15JPSS23Q00000033.pdf

PDF 121 KB Posted

Attached to
Automated Translation and Transcription Platform Services
Solicitation number
15JPSS23Q00000033
Issued by

View the file

Other files

File Type Posted
Question Answers Clarifications.pdf PDF
Appendix 1 - Past Performance Questionnaire.docx DOCX document
Mkt Research Analysis Veritone BPA Final.docx DOCX document
Attachment 3 - Security Requirements.pdf PDF
Attachment - NDA.pdf PDF
Veritone BPA SOW.docx DOCX document
Attachment 1 - Pricing Table.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15JPSS23Q00000033 Page 1 of 29

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 & 30

1. REQUISITION NUMBER PAGE 1 OF

5. SOLICITATION NUMBER

15JPSS23Q00000033

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 6. SOLICITATION ISSUE

DATE

03/28/2023

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls) 8. OFFER DUE DATE / LOCAL

TIME

04/10/2023 12:00 ET

CODE9. ISSUED BY X UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS: 541930

SIZE STANDARD:

10. THE ACQUISITION IS

SEE

SCHEDULE

X

11. DELIVERY FOR FOB DESTINATION

UNLESS BLOCK IS MARKED

NET 30

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER DPAS

(15 CFR 700)

13b. RATING

X RFQ IFB RFP

14. METHOD OF SOLICITATION

CODE15. DELIVER TO

SEE SCHEDULE

CODE16. ADMINISTERED BY

FACILITY

CODE

CODE

TELEPHONE NO.

17a. CONTRACTOR/

OFFEROR

CODE18a. PAYMENT WILL BE MADE BY

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER SEE ADDENDUM

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS

CHECKED

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

0001 Firm Fixed Price Base Year License Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

PSC: R617

See Continuation Sheet(s) (Use Reverse and/or Attach Additional Sheets as Necessary)

1 LT $________________ $________________

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

X 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPIES TO

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE

TERMS AND CONDITIONS SPECIFIED.

29. AWARD OF CONTRACT: REF. _____________________________ OFFER

DATED _________________ . YOUR OFFER ON SOLICITATION (BLOCK 5)

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN,

IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (TYPE OR PRINT)

Fitzgerald V Escalona

31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

15JPSS23Q00000033 Page 2 of 29

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

PARTIAL FINAL

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

COMPLETE PARTIAL FINAL

36. PAYMENT 37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

15JPSS23Q00000033 Page 3 of 29

Table of Contents

Section Description Page Number

1 Solicitation/Contract Form 2 Commodity or Services Schedule 3 Contract Clauses

DJAR-PGD-02-02A Non-U.S. Citizens Prohibited from Access to DOJ Information Technology (IT) Systems DJAR-PGD-02-02B Non-U.S. Citizens Prohibited from Access to DOJ Information Technology (IT) Systems DJAR-PGD-05-08 Implementation of Homeland Security Presidential Directive (HSPD) 12 - Policy for a Common Identification Standard for Federal Employees and Contractor DJAR-PGD-06-09 Reprogramming of Funds Notices to Congress for A-76 Competitions DJAR-PGD-07-10 Ensuring New Acquisitions Include Common Security Configurations DJAR-PGD-07-12 Maintaining Contractor Performance During a Pandemic or Other Emergency DJAR-PGD-08-04 Security of Systems and Data, Including Personally Identifiable Information DJAR-PGD-08-05 Contractor Certification of Compliance with Federal Tax Requirements DOJ-05 Security of Department Information and Systems (APR 2015) DOJ-07 Prohibition On Access By Non-U.S. Citizens To DOJ IT Systems (MAR 2002) DOJ-02 Contractor Privacy Requirements (JAN 2022) DOJ-03 Personnel Security Requirements For Contractor Employees (Nov 2021) DOJ-08 Continuing Contract Performance During a Pandemic Influenza or other National Emergency

(OCT 2007)

4 List of Attachments 5 Solicitation Provisions

2852.233-70 Protests Filed Directly with the Department of Justice (NOV 2020) DOJ-06 National Security Risk Assessment (APR 2014)

15JPSS23Q00000033 Page 4 of 29

Section 2 - Commodity or Services Schedule

SCHEDULE OF SUPPLIES/SERVICES

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Transcription Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Translation Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Image Detection Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Video Detection Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Professional Services (If Applicable) Qty

LCAT: ; 20 Hours @$XX.XX LCAT: ; 40 Hours @$XX.XX LCAT: ; 80 Hours @$XX.XX

Line Period of Performance: 05/30/2023 - 05/29/2024

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 Option Year 1 License Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Transcription Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Translation Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Image Detection Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Video Detection Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Professional Services (If Applicable) Qty

LCAT: ; 20 Hours @$XX.XX LCAT: ; 40 Hours @$XX.XX LCAT: ; 80 Hours @$XX.XX

PSC: R617

Line Period of Performance: 05/30/2024 - 05/29/2025

1 LT $________ $_________________

15JPSS23Q00000033 Page 5 of 29

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 Option Year 2 License Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Transcription Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Translation Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Image Detection Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Video Detection Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Professional Services (If Applicable) Qty

