REVISED RFP - 15M300-21-R-A370-0001.pdf

PDF 814 KB Posted

Attached to
Purchase of Aircraft - Boeing 737-700 or 737-800
Solicitation number
15M30021RA3700001
Issued by

About this file

This request for proposal from the Department of Justice United States Marshals Service seeks offers for the purchase of one Boeing 737-700 or 737-800 aircraft. Offers are due by June 28, 2021. The aircraft will be used to transport federal detainees and prisoners for the Justice Prisoner and Alien Transportation System based in Oklahoma City. The aircraft must meet specifications for passenger capacity of at least 132 seats, lavatories, stairs, and required avionics and maintenance programs. The government will evaluate offers based on technical specifications of the aircraft, delivery schedule, corporate experience, past performance, and price. The award will be a firm fixed-price contract for one aircraft to the offer representing the best value.

View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
RFP - 15M300-21-R-A370-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

April 1, 2021

PURCHASE OF A BOEING 737-700 OR 737-800 AIRCRAFT

AIRCRAFT TECHNICAL SPECIFICATIONS

JUSTICE PRISONER AND ALIEN TRANSPORTATION SYSTEM (JPATS)

OKLAHOMA CITY, OKLAHOMA

I. GENERAL

The primary mission of U.S. Marshals Service, Justice Prisoner and Alien Transportation System (JPATS) is the safe, secure and efficient transportation of federal and non-federal prisoners and the provision of aircraft and flight crew for the support of other operational missions. Additional mission assignments include, but are not limited to, international flights in support of foreign extraditions, witness security and enforcement operations, strategic deployment of USMS and Special Operations Group personnel and equipment and other special operations assigned by the USMS or U.S. Attorney General.

JPATS has a requirement to purchase one (1) Boeing 737-700 or 737-800, transport category, narrow body, twin engine jet aircraft. (NOTE: Brand Name Requirement is based on pilot type certification, passenger seating, maintenance, repair parts and logistics support). This aircraft will be operated primarily from the JPATS Oklahoma City operational site but may at times, based on particular mission demands, operate from the JPATS Las Vegas operational site. The aircraft will be operated by JPATS as Public Use aircraft meeting the mandatory requirements of Title 14 CFR Part 91 for operations in National Airspace. JPATS will take delivery of the aircraft 12 weeks after contract award.

II. AIRCRAFT UTILIZATION

Based on current mission flying schedules, JPATS’ estimated utilization rate for the proposed aircraft is approximately 1290 flight hours or 900 takeoffs and landings (cycles) per year. “Flight Hour” by definition is “wheels off” during takeoff to “wheels on” during landing. The actual hours and cycles will vary due to scheduling demands.

III. AIRCRAFT REQUIREMENTS / CONFIGURATION

A. Aircraft / General: The Contractor shall provide one (1) aircraft that, at time of delivery:

1. Is a large, transport category, narrow body, twin engine jet aircraft with a United

States of America registration (“N” number) as well as a current and valid FAA issued Standard Certificate of Airworthiness.

2. Meets all specifications of its original Type Certificate in accordance with Title 14 CFR Part 25.

3. Has a printed copy of a current, aircraft serial number specific, Airplane Flight Manual (AFM) with Performance Specifications and Systems Description and Operation in English print and United States measurement units.

4. Has a printed copy of a current, aircraft serial number specific, Flight Crew Operating Manual (or equivalent) in English print and United States measurement units.

5. Has a printed copy of a current, aircraft serial number specific, Minimum Equipment

List in English print and United States measurement units.

6. Has two (2) printed current, aircraft serial number specific, Quick Reference

Handbooks (QRH) in English print and United States measurement units.

7. Has the current Weight and Balance Manual (if separate from the Airplane Flight

Manual) in English print and United States measurement units.

8. Is accompanied with a current (within 12 calendar months) and valid (meeting FAA standards) Weight and Balance report in English print and US measurement units accomplished in accordance with the applicable manufacturer weight and balance manual. At a minimum, the report will provide the aircraft’s configuration at weighing, empty weight, weight and moment for each gear, basic empty weight and basic empty weight present of MAC.

9. Is accompanied with a current aircraft serial number specific Layout of Passenger

Accommodations (LOPA) in English print and United States measurement units.

10. Is accompanied with a current aircraft serial number specific Emergency Equipment

Layout in English print and United States measurement units.

11. Is accompanied with current (within 12 calendar months) aircraft Equipment List in

English print and United States measurement units.

12. Is accompanied with documentation and manuals for the operation of the aircraft flight systems (e.g., FMS, TCAS, etc.) that are not addressed in the current, aircraft serial number specific, Flight Crew Operating Manual.

13. Is currently being maintained and inspected on an approved, aircraft serial number specific, maintenance and inspection program.

14. Is accompanied by a current, aircraft serial number specific, maintenance and inspection status report (in a format acceptable to JPATS) in respect to the aircraft, including the AD and SB status of the airframe, appliances, engines, and APU; status of hard time components, alterations, major repairs (337s, STCs, Engineering Orders, etc.), and flight hour / flight cycle summary.

15. Has not accumulated more than 40,000 total cycles since new (TCSN).

16. Is certified for day, night, Visual Flight Rules (VFR), Instrument Flight Rules (IFR) operations and flights into known icing conditions.

17. Is accompanied with appropriate documentation testifying that the aircraft has not sustained any substantial damage as defined by National Transportation Safety Board 49 CFR Subpart A, General 830.2.

18. Has all cockpit and cabin instrumentation, avionics, placards, gauges readable in the

English language and in the United States measuring system.

