16-Exhibit F Exhibit G OMB 2 CFR Appendix II Appendix III.docx
DOCX document 56 KB Posted
- Solicitation number
- 544805
- Issued by
- Wayne County, Detroit City, Michigan
About this file
This document comprises exhibits and grant agreement provisions governing a Federal financial assistance award from the USDA Forest Service, Eastern Region, State, Private and Tribal Forestry to the City of Detroit for forest management plan services across five municipal parks. The City of Detroit Office of Contracting and Procurement solicits qualified respondents to provide Tree Forest Restoration Plans for Rouge Park, O'Hair Park, Eliza Howell Park, Balduck Park, and a forest restoration plan update for Palmer Park's Witherell Woods. The project is funded through the USDA Forest Service Inflation Reduction Act: Detroit Resilient Tree Canopy Initiative grant (Award No. 24-DG-11094200-123) and carries a two-year period of performance. The grant agreement establishes that the City serves as the prime recipient responsible for compliance with all OMB guidance in 2 CFR Parts 200 and 400, as well as Forest Service-specific provisions detailed in the attached award provisions.
The grant supports advanced and reimbursable payments submitted via Standard Form 270, with advance payments limited to the minimum amount needed or no more than a 30-day period. Payment requests must include the award number and project identification and may be submitted no more than monthly via email to SM.FS.asc_ga@usda.gov, facsimile to 877-687-4894, or postal mail. Prior written approval is required for subawards exceeding $30,000, which must be reported at fsrs.gov in accordance with 2 CFR 170. Equipment purchases with a fair market value of $5,000 or more per unit are not reimbursable under this award. All incorporated materials, products, and supplies must comply with Buy America Preference standards under the Build America, Buy America Act, with domestic content requirements of at least 55 percent for manufactured products unless a waiver is granted. Award closeout must occur within 120 calendar days after the period of performance ends, with submission of all financial, performance, and other required reports. The recipient must return any unobligated cash balance and comply with prohibitions on telecommunications equipment identified in 2 CFR 200.216 and applicable federal labor standards including Davis-Bacon Act and prevailing wage requirements.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT F
OMB Guidance Pt. 200, App. II
1. Administrative and National Policy Requirements—Required. This section must identify the usual administrative and national policy requirements the Federal awarding agency’s Federal awards may include. Pro- viding this information lets a potential applicant identify any requirements with which it would have difficulty complying if its application is successful. In those cases, early notification about the requirements al- lows the potential applicant to decide not to apply or to take needed actions before receiving the Federal award. The announcement need not include all of the terms and conditions of the Federal award, but may refer to a document (with information about how to obtain it) or Internet site where applicants can see the terms and conditions. If this funding opportunity will lead to Federal awards with some special terms and conditions that differ from the Federal awarding agency’s usual (sometimes called ‘‘general’’) terms and conditions, this section should highlight those special terms and conditions. Doing so will alert applicants that have received Federal awards from the Federal awarding agency previously and might not otherwise expect different terms and conditions. For the same reason, the announcement should inform potential applicants about special requirements that could apply to particular Federal awards after the review of applications and other information, based on the particular circumstances of the effort to be supported (e.g., if human subjects were to be involved or if some situations may justify special terms on intellectual property, data sharing or security requirements).
2. Reporting—Required. This section must include general information about the type (e.g., financial or performance), frequency, and means of submission (paper or electronic) of post-Federal award reporting requirements. Highlight any special reporting requirements for Federal awards under this funding opportunity that differ (e.g., by re- port type, frequency, form/format, or circumstances for use) from what the Federal awarding agency’s Federal awards usually require. Federal awarding agencies must also describe in this section all relevant requirements such as those at 2 CFR 180.335 and 180.350.
If the Federal share of any Federal award may include more than $500,000 over the period of performance, this section must in- form potential applicants about the post award reporting requirements reflected in appendix XII to this part.
G. FEDERAL AWARDING AGENCY CONTACT(S) REQUIRED
The announcement must give potential applicants a point(s) of contact for answering questions or helping with problems while the funding opportunity is open. The intent of this requirement is to be as helpful as possible to potential applicants, so the Federal awarding agency should consider approaches such as giving:
i. Points of contact who may be reached in multiple ways (e.g., by telephone, FAX, and/ or email, as well as regular mail).
ii. A fax or email address that multiple people access, so that someone will respond even if others are unexpectedly absent during critical periods.
iii. Different contacts for distinct kinds of help (e.g., one for questions of programmatic content and a second for administrative questions).