LCAT: ; 20 Hours @$XX.XX LCAT: ; 40 Hours @$XX.XX LCAT: ; 80 Hours @$XX.XX

PSC: R617

Line Period of Performance: 05/30/2025 - 05/29/2024

Option Period

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0004 Option Year 3 License Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Transcription Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Translation Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Image Detection Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Video Detection Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Professional Services (If Applicable) Qty

LCAT: ; 20 Hours @$XX.XX LCAT: ; 40 Hours @$XX.XX LCAT: ; 80 Hours @$XX.XX

PSC: R617

Line Period of Performance: 05/30/2026 - 05/29/2027

15JPSS23Q00000033 Page 6 of 29

Option Period

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0005 Option Year 4 License Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Transcription Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Translation Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Image Detection Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Video Detection Qty

LOW @$XX.XX

MEDIUM @$XX.XX

HIGH @$XX.XX

Professional Services (If Applicable) Qty

LCAT: ; 20 Hours @$XX.XX LCAT: ; 40 Hours @$XX.XX LCAT: ; 80 Hours @$XX.XX

PSC: R617

Line Period of Performance: 05/30/2027 - 05/29/2028

Option Period

15JPSS23Q00000033 Page 7 of 29

Section 3 - Contract Clauses

Clauses By Full Text

DJAR-PGD-02-02A Non-U.S. Citizens Prohibited from Access to DOJ Information Technology (IT) Systems

The Department of Justice does not permit the use of Non-U.S. citizens in the performance of this contract or commitment for any position that involves access to or development of any DOJ IT system. By signing the contract or commitment document, the contractor agrees to this restriction. [In those instances where other non-IT requirements contained in the contract or commitment can be met by using Non-U.S. citizens, those requirements shall be clearly described.].

(End of Clause)

DJAR-PGD-02-02B Non-U.S. Citizens Prohibited from Access to DOJ Information Technology (IT) Systems

The Department of Justice (DOJ) will no longer permit the use of Non-U.S. citizens in the performance of this contract or commitment for any position that involves access to or development of any DOJ IT system. By signing the contract or commitment document, the contractor agrees to this restriction with respect to all new employees utilized directly to perform duties on the contract.

Non-U.S. citizens currently employees under this contract or commitment may continue performance unless otherwise directed by the Department of Justice. No new, replacement, or additional Non-U.S. citizens may be added to the contract without the express approval of the Department of Justice. [In those instances where other non-IT requirements contained in the contract or commitment can be met by using Non-U.S. citizens, those requirements shall be clearly described.].

(End of Clause)

DJAR-PGD-05-08 Implementation of Homeland Security Presidential Directive (HSPD) 12 - Policy for a Common Identification Standard for Federal Employees and Contractor

NOTICE OF CONTRACTOR PERSONNEL SECURITY REQUIREMENTS

Compliance with Homeland Security Presidential Directive-12 (HSPD-12) and Federal Information Processing Standard Publication 201 (FIPS 201)' entitled "Personal Identification Verification (PIV) for Federal Employees and Contractors," Phase I.

1. Long-Term Contractor Personnel:

In order to be compliant with HSPD-12/PIV I, the following investigative requirements must be met for each new long-term2 contractor employee whose background investigation (BI) process begins on or after October 27, 2005:

a. Contractor Personnel must present two forms of identification in original form prior to badge issuance (acceptable documents are listed in Form 1-9, OMB No. 1615-0047, " Employment Eligibility Verification," and at least one document must be a valid State or Federal government-issued picture ID);

b. Contractor Personnel must appear in person at least once before a DOJ official who is responsible for checking the identification documents. This identity proofing must be completed sometime during the clearance process but prior to badge issuance and must be documented by the DOJ official;

c. Contractor Personnel must undergo a BI commensurate with the designated risk level associated with the duties of each position.

Outlined below are the minimum BI requirements for each risk level:

•High Risk - Background Investigation (5 year scope) •Moderate Risk - Limited Background Investigation (LBI) or Minimum Background Investigation (MBI) •Low Risk - National Agency Check with Inquiries (NACI) investigation

d. The pre-appointment BI waiver requirements for all position sensitivity levels are a:

1) Favorable review of the security questionnaire form;

2) Favorable fingerprint results;

3) Favorable credit report, if required;3

4) Waiver request memorandum, including both the Office of Personnel Management schedule date and position sensitivity/risk level; and 5) Favorable review of the National Agency Check (NAC)4 portion of the applicable BI that is determined by position sensitivity/risk level.

A badge may be issued following approval of the above waiver requirements.

If the NAC is not received within five days of OPM' s scheduling date, the badge can be issued based on a favorable review of the Security Questionnaire and the Federal Bureau of Investigation Criminal History Check (i.e., fingerprint check results).

e. Badge re-validation will occur once the investigation is completed and favorably adjudicated. If the BI results so justify, badges issued under these procedures will be suspended or revoked.

15JPSS23Q00000033 Page 8 of 29

2. Short-Term Contractor Personnel:

It is the policy of the DOJ that short-term contractors having access to DOJ information systems and/or DOJ facilities or space for six months or fewer are subject to the identity proofing requirements listed in items la. and lb. above. The pre-appointment waiver requirements for short-term contractors are:

a.Favorable review of the security questionnaire form;

b.Favorable fingerprint results;

c.Favorable credit report, if required;5 and d.Waiver request memorandum indicating both the position sensitivity/risk level and the duration of the appointment. The commensurate BI does not need to be initiated.

A badge may be issued following approval of the above waiver requirements and the badge will expire six months from the date of issuance. This process can only be used once for a short-term contractor in a twelve month period. This will ensure that any consecutive short-term appointments are subject to the full PFV-I identity proofing process.

For example, if a contractor employee requires daily access for a three or four-week period, this contractor would be cleared according to the above short-term requirements. However, if a second request is submitted for the same contractor employee within a twelve-month period for the purpose of extending the initial contract or for employment under a totally different contract for another three or four-week period, this contractor would now be considered "long-term" and must be cleared according to the long-term requirements as stated in this interim policy.

3. Intermittent Contractors:

An exception to the above-mentioned short-term requirements would be intermittent contractors.

a. For purposes of this policy, "intermittent" is defined as those contractor employees needing access to DOJ information systems and/or DOJ facilities or space for a maximum of one day per week, regardless of the duration of the required intermittent access. For example, the water delivery contractor that delivers water one time each week and is working on a one-year contract.

b. Contractors requiring intermittent access should follow the Department's escort policy. Please reference the August 11, 2004, and January 29, 2001, Department Security Officer policy memoranda that conveys the requirements for contractor facility escorted access.

c. Due to extenuating circumstances, if a component requests unescorted access or DOJ IT system access for an intermittent contractor, the same pre-employment background investigation waiver requirements that apply to short-term contractors are required.

d. If an intermittent contractor is approved for unescorted access, the contractor will only be issued a daily badge. The daily badge will be issued upon entrance into a DOJ facility or space and must be returned upon exiting the same facility or space.

e. If an intermittent contractor is approved for unescorted access, the approval will not exceed one year. If the intermittent contractor requires unescorted access beyond one year, the contractor will need to be re-approved each year.

4. An individual transferring from another department or agency shall not be re-adjudicated provided the individual has a current (within the last five years), favorably adjudicated BI meeting HSPD-12 and DOJ's BI requirements.

5.The DOJ's current escorted contractor policy remains unchanged by this acquisition notice.

NOTES:

1. FIPS 201 is available at: www.csrc.nist.gov/publications/fips/fips201 /FIPS-201-22505.pdf.

2. Under HSPD-12, long-term contractors are contractors having access to DOJ information systems and/or DOJ facilities or space for six months or longer. The PIV-I identity proofing process, including initiation and adjudication of the required background investigation, is required for all new long-term contractors regardless of whether it is the current practice to issue a badge. The second phase of HSPD-12 implementation (PIV-II) requires badge issuance to all affected long-term contractors.

3. For contractors in position sensitivity/risk levels above level 1, a favorable review of a credit check is required as part of the pre-appointment waiver package.

4. In order to avoid a delay in the hiring process, components should request an Advance NAC Report when initiating investigations to OPM. Per OPM 's instructions, to obtain an Advance NAC Report, a Code " 3" must be placed in block "B " of the " Agency Use Only " section of the investigative form. This report is available for all case types.

5. For contractors in position sensitivity/risk levels above level 1, a favorable review of a credit check is required as part of the pre-appointment waiver package.

(End of Clause)

DJAR-PGD-06-09 Reprogramming of Funds Notices to Congress for A-76 Competitions

Congressional Notification Under the provisions of section 605(a) of the Department of Justice's appropriations act, an award in this procurement triggers a requirement that the Department notify congressional appropriations committees of actions resulting from the award which may include reorganization or contracting out of functions or activities presently performed by Federal employees.

An award in this procurement, and its implementation, are contingent upon satisfactory completion of the process required under section 605(a). After award, the Department will notify the source provider when this process has been satisfactorily completed and that implementation may begin. In the event that either congressional committee expresses reservations, the Department may cancel the procurement and award, without charge or penalty. Because the contract/performance start date could be delayed or actually

15JPSS23Q00000033 Page 9 of 29 cancelled due to the reprogramming notice to Congress, it is understandable not to include the expected start date in A-76 solicitations.

However, the lack of a contract/performance start date makes it difficult for potential source providers to propose realistic pricing in their proposals.

As a best practice, it is recommended that future solicitations for streamlined or standard competitions include a notice similar to the following sentences.

For pricing purposes only, offerors shall assume a contract/performance start date of [Start Date], which is the date it is assumed that the transition/phase-in period begins. The actual contract/performance start date may be different. (See the "Congressional Notification" term of the solicitation).

(End of Clause)

DJAR-PGD-07-10 Ensuring New Acquisitions Include Common Security Configurations

The following language is to be used in all appropriate solicitations and contracts.

(a) The provider of information technology shall certify applications are fully functional and operate correctly as intended on systems using the Federal Desktop Core Configuration (FDCC). This includes Internet Explorer 7 configured to operate on Windows XP and Vista (in Protected Mode on Vista). For the Windows XP settings, see: http://csrc.nist.gov/itsec/guidance_WinXP.html and for the Windows Vista settings, see: http://csrc.nist.gov/itsec/guidance_vista.html

(b) The standard installation, operation, maintenance, update, and/or patching of software shall not alter the configuration settings from the approved FDCC configuration. The information technology should also use the Windows Installer Service for installation to the default "program files" directory and should be able to silently install and uninstall.

(End of Clause)

DJAR-PGD-07-12 Maintaining Contractor Performance During a Pandemic or Other Emergency

Continuing Contract Performance During a Pandemic Influenza or other National Emergency During a Pandemic or other emergency we understand that our contractor workforce will experience the same high levels of absenteeism as our federal employees. Although the Excusable Delays and Termination for Default clauses used in government contracts list epidemics and quarantine restrictions among the reasons to excuse delays in contract performance, we expect our contractors to make a reasonable effort to keep performance at an acceptable level during emergency periods.

The Office of Personnel Management (OPM) has provided guidance to federal managers and employees on the kinds of actions to be taken to ensure the continuity of operations during emergency periods. This guidance is also applicable to our contract workforce.

Contractors are expected to have reasonable policies in place for continuing work performance, particularly those performing mission critical services, during a pandemic influenza or other emergency situation.

The types of actions a federal contractor should reasonably take to help ensure performance are:

Encourage employees to get inoculations or follow other preventive measures as advised by the public health service.

Contractors should cross-train workers as backup for all positions performing critical services. This is particularly important for work such as guard services where telework is not an option.

• Implement telework to the greatest extent possible in the workgroup so systems are in place to support successful remote work in an emergency.

• Communicate expectations to all employees regarding their roles and responsibilities in relation to remote work in the event of a pandemic health crisis or other emergency.

Establish communication processes to notify employees of activation of this plan.

• Integrate pandemic health crisis response expectations into telework agreements.

With the employee, assess requirements for working at home (supplies and equipment needed for an extended telework period). Security concerns should be considered in making equipment choices; agencies or contractors may wish to avoid use of employees' personal computers and provide them with PCs or laptops as appropriate.

• Determine how all employees who may telework will communicate with one another and with management to accomplish work.

Practice telework regularly to ensure effectiveness.

• Make it clear that in emergency situations, employees must perform all duties assigned by management, even if they are outside usual or customary duties.

• Identify how time and attendance will be maintained.

It is the contractor's responsibility to advise the government contracting officer if they anticipate not being able to perform and to work with the Department to fill gaps as necessary. This means direct communication with the contracting officer or in his/her absence, another responsible person in the contracting office via telephone or email messages acknowledging the contractors notification.

The incumbent contractor is responsible for assisting the Department in estimating the adverse impacts of nonperformance and to work diligently with the Department to develop a strategy for maintaining the continuity of operations.

(End of Clause)

15JPSS23Q00000033 Page 10 of 29

DJAR-PGD-08-04 Security of Systems and Data, Including Personally Identifiable Information

Security of Systems and Data, Including Personally Identifiable Data.

a. Systems Security The work to be performed under this contract requires the handling of data that originated within the Department, data that the contractor manages or acquires for the Department, and/or data that is acquired in order to perform the contract and concerns Department programs or personnel.

For all systems handling such data, the contractor shall comply with all security requirements applicable to Department of Justice systems, including but not limited to all Executive Branch system security requirements (e.g., requirements imposed by OMB and NIST), DOJ IT Security Standards, and DOJ Order 2640.2E. The contractor shall provide DOJ access to and information regarding the contractor's systems when requested by the Department in connection with its efforts to ensure compliance with all such security requirements, and shall otherwise cooperate with the Department in such efforts. DOJ access shall include independent validation testing of controls, system penetration testing by DOJ, FISMA data reviews, and access by the DOJ Office of the Inspector General for its reviews.

The use of contractor-owned laptops or other media storage devices to process or store data covered by this clause is prohibited until the contractor provides a letter to the contracting officer (CO) certifying the following requirements:

1. Laptops must employ encryption using a NIST Federal Information Processing Standard (FIPS) 140-2 approved product;

2. The contractor must develop and implement a process to ensure that security and other applications software is kept up-to-date;

3. Mobile computing devices will utilize anti-viral software and a host-based firewall mechanism;

4. The contractor shall log all computer-readable data extracts from databases holding sensitive information and verify each extract including sensitive data has been erased within 90 days or its use is still required. All DOJ information is sensitive information unless designated as non-sensitive by the Department;

5. Contractor-owned removable media, such as removable hard drives, flash drives, CDs, and floppy disks, containing DOJ data, shall not be removed from DOJ facilities unless encrypted using a NIST FEPS 140-2 approved product;

6. When no longer needed, all removable media and laptop hard drives shall be processed (sanitized, degaussed, or destroyed) in accordance with security requirements applicable to DOJ;

7. Contracting firms shall keep an accurate inventory of devices used on DOJ contracts;

8. Rules of behavior must be signed by users. These rules shall address at a minimum: authorized and official use; prohibition against unauthorized users; and protection of sensitive data and personally identifiable information;

9. All DOJ data will be removed from contractor-owned laptops upon termination of contractor work. This removal must be accomplished in accordance with DOJ IT Security Standard requirements. Certification of data removal will be performed by the contractor's project manager and a letter confirming certification will be delivered to the CO within 15 days of termination of contractor work;

b. Data Security By acceptance of, or performance on, this contract, the contractor agrees that with respect to the data identified in paragraph a, in the event of any actual or suspected breach of such data (i.e., loss of control, compromise, unauthorized disclosure, access for an unauthorized purpose, or other unauthorized access, whether physical or electronic), the contractor will immediately (and in no event later than within one hour of discovery) report the breach to the DOJ CO and the contracting officer's technical representative

(COTR).

If the data breach occurs outside of regular business hours and/or neither the CO nor the COTR can be reached, the contractor shall call the DOJ Computer Emergency Readiness Team (DOJCERT) at 1-866-US4-CERT (1-866-874-2378) within one hour of discovery of the breach. The contractor shall also notify the CO as soon as possible during regular business hours.

c. Personally Identifiable Information Notification Requirement The contractor further certifies that it has a security policy in place that contains procedures to promptly notify any individual whose personally identifiable information (as defined by OMB) was, or is reasonably believed to have been, breached. Any notification shall be coordinated with the Department, and shall not proceed until the Department has made a determination that notification would not impede a law enforcement investigation or jeopardize national security. The method and content of any notification by the contractor shall be coordinated with, and be subject to the approval of, the Department. The contractor assumes full responsibility for taking corrective action consistent with the Department's Data Breach Notification Procedures, which may include offering credit monitoring when appropriate.

d. Pass-through of Security Requirements to Subcontractors The requirements set forth in Paragraphs a through c above, apply to all subcontractors who perform work in connection with this contract. For each subcontractor, the contractor must certify that it has required the subcontractor to adhere to all such requirements.

Any breach by a subcontractor of any of the provisions set forth in this clause will be attributed to the contractor.

B. Information Resellers or Data Brokers For contracts where the Department obtains PII from a contractor (such as an information reseller or data broker) but the contractor does not handle the data described in Section A of this guidance document, the following clause must be used:

Information Resellers or Data Brokers Under this contract, the Department obtains personally identifiable information about individuals from the contractor. The contractor hereby certifies that it has a security policy in place which contains procedures to promptly notify any individual whose personally

15JPSS23Q00000033 Page 11 of 29 identifiable information (as defined by OMB) was, or is reasonably believed to have been, lost or acquired by an unauthorized person while the data is under the control of the contractor. In any case in which the data that was lost or improperly acquired reflects or consists of data that originated with the Department, or reflects sensitive law enforcement or national security interest in the data, the contractor shall notify the Department contracting officer so that the Department may determine whether notification would impede a law enforcement investigation or jeopardize national security. In such cases, the contractor shall not notify the individuals until it receives further instruction from the Department.

(End of Clause)

DJAR-PGD-08-05 Contractor Certification of Compliance with Federal Tax Requirements

Contractor Certification of Compliance with Federal Tax Requirements By submitting a response to a solicitation or accepting a contract award, the contractor certifies that, to the best of its knowledge and belief, the contractor has filed all Federal tax returns required during the three years preceding the certification, has not been convicted of a criminal offense under the Internal Revenue Code of 1986, and has not, more than 90 days prior to certification, been notified of any unpaid Federal tax assessment for which the liability remains unsatisfied, unless the assessment is the subject of an installment agreement or offer in compromise that has been approved by the Internal Revenue Service and is not in default, or the assessment is the subject of a nonfrivolous administrative or judicial proceeding.

(End of Clause)

DOJ-05 Security of Department Information and Systems (APR 2015)

I. Applicability to Contractors and Subcontractors

This clause applies to all contractors and subcontractors, including cloud service providers (“CSPs”), and personnel of contractors, subcontractors, and CSPs (hereinafter collectively, “Contractor”) that may access, collect, store, process, maintain, use, share, retrieve, disseminate, transmit, or dispose of DOJ Information. It establishes and implements specific DOJ requirements applicable to this Contract. The requirements established herein are in addition to those required by the Federal Acquisition Regulation (“FAR”), including FAR 11.002(g) and 52.239-1, the Privacy Act of 1974, and any other applicable laws, mandates, Procurement Guidance Documents, and Executive Orders pertaining to the development and operation of Information Systems and the protection of Government Information. This clause does not alter or diminish any existing rights, obligation or liability under any other civil and/or criminal law, rule, regulation or mandate.

II. General Definitions

The following general definitions apply to this clause. Specific definitions also apply as set forth in other paragraphs.

A. Information means any communication or representation of knowledge such as facts, data, or opinions, in any form or medium, including textual, numerical, graphic, cartographic, narrative, or audiovisual. Information includes information in an electronic format that allows it be stored, retrieved or transmitted, also referred to as “data,” and “personally identifiable information” (“PII”), regardless of form.

B. Personally Identifiable Information (or PII) means any information about an individual maintained by an agency, including, but not limited to, information related to education, financial transactions, medical history, and criminal or employment history and information, which can be used to distinguish or trace an individual's identity, such as his or her name, social security number, date and place of birth, mother's maiden name, biometric records, etc., including any other personal information which is linked or linkable to an individual.

C. DOJ Information means any Information that is owned, produced, controlled, protected by, or otherwise within the custody or responsibility of the DOJ, including, without limitation, Information related to DOJ programs or personnel. It includes, without limitation, Information (1) provided by or generated for the DOJ, (2) managed or acquired by Contractor for the DOJ in connection with the performance of the contract, and/or (3) acquired in order to perform the contract.

D. Information System means any resources, or set of resources organized for accessing, collecting, storing, processing, maintaining, using, sharing, retrieving, disseminating, transmitting, or disposing of (hereinafter collectively, “processing, storing, or transmitting”) Information.

E. Covered Information System means any information system used for, involved with, or allowing, the processing, storing, or transmitting of DOJ Information.

15JPSS23Q00000033 Page 12 of 29

III. Confidentiality and Non-disclosure of DOJ Information

A. Preliminary and final deliverables and all associated working papers and material generated by Contractor containing DOJ Information are the property of the U.S. Government and must be submitted to the Contracting Officer (“CO”) or the CO’s Representative (“COR”) at the conclusion of the contract. The U.S. Government has unlimited data rights to all such deliverables and associated working papers and materials in accordance with FAR 52.227-14.

B. All documents produced in the performance of this contract containing DOJ Information are the property of the U.S.

Government and Contractor shall neither reproduce nor release to any third-party at any time, including during or at expiration or termination of the contract without the prior written permission of the CO.

C. Any DOJ information made available to Contractor under this contract shall be used only for the purpose of performance of this contract and shall not be divulged or made known in any manner to any persons except as may be necessary in the performance of this contract. In performance of this contract, Contractor assumes responsibility for the protection of the confidentiality of any and all DOJ Information processed, stored, or transmitted by the Contractor. When requested by the CO (typically no more than annually), Contractor shall provide a report to the CO identifying, to the best of Contractor’s knowledge and belief, the type, amount, and level of sensitivity of the DOJ Information processed, stored, or transmitted under the Contract, including an estimate of the number of individuals for whom PII has been processed, stored or transmitted under the Contract and whether such information includes social security numbers (in whole or in part).

IV. Compliance with Information Technology Security Policies, Procedures and Requirements

A. For all Covered Information Systems, Contractor shall comply with all security requirements, including but not limited to the regulations and guidance found in the Federal Information Security Management Act of 2014 (“FISMA”), Privacy Act of 1974, E-Government Act of 2002, National Institute of Standards and Technology (“NIST”) Special Publications (“SP”), including NIST SP 800-37, 800-53, and 800-60 Volumes I and II, Federal Information Processing Standards (“FIPS”) Publications 140-2, 199, and 200, OMB Memoranda, Federal Risk and Authorization Management Program (“FedRAMP”), DOJ IT Security Standards, including DOJ Order 2640.2, as amended. These requirements include but are not limited to:

1. Limiting access to DOJ Information and Covered Information Systems to authorized users and to transactions and functions that authorized users are permitted to exercise;

2. Providing security awareness training including, but not limited to, recognizing and reporting potential indicators of insider threats to users and managers of DOJ Information and Covered Information Systems;

3. Creating, protecting, and retaining Covered Information System audit records, reports, and supporting documentation to enable reviewing, monitoring, analysis, investigation, reconstruction, and reporting of unlawful, unauthorized, or inappropriate activity related to such Covered Information Systems and/or DOJ Information;

4. Maintaining authorizations to operate any Covered Information System;

5. Performing continuous monitoring on all Covered Information Systems;

6. Establishing and maintaining baseline configurations and inventories of Covered Information Systems, including hardware, software, firmware, and documentation, throughout the Information System Development Lifecycle, and establishing and enforcing security configuration settings for IT products employed in Information Systems;

7. Ensuring appropriate contingency planning has been performed, including DOJ Information and Covered Information System backups;

8. Identifying Covered Information System users, processes acting on behalf of users, or devices, and authenticating and verifying the identities of such users, processes, or devices, using multifactor authentication or HSPD-12 compliant authentication methods where required;

9. Establishing an operational incident handling capability for Covered Information Systems that includes adequate preparation, detection, analysis, containment, recovery, and user response activities, and tracking, documenting, and reporting incidents to appropriate officials and authorities within Contractor’s organization and the DOJ;

15JPSS23Q00000033 Page 13 of 29

10. Performing periodic and timely maintenance on Covered Information Systems, and providing effective controls on tools, techniques, mechanisms, and personnel used to conduct such maintenance;

12. Protecting Covered Information System media containing DOJ Information, including paper, digital and electronic media; limiting access to DOJ Information to authorized users; and sanitizing or destroying Covered Information System media containing DOJ Information before disposal, release or reuse of such media;

13. Limiting physical access to Covered Information Systems, equipment, and physical facilities housing such Covered Information Systems to authorized U.S. citizens unless a waiver has been granted by the Contracting Officer (“CO”), and protecting the physical facilities and support infrastructure for such Information Systems;

14. Screening individuals prior to authorizing access to Covered Information Systems to ensure compliance with DOJ Security standards;

15. Assessing the risk to DOJ Information in Covered Information Systems periodically, including scanning for vulnerabilities and remediating such vulnerabilities in accordance with DOJ policy and ensuring the timely removal of assets no longer supported by the Contractor;

16. Assessing the security controls of Covered Information Systems periodically to determine if the controls are effective in their application, developing and implementing plans of action designed to correct deficiencies and eliminate or reduce vulnerabilities in such Information Systems, and monitoring security controls on an ongoing basis to ensure the continued effectiveness of the controls;

17. Monitoring, controlling, and protecting information transmitted or received by Covered Information Systems at the external boundaries and key internal boundaries of such Information Systems, and employing architectural designs, software development techniques, and systems engineering principles that promote effective security; and

18. Identifying, reporting, and correcting Covered Information System security flaws in a timely manner, providing protection from malicious code at appropriate locations, monitoring security alerts and advisories and taking appropriate action in response.

B. Contractor shall not process, store, or transmit DOJ Information using a Covered Information System without first obtaining an Authority to Operate (“ATO”) for each Covered Information System. The ATO shall be signed by the Authorizing Official for the DOJ component responsible for maintaining the security, confidentiality, integrity, and availability of the DOJ Information under this contract. The DOJ standards and requirements for obtaining an ATO may be found at DOJ Order 2640.2, as amended. (For Cloud Computing Systems, see Section V, below.)

C. Contractor shall ensure that no Non-U.S. citizen accesses or assists in the development, operation, management, or maintenance of any DOJ Information System, unless a waiver has been granted by the by the DOJ Component Head (or his or her designee) responsible for the DOJ Information System, the DOJ Chief Information Officer, and the DOJ Security Officer.

D. When requested by the DOJ CO or COR, or other DOJ official as described below, in connection with DOJ’s efforts to ensure compliance with security requirements and to maintain and safeguard against threats and hazards to the security, confidentiality, integrity, and availability of DOJ Information, Contractor shall provide DOJ, including the Office of Inspector General (“OIG”) and Federal law enforcement components, (1) access to any and all information and records, including electronic information, regarding a Covered Information System, and (2) physical access to Contractor’s facilities, installations, systems, operations, documents, records, and databases. Such access may include independent validation testing of controls, system penetration testing, and FISMA data reviews by DOJ or agents acting on behalf of DOJ, and such access shall be provided within 72 hours of the request. Additionally, Contractor shall cooperate with DOJ’s efforts to ensure, maintain, and safeguard the security, confidentiality, integrity, and availability of DOJ Information.

E. The use of Contractor-owned laptops or other portable digital or electronic media to process or store DOJ Information covered by this clause is prohibited until Contractor provides a letter to the DOJ CO, and obtains the CO’s approval, certifying compliance with the following requirements:

1. Media must be encrypted using a NIST FIPS 140-2 approved product;

15JPSS23Q00000033 Page 14 of 29

2. Contractor must develop and implement a process to ensure that security and other applications software is kept up-to-date;

3. Where applicable, media must utilize antivirus software and a host- based firewall mechanism;

4. Contractor must log all computer-readable data extracts from databases holding DOJ Information and verify that each extract including such data has been erased within 90 days of extraction or that its use is still required.

All DOJ Information is sensitive information unless specifically designated as non-sensitive by the DOJ; and,

5. A Rules of Behavior (“ROB”) form must be signed by users. These rules must address, at a minimum, authorized and official use, prohibition against unauthorized users and use, and the protection of DOJ Information.

The form also must notify the user that he or she has no reasonable expectation of privacy regarding any communications transmitted through or data stored on Contractor-owned laptops or other portable digital or electronic media.

F. Contractor-owned removable media containing DOJ Information shall not be removed from DOJ facilities without prior approval of the DOJ CO or COR.

G. When no longer needed, all media must be processed (sanitized, degaussed, or destroyed) in accordance with DOJ security requirements.

H. Contractor must keep an accurate inventory of digital or electronic media used in the performance of DOJ contracts.

I. Contractor must remove all DOJ Information from Contractor media and return all such information to the DOJ within 15 days of the expiration or termination of the contract, unless otherwise extended by the CO, or waived (in part or whole) by the CO, and all such information shall be returned to the DOJ in a format and form acceptable to the DOJ. The removal and return of all DOJ Information must be accomplished in accordance with DOJ IT Security Standard requirements, and an official of the Contractor shall provide a written certification certifying the removal and return of all such information to the CO within 15 days of the removal and return of all DOJ Information.

J. DOJ, at its discretion, may suspend Contractor’s access to any DOJ Information, or terminate the contract, when DOJ suspects that Contractor has failed to comply with any security requirement, or in the event of an Information System Security Incident (see Section V.E. below), where the Department determines that either event gives cause for such action.

The suspension of access to DOJ Information may last until such time as DOJ, in its sole discretion, determines that the situation giving rise to such action has been corrected or no longer exists. Contractor understands that any suspension or termination in accordance with this provision shall be at no cost to the DOJ, and that upon request by the CO, Contractor must immediately return all DOJ Information to DOJ, as well as any media upon which DOJ Information resides, at Contractor’s expense.

V. Cloud Computing

A. Cloud Computing means an Information System having the essential characteristics described in NIST SP 800-145, The NIST Definition of Cloud Computing. For the sake of this provision and clause, Cloud Computing includes Software as a Service, Platform as a Service, and Infrastructure as a Service, and deployment in a Private Cloud, Community Cloud, Public Cloud, or Hybrid Cloud.

B. Contractor may not utilize the Cloud system of any CSP unless:

1. The Cloud system and CSP have been evaluated and approved by a 3PAO certified under FedRAMP and Contractor has provided the most current Security Assessment Report (“SAR”) to the DOJ CO for consideration as part of Contractor’s overall System Security Plan, and any subsequent SARs within 30 days of issuance, and has received an ATO from the Authorizing Official for the DOJ component responsible for maintaining the security confidentiality, integrity, and availability of the DOJ Information under contract; or,

2. If not certified under FedRAMP, the Cloud System and CSP have received an ATO signed by the Authorizing Official for the DOJ component responsible for maintaining the security, confidentiality, integrity, and availability of the DOJ Information under the contract.

C. Contractor must ensure that the CSP allows DOJ to access and retrieve any DOJ Information processed, stored or transmitted in a Cloud system under this Contract within a reasonable time of any such request, but in no event less than 48

15JPSS23Q00000033 Page 15 of 29 hours from the request. To ensure that the DOJ can fully and appropriately search and retrieve DOJ Information from the Cloud system, access shall include any schemas, meta-data, and other associated data artifacts.

VI. Information System Security Breach or Incident

A. Definitions

1. Confirmed Security Breach (hereinafter, “Confirmed Breach”) means any confirmed unauthorized exposure, loss of control, compromise, exfiltration, manipulation, disclosure, acquisition, or accessing of any Covered Information System or any DOJ Information accessed by, retrievable from, processed by, stored on, or transmitted within, to or from any such system.

2. Potential Security Breach (hereinafter, “Potential Breach”) means any suspected, but unconfirmed, Covered Information System Security Breach.

3. Security Incident means any Confirmed or Potential Covered Information System Security Breach.

B. Confirmed Breach. Contractor shall immediately (and in no event later than within 1 hour of discovery) report any Confirmed Breach to the DOJ CO and the CO's Representative (“COR”). If the Confirmed Breach occurs outside of regular business hours and/or neither the DOJ CO nor the COR can be reached, Contractor must call DOJ-CERT at 1-866-US4- CERT (1-866-874-2378) immediately (and in no event later than within 1 hour of discovery of the Confirmed Breach), and shall notify the CO and COR as soon as practicable.

C. Potential Breach.

1. Contractor shall report any Potential Breach within 72 hours of detection to the DOJ CO and the COR, unless Contractor has (a) completed its investigation of the Potential Breach in accordance with its own internal policies and procedures for identification, investigation and mitigation of Security Incidents and (b) determined that there has been no Confirmed Breach.

2. If Contractor has not made a determination within 72 hours of detection of the Potential Breach whether an Confirmed Breach has occurred, Contractor shall report the Potential Breach to the DOJ CO and COR within one-hour (i.e., 73 hours from detection of the Potential Breach).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .