1605C2-23-R-00007 - Amendment 0001 - Building Construction.pdf
PDF 277 KB Posted
- Attached to
- Operation of CTT programs at Job Corps Centers – Building Construction Federal contract opportunity
- Solicitation number
- 1605C2-23-R-00007
About this file
This document contains an amendment and question and answer sheet for solicitation number 1605C2-23-R-00007 from the Department of Labor for Operation of Career Technical Training programs in Building Construction at Job Corps Centers. The amendment provides answers to questions received about the solicitation and clarifies that there will be two cost-reimbursement contract line item numbers for the base year and each option year, with the first for operational expenses and the second for fees. The question and answer sheet addresses topics such as the indirect cost rate analysis process and whether the proposed target profit is at the contractor's discretion. The response due date and time are not extended by the amendment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Past Performance Questionaire - Attachment A.doc | DOC document | |
| 1605C2-23-R-00007.pdf | ||
| QuestionAndAnswers - Building Construction.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1605C2-23-R-00007 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Washington DC 20210
CAS
S-4307 200 Constitution Ave, NW Customer Acquisition Services US Department of Labor
05/03/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/03/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide the Government's answers to solicitation questions received. The solicitation closing date and time are not extended. Contractors shall submit one signed copy of this amendment with their response.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Evon M. Pollack
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
TEL: EMAIL: 202-693-4582 pollack.evon@dol.gov
5/18/2023
QuestionAndAnswers - Building Construction Sheet
Question # Question Title RFQ Section Number/Page Number Vendor Questions Government Comment
1 CLINS 2-3 For each RFP, it appears there is single CLIN for each Option Year.
Are we tracking expenses each year only against 1 CLIN?
The government intends to have 2 CLINs for the Base Year, and 2 CLINs for each subsequent Option Year, The first CLIN will confine all operational/program expenses, and the second CLIN will encompass fees.
2 Annual IDCR 13, section 1.7.26 Is the annual Indirect Cost Rate analysis still the same? Correct.
3 Target Profit 2-3 Is “target profit” at contractor discretion as to what we propose, or is it a fixed margin set by DOL?
This should be proposed at the contractors discretion and ultimately this is negotiable by the government.
OJC National Training Contractor (NTC) Building Construction Question and Answer Spreadsheet Solicitation Number - 1605C2-23-R-00007