15M20019NA32NPS01_Questions_and_Answers.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
National Physical Security Program - Installation and Maintenance
Solicitation number
15M20019NA32NPS01
Issued by

About this file

Responses to Questions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1

Question #SectionSubsectionQuestionGovernment ReponseOfferor2
1PWSC.8What product is currently being used? (IMS)Excel.IntelliWare
2PWSC.8Does the IMS only include Physical Security Assets or all US Marshals Service (USMS) Assets?Physical Security Assets only.IntelliWare
3PWSC.8What functionality does the IMS provide that is currently being utilized by the USMS?Make, model, state, location, date installed.IntelliWare
4PWSC.8Is there a desire to replace the IMS at this time?Yes.IntelliWare
5PWSN/ACan the provided Performance Work Statement (PWS) document be edited with track changes and provided as a separate attachment in addition to our 30 page response?Yes.IntelliWare
6RFIInstructionsPlease confirm that Company information/Past Performance Summary is included in the 30 page count.No it is not included.IntelliWare
7PWSN/ACan the USMS provide the sections referenced in the PWS that were not included in the document (i.e., Section C.4, Performance Standards, Section C.9, Offeror Personnel and Qualifications, Section C.12, Other Relevant Information, Section XX, Definitions, Attachment XX, Equipment Listing, Attachment XX, Component Performance Specifications)?This section were intentionally left blank and will be provided in the final RFP.IntelliWare
8PWSC.11.1Can the USMS provide the NDA referenced in the PWS, so that we can obtain the USMS Design Specifications [USMS Requirements and Specifications for Special Purpose and Support Space Manuals, Publication 64, Volumes I (construction), II (electronic security), and III (judicial security)]?Yes. However, Publication 64 viewing must be conducted onsite at USMS HQ.Markon
9RFIQuestion 6Regarding response Question #6, what does the USMS mean when referencing “independent” for the USMS program?That the contractor provide a dedicated program for the USMS.Markon
10RFIQuestion 7Can the USMS provide the barrier map referenced in the Question #7?Yes.Markon
11RFIQuestion 7Can the USMS provide the manufacturer, model number, and name of the 249 barriers?Yes, upon completion of NDA.Markon
12RFIQuestion 8Regarding response Question #8 (which is located in between two other questions concerning barriers) - is this question specifically related to barriers, or all equipment in the PWS?Both.Markon
13RFIQuestion 8If Question #8 is related to all equipment in the PWS, can the USMS please provide a list (including make/model) of all currently installed equipment on the program?No.Markon
14RFIQuestion 9Regarding response Question #9, what is the make and model of mobile barriers?Nisaka K4 Single Axle.Markon
15RFIQuestion 9Regarding response Question #9, will the barriers be centrally housed in one location or randomly located throughout the U.S.? What are their locations?New Jersey and Maryland.Markon
16RFIQuestion 7This question references a barrier map which was not provided with the RFI. Can the Government please provide this map along with a listing of the barrier types, manufactures, and models?Yes.Markon
17RFIQuestion 8This question references a requirement that only certified factory trained technicians shall provide repair services. Please confirm that this requirement and question pertain to the servicing of barriers referenced in question 7.Technicians need to be certified on all equipment.Markon
18RFIQuestion 9Can the Government provide more information on these mobile barriers (e.g., type, make/model, size, weight, storage location(s)) to assist in making a better recommendation on a realistic time period?Nisaka K4 Single Axle.Markon
19PWSC.3.1.1.2.2Will the Government provide “Attachment XX – Equipment Listing”?Yes, it will be provided in the final RFP.Markon
20RFIQuestion 8Please confirm the requirement to have factory trained technicians only applies to barrier maintenance and installation.Applies to all equipment.Markon
21PWSN/AWhat type of contract does the Government intend to award for this contract? T&M? FFP? If FFP will the price incrments be based on the number or complexity of sites, devices, dispatches, work orders, etc?.TBD
22PWSN/AWill the Government be able to provide the service call (incident) and service request ticket data for one year.Yes.
23PWSN/Awill the government provide details on the primary place of performance? USMS headquarters or vendor site based in particular as it relates to field based operations.Primary performance will be throughout the U.S. and U.S. territories. Prospective vendors should provide viable solutions.
24PWSN/AWill the NPS PMO established under RFP solicitation 15M20018QA32NPS01 have direct oversight of the installation teams on the individual sites or is the offeror of this proposal expected to project manage and schedule teams?No, the PMO will not have direct oversight. Offerors shall provide their own program and project management.
25PWSN/APlease provide clarification if the Government anticipates any subsequent RFP/RFQ for installation and maintenance services to be broken into two (2) separate offeringsThe Government does not anticipate a subsequent RFP/RFQ.
26PWSN/AIf the offeror has previously bid on and won the NPS PMO contract for solicitation 15M20018QA32NPS01, will they be excluded from bidding on this installation and maintenance procurement?Yes.
27PWSN/APlease clarify if the intent is to award for individual Installation or O&M or Installation/Maintenance?Installation/Maintance.
28PWSN/ADoes the USMS OSS currently have an analytics and/or BI tools to enable visibility into program status? What tools/platforms are preferred?No. The Government would like the propspective Offerors to provide innovative solutions.
29PWSN/AWill the scope of any installation/maintenance project and/or quality plans be outside of the responsibility of any NPS PMO?Please clarify the question.
30PWSN/AThe USMS has historically received security services via a single contract vehicle, what will be required of the incumbent contractor during the transition period after any awarded contract from this RFI? What can be expected to be received from that incumbent contractor?To be determined upon contact award.
31PWSN/AWhat is the expected transition period of performance? What are the roles and responsibilities of the incumbent contractor and USMS in regards to the awardee performing and/or obtaining current data for asset inventories, facility assessments, projects in process, etc.?A 60 to 120 day transition period is tentatively planned.
32PWSC2.3Is the Government expecting the offeror to stand up a Project Management Office for the Installation and Maintenance activities? If yes please explain how responsibilities will differ from the Program Office established under solicitation 15M20018QA32NPS01No. The Offeror shall provide their own organizational structure to best meet USMS requirements.
33PWSC2.3.2Is the USMS wanting or expecting a Nationalized integrated security solution shared by all 900 facilities?Yes.
34PWSC2.3.4What types of equipment will the winning offeror be responsible for installation, inventory, O&M (manufacturer, brand, make, and model)? Will the Government provide a list of all Security Equipment vendors (make), equipment model, software / hardware versions, etc.USMS uses numerous physical security equipment brands.
35PWSC2.3.4Are personnel to be assigned to each of the 900 site locations to oversee the QC of the installation teams?No.
36PWSC2.3.4Is the current IMS eQuip? Will the Government provide a baseline inventory?No. Not at this time.
37PWSC3.2.2.Will a design A/E be under contract to GSA? Will they support design efforts required for USMS projects? Are there projects would not utilize the A/E? If so, please specify the types of projects to be excluded.No. The Government expects to Offeror to provide A/E services upon request.
38PWSC3.1.2Please provide elaboration on the logic of using the Micro-Purchase Threshold vs issuing a Task Order if non-maintenance services are already a service offering covered under the work umbrella of this RFIThe provision of non-maintenance repair services will be provided as needed.
39PWSC3.1.2Section 3.1.2 refers to procedures under the micro-pushcase threshold and then section 3.1.2.1 refers to items as minor repair services up to $2500.00. are these section referring to the same type of non-maintenance services? Section 806 of the NDAA currently lists the mciro-purchase threshold at $10,000. can you please elaborate on the distinction between the efforts?Yes, minor repair is a type of non-maintenance service. However, the anticipated solicitation is subject to 41 U.S.C. chapter 67, Service Contract Labor Standards. Per FAR Part 2.101, for acquisitions of services subject to the Service Contract Labor Standards the micro-purchase threshold is $2,500.
40PWSC3.1.2The RFI indicates the offeror shall invoice MOCs and MASs seperately. Does this include a requirement that separate field forces must be assigned to work MOCs vs MASs? If the same technicians can work both, will the dispatch for work have to occur on seperate visits or can the work effort be prorated based on tasks and equipment serviced?No, separate field forces are not required. The nature of the work must be billed separately.
41PWSC3.3 - 3.2Section 3.2 jumps from project desing to section 3.3 to equipment installation. The acutal process of ordering equipment seems to be missing. Will that be handled under a separate contract? Section 3.3.3.1 makes references to equipement CLINs. Do that suggest a predetermined equipment catelog will be able for the Desgin Engineers to make selections from for each project? If equipment required for a specific tasks does not have a defined CLIN how will the equipment be identified for ordering? Where and how will equipment enter into a distribution systme for staging and scheduling of installation? Where will equipment be stored until the installation process is scheduled?The offeror will be responsible for providing complete end to end supply chain management services.
42PWSC3.2.2.Who is responsible for providing the redline and final drawings at the completion of each project?The offeror.
43PWSC.3.3.This section addresses Installation Design Packages which will be awarded to a to be determinded FFP or T&M quote. 1) Does this suggest installation work will be handled seperately from the O& M work and treated on a project by project basis? If the governement rejects a price quote how will the work be addressed?Yes. If the price quote is rejected the work will not be completed.
44PWSC.3.1.1.1.1How will new and removed assets associated with installation and maintenance projects be incorporated into the master inventory included in the IMS? Will the awardee be responsible for all data input to maintain the integrity of the database?The offeror shall update the IMS upon completion of each project to reflect changes by project installation and/or removal.
45PWSC3.1.1.1/C3.1.1.2/3.1.2What level of spares inventory is the Government expecting the contractor to maintain?The gov't. is expecting the contractor to provide solutions.
46RFIQuestion 7Question 7 refers to an “attached barrier map.” Please provide a copy of this attachment.Gov't. will provide.
47RFIQuestion 8Does the requirement for “only certified factory trained technicians” in Question 8 apply solely to barriers, or does it apply to all USMS security equipment?Applies to all equipment.
48RFIQuestion 8Please identify the manufacturers of all equipment that requires repair services by “only certified factory trained technicians.”USMS uses numerous physical security equipment brands.
49PWSC.1/C.2.3The last paragraph in Section C.1 includes the term “first responder repair services.” Section C.2.3 uses the term “first responder maintenance services.” Please clarify the Government’s definition of these “first responder” services; specifically addressing how they differ from “standard” repair and maintenance services.The offeror will provide staff with specialized training to be able to arrive within an agreed upon time window and perform emergency repairs
50PWSC.4Throughout the draft PWS there are ten references to “additional requirements” and “additional details” which are directed to parts of Section C.4. Section C.4 is titled “Performance Standards,” and the entire section is listed as “intentionally left blank.” Please provide updated section references; or provide Section C.4.This section was intentionally left blank and will be provided in the final RFP.
51PWSC.3.1.1.2.2This section includes a reference to “Attachment XX – Equipment Listing.” Please provide this attachment.This will be provided in the final RFP.
52PWSC.3.1.2.5.1FAR Part 45.6 does not include significant information regarding performance requirements for equipment disposal. Please detail the referenced USMS policies applicable to equipment disposal.The offeror shall provide an equipment disposal solutions.
53PWSC.6This section requires the contractor to develop Standard Operating Procedures to “facilitate meeting OSS objectives.” Please be specific about the relevant OSS objectives so that offerors can better understand the scope of this requirement.The offeror shall be required to provide SOP to advance the USMS functions related to installation of security systems for all facility construction, renovation, and upgrade projects, preventive and corrective maintenance services, and repair services.
54PWSC.2.3.4/ C.3.1.1.1Section C.2.3.4 requires the contractor to conduct an on-site equipment inventory of all facilities within 12 months. We interpret this to be a “quantitative” activity.

Section C.3.1.1.1 requires the contractor to conduct a “current fleet inspection and evaluation” within the first 12 months. We interpret this to be a “qualitative” activity, as it involves assessment of current conditions and development of remediation plans. Furthermore, the assessment parameters detailed in the following sections seem highly specific to barriers and gates, and do not seem to address other physical security equipment.

Please clarify the inventory and inspection/evaluation activities required by this contract; and address how the Installation and Maintenance contractor will coordinate and/or divide responsibility for these activities with the Program Management contractor.

Also, please identify the specific standards against which current site conditions will be evaluated.C.2.3.4 only applies to Physical Security Equipment (other than AVB). The offeror shall be responsible for providing solutions for management of an all encompasing maintenance, installation, and repair services portfolio. This section will be revised for clarity in a final RFP.
55PWSCorrective MaintenanceThe PWS includes significant detail regarding Preventative Maintenance and Non-Maintenance Service. However, it seems to be silent on Corrective Maintenance, which is the contractor’s response to equipment that has unexpectedly failed and must be repaired or replaced to restore functionality in a timely manner.
Please clarify the Government’s requirements for performing Corrective Maintenance.Corrective maintenance falls under repair services.