, if similar services have been performed in the past, or if this is a new requirement. If this is a follow-on requirement, could you please provide the previous contract or task order number?
Yes, there is a contractor currently performing these services, and this is a follow-on requirement to Contract #1630J5-18-C-0010.
Please confirm that the Wage Comparability Tool is to be submitted on the 10th of every month in lieu of the 2110S in FMS.
Yes, the Wage Comparability Tool is to be submitted by the 10th of each month; it is to be used in lieu of the 2110S for all firm, fixed-price contracts.
Page 16 Objective The Facility Survey indicates that Wellness Services are only offered at the main campus. Please confirm that Swope Site non-residential students would need to be transported to the main campus for PRH-required wellness services.
The Satellite location is closed.
Page 17 Please provide the nonresidential student OBS for the satellite campus at 2401 Swope Parkway, Kansas City, MO. The Satellite location is closed.
Page 17 Please provide the non-residential student OBS that attend the Excelsior Springs’ main campus.
The non-residential OBS is listed in Section B.1 and Section C.2.C. of the solicitation.
Page 18 Please identify the Career Technical Training offerings and number of training slots for each of the programs offered at the SWOPE Site.
All training slots are at the main campus - the Satellite location is closed.
Page 18 Please confirm that the 50 slots for the TCU Advanced Training are full time slots. The TCU Advanced Training slots are not full time slots.
Page 18 Please provide the Staffing (FTE levels) for each of the National Training Contractor (NTCs) providers. This information is proprietary.
Page 17 -18 Is the operator responsible for transportation for non-residential participants at the Swope Site? The Satellite location is closed.
Attachment J-1 Please confirm that the duplicated CLIN 0010 on the Evaluated Tab should be CLIN 0005.
Yes, the duplicate CLIN 0010 on the Evaluation Tab should be CLIN 0005 - Career Transition Services. Attachment J-1 is revised and attached with Amendment 0001.
J-9 Facility Survey The Facility Survey indicates that there is not a kitchen at the Swope Site. Please provide the estimated number of meals that should be prepared for SWOPE participants on a daily basis.
Satellite location is closed.
J-9 Facility Survey
The 2019 Facility Planning Report states” The Swope leased facility is in poor condition due to numerous issues related to infrastructure systems, interior and exterior conditions. The building does not have a functioning cafeteria and wellness services are only offered on the main campus”. Have the identified serious issues at the Swope Site been repaired?
Satellite locations is closed.
J-9 Facility Survey Please provide an update on the two National Projects (HazMat Abatement, Structural Repairs) identified in the 2019 Facility Survey.
3737 – This was the project for Roosevelt, Admin and the Social Hall (12, 13, and 14) for the structural and ancillary needs. This included a variety of things including some gutter/downspout work, etc. This project was with R&B Construction and was completed in 2019.
3984 – This is the current Hazmat/Abatement project for Roosevelt, Admin and the Social Hall (12, 13, and 14).
They have completed Roosevelt and have done work to a point in the Social Hall. As there is water intrusion in a few areas, they had to stop at the Social Hall and are in the process of trying to get an approved plan to resolve those matters. In the meantime, they did a substantial completion walkthrough for the work completed thus far and then moved all from the Administration Building to the Social Hall. They are in the process of completing the Administration building. There is one RFP open on the project, but once that is approved, they should be able to complete in Admin within a few weeks. Then they will move us back to Admin and continue working on the Social Hall to complete that project (again assuming the plan for the Social Hall is approved). This project is being completed by AMES.
Attachment J-12 Please confirm utility consumption costs for the Swope building are included in the J- 12 attachment, “Utilities Summary”. Satellite location is closed.
Attachment J-28 Please provide a copy of attachment J-28, Staff Compensation Plan. The Staff Compensation Plan (Attachment J-28) has been included in Amendment 0001.
Page 51 H.25 Adherence to Lease Agreements Please provide a copy of the executed lease agreement. Satellite location is closed.
Page 51 H.25 Adherence to Lease Agreements
The facility survey states the Swope building is leased. Please confirm the operator is not required to pay the leased expenses out of operating funds. Satellite location is closed.
Page 51 If the operator is required to pay the lease payments for the Swope building out of operating funds, please provide the associated annual costs. Satellite location is closed.
Page 81 The virtual tour does not show the condition / layout of the Swope facility. Please provide the facility layout (including classrooms) for the SWOPE Site. Satellite location is closed.
Page 81 There is no opportunity to virtually tour the Swope building. Please confirm there is adequate furnishings and current technology available for student and staff utilization. Satellite location is closed.
There is no opportunity to virtually tour the Swope building. We are unable to ascertain if there is adequate parking for students and staff. Please provide any costs associated with student and staff parking at the Swope Site.
Page 8 Please provide the exact number of beds available for each of the dormitories. Gonzales Hall - 168 Beds - Truth Hall - 100 Beds - Roosevelt Hall - 92 Beds.
The NEAP map includes a total of 11 Local Workforce Development Areas (LWDAs) in the Excelsior Springs OA recruitment zone. The Central Region and Jefferson/Franklin Consortium LWDAs are listed on the NEAP map but not included in the RFP. Please confirm if these two LWDAs will or will not be assigned to the Excelsior Springs OA recruitment area.
The Government anticipates reallocating the local workforce zones in the state. The proposed zones for Excelsior Springs include: East Jackson Region and Kansas City and Vicinity; West Central Region; Northwest Region;
Northeast Region. For a short time, this will vary from the zones identified at neapmap.com. If there are discrepancies, the contract will take precedence.
Page 2 - 7 Do the Continuation Sheets need to be included in the BMP even though the same information is provided on the Attachment J-1 Forms?
The Continuation Sheets on pages 2 through 7 are not required to be included in the BMP.
Page 10 -14 Do the CLIN Sheets need to be included in the BMP even though the same information is provided on the Attachment J-1 Forms?
The CLIN Sheets on pages 10 through 14 are not required to be included in the BMP.
15 Please clarify if the statement work includes the Kansas City Satellite Center. Satellite location is closed.
Please validate the recruitment zone for Excelsior Springs includes all counties and workforce development regions covering MORZ01 as outlined in the NEAP. The RFP appears to limit the recruitment zone to select regions and does not include the Central Region or the Jefferson/Franklin Consortium.
The Government anticipates reallocating the local workforce zones in the state. The proposed zones for Excelsior Springs include: East Jackson Region and Kansas City and Vicinity; West Central Region; Northwest Region;
Northeast Region. For a short time, this will vary from the zones identified at neapmap.com. If there are discrepancies, the contract will take precedence.
18 Please confirm that Career Transition Services include graduates and FE’s of the Mingo CCC.
Excelsior Springs will provide CTS for Mingo initially.
This will be eventually transitioned to the Forest Service.
18 Please indicate if any of the Career Technical Training Offerings are provide through an Other Training Provider (OTP). No Training being conducted through OTP.
18 The Career Technical Training Offerings on Attachment J-5 differ than those as listed on page 18 of the RFP. Please confirm the Career Technical Training Offerings.
The J-5 represents the Career Technical Skills Training.
Please refer to the RFP for the CTT programs offered.
20-43
Please advise if the Wage Comparability tool (Attachment J-27) is required on 10th day of every month or quarterly, as noted in a recent Demonstration of Vacancy and Salary Oversight Tool webinar. Does DOL expect the Attachment J-27 to be included in the BMP submission?
The Wage Comparability Tool is the new 2110S and will be required on the 10th of every month. Attachment J-27 will not be required with the BMP, rather a completed Attachment J-28 (Staff Compensation Plan) will be required with the BMP.
42 Please advise if there are any collective bargaining agreements in place at the Excelsior Springs Job Corps Center.
There is no collective bargaining agreement applicable for the Excelsior Springs JCC.
47 Does the statement in section H.16, paragraph I include the development and distribution of monthly newsletters developed by the center?
Section H.16, Paragraph I applies to newsletters as well.
CO approval will be required to produce such publications.
Section H.22 requires Contractor shall immediately notify the CO in writing, accompanied by the resume of the proposed replacement Center Director. This statement, taken literally, appears unrealistic and can place the contractor in default.
Please clarify.
It is understandable if the resume of a replacement is not available immediately. However, the Contractor must notify the CO as soon as they are aware that the Center Director position will become vacant.
51 & 67 Section H.25 – Please provide information any existing lease agreements (Attachment J- 19), as applicable. Page 67 indicates it is not applicable. Please confirm, particularly with regard to the Kansas City Satellite Center located on Swope Parkway.
Section H.26 discusses asset reporting requirements. PRH 5.6 requires operators to Maintain an inventory system to account for all non-expendable property through the use of the Electronic Property Management System (EPMS). Has DOL issued a revised Employment Training Administration (ETA) 359, ETA Property Management Handbook or does PRH Appendix 505 apply?
Appendix 505 does apply in conjunction with the ETA handbook (2003 -2004)
66 Please clarify if the J-8 (Standard Form 1413) is required to be included in the BMP submission or submitted within 14 days of contract award.
The SF 1413s can be submitted up to 14 days after contract award, however the Offeror must comply with Section L.7 FACTOR 4.d. of the solicitation.
66 Attachments J-12 and J-23 do not reconcile. Are there separate utility costs for the Kansas City Satellite Center that are not included in the data provided? Please clarify. Satellite location is closed.
Exhibit J-11 does not include an estimate of expendable property. Please clarify or provide most recent expendable property valuation. Also, please affirm whether the expendable property will be transferred to the successful operator or will the successful operator be required to negotiate a purchase. If transferred, please clarify accounting for the use of the expendable property as a government asset. See J-25 FAQ for phase-in on page 13.
Non-expendable property is on the master property list.
66 Attachment J-22 includes 23 vehicles. Please indicate if any of the vehicles are scheduled to be turning in due to under-utilization prior to contract award? At this time there are no vehicles currently slotted to return.
82 & 86 Please clarify whether the description of the staffing approach in subfactor 3B is included or excluded from the 6 page limit.
The staffing approach is included in the 6 page limit. The only items excluded from the limit are the organizational chart and staff schedules (reference Section L.7 FACTOR 3.).
BMP Section Factor 4.a.4) requires offerors to submit a staff compensation plan (Attachment J-28) that includes proposed salaries and fringe benefits for professional employees working on the contract. There is no Attachment J-28. Please clarify.
The Staff Compensation Plan (Attachment J-28) has been
Do the NTE amounts reflected on the CLIN sheets need to be added to the J-1 forms? Yes, the NTE amounts reflected on the CLIN sheets should be added to the Attachment J-1.
The utility costs on the Center Utilities PY 18 $413,900 without escalation to PY 2020. This is the most recent data. No escalation applied.
The Utility cost provided in the RFP attachment J-12 reflects a utility cost of $304,709.
Can DOL explain the significantly reduced usage/cost and which cost should be considered in the proposed BMP?
Submit a proposal based on 100% OBS.
Facility Survey The Facility Survey indicates that there is a Water Tower on the grounds. What responsibility/maintenance to the structure is provided by the Center Contractor?
Any maintenance or repair requirements associated with the water tower will be addressed through CRA funding.
The virtual tour indicates pool tables have tears. Will all the tables as well as recreation equipment be in operable conditions upon award?
We cannot guarantee that all pool tables will be in operable condition. Any repairs/replacements needed will be made through the obligation of Equipment funds.
Will all the heating and air conditioning units all be in operable condition upon award?
We cannot guarantee that all units will be operable. Any repairs/replacements needed will be made through the obligation of CRA funds.
Is there any asbestos on the Center that a proposer should be aware of? Please reference the facility survey.
H.7 H.7 – indicates the contractor will be required to comply with comparable wages identified in Section H.9. Section H.9 of the RFP does not supply this information.
H.7 does not include any references to H.9. Section H.8 discusses wage comparability and explains that it is "the contractor's responsibility to be familiar with the local area labor market and the wages and benefits that prevail in that market".
Should the Presidential Executive Order for the minimum wage of $15 be applied to this proposal?
The Offeror shall propose wages that will be in compliance with applicable minimum wage rates effective May 1, 2022, Section H.8, and with the Wage Determinations listed in the solicitation.
The EPMS run lists over 513 missing items, will these be removed from EPMS prior to the new contract?
The Government will address any missing property during transition.
Does the center have any CRA or CTST projects “in progress” and will they be completed prior to the transition period? Or what is the projected completion date?
Yes. There are open CTST and CRA projects. Can't confirm if projects will be completed contract year end.
This concern can be addressed during transition.
What are the current national projects of the center? Will these be completed prior to transition, or do you have an estimated completion date? Reference the facility survey
Page 14, Section C.
Statement of Work Does the Excelsior Job Corps Center have a satellite center attached? No.
Page 9, Section B Introduction
The government notes that the offeror’s proposed technical and staffing approaches will be incorporated into the contract and shall become requirements. Does the incorporation include the BMP?
The contractor's entire proposal may be incorporated into the contract. Any terms or conditions included in the BMP or elsewhere that contradict terms/conditions in the contract, or are counter to the interest of the Government would not be incorporated.
Page 9, Section B.1
The facility survey states the center has a satellite campus located 35 miles from the main campus and approximately six miles from Kansas City. However, the RFP does not mention this SWOPE satellite. Are bidders required to include the satellite in their proposals? How many students are enrolled at the satellite? What trades are offered at that location and how many CTT slots are for the satellite? Is the satellite still located at the location indicated in the Facility Survey and is the building configuration still the same?
The Satellite location is closed.
Page 15, C.1.B
As you are aware, Change Notice No. 20-05, “Policy and Requirements Handbook (PRH) Changes to Health and Wellness Staffing (Exhibits 5-3 and 5-6)” was issued on April 16, 2021. The notice states the effective date of the PRH change of June 15, 2021. With respect to the Excelsior Springs JCC RFP, does the government expect contractors to include the change notice in the procurement?
Yes, the Government expects Offerors to incroporate the requirements of PRH Change Notice 20-05 into their proposals.
Page 16, C.1.C.2
The contractor is requested to provide basic health care, counseling, and other support services as required by the ePRH. Are all these same services expected given the current COVID-19 pandemic & remote learning environment? Or are these services going to be modified as students return to campus and some students are still in remote learning status? If there are changes, will the government provide further details of what those expectations will be?
Offerors are to submit proposals assuming operation at 100% OBS under normal conditions. If special circumstances exist during the performance of the new award, such changes will be addressed via contract modification after award.
Page 18, C.2.D
Please clarify the slots for the Transportation TCU/Advance Training is correct. The current center CTT-10 report lists the trade as 100 slots. Please clarify the slots for the Certified Nurse Assistant is correct. The current center CTT-10 report lists the trade as 90 slots. Please clarify the Culinary Arts Registered Apprenticeship trade name is correct? The Job Corps website lists this trade as a standard Culinary Arts trade. Is this trade considered an OTP?
The TCU CTT has been reduced to 50 slots
Page 18, C.2.D The CTT chart does not specify which trades are provided at the main center site and which are at the satellite campus. Please clarify. The Satellite location is closed.
Page 30, G.9 With the current COVID-19 pandemic atmosphere and remote learning, is 100% OBS still the expectation after 3 months grace period? And if not, how does the government expect to adjust monthly price given the current situation?
The start date for this requirement is June 1, 2022 (with a transition beginning May 1, 2022). Offerors shall submit proposals under the assumption that the Center will operate at 100% OBS.
Page 66, J-1 Price Detail Template
Please clarify that the formula in the J-1 Price Detail Template is correct regarding 52.217-8 Option to Extend Services. The formula includes Phase Out which should not be included as a part of the pricing for Option Year Three according to Section B Pricing Schedule.
The formula in the J-1 Pricing Detail for 52.217-8 Option to Extend Services is correct and does not include the phase out cost.
On the J-1 attachment, Evaluated Price tab the Base Period lists CLIN 0010 twice and there is not a CLIN 0005. Will the J-1 be revised?
On the J-1 attachment the Contract Award tab does not include the NTE amounts listed in the Section B.2 Pricing Schedule. Will the J-1 be revised, or should these values be added?
The NTE amounts reflected on the CLIN sheets should be added to the Attachment J-1.
Page 66, J-6 The RFP specifies that a Subcontracting Plan is not required for total small business solicitations. However, the J-6 was included. Please specify whether or not the J-6 is required for submission.
Attachment J-6 is a standard attachment for Job Corps solicitations. Small businesses need not submit an Attachment J-6.
Page 66, J-9 Facility Survey – Volume 1
The Executive Summary notes there are several buildings in poor condition and the preventive maintenance needs improvement. Can the contractor assume that these are to be fixed through CRA funding, Equipment, and/or CTST funding rather than through Operational funding? If some of the above issues are to be fixed through Operational dollars, can the Government identify which items those will be and provide further insight for contractors?
The facility survey defines those deficiencies that can repaired through CRA funding and those that can be repaired through operational funding. Any remaining funds for incomplete projects will be transferred to the new operator for completion.
Page 66, J-9 Please confirm the Department of Labor is directly responsible for the lease costs of the leased satellite “SWOPE” campus, and the center operator/contractor is not required to propose the lease costs.
Page 66, J-9 Please clarify the costs the operator/contractor is responsible for in maintaining the leased space for the satellite “SWOPE” campus. Satellite location is closed.
Page 66, J-9 As described in the Facility Survey, please confirm the satellite “SWOPE” campus does not have a full-service kitchen. What is available for heating/storing food? Satellite location is closed.
Page 66, J-12
Would the Government please provide more utility information relating to the Excelsior Springs Job Corps Center? The information provided includes billing for June 2019 – May 2020 and consumption for June 2018 – May 2019. Could the government please provide billing amounts for the June 2018 – May 2019 period? Are there any costs for utilities outside of Electricity, Natural Gas and Water? Clarify if the water costs include sewer.
No. There are no additional cost for utilities of Electricity, Natural Gas and Water. The water bill includes sewer cost.
Page 66, J-12 Does this utility information include costs for the main center and the satellite “SWOPE” campus? If not, please provide similar utility information for the satellite as applicable.
Page 67, J-16
Please confirm the Wage Determination listed is correct. Per the Sam.gov website the applicable WD is 2015-5105 for Clary County. Revision 12 is dated 12/21/20 and Revision 11 is dated 06/25/20. Are there two Wage Determinations applicable for the
RFP?
The Service Contract Act Wage Determination has been corrected in Amendment 0001.
Page 67, J-18 Will the Government provide the correct website for the State of Georgia Workforce Development goals? The current one listed in the RFP does not work.
The State of Georgia Workforce Development Goals do not apply to this requirement. Refer to Section J, Attachment J- 18 for the link to the State of Missouri Workforce Development Goals.
Page 87, Factor 4. a.4.
The RFP requires that Attachment J-28 must be submitted as a part of the staff compensation plan, but the attachment was not provided. Can we expect the attachment to be provided at a later date?
The Staff Compensation Plan (Attachment J-28) has been
N/A Are the washers and dryers at the Excelsior Springs Job Corps Center government property or are they leased? If they are government owned, are they all operable? Leased.
Page 82, L.6 Instructions for Proposal Submission Could the Appendices not be included within the page count? The only items excluded from the page counts are the organizational chart, staff schedules, and Attachment J-4.
J-1, Line 15 in the Evaluated Price Tab It seems the content is incorrect. Should it be CLIN 0005 CTS?
J-4, No breakout for Mingo OA/CTS Do you want to see a breakout for OA/CTS for the Mingo Center?
Mingo O&A and CTS shall be priced separately. Please submit pricing for Excelsior Springs O&A and CTS under CLINs X004 and X005 respectively. Please submit pricing for Mingo O&A and CTS under CLINs X009 and X010 respectively.
JCAS
EVALUATED PRICE
Contractor Name and Address
Company POC
DOL Agency
RFP Number
Center
BASE PERIOD
CLIN Number Supplies/Service Type Quantity Unit Unit Price Amount
CLIN 0002 Center Operations Fixed Price with Price Adjustment 24 MO $0.00
CLIN 0003 Management Fee - 1% of Center Operations Price Fixed Price with Price Adjustment 24 MO $0.00
CLIN 0004 Outreach and Admissions Firm Fixed Price 24 MO $0.00
CLIN 0005 Career Transition Services Firm Fixed Price 24 MO $0.00
CLIN 0009 Outreach & Admissions (Mingo) Firm Fixed Price 24 MO $0.00
CLIN 0010 Career Transition Services (Mingo) Firm Fixed Price 24 MO $0.00
TOTAL $0.00
OPTION PERIOD ONE
CLIN Number Supplies/Service Type Quantity Unit Unit Price Amount
CLIN 1002 Center Operations Fixed Price with Price Adjustment 12 MO $0.00
CLIN 1003 Management Fee - 1% of Center Operations Price Fixed Price with Price Adjustment 12 MO $0.00
CLIN 1004 Outreach and Admissions Firm Fixed Price 12 MO $0.00
CLIN 1005 Career Transition Services Firm Fixed Price 12 MO $0.00
CLIN 1009 Outreach & Admissions (Mingo) Firm Fixed Price 12 MO $0.00
CLIN 1010 Career Transition Services (Mingo) Firm Fixed Price 12 MO $0.00
TOTAL $0.00
OPTION PERIOD TWO
CLIN Number Supplies/Service Type Quantity Unit Unit Price Amount
CLIN 2002 Center Operations Fixed Price with Price Adjustment 12 MO $0.00
CLIN 2003 Management Fee - 1% of Center Operations Price Fixed Price with Price Adjustment 12 MO $0.00
CLIN 2004 Outreach and Admissions Firm Fixed Price 12 MO $0.00
CLIN 2005 Career Transition Services Firm Fixed Price 12 MO $0.00
CLIN 2009 Outreach & Admissions (Mingo) Firm Fixed Price 12 MO $0.00
CLIN 2010 Career Transition Services (Mingo) Firm Fixed Price 12 MO $0.00
TOTAL $0.00
OPTION PERIOD THREE
CLIN Number Supplies/Service Type Quantity Unit Unit Price Amount
CLIN 3002 Center Operations Fixed Price with Price Adjustment 12 MO $0.00
CLIN 3003 Management Fee - 1% of Center Operations Price Fixed Price with Price Adjustment 12 MO $0.00
CLIN 3004 Outreach and Admissions Firm Fixed Price 12 MO $0.00
CLIN 3005 Career Transition Services Firm Fixed Price 12 MO $0.00
CLIN 3009 Outreach & Admissions (Mingo) Firm Fixed Price 12 MO $0.00
CLIN 3010 Career Transition Services (Mingo) Firm Fixed Price 12 MO $0.00
TOTAL $0.00
52.217-8 Option to Extend Services
For the purpose of determining the evaluated price, DOL will calculate the value of the option to extend services as ½ of the total proposed price of option year three (minus phase out cost) $0.00
TOTAL ALL PERIODS $0.00
(TOTAL EVALUATED PRICE)
CONTRACT AWARD
Contractor Name and Address
Company POC
DOL Agency
RFP Number
Center
BASE PERIOD
CLIN Number Supplies/Service Type Quantity Unit Unit Price Amount
CLIN 0001 Phase In Firm Fixed Price 1 MO $0.00
CLIN 0002 Center Operations Fixed Price with Price Adjustment 24 MO $0.00
CLIN 0003 Management Fee - 1% of Center Operations Price Fixed Price with Price Adjustment 24 MO $0.00
CLIN 0004 Outreach and Admissions Firm Fixed Price 24 MO $0.00
CLIN 0005 Career Transition Services Firm Fixed Price 24 MO $0.00
CLIN 0006 Construction, Rehabilition and Acquisition TBD NTE
CLIN 0007 Equipment TBD NTE
CLIN 0008 Career Technical Skills Training TBD NTE
CLIN 0009 Outreach & Admissions (Mingo) Firm Fixed Price 24 MO $0.00
CLIN 0010 Career Transition Services (Mingo) Firm Fixed Price 24 MO $0.00
TOTAL $0.00
OPTION PERIOD ONE
CLIN Number Supplies/Service Type Quantity Unit Unit Price Amount
CLIN 1002 Center Operations Fixed Price with Price Adjustment 12 MO $0.00
CLIN 1003 Management Fee - 1% of Center Operations Price Fixed Price with Price Adjustment 12 MO $0.00
CLIN 1004 Outreach and Admissions Firm Fixed Price 12 MO $0.00
CLIN 1005 Career Transition Services Firm Fixed Price 12 MO $0.00
CLIN 1006 Construction, Rehabilition and Acquisition TBD NTE
CLIN 1007 Equipment TBD NTE
CLIN 1008 Career Technical Skills Training TBD NTE
CLIN 1009 Outreach & Admissions (Mingo) Firm Fixed Price 12 MO $0.00
CLIN 1010 Career Transition Services (Mingo) Firm Fixed Price 12 MO $0.00
TOTAL $0.00
OPTION PERIOD TWO
CLIN Number Supplies/Service Type Quantity Unit Unit Price Amount
CLIN 2002 Center Operations Fixed Price with Price Adjustment 12 MO $0.00
CLIN 2003 Management Fee - 1% of Center Operations Price Fixed Price with Price Adjustment 12 MO $0.00
CLIN 2004 Outreach and Admissions Firm Fixed Price 12 MO $0.00
CLIN 2005 Career Transition Services Firm Fixed Price 12 MO $0.00
CLIN 2006 Construction, Rehabilition and Acquisition TBD NTE
CLIN 2007 Equipment TBD NTE
CLIN 2008 Career Technical Skills Training TBD NTE
CLIN 2009 Outreach & Admissions (Mingo) Firm Fixed Price 12 MO $0.00
CLIN 2010 Career Transition Services (Mingo) Firm Fixed Price 12 MO $0.00
TOTAL $0.00
OPTION PERIOD THREE
CLIN Number Supplies/Service Type Quantity Unit Unit Price Amount
CLIN 3002 Center Operations Fixed Price with Price Adjustment 12 MO $0.00
CLIN 3003 Management Fee - 1% of Center Operations Price Fixed Price with Price Adjustment 12 MO $0.00
CLIN 3004 Outreach and Admissions Firm Fixed Price 12 MO $0.00
CLIN 3005 Career Transition Services Firm Fixed Price 12 MO $0.00
CLIN 3006 Construction, Rehabilition and Acquisition TBD NTE
CLIN 3007 Equipment TBD NTE
CLIN 3008 Career Technical Skills Training TBD NTE
CLIN 3009 Outreach & Admissions (Mingo) Firm Fixed Price 12 MO $0.00
CLIN 3010 Career Transition Services (Mingo) Firm Fixed Price 12 MO $0.00
CLIN 3011 Phase Out Firm Fixed Price 1 MO $0.00
TOTAL $0.00
TOTAL ALL PERIODS $0.00
(TOTAL AWARD AMOUNT)
Introduction
Instructions for Completing the Staff Compensation Chart
The following staff compensation chart shall be completed. The number of staff in each function shall be shown on this chart. The estimated average salary of each staff position shall be shown. Each contractor has its own manner of organizing its staff; however, for the purposes of this proposal, follow the outline of this Staff compensation chart.
Different contractors have different position titles for similar functions. However, for purposes of evaluation, offerors may not change position titles in column 1. Where offeror’s position titles differ, actual titles should be entered in the “Remarks” column. The Staffing Chart describes functions. In the event that a position is so unique that it does not fit any title on the chart, place the position in the appropriate place on the chart.
Subcontractor staff must be reported. Therefore, if a subcontractor has deemed their salary information proprietary, they may submit this information directly to the Contracting Officer at the email address identified for receipt of proposals. The subcontractor must clearly identify which prime contractor's proposal their submission is associated with.
DOL recognizes that at the time of proposal submission, offerors would not have made firm offers of employment to individuals that therefore, the salary information provided in this tool may be an estimate of the competitive salary that the offeror anticiaptes for a position(s).
Definitions.
1. Standard Position Title
2. The number of staff at each position title. If none are proposed, leave the line blank. If one person performs more than one function or one person performs the same function in two or more different functional areas, show the allocation of that person's time as a decimal (e.g., .5) allocation to the proper line.
3. If a position is subcontracted, show the number in the appropriate column.
4. Remarks. The center title, if different from the title shown in the left-hand column, and any comments you wish to make.
5. Proposed Salary should be the annual salary estimated for this position title.
6. Fringe benefit percentage should be listed for each position title and the offeror can use it's average fring benefit percentage, rather than the actual percentage for each position.
7. Proposed Salary Source/Justification should be the source used to support the annual salary estimate.
Staffing Summary
TOTAL FULL-TIME EQUIVALENT STAFF
Total Contractor Staff 66
Total Subcontracted Staff 35.45
Total National Training Contractor Staff 0
TOTAL FTE 101.45
Staffing Calculator Center
Staffing Chart
Full-Time Equivalent
Line 01 Academic Personnel Prime Contractor Subcontractor Remarks Estimated Proposed Salary (Annual Salary) Fringe Benefit Ratio Proposed Salary Source/Justification
Career Training Services Director
Academic Manager 1 $ 55,000 25% Indeed.com
Academic Supervisor
Instructors: Please list by Academic Program
Reading Instructor 1 $ 35,000 25% Economic Research Institute (ERI)
Math Instructor 1 $ 35,000 25% Economic Research Institute (ERI)
Applied Academics Instructor
HSE Instructor 0.5 $ 32,500 25% Salary.com
High School Diploma Instructor 1.5 $ 35,000 25% Salary.com
English as a Second Language Instructor
Driver’s Education Instructor 1 $ 45,000 25% Economic Research Institute (ERI)
Communications Instructor
Wellness/Safety Instructor
Information Technology Instructor
Instructor Substitute 0.5
Support:
Testing Coordinator 1 Testing/OCT Coordinator
ACT/OCT Coordinator
Administrative Assistant 0.5
Secretary
Clerical 0.5 Scheduling Clerk
Other Academic Positions (Specify)
Subtotal Academic Personnel 8.5 0
TOTAL Academic Personnel 8.5
Staffing Chart
Full-Time Equivalent
Line 03 Career Technical Training (CTT) Personnel Prime Contractor Subcontractor Remarks Estimated Proposed Salary (Annual Salary) Fringe Benefit Ratio Proposed Salary Source/Justification
Career Training Services Director
CTT Manager 1
CTT Supervisor
Instructors: Please list by CTT Offering
Material Handling and Dist. Ops 1
Facilities Maint, Pre-Apprentice
Plumbing
Office Administration 1
Culinary Arts 1
Welding 1
Computer Technician 1
Cement Masonry
Career Exploration Instructor
Instructor Substitute 0.5
Support:
CTST Coordinator
WBL Coordinator 0.5 WBL/CTST Coordinator
Testing Coordinator
Administrative Assistant 0.5
Secretary
Clerical
Other CTT Positions (Specify)
Subtotal CTT Personnel 7.5 0
TOTAL CTT Personnel 7.5
Staffing Chart
Full-Time Equivalent
Line 05 Career Success Personnel Prime Contractor Subcontractor Remarks Estimated Proposed Salary (Annual Salary) Fringe Benefit Ratio Proposed Salary Source/Justification
Career Success Director
Residential Living Manager 1
Residential Living Supervisor
Center Shift Manager 3
Counseling Manager 1
Counseling Supervisor
Recreation Manager 1
Recreation Supervisor
Student Personnel Officer 1
Residential Counselors 5
Senior Residential Counselors 0
Day RA 1 Day Asst. Res. Counselor
Duty Officer
Substitute Residential Advisor 0.5
Counselor 3
Senior Counselor
ACT/OCT Counselor
Senior Recreation Specialist
Recreation Specialist 2
Recreation Coordinator
Recreation Aide
Arts & Crafts Instructor
Leadership Coordinator
Diversity Coordinator
Student Government Advisor 0.5
Women’s Program Coordinator
Student Safety Advisor/Coordinator
Evening Studies Coordinator 1
Assistant Student Personnel Officer 0
Staffing Chart
Full-Time Equivalent
Line 05 Career Success Personnel - Continued Prime Contractor Subcontractor Remarks Estimated Proposed Salary (Annual Salary) Fringe Benefit Ratio Proposed Salary Source/Justification
Student Personnel Officer Clerk
Support:
Student Store Specialist
Librarian
Administrative Assistant
Secretary
Clerk 1
Residential Counseling Assistants 7
Other Career Success Positions (Specify)
Subtotal Career Success Personnel 28 0
TOTAL Career Success Personnel 28
Staffing Chart
Full-Time Equivalent
Line 09 Support Service Personnel Prime Contractor Subcontractor Remarks Estimated Proposed Salary (Annual Salary) Fringe Benefit Ratio Proposed Salary Source/Justification
Dining Hall Manager
Food Service Supervisor 1 Food Service Manager
Assistant Food Service Manager
Transportation Manager
Transportation Supervisor
Vehicle Fleet Manager
Child Care Manager
Child Care Supervisor
Laundry Manager
Senior/Lead Cook
Cook 2
Cook Helper/Assistant 1
Culinary Worker 1
Transportation Coordinator
Driver 3
Substitute Driver
Child care Teacher
Child Care Specialist
Child Care Aide
Laundry Operator
Incidental OA/CTS staff
Support:
Student Intern/WBL 0.5
Administrative Assistant
Secretary
Clerical
Other Support Positions (Specify)
Subtotal Support Service Personnel 0 8.5
TOTAL Support Service Personnel 8.5
Staffing Chart
Full-Time Equivalent
Line 11 Medical/Dental Personnel Prime Contractor Subcontractor Remarks Estimated Proposed Salary (Annual Salary) Fringe Benefit Ratio Proposed Salary Source/Justification
Medical Services Director
Health Services Manager 1
Health Services Administrator
Wellness Supervisor
Physician 0.2 Medical Professional Subcontract
Optometrist
Mental Health Consultant 0.45 Medical Professional Subcontract
Psychiatrist/Psychologist
TEAP Specialist 0.3 Medical Professional Subcontract
TEAP Coordinator
TEAP Assistant
Dentist 0.15 Medical Professional Subcontract
Dental Hygienist 0.15 Medical Professional Subcontract
Dental Technician
Dental Assistant 0.2 Medical Professional Subcontract
Pharmacist
Registered Nurse (RN)
Vocational/Practical Nurse (LVN/LPN) 2
Physician’s Assistant/Nurse Practitioner (PA/NP)
Medical Assistant
Physician Assistant
Staffing Chart
Full-Time Equivalent
Line 11 Medical/Dental Personnel - Continued Prime Contractor Subcontractor Remarks Estimated Proposed Salary (Annual Salary) Fringe Benefit Ratio Proposed Salary Source/Justification
Lab Technician
X-Ray Technician
Reproductive Health Specialist
Support:
Administrative Assistant
Secretary 1
Clerical
Other Medical/Dental Positions (Specify)
Subtotal Medical/Dental Personnel 0 5.45
TOTAL Medical/Dental Personnel 5.45
Staffing Chart
Full-Time Equivalent
Line 13 Career Prep/Career Transition Readiness Personnel Prime Contractor Subcontractor Remarks Estimated Proposed Salary (Annual Salary) Fringe Benefit Ratio Proposed Salary Source/Justification
CP/CTR Manager 1
Career Preparation Manager
Career Preparation Supervisor
Career Transition Readiness Manager
Career Transition Readiness Supervisor
Career Preparation Specialist
Career Preparation Instructor 3
Career Preparation Coordinator
Career Preparation Advisor
Career Transition Readiness Specialist 0.5
Career Transition Readiness Instructor 0.5
Career Transition Readiness Coordinator
Employability Specialist
Substitute Instructor 0.5
Support:
Administrative Assistant
Secretary
Clerical 0.5
Other CP/CTR Positions (Specify)
Subtotal CP/CTR Personnel 0 6
TOTAL CP/CTR Personnel 6
Staffing Chart
Full-Time Equivalent
Line 15 Administrative Personnel Prime Contractor Subcontractor Remarks Estimated Proposed Salary (Annual Salary) Fringe Benefit Ratio Proposed Salary Source/Justification
Center Director 1
Deputy Center Director
Training/Program Director 1
Administration Director 1 F & A Director
Administration Manager
Finance Manager 1
Finance Supervisor
Senior Accountant
Accountant 1
Accounting Clerk
Bookkeeper
Procurement Manager
Procurement Specialist 1
Procurement Clerk
Purchasing Agent/Buyer 1
Human Resources (HR) Manager 1
HR Specialist
Personnel Specialist
Personnel Assistant
EEO Coordinator
Staff Training Coordinator
Business & Community Liaison
Student Records Manager 1
Student Records Supervisor
Scheduling Clerk
Student Records Specialist
Student Records Clerk
Data Integrity/Quality Assurance Supervisor
Data Integrity Specialist 1
Data Integrity Clerk
Student Accountability Officer/Duty Officer
Staffing Chart
Full-Time Equivalent
Line 15 Administrative Personnel - Continued Prime Contractor Subcontractor Remarks Estimated Proposed Salary (Annual Salary) Fringe Benefit Ratio Proposed Salary Source/Justification
Property/Supply Manager
Property/Supply Officer
Property/Supply Specialist 1
Property/Supply Clerk
Warehouse Worker
Payroll/Clothing Clerk
IT Systems Administrator
Information Technology Specialist 1
IT Assistant
Postmaster
Mail Clerk
Receptionist
PBX Operator
Student Intern/WBL
Support:
Executive Assistant (CD) 1
Administrative Assistant 1
Secretary
Clerical
Other Administrative Positions (Specify)
Subtotal Administrative Personnel 14 0
TOTAL Administrative Personnel 14
Staffing Chart
Full-time Equivalent
Line 18 Facilities Maintenance Prime Contractor Subcontractor Remarks Estimated Proposed Salary (Annual Salary) Fringe Benefit Ratio Proposed Salary Source/Justification
Maintenance Manager 1
Maintenance Supervisor
Maintenance Engineer
Maintenance Technician 3
Maintenance Mechanic
Maintenance Worker
Maintenance Helper
Maintenance Custodian 1
Senior Custodian
Utility Worker 0.5
Groundskeeper
Janitor
Student Intern/WBL 0.5
Support:
Administrative Assistant
Secretary
Clerical
Other Facility Maintenance Positions (Specify)
Subtotal Facilities Maintenance Personnel 0 6
TOTAL Facilities Maintenance Personnel 6
Staffing Chart
Full-time Equivalent
Line 20 Security Personnel Prime Contractor Subcontractor Remarks Estimated Proposed Salary (Annual Salary) Fringe Benefit Ratio Proposed Salary Source/Justification
Security Manager
Security Supervisor
Safety/Security Manager 1
Safety/Security Supervisor
Senior/Lead Security Officer 2
Security Officer 6
Security Guard
Front Gate Officer
Substitute Security Officer 0.5
Safety Officer
Fire Chief
Student Intern/WBL
Support:
Administrative Assistant
Secretary
Clerical
Other Security Positions (Specify)
Subtotal Security Personnel 0 9.5
TOTAL Security Personnel 9.5
Staffing Chart
Full-time Equivalent
Prime Contractor Subcontractor Remarks Estimated Proposed Salary (Annual Salary) Fringe Benefit Ratio Proposed Salary Source/Justification
OA/CTS Director 1
Outreach & Admissions Manager
Outreach & Admissions Supervisor
Career Transition Services Manager
Career Transition Services Supervisor
OA Coordinator
Admissions Counselor 3
Quality Assurance Specialist
Career Transition Services Specialist 3
Job Developer
Transition Counselor
WBL Specialist/Coordinator
Student Intern/WBL
Support:
Administrative Assistant
Secretary
Clerk 1
Other OA/CTS Positions (Specify)
Subtotal OA & CTS Personnel 8
TOTAL FULL-TIME EQUIVALENT STAFF
Total Contractor Staff 66
Total Subcontracted Staff 35.45
Total National Training Contractor Staff 0
TOTAL FTE 101.45
ATTACHMENT J-4 STAFFING CHART
&P
Staffing Calculator OACTS
OUTREACH, ADMISSIONS, and CAREER TRANSITION SERVICES
Full-Time Equivalent
Prime Contractor Subcontractor Remarks Estimated Proposed Salary (Annual Salary) Fringe Benefit Ratio Proposed Salary Source/Justification
OA/CTS Director 1 $ 55,000 25% Economic Research Institute (ERI)
Outreach & Admissions Manager
Outreach & Admissions Supervisor
Career Transition Services Manager
Career Transition Services Supervisor
OA Coordinator
Admissions Counselor 3
Quality Assurance Specialist
Career Transition Services Specialist 3
Job Developer
Transition Counselor
WBL Specialist/Coordinator
Student Intern/WBL
Support:
Administrative Assistant
Secretary
Clerk 1
Other OA/CTS Positions (Specify)
Subtotal OA & CTS Personnel 8
TOTAL OA & CTS Personnel 8
File details come from the government source that posted it. Updated .