H. OTHER INFORMATION—OPTIONAL
This section may include any additional information that will assist a potential applicant. For example, the section might:
i. Indicate whether this is a new program or a one-time initiative.
ii. Mention related programs or other up- coming or ongoing Federal awarding agency funding opportunities for similar activities.
iii. Include current Internet addresses for Federal awarding agency Web sites that may be useful to an applicant in understanding the program.
iv. Alert applicants to the need to identify proprietary information and inform them about the way the Federal awarding agency will handle it.
v. Include certain routine notices to applicants (e.g., that the Federal Government is not obligated to make any Federal award as a result of the announcement or that only grants officers can bind the Federal Government to the expenditure of funds).
[78 FR 78608, Dec. 26, 2013, as amended at 80 FR 43310, July 22, 2015; 85 FR 49575, Aug. 13, 2020] APPENDIX II TO PART 200—CONTRACT PROVISIONS FOR NON-FEDERAL ENTITY CONTRACTS UNDER FEDERAL AWARDS In addition to other provisions required by the Federal agency or non-Federal entity, all contracts made by the non-Federal entity under the Federal award must contain provisions covering the following, as applicable.
(A) Contracts for more than the simplified acquisition threshold, which is the inflation adjusted amount determined by the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) as authorized by 41 U.S.C. 1908, must address administrative, contractual, or legal remedies in instances where contractors violate or breach contract terms, and provide for such sanctions and penalties as appropriate.
(B) All contracts in excess of $10,000 must address termination for cause and for convenience by the non-Federal entity including
EXHIBIT F (continued)
Pt. 200, App. II the manner by which it will be effected and the basis for settlement.
(C) Equal Employment Opportunity. Except as otherwise provided under 41 CFR Part 60, all contracts that meet the definition of ‘‘federally assisted construction con- tract’’ in 41 CFR Part 60–1.3 must include the equal opportunity clause provided under 41 CFR 60–1.4(b), in accordance with Executive Order 11246, ‘‘Equal Employment Opportunity’’ (30 FR 12319, 12935, 3 CFR Part, 1964-1965 Comp., p. 339), as amended by Executive Order 11375, ‘‘Amending Executive Order 11246 Relating to Equal Employment Opportunity,’’ and implementing regulations at 41 CFR part 60, ‘‘Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor.’’
(D) Davis-Bacon Act, as amended (40 U.S.C. 3141–3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141–3144, and 3146–3148) as supplemented by Department of Labor regulations (29 CFR Part 5, ‘‘Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction’’). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The non-Federal entity must place a copy of the current pre- vailing wage determination issued by the Department of Labor in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency. The contracts must also include a provision for compliance with the Copeland ‘‘Anti-Kickback’’ Act (40 U.S.C. 3145), as supplemented by Department of Labor regulations (29 CFR Part 3, ‘‘Contractors and Sub- contractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States’’). The Act provides that each contractor or sub- recipient must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency.
(E) Contract Work Hours and Safety Standards Act (40 U.S.C. 3701–3708). Where applicable, all contracts awarded by the non- Federal entity in excess of $100,000 that in- volve the employment of mechanics or laborers must include a provision for compliance
2 CFR Ch. II (1–1–22 Edition) with 40 U.S.C. 3702 and 3704, as supplemented by Department of Labor regulations (29 CFR Part 5). Under 40 U.S.C. 3702 of the Act, each contractor must be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. 3704 are applicable to construction work and provide that no laborer or mechanic must be re- quired to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence.
(F) Rights to Inventions Made Under a Contract or Agreement. If the Federal award meets the definition of ‘‘funding agreement’’ under 37 CFR § 401.2 (a) and the recipient or subrecipient wishes to enter into a contract with a small business firm or nonprofit organization regarding the substitution of parties, assignment or performance of experimental, developmental, or research work under that ‘‘funding agreement,’’ the recipient or subrecipient must comply with the requirements of 37 CFR Part 401, ‘‘Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,’’ and any implementing regulations issued by the awarding agency.
(G) Clean Air Act (42 U.S.C. 7401–7671q.) and the Federal Water Pollution Control Act (33 U.S.C. 1251–1387), as amended—Contracts and subgrants of amounts in excess of $150,000 must contain a provision that requires the non-Federal award to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401–7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251–1387). Violations must be reported to the Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA).
(H) Debarment and Suspension (Executive Orders 12549 and 12689)—A contract award (see 2 CFR 180.220) must not be made to parties listed on the governmentwide exclusions in the System for Award Management (SAM), in accordance with the OMB guide- lines at 2 CFR 180 that implement Executive Orders 12549 (3 CFR part 1986 Comp., p. 189) and 12689 (3 CFR part 1989 Comp., p. 235), ‘‘Debarment and Suspension.’’ SAM Exclusions contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549.
EXHIBIT F (continued) OMB Guidance Pt. 200, App. III
(I) Byrd Anti-Lobbying Amendment (31 U.S.C. 1352)—Contractors that apply or bid for an award exceeding $100,000 must file the required certification. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier must also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the non-Federal award.
(J) See § 200.323.
(K) See § 200.216.
(L) See § 200.322.
[78 FR 78608, Dec. 26, 2013, as amended at 79 FR 75888, Dec. 19, 2014; 85 FR 49577, Aug. 13, 2020] APPENDIX III TO PART 200—INDIRECT (F&A) COSTS IDENTIFICATION AND ASSIGNMENT, AND RATE DETERMINATION FOR INSTITUTIONS OF HIGHER EDUCATION (IHES)
A. GENERAL
This appendix provides criteria for identifying and computing indirect (or indirect (F&A)) rates at IHEs (institutions). Indirect (F&A) costs are those that are incurred for common or joint objectives and therefore cannot be identified readily and specifically with a particular sponsored project, an instructional activity, or any other institutional activity. See subsection B.1 for a discussion of the components of indirect (F&A) costs.
1. Major Functions of an Institution Refers to instruction, organized research, other sponsored activities and other institutional activities as defined in this section:
a. Instruction means the teaching and training activities of an institution. Except for research training as provided in subsection b, this term includes all teaching and training activities, whether they are offered for credits toward a degree or certificate or on a non-credit basis, and whether they are offered through regular academic departments or separate divisions, such as a summer school division or an extension division. Also considered part of this major function are departmental research, and, where agreed to, university research.
(1) Sponsored instruction and training means specific instructional or training activity established by grant, contract, or cooperative agreement. For purposes of the cost principles, this activity may be considered a major function even though an institution’s accounting treatment may include it in the instruction function.
EXHIBIT G
The below excerpts are the contract and procurement related provisions applicable to the above referenced Grant Agreement, as governed by the Federal Financial Assistance Award of Domestic Grant between the USDA, Forest Service, Eastern Region, State, Private and Tribal Forestry, and the City Detroit [Grant No. 24-DG-11094200-123]
GRANT AGREEMENT PROVISIONS
This is an award of Federal financial assistance. Prime and sub-recipients to this award are subject to the OMB guidance in subparts A through F of 2 CFR Part 200 as adopted and supplemented by the USDA in 2 CFR Part 400. Adoption by USDA of the OMB guidance in 2 CFR 400 gives regulatory effect to the OMB guidance in 2 CFR 200 where full text may be found.
D. ADVANCED AND REIMBURSABLE PAYMENTS – FINANCIAL ASSISTANCE.
Advanced and Reimbursable payments are approved under this award. Only costs for those project activities approved in (1) the initial award, or (2) modifications thereto, are allowable. Requests for payment must be submitted on Standard Form 270 (SF- 270), Request for Advance or Reimbursement, and must be submitted no more than monthly. In order to approve a Request for Advance Payment or Reimbursement, the Forest Service shall review such requests to ensure advances or payments for reimbursement are in compliance and otherwise consistent with OMB, USDA, and Forest Service regulations.
Advance payments must not exceed the minimum amount needed or no more than is needed for a 30-day period, whichever is less. If the Recipient receives an advance payment and subsequently requests an advance or reimbursement payment, then the request must clearly demonstrate that the previously advanced funds have been fully expended before the Forest Service can approve the request for payment. Any funds advanced, but not spent, upon expiration of this award must be returned to the Forest Service.
The Program Manager reserves the right to request additional information prior to approving a payment. To expedite payment, please attach a list of expenses that match the approved project budget when submitting each SF-270. Each SF-270 shall include the award number 24-DG-11094200-123 in Block 4. If this award has multiple projects, each project must be identified in separate columns for tracking purposes in Block 11. A final SF-270 must have a final performance report submitted prior to its approval.
| The invoice must be sent by one of three methods: |
| Send a copy to: |
EMAIL (preferred): SM.FS.asc_ga@usda.gov FAX: 877-687- POSTAL: USDA Forester Service Budget & Finance - Grants and Agreements 4000 Masthead St, NE Albuquerque, NM 87109 Jill.johnson@usda.gov
F. PRIOR WRITTEN APPROVAL. The Recipient shall obtain prior written approval pursuant to conditions set forth in 2 CFR 200.407.
ATTACHMENT A: FOREST SERVICE AWARD PROVISIONS
A. COLLABORATIVE ARRANGEMENTS. Where permitted by terms of the award and Federal law, The Recipient a may enter into collaborative arrangements with other organizations to jointly carry out activities with Forest Service funds available under this award.
D. SUBAWARDS. Prior approval is required to issue subawards under this grant. The intent to subaward must be identified in the approved budget and scope of work and approved in the initial award or through subsequent modifications. Approval of each individual subaward is not required, however the cooperator must document that each sub-recipient does NOT have active exclusions in the System for Award Management (sam.gov).
The Cooperator must also ensure that they have evaluated each subrecipient’s risk in accordance with 2 CFR 200.332 (b).
Any subrecipient under this award must be notified that they are subject to the OMB guidance in subparts A through F of 2 CFR Part 200, as adopted and supplemented by the USDA in 2 CFR Part 400. Any sub-award must follow the regulations found in 2 CFR 200.331 through .333.
All subawards $30,000 or more must be reported at fsrs.gov in compliance with 2 CFR
170. See Attachment B for full text.
J. FUNDING EQUIPMENT. Federal funding under this award is not available for reimbursement of the Recipient’s purchase of equipment. Equipment is defined as having a fair market value of $5,000 or more per unit and a useful life of over one year. Supplies are those items that are not equipment.
P. AWARD CLOSEOUT. The Recipient must submit, no later than 120 calendar days after the end date of the period of performance, all financial, performance, and other reports as required by the terms and conditions of the Federal award.
Any unobligated balance of cash advanced to The Recipient must be immediately refunded to the Forest Service, including any interest earned in accordance with 2 CFR 200.344(d).
If this award is closed without audit, the Forest Service reserves the right to disallow and recover an appropriate amount after fully considering any recommended disallowances resulting from an audit which may be conducted later.
W. BUY AMERICA BUILD AMERICA. Recipients of an award of Federal financial assistance from a program for infrastructure are hereby notified that none of the funds provided under this award may be used for an infrastructure project unless:
(1) All iron and steel used in the project are produced in the United States—this means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States;
(2) All manufactured products used in the project are produced in the United States— this means the manufactured product was manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard that meets or exceeds this standard has been established under applicable law or regulation for determining the minimum amount of domestic content of the manufactured product; and
(3) All construction materials are manufactured in the United States—this means that all manufacturing processes for the construction material occurred in the United States. The construction material standards are listed below.
Incorporation into an infrastructure project. The Buy America Preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a Buy America Preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project, but are not an integral part of the structure or permanently affixed to the infrastructure project.
Categorization of articles, materials, and supplies. An article, material, or supply should only be classified into one of the following categories: (i) Iron or steel products; (ii) Manufactured products; (iii) Construction materials; or (iv) Section 70917(c) materials. An article, material, or supply should not be considered to fall into multiple categories. In some cases, an article, material, or supply may not fall under any of the categories listed in this paragraph. The classification of an article, material, or supply as falling into one of the categories listed in this paragraph must be made based on its status at the time it is brought to the work site for incorporation into an infrastructure project. In general, the work site is the location of the infrastructure project at which the iron, steel, manufactured products, and construction materials will be incorporated.
Application of the Buy America Preference by category. An article, material, or supply incorporated into an infrastructure project must meet the Buy America Preference for only the single category in which it is classified.
Determining the cost of components for manufactured products. In determining whether the cost of components for manufactured products is greater than 55 percent of the total cost of all components, use the following instructions:
(a) For components purchased by the manufacturer, the acquisition cost, including transportation costs to the place of incorporation into the manufactured product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(b) For components manufactured by the manufacturer, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (a), plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the manufactured product.
Construction material standards. The Buy America Preference applies to the following construction materials incorporated into infrastructure projects. Each construction material is followed by a standard for the material to be considered “produced in the United States.” Except as specifically provided, only a single standard should be applied to a single construction material.
(1) Non-ferrous metals. All manufacturing processes, from initial smelting or melting through final shaping, coating, and assembly, occurred in the United States.
(2) Plastic and polymer-based products. All manufacturing processes, from initial combination of constituent plastic or polymer-based inputs, or, where applicable, constituent composite materials, until the item is in its final form, occurred in the United States.
(3) Glass. All manufacturing processes, from initial batching and melting of materials through annealing, cooling, and cutting, occurred in the United States.
(4) Fiber optic cable (including drop cable). All manufacturing processes, from the initial ribboning (if applicable), through buffering, fiber stranding and jacketing, occurred in the United States. All manufacturing processes also include the standards for glass and optical fiber, but not for non-ferrous metals, plastic and polymer-based products, or any others.
(5) Optical fiber. All manufacturing processes, from the initial preform fabrication stage through the completion of the draw, occurred in the United States.
(6) Lumber. All manufacturing processes, from initial debarking through treatment and planning, occurred in the United States.
(7) Drywall. All manufacturing processes, from initial blending of mined or synthetic gypsum plaster and additives through cutting and drying of sandwiched panels, occurred in the United States.
(8) Engineered wood. All manufacturing processes from the initial combination of constituent materials until the wood product is in its final form, occurred in the United States.
Waivers. When necessary, recipients may apply for, and the agency may grant, a waiver from these requirements. The agency should notify the recipient for information on the process for requesting a waiver from these requirements.
When the Federal agency has made a determination that one of the following exceptions applies, the awarding official may waive the application of the Buy America Preference in any case in which the agency determines that:
(1) applying the Buy America Preference would be inconsistent with the public interest;
(2) the types of iron, steel, manufactured products, or construction materials are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality; or
(3) the inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase the cost of the overall project by more than 25 percent.
A request to waive the application of the Buy America Preference must be in writing. The agency will provide instructions on the format, contents, and supporting materials required for any waiver request. Waiver requests are subject to public comment periods of no less than 15 days and must be reviewed by the Made in America Office.
There may be instances where an award qualifies, in whole or in part, for an existing waiver described at USDA Buy America Waivers for Federal Financial Assistance | USDA.
Definitions
“Buy America Preference” means the “domestic content procurement preference” set forth in section 70914 of the Build America, Buy America Act, which requires the head of each Federal agency to ensure that none of the funds made available for a Federal award for an infrastructure project may be obligated unless all of the iron, steel, manufactured products, and construction materials incorporated into the project are produced in the United States.
“Construction materials” means articles, materials, or supplies that consist of only one of the items listed in paragraph (1) of this definition, except as provided in paragraph (2) of this definition. To the extent one of the items listed in paragraph (1) contains as inputs other items listed in paragraph (1), it is nonetheless a construction material.
(1) The listed items are:
(i) Non-ferrous metals;
(ii) Plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables);
(iii) Glass (including optic glass);
(iv) Fiber optic cable (including drop cable);
(v) Optical fiber;
(vi) Lumber;
(vii) Engineered wood; and
(viii) Drywall.
(2) Minor additions of articles, materials, supplies, or binding agents to a construction material do not change the categorization of the construction material.
“Infrastructure” means public infrastructure projects in the United States, which includes, at a minimum, the structures, facilities, and equipment for roads, highways, and bridges; public transportation; dams, ports, harbors, and other maritime facilities; intercity passenger and freight railroads; freight and intermodal facilities; airports; water systems, including drinking water and wastewater systems; electrical transmission facilities and systems; utilities; broadband infrastructure; and buildings and real property; and structures, facilities, and equipment that generate, transport, and distribute energy including electric vehicle (EV) charging.
“Infrastructure project” means any activity related to the construction, alteration, maintenance, or repair of infrastructure in the United States regardless of whether infrastructure is the primary purpose of the project. See also paragraphs (c) and (d) of 2 CFR 184.4.
“Iron or steel products” means articles, materials, or supplies that consist wholly or predominantly of iron or steel or a combination of both.
Z. PROHIBITION AGAINST USING FUNDS WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS.
1. The recipient may not require its employees, contractors, or subrecipients seeking to report fraud, waste, or abuse to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting them from lawfully reporting that waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.
2. The recipient must notify its employees, contractors, or subrecipients that the prohibitions and restrictions of any internal confidentiality agreements inconsistent with paragraph (1) of this award provision are no longer in effect.
3. The prohibition in paragraph (1) of this award provision does not contravene requirements applicable to any other form issued by a Federal department or agency governing the nondisclosure of classified information.
4. If the Government determines that the recipient is not in compliance with this award provision, it;
a. Will prohibit the recipient’s use of funds under this award in accordance with sections 743, 744 of Division E of the Consolidated Appropriations Act, 2016, (Pub. L. 114-113) or any successor provision of law; and
b. May pursue other remedies available for the recipient’s material failure to comply with award terms and conditions.
EE. PROHIBITION ON CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT. The cooperator (including subrecipients) is responsible for compliance with the prohibition on certain telecommunications and video surveillance services or equipment identified in 2 CFR
200.216. See Public Law 115-232, Section 889 for additional information.
In accordance with 2 CFR 200.216, the grantee (including subrecipients) is prohibited from obligating or expending loan or grant funds for covered telecommunications equipment or services to:
(1) procure or obtain, extend or renew a contract to procure or obtain;
(2) enter into a contract (or extend or renew a contract) to procure; or
(3) obtain the equipment, services or systems.