19. Is “Stage 3” noise level compliant with maximum takeoff noise levels not exceeding those levels as prescribed in Title 14 CFR Part 36, Section B36.5 (d) of appendix B and International Civil Aviation Organization (ICAO) Annex 16, Environmental Protection, Volume 1, Aircraft Noise, Third Edition, July 1993, Amendment 7, effective March 21, 2002, or later edition.

20. Is equipped with Auxiliary Power Unit (APU) Model GTCP131-9B, Part Number

3800702-1 and is suitable for providing ground electrical power and self-contained engine starts. It must be capable of supplying electrical power to the aircraft’s electrical system while airborne and running two environmental systems, simultaneously, for ground heating or cooling of the aircraft.

21. Has a minimum of 132 passenger seats installed. Seats shall be “Tourist Class” configuration and meet Title 14 CFR Part 121 standards for the carriage of passengers.

Seat cushions, seat covers, and seat backs will conform to Title 14 CFR Part 121 burn certification criteria.

22. Minimum Requirement: Equipped with two (2) flushable lavatories; one located in the forward cabin and one located in the aft cabin, configured for external servicing.

(a) Future Requirement: Equipped with three (3) flushable lavatories; one located in the forward cabin and two located in the aft cabin, configured for external servicing.

(b) Roadmap Requirement: Offeror must provide a roadmap containing the requirements detailed in the Instructions to Offeror.

23. Minimum Requirement: Boeing OEM provisioned (pre-wired) for self-contained, powered, forward air stairs at the L-1 door.

(a) Future Requirement: Equipped with Boeing OEM self-contained, powered, forward air stairs at the L-1 door.

24. Has all time controlled parts (any part that requires maintenance at a predefined interval) and Life Limited Parts (LLP) that are associated with the airframe, APU, appliances, and landing gear at “mid-life” or greater, meaning they have 50% or greater life remaining based on the interval specified by the Manufacturer in terms of flight hours, flight cycles or calendar months.

25. Is powered by CFM56-7B24/B1 engines when installed on a 737-700 aircraft or powered by CFM56-7B26 series engines when installed on a 737-800 aircraft.

26. Has CFM56-7 series engines with a minimum of 5,000 cycles remaining prior to any scheduled shop visit (scheduled off-wing maintenance) with any recurring inspections identified.

27. Is accompanied by an on-wing Max Power Assurance Run sheet showing clear documentation of full rated thrust for the applicable installed engines with demonstrated EGT Margins of not less than 20 degrees for each installed engine. This requirement must be current and valid and have been performed after the last flight of the previous operator and prior to the first flight by JPATS.

28. Has engines eligible for enrollment in an “industry standard” Power by the Hour engine maintenance program.

29. Is in compliance with all applicable FAA Airworthiness Directives (AD) and Manufacturer Mandatory Service Bulletins (SB). Any repetitive (recurring) inspections that are associated with these ADs and SBs must not come due within 12 months of contract award unless recurring inspection interval is less than 12 months.

30. Is in compliance with all calendar, flight hour, flight cycle maintenance inspections and events from either a Manufacturer or FAA approved maintenance program.

31. Has no “Scheduled” Heavy Maintenance or Major Inspection (C Check or higher) within 12 months of contract award.

32. Is equipped with emergency equipment and over water passenger operations equipment in accordance with Title 14 CFR Parts: 121.309, 121.310, 121.337, and 121.339.

33. Has a minimum Maximum Takeoff Weight (MTOW) of 154,500 lbs.

34. Has the minimum number of flight attendant seats required by 14 CFR Part 121.

35. Has standard “airline” type and style galleys with service carts, coffee makers, and ovens installed.

36. Has a reinforced Flight Deck Door meeting the standards for a Title 14 CFR Part

121.313 commercial air carrier.

37. Has non-descript paint scheme with no logos from any previous operator visible.

38. Has its appropriately assigned U.S. registration (“N”) number applied to the aircraft in accordance with Title 14 CFR Part 45.25 requirements.

39. Has each hard time-controlled part (any part that requires maintenance at a predefined interval) and life limited parts (LLP) serviceable and supported by appropriate installation certification documentation with either an EASA Form 1, FAA Form 8130-3, or CAA Form 1.

40. Has all impact structural damages (regardless of cause) permanently repaired in accordance the Manufacturer Structural Repair Manual (SRM) or other EASA / FAA-approved data. There shall be no temporary repairs, time-limited repairs or repairs requiring repetitive inspections.

41. Is free of fuel, oil, hydraulic and pneumatic leaks. Any repair of leaks will have been permanent repairs.

42. Has a fuselage free of dents and abrasions.

43. Has windows free from delamination, blemishes, crazing and properly sealed with all window shades operating smoothly.

44. Has doors that are free moving, properly rigged and with serviceable seals.

45. Has the wing’s and stabilizer’s leading edges serviceable in accordance with AMM limits (e.g., no significant hail or other foreign object damage).

46. Has wings free of fuel leaks as demonstrated by the Manufacturer’s relevant testing guidelines.

47. Has horizontal stabilizer and empennage leading edges serviceable in accordance with AMM limits (e.g., no significant hail or other foreign object damage.)

48. Is capable of allowing for loading and unloading of normal JPATS’ mission equipment and provisions in the lower cargo compartments without the use of external ground support equipment.

49. Equipped with a Boeing OEM Nitrogen Generation System (NGS).

50. As a minimum, is equipped with single 24-volt nickel-cadmium rated 48-AH battery providing RNP & other essential equipment 30-min standby power capability.

51. Is equipped with a fixed permanently installed Emergency Locator Transmitter

(ELT).

B. Avionic/Navigation/Auto Flight System: In addition to the requirements of Paragraph A the aircraft shall have, as a minimum, the following at the time of delivery to JPATS:

1. Equipped with a Collins avionics suite.

2. Dual Flight Management System (FMS)

(a) Minimum Requirement: Equipped with at least U10.8A FMS OPS Software.

i. Future Requirement: Equipped with U13.0 FMS OPS Software.

ii. Roadmap Requirement: Offeror must provide a roadmap containing the

(b) The FMS must be fully interfaced with and receive navigational data/inputs from a minimum of two (2) Inertial Reference Systems (IRS), two (2) Global Navigation Satellite Systems (GPS position updating systems), and a minimum of two (2) radio navigation systems.

(c) Equipped with two (2) 176200-01-01 Flight Management Computers.

3. Air Data Inertial Reference System (ARDIRS): dual ADIRUs (both IRS) with most current magnetic variation tables (MAG VAR EPOC) cited under AFM.

4. Dual Global Navigation Satellite System (GNSS) position updating system, capable of gaining operational approval to conduct Title 14 CFR part 97 instrument procedures within the U.S. National Airspace System (NAS) where domestic air traffic control (ATC) procedures are applied. Dual GNSS, compliant with latest version of TSO-C145, is compatible position source as paired with aircraft specific ADS-B OUT equipment indicated by OEM/STC/AFMS statement of compliance.

5. Capable of navigating RNAV-1 Departure and Arrival Procedures, RNP-1 Departure and Arrival Procedures, RNAV-2 Q-Routes and T-Routes, RNP-10 RNP-4 and RNP- 2 Domestic Offshore and Oceanic/Remote Enroute operations as cited by Statement of Compliance in AFM/AFMS/POH or avionics operating manual.

6. Certified to execute RNP 0.3 Enroute and Terminal operations requiring

RNAV(GPS) [GPS (RNP Approaches)] IAPs to LNAV/VNAV minima, and RNAV(RNP) [RNP-AR Approaches)] IAPs to RNP 0.10 minima using Navigation Performance Scales AFDS guidance with an appropriate performance approval certification statement in the Aircraft Flight Manual (AFM), Pilots Operating Manual (POM), or aircraft approved avionics operating manual reflecting III.B.24 Cockpit Configuration.

7. Dual Flight Guidance/Autopilot System capable of meeting the required lateral and vertical RNAV/VNAV performance while coupled with FMS system.

8. Three (3) digital VHF transceivers communication systems with a minimum of 760 channels with 8.33 KHZ spacing with three each GABLES G7404-124 radio tuning panels with three VHF (1-2-3), two HF (1-2) and amplitude modulation (AM) switch functions in cockpit.

9. Minimum Requirement: Equipped with an Audio Control Panel (ACP) with VHF 1-

3, INT, CABIN, PA, SAT 1-2 switch and call light functions.

(a) Future Requirement: AVTECH 5145-1-77 Audio Control Panel (ACP) with

VHF 1-3, HF 1-2, INT, CABIN, PA, SAT 1-2 switch and call light functions.

requirements details in the Instructions to Offeror.

10. Minimum Requirement: Boeing OEM provisioned for HF communication system.

(a) Future Requirement: HF transceiver communication system with SELCAL that satisfies one of two long range communication systems (LRCS) supporting Air Traffic Services (ATS) communication.

11. Iridium SATVOICE (satellite voice communication system) to include, as a minimum:

(a) Flightcrew SATVOICE calls through Cockpit Interphone system with

MCDU’s phone control interface functions.

(b) Cabin SATVOICE calling through wireless handset system.

(c) Call management programming system with ability to setting up and receiving SATVOICE calls within level of Priority, Preemption and Precedence (PPP) feature consistent with table below:

For single-channel systems, if the satellite voice channel is in use for a lower priority call and the aircraft receives a higher priority call, the satellite voice equipment or network should clear the channel and accept the higher priority call. For multi-channel systems, if all available channels are in use, the equipment should preempt the channel supporting the lowest priority call in favor of the higher priority call. If SATVOICE resources are shared on the aircraft (e.g. for cabin use), the satellite voice equipment must provide the flight crew the means to preempt those resources at any time. The equipment may provide the means for preemption of resources when the flight crew makes a call.

(d) AUDIO MANAGEMENT SYSTEM: Call alert notification, audio listen through cockpit interphone system providing full-duplex voice capability via hand, boom, and oxygen mask microphones for both pilots and any additional flight crewmember (e.g., jumpseat position).

(e) FLIGHT DECK ANNUNCIATION. Alerting associated with non-normal conditions (such as failures) of the airborne SATVOICE system must comply with the appropriate part of Title 14 of the Code of Federal Regulations (14 CFR) 25.1322/1302. REF: AC20-150( ) paragraph 8 meeting all aural and visual crew alerts; airborne system failure detection; call ID termination or connection failure indications.

(f) TWO INDEPENDENT SERVICE LINE GROWTH– one used for company datalink/tracking, other used for normal voice/data transmissions (total of three SATVOICE/DATA channels 1-ATS/2-DATA/3-GOV duty- Medical Voice/Data mix).

12. Aircraft Data Link System at a minimum ACARS management unit interfacing with

Aircraft Condition Monitoring System (ACMS) software functions and Digital Flight Data Acquisition Unit (DFDAU) reporting functionality. DATA LINK SOC REPORT: In addition to the avionics equipment list, appropriate to offeror configuration, a data link equipage report must include Statement of Compliance (SOC) summary.

13. One (1) Predictive Windshear Radar system meeting the requirement of Title 14 CFR

Part 121.357 fully interfaced with TAWS mapping for auto tilt functions.

14. One (1) Enhanced Ground Proximity Warning System (EGPWS) with low level wind shear detection meeting the requirement of Title 14 CFR Part 121.358.

15. Class A TAWS conforming to TSO-C151b dated Dec. 17, 2002.

16. Two (2) digital VHF, VOR/Beacon navigation receivers providing NAV-1 data on

Standby RMI/DME indicator in addition with normal NAV-1 & NAV-2 on cockpit displays.

17. Distance Measuring Equipment (DME) Interrogator with Nav-1 and Nav-2 and autotune channeling functions.

18. Two (2) Mode S Transponder systems under 1090ES equipment installation mandate

14CFR 91.225 without temporary exemption restriction (must have SBAS MMR’s interfaced with commercial aviation ATC transponders for ADSB-OUT compliance) including AFM/AFMS/STC performance compliance statement under 14CFR 91.227 meeting the latest TSO C166b (DO-260B / Version 2) standard.

19. Minimum Requirement: Equipped with a Traffic Collision Avoidance System

(TCAS).

(a) Future Requirement: Traffic Collision Avoidance System (TCAS) II system that meets latest revision of TSO C–119b (Version 7.1), integrated into cockpit display and warning advisory system.

20. Two (2) Radio Altimeter systems.

21. One (1) Solid State Digital Flight Data Recorder which complies with Title 14 CFR Part 121.343 and 131.344 including Part 121 Appendix B and M as applicable.

22. Quick-Access Recorder (QAR) conforming to the USMS Flight Operations Quality Assurance (FOQA) program. The current program hardware accepted QAR is the L3 Micro QAR combined with the Honeywell Digital Flight Data Acquisition Unit (DFDAU) P/N 967-0212-002 utilizing 737-5 data frame for QAR readouts.

23. One (1) Digital Cockpit Voice Recorder that records all flight crew SATVOICE, HF, VHF interphone, and cockpit area communications including datalink messages in crash survivable memory.

24. Cockpit Configuration: FMS SW, EFIS and Standby options affording

(a) Flight Path Vector (FPV button) & Vertical Situation Display (VSD) controlled by Center (CTR) switch options enabled on EFIS Panel Controls,

(b) PFD Split axis command bars, Navigation Performance Scales (NPS) and (Integrated Approach Navigation (IAN) - Flight Director indications,

(c) PLI pop-up, Airspeed Indication low airspeed alert option enabled, angle of attack,

(d) ND Map, Expanded & Center Map modes – TRK up orientation,

(e) V1 aural enabled (if Look Ahead Terrain Alerting callout is functional),

(f) Minimum Requirement: Standby Flight Display with ILS/GS deviation indications from MMR#1, and MAG HDG from ARIRU#1 or automatic TRUE HDG in Polar regions.

i. Future Requirement: THALES AVIONICS CI6221KA01 Integrated

Standby Flight Display with ILS/GS deviation indications from MMR#1, and MAG HDG from ARIRU#1 or automatic TRUE HDG in Polar regions.

ii. Roadmap Requirement: Offeror must provide a roadmap containing the

IV. DELIVERABLES

Table No. 2 – Deliverables Per Aircraft Purchased

Item No.

Due Date

1. Large Transport Category, Narrow Body, Twin Engine Jet Aircraft (Oklahoma City, Oklahoma)

12 weeks after contract award

2. Airplane Flight Manual (AFM) (with Performance Specifications and Systems Description and Operation) in English print and U.S. measurement system.

Delivered with aircraft

3. Manufacturer Flight Crew Operating Manual (or equivalent) in English print and United States measurement units specific to the aircraft serial number.

4. A printed copy of a current, aircraft serial number specific, Minimum Equipment List in English print and United States measurement units.

5. Manufacturer Quick Reference Handbooks (QRH) or equivalent in English print and U.S. measurement system.

6. Manufacturer Weight and Balance Manual (if separate from the Airplane Flight Manual) in English print and U.S. measurement system.

7. A current (within 12 calendar months) and valid (meeting FAA standards) Weight and Balance report in English print and US measurement units accomplished in accordance with the manufacturer’s weight and balance manual. At a minimum, the report will provide the aircraft’s configuration at weighing, empty weight, weight and moment for each gear, basic empty weight and basic empty weight present of MAC

8. Current Aircraft Layout of Passenger Accommodations (LOPA) in English print and U.S. measurement system

9. Current Aircraft Equipment List in English print. Delivered with aircraft

10. Documentation and manuals for the operation of the aircraft flight systems (e.g., FMS, TCAS, etc.) that are not addressed in the current aircraft serial number specific Flight Crew Operating Manual.

11. A current status report in respect to the aircraft, including the AD and SB status of the airframe, appliances, engines, and APU; status of hard time / life limited components, alterations, major repairs (337s / STCs), and flight hour / flight cycle summary.

12. Approved data to include all Aircraft Maintenance Manuals, Illustrated Parts Catalogs, Structural Repair Manuals, Wiring Diagrams, STC Data, Engineering Orders, etc. for accomplishment of Line Maintenance and

No.

Due Date

Line Servicing.

13. An editable digital and physical copy of the aircraft’s maintenance and inspection program.

14. All applicable burn certification documentation. Delivered with aircraft

15. Current EASA Form 1, FAA Form 8130-3, and CAA Form

1 for each engine, APU, landing gear, and all Hard Time and / or Life Limited components.

16. Instructions for Continued Airworthiness (ICAs) for all aircraft, engine, and appliance alterations and / or repairs.

17. Engine Mini Packs with a current Life Limited Parts List. Delivered with aircraft

18. APU Mini Pack with a current Life Limited Parts List. Delivered with aircraft

19. Physical and digital copy of all software installed. Delivered with aircraft

20. Previous 120 flight days of engine trend data. Delivered with aircraft

21. Current Electrical Load Analysis (ELA) with

Coordination Sheet including all associated aircraft alterations.

22. Current Dent & Buckle Report Delivered with aircraft Note: All deliverables shall be presented with a printed physical copy and an editable digital copy.

All historical records shall be delivered to JPATS at the time of purchase.

V. PRE-AWARD INSPECTION, FINAL DELIVERY/INSPECTION AND

ACCEPTANCE OF THE AIRCRAFT

A. Pre-Award Inspection -- After all Offers have been evaluated and an Apparent Successful Offeror has been determined, the Apparent Successful Offeror will be notified to present the aircraft for a pre-award inspection. This inspection will take place not later than 14 days after notification at a location determined by the Offeror and must be within the Continental United States (CONUS). A period of up to three (3) days will be required for the pre-award inspection. The purpose of this pre-award inspection is to determine if the condition of the aircraft is as presented in the Offeror’s proposal. If the aircraft is found to not meet all the requirements as detailed in the Aircraft Technical Specifications and as presented in the Offeror’s proposal, the Government will then determine if those items not meeting the Aircraft Technical Requirements can be corrected prior to Final Delivery/Inspection of the aircraft (within 12 weeks after contract award). If the Government determines they can, then award will be made to the Apparent Successful Offeror and the Contractor shall bring the aircraft up to the technical requirements prior to final delivery/inspection and acceptance by the Government. If the Government determines the aircraft requires extensive repairs/modifications and cannot reasonably become “Acceptable” within 12 weeks after contract award, the aircraft will be determined to be “Unacceptable” and the offer will not be further evaluated, nor considered for award. The

Government plans to utilize an independent third-party expert(s) to assist with this pre-award inspection.

B. Final Delivery/Inspection – The Contractor shall configure the aircraft for final delivery/inspection and acceptance not later than twelve (12) weeks after award. The aircraft shall be delivered in an airworthy condition, in good working order, condition and appearance, and with all pilot discrepancies and deferred maintenance items cleared, clean by commercial airline standards and ready for flight with all the aircraft equipment, components and systems operating within limits specified in the appropriate aircraft maintenance manual and functioning in accordance with their intended use. There shall be no “on-watch” conditions, special callouts, special repetitive inspections, deferred maintenance, special waivers, or exemptions in effect on the Airframe, any Engine, the APU, or any part. The aircraft shall be in full compliance with the rules and regulations of the FAA and with applicable Type Certificate Data Sheets. Each AD issued by the FAA and with a compliance date on or prior to Delivery shall be complied with. The Government will perform a Final Delivery/Inspection of the aircraft to verify that the aircraft complies with all of the technical specifications of the Contract and to ensure all of the findings from the pre-award inspection have been corrected to the full satisfaction of the Government. The Government will have seven (7) calendar days to conduct this inspection. During the Final Delivery/Inspection, the Government will document any findings where the aircraft or deliverables do not meet the contract requirements. The contractor will be required to correct any findings within five (5) calendar days. The Government plans to utilize an independent third-party expert(s) to assist with this pre-award inspection.

C. Deliverables --In addition to the aircraft, during the Final Delivery/Inspection, and acceptance process, the Contractor must provide all contract deliverables as identified in this Aircraft Technical Specifications, Table 1, Deliverables (Items 2-22). All flight deck presentations, placards, cockpit indications and gages and associated navigational equipment/instruments and manuals and supporting documentation all in the English language and U.S. standard measurement system.

D. Delivery Location--The aircraft final delivery/inspection and acceptance shall be at the Contractor’s designated location within the continental United States.

E. Other Final Delivery/Inspection Items & Acceptance Flight –

(a) The final delivery/inspection process will include a Maximum Power Assurance run on each installed engine in accordance with the appropriate aircraft maintenance manual, to include associated documentation, a chip detector inspection, and an evaluation of the cruise and take-off trend analysis followed by an Acceptance Flight.

These will be done at the Contractor’s expense and shall be overseen by JPATS representatives.

(b) Utilizing an independent third-party expert at JPATS expense, JPATS will ensure each engine receives an external inspection and a full internal borescope inspection of the engine’s entire gas path resulting in a video borescope record of each installed engine with a written borescope report detailing the internal health of the engines to include the fan, compressor, combustion, and turbine sections of the engine. JPATS will provide a copy of the borescope inspection reports to the Contractor. This borescope will be accomplished during the seven (7) calendar day inspection. Note:

Full gas path borescope inspection will be reviewed by independent third-party propulsion engineer prior to engine acceptance.

(c) Utilizing an independent third-party expert at JPATS expense, JPATS will ensure the APU receives an external inspection and a full internal borescope inspection of its entire gas path resulting in a video borescope record with a written borescope report detailing the internal health of the APU to include the compressor, combustion, and turbine sections. JPATS will provide a copy of the borescope inspection report to the Contractor. This borescope will be accomplished during the seven (7) calendar day inspection.

