Gulfport-1605AE-21-R-00014 (Amendment 0004).pdf

PDF 3 MB Posted

Attached to
Gulfport Redevelopment Project at the Gulfport Job Corps Center located in Gulfport, Mississippi
Solicitation number
1605AE-21-R-00014
Issued by

About this file

This federal contract opportunity solicits offers for construction services at the Gulfport Job Corps Center in Gulfport, Mississippi. The work involves constructing approximately 90,000 gross square feet of six new buildings using plans and specifications prepared by Eley Guild Hardy Architects. The buildings include a two-story Administration/Education Building, single-story Cafeteria, Recreation, Operations and Maintenance, and Chiller Plant buildings, and a single-story Hard Vocational/Warehouse Building. The project has historical significance and requires supporting, preserving, and restoring existing masonry facades during construction in compliance with applicable historic standards. Additional work includes hazardous materials remediation, utility installation, site work, landscaping, and demolition of existing buildings and temporary classrooms. The period of performance is 780 calendar days from notice to proceed. The estimated cost range is over $10 million. This is a 100% small business set-aside acquisition under NAICS Code 236220 with a size standard of $39.5 million. Offerors must be registered in the System for Award Management prior to contract award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1605AE-21-R-00014

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Washington DC 20210

JCAS

N-4643 200 Constitution Ave, NW Job Corps Acquisition Services US Department of Labor

305505/20/20210004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/29/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project Title: Construction project for the Redevelopment Project at Gulfport Job Corps

Center Gulfport, Mississippi

Please see continuation page two (2) for a detailed list of all changes and inclusions.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Ronette C. McBean-Felder

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

TEL: EMAIL: 202-693-3878 mcbeanfelder.ronette.c@dol.gov

1605AE-21-R-00014

Gulfport Job Corps Center – Redevelopment Project

Amendment 0004

Project Title: Construction project for the Redevelopment Project at Gulfport Job Corps Center Gulfport, Mississippi a.) The purpose of this amendment is to accomplish the following actions:

1. Include responses to questions pertaining to Solicitation No. 1605AE-21-R-00014 and the second site visit held on May 17, 2021 in the body of Amendment 0004.

2. Include the second site visit attendance sign-in sheets (See Attachment 1).

3. Update hyperlink in Section J.7 entitled “Drawings and Specifications Link” to include the “Revision 2 to Site Electrical Drawing Sheet E010” dated May 19, 2021 (via hyperlink).

4. Update Attachment J.3 entitled “Past Performance Questionnaire” Section C email address to reflect gloster.monica@dol.gov (See Attachment J.3)

Questions/Clarifications and Responses

1. Can you provide me with a general contractors bidders list for the following job: Gulfport Redevelopment Project at the Gulfport Job Corps Center- Gulfport, MS?

RESPONSE: Please reference Amendment 0003 for the Pre-Proposal Conference sign-in sheet in addition the sign-in sheet for the second Site Visit attached. (Attachment 1 to this Amendment)

2. Sheet EC210, Keynote #4 calls for us to provide a 60A Busway in Work Bays C118, C109, C105. Please provide details for busway including linear ft., specs, & feeder designation.

RESPONSE: Replace Keynote #4 with the following: Provide 60’ of 100-amp, 3 phase, 4 wire, class 5600 Powerbus in each work bay. Each system to include a 100-amp feeder to panel CP1 and 8 drops. 3 – 30-amp, 2 pole twist lock, 3 – 20-amp single pole and 2 60-amp, 2 pole twist locks. Drops complete with SO chord, Kellum grips, bell box and bus plug.

3. Please provide circuitry and panel designation for site lights shown on E010.

RESPONSE: See revised Site Plan E010 Revision #2 at www.solicitationattachments.com/gulfportredevelop

4. Per the Manufacturer, American Olean Bright and Matte series tile has been discontinued. Bright and Matte series has been replaced with American Olean Color Story. Please advise.

RESPONSE: American Olean Color Story is acceptable. We will color match the original selections during the submittal phase of the project.

5. IA102, room A125 is showing a pattern per the Floor Finish Plan Legend as VCT-1. Per the transition note, this room is calling for Sealed Concrete. Please clarify.

RESPONSE: Sheet IA102, drawing 1/IA102: At the door leading into “Stor A125” delete the transition callout.

Provide VCT per the Finish Schedule.

6. Please confirm materials testing and commissioning services will be secured and paid for by the Owner.

RESPONSE: Special Inspections and testing as required by Chapter 17 of the IBC, as well as commissioning, will be provided through the AE’s contract with the Owner. All other testing required by specific specification sections shall be provided and paid for by the Contractor.

7. Per Amendment 0003 – RFI #15 Response - Previously completed Past Performance Questionnaires are acceptable if the work identified is within the timeframe specified in the Solicitation.

mailto:gloster.monica@dol.gov http://www.solicitationattachments.com/gulfportredevelop

Amendment 0004

Question – Since the RFP states that the Completed Past Performance Questionnaires are to be emailed directly to the Contract Specialist, if we submit previously completed PPQs – how should those be submitted? Do we include them in the Volume Two proposal, or do we need to email them separately?

RESPONSE: Previously completed Past Performance Questionnaires shall be included in your Proposal’s Volume II

8. Per Amendment 0003 – RFI #83 – The second sentence of the response is cut off.

Question – Would you please provide the full response to RFI #83?

RESPONSE:

“83. Is it acceptable for the Project Manager to be part time or reside at the Contractor's home office or other local project?

RESPONSE: See Specification Section 01 45 10. The Project Manager must be dedicated to the project at all times.

The required personnel are required to be on-site at all times.”

9. Please consider a minimum of 2 weeks bid date extension.

RESPONSE: At this time, the Government is not able to accommodate this request.

10. Drawing #AB600 - Building B: Please specify if the interior windows as noted on AB600 are to be hollow metal or aluminum (Type B1).

RESPONSE: Hollow Metal.

11. Drawing #AC600 - Building C: Please specify if the interior windows as noted on AC600 are to be hollow metal or aluminum (Type CG, CH and CJ).

RESPONSE: Hollow Metal.

12. Drawing #AD600 - Building D: Please confirm that Window D2 shown on AD110 is the same as Window DB shown on

AD600.

RESPONSE: Window D2 shown on AD110 is incorrectly labeled. Change frame tag labeled “D2” to read “DB”, this frame type is to be Hollow Metal.

13. Drawing #AD600 - Building D: Please confirm that Window D5 shown on AD110 is the same as Window DE shown on

AD600.

RESPONSE: Window D5 shown on AD110 is incorrectly labeled. Change frame tag labeled “D5” to read “DE”.

14. Drawing #AD600 - Building D: Please confirm that Window D6 shown on AD110 is the same as Window DF shown on

AD600.

RESPONSE: Window D6 shown on AD110 is incorrectly labeled. Change frame tag labeled “D6” to read “DF”.

15. Drawing #AD600/AD601/ID200 - Building D: Please specify if the exterior windows Type DE are to receive Solid Surface Window Sills as shown on 6/AD600 and 9/AD601 or QTZ-2 Sill as shown on 6/AD600 and 9/AD601 or QTZ-2 Sill as shown on 4/ID200.

RESPONSE: Window frames DE shall receive quartz (QTZ-2) sills.

16. Drawing #AF600 - Building F: Please specify if the interior windows as noted on AF600 are to be hollow metal or aluminum (Type F1, F2, F3 and F4).

RESPONSE: Hollow Metal.

17. Drawing #AA345 - Please provide more details on how the retrofit brick ties shown in Detail 1 are to be secured to the existing walls and also how the retrofit brick ties are to be secured to the new structural studs.

RESPONSE: The manufacturer’s website provides all the necessary information on material and installation, however to simplify: (See image below for representative condition).

a. Provide 6mm stainless steel stitch-tie anchor

Amendment 0004

b. Select proper length by field verification (anchor to extend into existing veneer 2” – 3” minimum)

c. Drill proper pilot hole size per the anchor type (from the inside)

d. Install helical tie anchor into the pilot hole

e. Exposed end of anchor will be set into the slotted end of a stitch-tie bracket fastened to metal studs with self-tapping screws.

18. Clarification to RFI #72 responded to via Amendment 0003

“72. Due to the current volatile escalation costs, we request FAR Clauses 16.203 and 52-216 be included in the contract clauses for Economic Price Adjustments since the contract period extends 780 calendar days and some materials may not be procured within 60 days of contract award.”

REVISED RESPONSE: While the Government is unable to accommodate this request all Offerors are reminded that Section H.29 entitled "Equitable Adjustments" outlines the requirements for submitting an equitable increase to the contract price based on a change to the contract requirements that can be substantiated.

19. Will power and water be available at the site for asbestos abatement or do we need to provide our own?

RESPONSE: The contractor is responsible for payment of utility services, see FAR 52.236-14 Availability and Use of Utility Services incorporated into the contract by reference. Solicitation section H.37 Availability of Utility Services has been revised. See also Specification Section 01 50 00 Temporary Facilities and Controls. Please reference conformed copy of the solicitation in Amendment 0003.

The response for RFI #19 in Amendment 0003 shall mirror the response noted here.

20. Given the condition of the structures to be abated, would it be acceptable to abate the areas that contain only category 1 and category 2 non-friable asbestos materials without a negative pressure containment? Exterior transite and window glazing is generally removed without a negative pressure containment. Could we also remove the VCT/mastic in this same manner?

Building a negative pressure containment for this structure would mean a substantial cost increase.

RESPONSE: Removal activities that cannot be performed by removing the materials intact (see definitions in Section 1.3) or removed by full component removal are to be removed using the methods and controls identified in Section 2.3C, D. and E. If alternative methods are requested by the Contractor, the Contractor can submit in writing an abatement work plan, (which meets or exceeds the requirements of OSHA 29CFR1926.1101(g)(7) Work Practices and Engineering Controls for Class II work) for review and approval at the discretions of the Project Designer.

Amendment 0004

21. Since the structures to be abated are going to be demolished could PCM air clearances be ran instead of TEM?

RESPONSE: Clearance sampling will be performed as specified in the Section 2.8 of the specifications.

22. The buildings to be abated contain a substantial amount of debris throughout. Does all the debris need to be disposed of as asbestos contaminated waste?

RESPONSE: Non-ACM and debris should be removed as necessary per Section 2.3.B of the Specifications prior to impacting/removing any ACM in the regulated work area. Any Non-ACM materials which remain in the regulated area/NPE after asbestos-containing materials are impacted must be treated as asbestos-contaminated debris (ACD).

All debris/materials within the debris fields within the first floor main corridors of the main building (See Section 3.2.C) are to be treated as ACD.

23. Please confirm that the removal of the transite asbestos roofing does not require a negative pressure containment.

RESPONSE: Exterior transite asbestos roofing which is removed using methods which meet or exceeds the requirements of OSHA 29CFR1926.1101(g)(7) Work Practices and Engineering Controls for Class II work do not require removal under a negative pressure enclosure. Roofing materials shall be removed in an intact state to the extent feasible, using wet methods. Materials shall not be dropped or thrown to the ground.

24. Section 07 42 13 - Paragraph 2.2 B. indicates 20ga metal wall panels with zinc coating conforming to ASTM A653, Glass G 90. Paragraph 2.7 1.a indicates a 40yr finish warranty. According to the manufacturer, this warranty cannot be reached with the current specified material. Please clarify.

RESPONSE: Change 2.2.B.1 Material to read: 22 Gauge – Yield strength 50,000 psi; with aluminum-zinc alloy coating conforming to ASTM A792, Class AZ50. Provide 40-year finish warranty and 25-year substrate warranty.

25. Per Addendum 3, Question 38: The deflection criteria on S000 for masonry is listed as a Live Load. With Regard to the wall shoring, we believe it should be a Wind Load.

RESPONSE: The deflection criteria for Total Load, including wind or seismic, shall not be less than L/400. No additional reduction is permitted, including IBC 2018 Table 1604.3 note “f”.

26. Per Addendum 3, Question 38: The components and cladding loads are for a complete enclosed building. During construction, we believe it would be appropriate to design the shoring, not for components and cladding loads, but as a Solid Freestanding Wall & Solid Signs in accordance with ASCE 7-16.

RESPONSE: The minimum design wind criteria are provided on Sheet S000 for the project. The component & cladding wind loads are provided on sheets S002-S005 for the completed structure(s). The General Contractor is responsible for shoring and bracing the incomplete structures(s) during construction. The General Contractor’s Specialty Engineer for shoring and bracing shall use the minimum wind design criteria provided on Sheet S000 to determine the lateral wind loads to be resisted for the incomplete structure(s).

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

When Filled In This Document Is Source Selection Sensitive IAW FAR 2.101 and 3.104

A. GENERAL INFORMATION: Please correct any information below known to be inaccurate:

Contractor’s Name: ____________________ Address: __________________________

Telephone Number: ____________________ __________________________

Fax Number: ____________________ __________________________

Point of Contact: ___________________________[footnoteRef:1] [1: The government enters the following information based on list of references provided by the offeror. The offeror will enter this information if the solicitation requires him to submit questionnaires to the references.]

Project Title or Brief Description of Work: _________________________________________________*

Contract Number Provided by Offeror: ____________________ Dollar Amount: $____________

Contract Period or Dates of Performance Provided by Offeror: __________________________*

*Note: If offeror holds or has held other contracts with your agency/organization in the last 3 years, please complete separate evaluation forms for those contracts as well.

Contractor performed as the o Prime Contractor o Sub-Contractor o Key Personnel.

B. RESPONDENT INFORMATION:

Name of Respondent: ___________________________ Title: ____________________________

Address: _____________________ Telephone Number: ___________________ _____________________________ Fax Number: _____________________

_____________________________ Email Address: _____________________

C. EMAIL COMPLETED SURVEY FORM TO THE GOVERNMENT AT: gloster.monica@dol.gov

D. PERFORMANCE INFORMATION: Choose the number on the scale of 1 to 6 that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF 1 OR 2.

6[footnoteRef:2] [2: If desired, the “Neutral” rating may be numerically placed in the questionnaire form between “Marginal” and “Satisfactory”.]

UNSATISFACTORY

MARGINAL

SATISFACTORY

VERY GOOD

EXCEPTIONAL

NEUTRAL

Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective.

Performance did not meet some contractual requirements. There were problems, some of a serious nature, for which corrective action was only marginally effective.

Performance met contractual requirements. There were some minor problems and corrective actions taken by the contractor were satisfactory.

Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems, which the contractor resolved in a timely, effective manner.

Performance met all contract requirements and exceeded many to the government’s benefit. Problems, if any, were negligible and were resolved in a timely, highly effective manner.

No record of past performance or the record is inconclusive.[endnoteRef:1] [1: ]

CONTRACTOR’S NAME: ________________________ CONTRACT NUMBER________________[footnoteRef:3] [3: Include this information on each page of the questionnaire form to ensure there is no mix up in information among contracts surveyed for respective primes/subs, etc. ]

The contractor:[footnoteRef:4] [4: While these questions are generic and will work as written in many acquisitions, consider them as they relate to each individual acquisition and tailor them as needed and appropriate. Also, when tailoring the form, consider leaving space between questions for comments.]

1.

Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.

2.

Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.

3.

Delegated authority to project managers and supervisors commensurate with contract requirements.

4.

Home office participated in solving significant local problems.

5.

Followed approved quality control plan.

6.

Provided effective quality control and/or inspection procedures to meet contract requirements.

7.

Corrected deficiencies in timely manner and pursuant to their quality control procedures.

8.

Provided timely resolution of contract discrepancies

9.

Identified problems as they occurred.

10.

Suggested alternative approaches to problems.

11.

Displayed initiative to solve problems.

12.

Developed realistic progress schedules.

13.

Met established project schedules.

14.

Provided timely resolution of warranty defects.

15.

Was responsive to contract changes.

16.

Provided adequate project supervision.

17.

Obtained consent of surety for increases in bonding as work-in-progress increased.

18.

Paid subcontractors/suppliers in a timely manner.

19.

Provided accurate and complete line item cost proposals including all aspects of work required for each task.

20.

Cooperated with Government personnel after award.

21.

How would you rate the contractor's overall performance?

22.

Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”

YES/NO

23.

Would you award another contract to this contractor? If not, explain in “remarks.”

YES/NO

24.

Is the contractor rated in CPARS?

YES/NO

CONTRACTOR’S NAME: ________________________CONTRACT NUMBER_________________

Remarks:________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________