(d) The Final Delivery/Inspection process will also include an Acceptance Flight. This

Acceptance Flight is meant to demonstrate the takeoff and landing capabilities and the en route characteristics of the proposed aircraft. It shall be performed by pilots provided by the Contractor; however, a JPATS pilot shall sit in the center cockpit "jump" seat on the flight deck during this Acceptance Flight as the official Government observer. This Acceptance Flight shall be in accordance with the Boeing Post Delivery 737NG Flight Profile (Attachment #1) and the Boeing 737 Next Generation Series Change of Operator Demonstration Profile (Attachment #2). The Acceptance Flight shall be for a duration not to exceed two hours and shall take place at the Delivery Location. All costs and expenses associated with this flight shall be the sole responsibility of the Contractor. The operating parameters of each Engine noted during the take-off power check shall be recorded. An Acceptance Flight will be deemed successful if all aircraft systems are fully operational and function properly during the reposition flight, and the aircraft exhibits an acceptable level of trim, stability, maneuverability, and controllability as determined by the JPATS pilot. Any inoperative or improperly functioning component or system discovered during the acceptance flight shall be documented by the JPATS pilot in the applicable flight logbook.

(e) After the Acceptance Flight, the Contractor shall perform an inspection of each magnetic chip detector on the installed engines as witnessed by a JPATS representative.

F. Final Delivery/Inspection & Acceptance Flight Deficiencies – The Contractor shall correct all deficiencies within three (3) calendar days from the date it receives the Government's notice to correct deficiencies, or in a time frame agreed to by the Contracting Officer, prior to a final determination of acceptance by the Government.

G. Termination for Cause -- If, after this final delivery/inspection process, it is determined by the Government that any proposed aircraft is not acceptable or is unavailable for delivery on the required delivery date, the Government may terminate for cause this contract in whole at no cost to the Government.

ATTACHMENTS:

Attachment #1 – Boeing Post Delivery 737NG Flight Profile (63 Pages)

Attachment #2 – Boeing 737 Next Generation Series Change of Operator Demonstration Profile (61 pages)

Attachment #2 RFP # 15M300-21-R-A370-0001

ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO OFFERORS --

COMMERCIAL ITEMS

In the event of any conflict between this addendum and the provisions in Section 5, offerors should be aware the addendum will be followed and adhered to.

A. GENERAL.

1. Period of acceptance of offers: 120 days

2. Each Offeror shall submit a written proposal to be considered for the award of a contract. Each Offeror’s proposal shall be submitted in two (2) separate parts -- one entitled "Technical Proposal" and the other entitled "Business/Price Proposal," in accordance with instructions set forth in this section.

3. Offerors are cautioned against discussing the preparation of their proposal or technical questions with Government technical personnel. The circumstances of such contact, when verified, may result in the non-consideration of the Offeror’s proposal.

Discussions with Government technical personnel concerning the specifications, the documents incorporated by reference, pricing, or any other technical matters are strictly forbidden. Accordingly, all communications prior to award shall be directed to the Contracting Officer.

4. The proposal shall be prepared simply and economically, providing a straight-forward, concise description of proposed aircraft. The proposal shall therefore be practical, legible, clear and coherent. In order that evaluation may be accomplished strictly on the merit of material submitted, no pricing information is to be included in the technical proposal.

5. The Offerors shall not propose any additional/different CLINs. The Offeror shall propose as many aircraft as desired; however, only one (1) contract will be awarded for one (1) aircraft.

B. PROPOSED ORGANIZATION AND CONTENT

1. Proposals submitted in response to this solicitation shall be formatted in accordance with the instructions provided in this section. Offerors shall furnish proposals in separately bound volumes in the quantities specified below. Each volume shall be complete in order that evaluation of one volume may be accomplished independently of, and concurrently with the evaluation of the others.

2. To aid in evaluation of the proposals, all proposals shall follow a format that mirrors the evaluation factors set forth in the solicitation. Each Offeror shall submit the following number of proposals:

Volume 1 - Technical Proposal - An original plus five (5) copies

Volume 2 - Business/Price Proposal - An original plus one (1) copy

3. The information set forth in this Section is required to ensure that Offerors have fully indicated their understanding of the Government's requirement. Failure to furnish full and complete information requested may cause an offer to be determined unacceptable.

4. Each page within each volume shall be numbered using a consistent numbering scheme. This scheme shall also be used for all supporting documentation such as charts, figures, etc. included in each volume. This means each attachment, appendix; chart, etc. may be pre-numbered or sequentially numbered within it.

5. Each volume, including all supporting documentation, shall be submitted in standard three ring loose leaf binders (as appropriate for 8.5" x 11" paper). All pages shall have appropriate left margins and three punched holes. The technical proposal shall not exceed 100 pages in length. Type (font) size must be no less than 10 point and no more than 12 point for general text. Page limit does not include the Maintenance Status Report.

6. An Executive Summary (or cover letter) shall accompany the proposal to set forth any information that the Offeror wishes to bring to the attention of the Government. This letter shall be considered part of the Offeror’s proposal and shall be included as part of Volume 1 - Technical Proposal.

VOLUME 1 – TECHNICAL PROPOSAL

The technical proposal shall be crafted to address the following technical evaluation factors succinctly and clearly without excess verbiage.

TAB A – TECHNICAL (AIRCRAFT) -

(1) Brand Name Aircraft - Offerors shall clearly identify the Brand Name aircraft being proposed, including the manufacturer's serial numbers (MSNs) and aircraft tail number. Offerors must provide adequate documentation and evidence to convince the Government that the proposed Brand Name aircraft meets all of the technical requirements at the time of proposal submission. If the aircraft does not meet these minimum technical requirements at the time of proposal submission, the Offeror shall describe a plan to meet these minimum technical requirements by the delivery date. In addition to this, offerors shall complete the Aircraft Specifications & Equipment Listing (Attachment # 3), included in these instructions for each proposed aircraft and submit it with their proposal.

(2) Additionally, JPATS intends to upgrade/replace/modify (“Future Requirements”) certain characteristics of the aircraft procured if the aircraft does not already possess the identified particular characteristics. The Aircraft Technical Specifications will identify those Future Requirement(s) but does not require any Offeror to propose an aircraft with those characteristics unless the Offeror chooses to do so. However, if the proposed aircraft does not possess any of the particular Future Requirement(s) and the Offeror is not offering the aircraft with those characteristics, Offerors are required to submit a written detailed path forward (“Roadmap Requirement” or

“Roadmap”) demonstrating whether it is feasible for JPATS to implement the Future Requirement(s) in that particular aircraft. The Roadmap must identify the current configuration of the aircraft, specific details with supporting information and data, if applicable, as to how JPATS could implement the Future Requirement (See Aircraft Specifications & Equipment Listing – Attachment #3). Aircraft proposed that currently meet the Future Requirement may be assessed with a preference during the evaluation process and best value determination. For aircraft proposed that do not currently possess the Future Requirement(s), the Roadmap provided will be assessed to determine whether it instills confidence that JPATS will feasibly, reasonably, and realistically be able to implement the particular Future Requirement onto the aircraft.

(3) Photos - For the proposed aircraft, offerors shall provide color photographs detailing the proposed aircraft’s interior, exterior, cargo/baggage compartments and cockpit. The following digital color photographs shall be submitted for each aircraft proposed by the Offeror:

(a) An exterior photograph taken from the front of the aircraft that depicts all of the aircraft from that viewpoint.

(b) An exterior photograph taken from the rear of the aircraft that depicts all of the aircraft from that viewpoint.

(c) An exterior photograph taken from the area of the left-wing tip that depicts all of the aircraft from that viewpoint.

(d) An exterior photograph taken from the area of the right-wing tip that depicts all of the aircraft from that viewpoint.

(e) An interior photograph taken from the front of the cabin area (just aft of the cockpit door) looking aft.

(f) An interior photograph taken from the rear of the cabin area (just forward of the rear door/bulkhead) looking forward.

(g) An interior photograph taken from the over wing exit area looking forward.

(h) An interior photograph taken from the over wing exit area looking aft.

(i) A cockpit photograph that depicts the overhead instrument panel.

(j) A cockpit photograph that depicts the Captain’s instrument panel.

(k) A cockpit photograph that depicts the Center forward instrument panel.

(l) A cockpit photograph that depicts the First Officer’s instrument panel.

(m) A cockpit photograph that depicts the Lower Center instrument console.

This documentation shall be of sufficient quality to readily determine the general exterior and interior colors and condition and the general cockpit instrumentation.

(3) Reports – The offerors shall provide a Maintenance Status Report (Contractor Format acceptable) showing scheduled maintenance status, to include, at a minimum, current status of all scheduled maintenance events, airworthiness directive (AD) and mandatory service bulletin (SB) compliance, life limited components and hard time change items due dates.

TAB B – DELIVERY SCHEDULE - The offeror shall provide a proposed delivery schedule (workflow schedule) for the aircraft proposed. The government’s required delivery schedule is 12 weeks after date of award. Any proposed delivery schedule exceeding 12 weeks after date of award will be determined as unacceptable.

TAB C – CORPORATE EXPERIENCE - The Offeror shall describe their experience during the past five (5) years in providing aircraft of similar size, complexity and scope to either public or private sector entities. The government requires this information to assess whether the Offeror’s experience reflects if the Offeror has performed similar work before.

TAB D – PAST PERFORMANCE - The Offerors shall provide up to five (5) references for the prime Offeror, no more than one (1) page each in length for all projects of similar size, scope and complexity, which are in progress or were completed within the past three (3) years. In contrast to the Corporate Experience factor described above, the government requires this information to assess how well the Offeror has previously performed work of similar size, scope and complexity. Past performance information is not included in the page count. Offerors shall provide the customer name and address;

point of contact (name, title, telephone number and e-mail address for contractual/administrative matters (e.g. the Contracting Officer) and for technical performance (e.g. the Contracting Officer's Technical Representative); contract/task order number; period of performance; total dollar value (if performed as part of a team, prime/subcontractor relationship provide the dollar value attributed to your firm's efforts; a brief description of the work performed; and identification of the team members/subcontractors and the role played by each member.

Offerors having little or no relevant performance record identifiable; will be given a neutral rating which has no positive or negative evaluation significance.

VOLUME 2 – BUSINESS/PRICE PROPOSAL

The Business/Price proposal shall be submitted in the following format:

(1) Offer - Offerors shall submit their Business proposal consisting of a Cover Letter including Contractor/Offeror Name, Address, Telephone Number, CAGE Code, and DUNS Number and any Discount Terms. The letter shall be signed by an authorized representative with the authority to bind the Offeror to show that the Offeror has read and agrees to comply with all the conditions and instructions provided in the solicitation document.

(2) Price – Completed SF-1449, Schedule of Supplies/Services.

(3) Terms and Conditions - In lieu of providing actual copies of the terms and conditions, the Offeror shall provide written certification (signed and dated) of acknowledgment and compliance with the terms and conditions of the solicitation.

___________________________________________[Name of Offeror] hereby incorporates by reference into this proposal dated________________[Date of Offer] the terms and conditions as stated in Solicitation # 15M30021RA3700001 and certifies that in so doing, the Offeror agrees to comply, in any contract issued as a result of this Solicitation.

[Signature] [Date] [Title]

Any proposal received without the above Certification may be considered non-compliant.

(4) Representations and Certifications – The Offeror must check or complete all applicable boxes or blocks in the paragraphs under FAR Clause 52.212-3, Offeror Representations and Certifications – Commercial Items, of this solicitation and resubmit the completed section as part of the proposal OR certify that such information is available under the System for Award Management (SAM), which includes the Online Representations and Certifications Application.

(5) Small Business Subcontracting Plan (if applicable) – If the Offeror is an “Other-than Small Business”, it shall prepare and submit its Small Business Subcontracting Plan with their offer. The U.S. Marshals Service subcontracting goals for Small Businesses - 39.5%, Small Disadvantaged Business (SDB) – 5%, Women-Owned Small Business (WO) – 5%, Service Disabled Veteran Owned Small Business (SDVO) – 3%, and HUBZone (HZ) – 3%. The plan should be submitted in accordance with the Small Business Subcontracting Plan outlined in FAR 19.704.

D. Inquires

(1) Any questions concerning the RFP must be submitted in writing via e-mail (Arlene.carlson@usdoj.gov) to Arlene Dee Carlson, Contracting Officer, not later than 12:00 pm (noon) EST, June 11, 2021.

(2) The Government plans to answer questions and publish a consolidated set of questions (redacted to remove questioner identities) and Government responses, as an Amendment to the Solicitation. Any questions received after the above date shall be answered on an optional, best-effort basis only. Offerors are cautioned against directing any questions concerning this RFP to anyone other than the Contracting Officer.

E. Proposal Submission

(1) The Government will not accept facsimile or Internet submissions of offers for this procurement. All hard copies of proposals must be submitted in sealed boxes or envelopes with the correct number of hardcopies to the following address:

Rob M. Hankins (Tele: 405-680-3431)

Chief of Maintenance U.S. Marshals Service Justice Prisoner and Alien Transportation System (JPATS) 5900 Air Cargo Road mailto:Arlene.carlson@usdoj.gov

Oklahoma City, Oklahoma 73159-1198

(2) IMPORTANT NOTE - Offeror shall not mail their proposal through the U.S.

mail (it may be diverted to an off-site facility for irradiation and may result in being delivered past the proposal due date.) Offerors should consider using commercial express shipping services (e.g. FedEx, UPS, etc.) to send their proposal.

(3) The date and time for proposal submission is: 12:00 pm ET, June 28, 2021. It is the Offeror’s sole responsibility to ensure that its complete proposal is received at the location designated above no later than the date and time designated for receipt of proposals. Any late proposal will be handled in accordance with FAR 15.208.

(4) Markings – The outer wrapping of the proposal package shall indicate “Solicitation Number: “15M30021RA3700001” to allow for easy identification.

(5) Proposal Validity – By submission of its signed offer, the Offeror attests to its validity for evaluation, acceptance and award purposes for a period not less than one hundred and twenty (120) calendar days from the Solicitation Closing Date. If the Offeror wishes to propose a longer proposal validity period, it may so state its length in the Business Proposal cover letter.

F. Disposition of Proposals

After evaluation, selection, and contract award, unsuccessful proposals will be disposed of as follows: One copy of each proposal will be retained by the Contracting Officer and the remainder will be destroyed.

ADDENDUM TO FAR 52.212-2, EVALUATION – COMMERCIAL ITEMS.

This addendum provides greater detail and depth than the provision in Section 5 and offerors should be aware this addendum will be followed and adhered to.

A. General.

(1) A Single Award will be made to the Offeror whose proposal, conforming to this solicitation, is determined to be in the best interest of the Government. Only one (1) contract will be awarded for one (1) aircraft.

(2) The Offeror’s compliance with those minimum standards is a prerequisite to an affirmative determination of responsibility as defined by Section 9.104-1 of the Federal Acquisition Regulation.

B. Evaluation – Commercial Items

(1) The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors (listed in descending order of importance) shall be used: Technical (Aircraft); Delivery Schedule;

Corporate Experience; Past Performance and Price

(a) Technical (Aircraft) - Based upon the documentation provided by the Offeror, the Government will evaluate if the proposed Brand Name aircraft meets all of the minimum technical requirements listed in the Aircraft Technical Specifications document at the time of proposal submission. If the aircraft does not meet these technical requirements at the time of proposal submission, the Government will evaluate the Offeror’s plan for the aircraft to meet these technical requirements by the delivery date as proposed by the offeror. Aircraft proposed that currently meet the Future Requirements as described previously may be assessed with a preference during the evaluation process and best value determination. For aircraft proposed that currently do not meet any particular Future Requirement, JPATS will assess the Roadmap provided and whether it instills confidence that the Future Requirement appear feasible, realistic, and reasonable to implement.

(b) Delivery Schedule – The government will evaluate the contractor’s proposed delivery schedule against the government’s required schedule. This is based on a 12-weeks from date of award; however, preference will be given to Offerors who propose an earlier delivery date.

(c) Corporate Experience - As previously described above in the instructions, experience reflects whether the offeror has performed similar work before.

Therefore, the Government will evaluate the extent and relevance of the offeror’s corporate experience in providing large aircraft similar in size, scope and complexity to what is described in the Technical Specifications. In other words, the Government will review whether the offeror has performed similar work, the frequency it performed such work, and for how long it has performed such work.

(d) Past Performance – Past performance is a measure of the degree to which an

Offeror as an organization has satisfied its customers. Although the U.S.

Marshals Service cannot guarantee that it will contact all of each Offeror’s and their proposed subcontractor’s references, it will make a reasonable effort to contact them to inquire about: 1) the Contractor’s ability to meet identified technical requirements; 2) the Contractor’s ability to deliver the aircraft in a…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .