This document is Amendment 0001 to solicitation 15DDHQ26Q00000156, issued by the Drug Enforcement Administration (DEA) Office of Acquisition on August 3, 2026, with an original solicitation date of July 17, 2026. The amendment addresses responses to 18 questions raised by prospective quoters and makes revisions to specific sections of the Blanket Purchase Agreement (BPA) for single and dual axle enclosed trailers.
The solicitation seeks quotations for four configurations of enclosed trailers (CLINs 0001-0004) with five annual evaluation units over a five-year term including one base year and four option years. Key amendments include: (1) clarification that the five units represent total trailers across all configurations for evaluation purposes only, not minimum orders; (2) revision to Section 3.17 Purchase Limitation establishing that the Government estimates but does not guarantee a dollar volume of purchases ($TBD upon award) with no minimum guaranteed amount; (3) incorporation of FAR Clause 52.219-33 (Nonmanufacturer Rule, September 2021), permitting small-business nonmanufacturers and dealers to submit quotations offering domestically manufactured trailers; and (4) clarification that the maximum delivery period is 90 calendar days from call order issuance. Technical evaluation will assess quoters on capability to meet specification requirements and lead times not exceeding 90 days, as well as past performance history from the preceding three years. Freight and off-loading costs must be included in unit pricing. CLINs 0003 and 0004 must feature black exterior walls and roofs. Government source inspections are required for first production, with 30 days' advance notice required for scheduling. No additional questions will be accepted after this amendment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A28 15DDHQ26Q00000156_FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 1
5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO.
Amendment 0001
3. EFFECTIVE DATE:
8/3/2026
4. REQUISITION/PURCHASE REQ.
NO.
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
CODE
DEA HQ
Office of Acquisition
8701 Morrissette Drive, Springfield, VA 22152
(X) 9A. AMENDMENT OF SOLICITATION NO.8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state and ZIP Code)
Prospective Quoter(s)
CODE FACILITY CODE
15DDHQ26Q00000156
9B. DATED (SEE ITEM 11)
07/17/2026
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
T. Roshau-Delgado Contracting Officer
15B. CONTRACTOR/OFFEROR 15C.DATE SIGNED 16B. UNITED STATES OF AMERICA 16C.DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
13.
X
N/A
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0001 is issued as follows:
1) Provide responses to Questions;
2) Revise Section 3.17, of the "Blanket Purchase Agreement (BPA)" "Purchase Limitation";
3) Revise Section 5.0, "Instructions to Quoters", Section 5.7.4 Technical Quotation (Volume I) Instructions", "Factor 1 - Technical Capability/Acceptability";
4) Revise Section 6.0, "Evaluation Factors and Basis for Award", Section 6.4 "Evaluation of Technical Quotations (Volume I)" "Factor 1 Technical Capability";
5) Revise Section 7.0, "Provisional Clause matrix, incorporate FAR Clause 52.219-33 "Nonmanufacturer Rule (SEP 2021).
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Changes are indicated by a vertical line to the right margin. Contractors must make a complete page substitution. All other terms and conditions remain unchanged.
NO ADDITIONAL QUESTIONS WILL BE ACCEPTED.
RFQ Section Page Paragraph Additional Reference QUESTION ANSWERS
Section 2;
Section 6.5.1
Section 2, Page 2;
Section 6, Commodity or Services Schedule;
Business Quotation Instructions
Table 1 - Pricing Table lists four configurations but does not allocate the five annual evaluation units among those configurations.
(a) Please clarify whether the quantity of five (5) units shown for each annual performance period represents five total trailers across all four trailer configurations, or five units of each configuration.
(b)Please also confirm the exact calculation DEA will use to determine the bottom-line evaluated price.
ANSWER:
(a) As referenced in section 6.5.3 " "of the solicitation, "The quantities listed in Section 2 are intended for evaluation purposes but are not intended to indicate the minimum order quantity or the minimum quantity expected to be ordered over the life of the BPA."
(b) As referenced in section 6.0(d)" ", "The Government will determine lowest evaluated price based on the bottom line grand total price derived from the evaluated quotations, which includes unit pricing from the Quoters’ quoted unit prices provided for each item within the Line Item Pricing in section1 of this solicitation."
The solicitation ( ) will (x ) will not be amended to reflect this clarification
Section 3.17 Section 3 Purchase Limitation
Section 3.17 references a maximum ordering limitation, but no dollar limitation was located in the RFQ.
Please identify the maximum dollar value permitted for an individual BPA call order and the maximum aggregate ceiling value of the BPA.
ANSWER:
(a) The Government estimates but does not guarantee, that the volume of purchases through this BPA will be ($TBD upon award ) over the term of the BPA.
(b) The Government is obligated only to the extent of authorized purchases actually ordered under this BPA. The ceiling value of the BPA will be determined upon award.
The solicitation ( x ) will ( ) will not be amended to reflect this clarification
Section 7 - Clause Matrix
Clause Matrix, Page 9 of
FAR 52.219-33,
Nonmanufacturer Rule
FAR 52.219-14 is checked;
FAR 52.219-33 appears unchecked.
Please confirm whether a small-business nonmanufacturer or dealer may submit a quotation offering trailers produced by a domestic trailer manufacturer, given that FAR 52.219-33 appears unchecked in the clause matrix.
ANSWER: Yes, a small-business nonmanufacturer/dealer may submit a quotation. FAR 52.219-33 "NonManufacturer Rule (Deviation Date)" is incorporated.
The solicitation (x ) will ( ) will not be amended to reflect this clarification
Section 7 - Clause Matrix
Clause Matrix, Page 9 of
Small Business Compliance
Requested to confirm manufacturer eligibility before establishing a subcontracting relationship.
If a small-business nonmanufacturer or dealer is eligible to submit, must the proposed trailer manufacturer also qualify as a small business under NAICS 336212?
ANSWER: Yes, a small-business nonmanufacturer/dealer may submit a quotation. FAR 52.219-33 "NonManufacturer Rule (Deviation Date)" is incorporated.
The solicitation (x ) will ( ) will not be amended to reflect this clarification
Please provide the previous solicitation documents for 15DDHQ21A00000004 ANSWER: Previous solicitation documents will not be provided by the Government. Interested parties may request these documents through the Freedom of Information Act (FOIA) process.
The solicitation ( ) will ( x ) will not be amended to reflect this clarification
Sections 3.8, 5.7.4, and 6.4
Sections 3, 5, and 6
Geographic Area;
Factor 1 - Technical Capability
Requested for accurate manufacturing and freight scheduling.
Section 3.8 permits delivery between 30 and 90 days after issuance of a call order, while Sections 5.7.4 and 6.4 require lead times not to exceed 60 calendar days.
Please confirm the controlling maximum delivery period.
ANSWER: The maximum delivery period is 90 calendar days upon issuing of a call order.
The solicitation (x ) will ( ) will not be amended to reflect this clarification
Sections 3 and 5
10 and 22 3.8 and 5.7.4 Delivery Requirement Clarification
Section 3.8 states that delivery and off-loading must occur between 30 and 90 days after issuance of a call order, while Sections 5.7.4 and 6.4 state that lead times must not exceed 60 calendar days. Please confirm the applicable maximum delivery period.
ANSWER: Delivery must occur between 30 and 90 calendar days after issuance of a call order.
The solicitation (x ) will ( ) will not be amended to reflect this clarification
Section 4 Pages 15-
Trailer Specifications;
CLINs 0003 and
The CLIN descriptions require black trailers, while portions of the detailed specifications state white.
For CLINs 0003 and 0004, should references within the detailed specifications requiring white prefinished aluminum exterior walls and a white roof be interpreted as black where applicable, or should only the exterior walls be black while the roof remains white?
ANSWER: CLINs 0003 and 0004 must be interpreted as the exterior walls and roof must be in the color black.
The solicitation ( ) will (x ) will not be amended to reflect this clarification
Sections 3.2, 3.8, and 6.5.1
Sections 3 and 6
Shipping and Handling;
Geographic Area;
Price Quotation
The delivery destination will not be known until each call order is issued.
Must each quoted trailer unit price include a single fixed nationwide freight and off-loading allowance applicable to every continental United States destination, or may destination-specific freight and off-loading be priced when individual call orders are issued?
ANSWER: Freight and off-loading should be all inclusive with CLINs 0001 thru 0004.
The solicitation ( ) will (x ) will not be amended to reflect this clarification
Sections 3.10 and 3.11
Section 3 First Production Inspection;
Source Inspection
Requested so manufacturers can accurately price factory inspection support.
Please confirm whether Government source inspection is required for every completed trailer under every call order, and whether the contractor is responsible only for inspection support costs while Government personnel remain responsible for their own travel and personal expenses.
ANSWER:
a) No.
b) The Government is responsible for their own travel and personal expenses.
The solicitation ( ) will (x ) will not be amended to reflect this clarification
Section 4 Pages 15-
Trailer Specifications - Lighting Components
Relevant to long-term product availability during the base and four option periods.
If a specified Whelen model becomes discontinued or unavailable during the five-year BPA period, may the contractor provide a current Whelen replacement or a functionally equivalent product that meets or exceeds the stated performance specifications, subject to prior Contracting Officer approval?
ANSWER: All proposed replacements or a functionally equivalent product must have pre-approval from the Program Office and the Contracting Officer.
The solicitation ( ) will ( x ) will not be amended to reflect this clarification
Section 3 12 3.10 First Production Inspection Please confirm whether the first-production inspection is required only once during the five-year BPA, separately for each trailer configuration, or for the first trailer produced under each funded BPA call order.
ANSWER: Yes, the first production inspection is required. All other inspections will be on an "as needed" basis.
The solicitation ( ) will ( x ) will not be amended to reflect this clarification
Section 3 13 3.11 Source Inspection Please confirm whether every completed trailer requires an in-person Government inspection at the manufacturer's factory or assembly plant before shipment.
ANSWER: No. Every trailer does not require an in-person inspection.
The solicitation ( ) will (x ) will not be amended to reflect this clarification
Section 3 12-13 3.10-3.11 Inspection Scheduling How much advance notice must the contractor provide to schedule the first-production inspection and the inspections of completed trailers?
ANSWER: 30-days
The solicitation ( ) will (x ) will not be amended to reflect this clarification
Section 3 12-13 3.10-3.11 Facility Access Please identify the anticipated inspection procedure, including the areas of the manufacturing facility the Government representative will need to access and whether the manufacturer may apply its customary visitor, safety, confidentiality, and security requirements.
ANSWER: A standard tour of the manufacturing facility is acceptable.
The solicitation ( ) will (x ) will not be amended to reflect this clarification
Sections 3 and 5
10 and 22 3.8 and 5.7.4 Delivery Schedule Will time required for Government review of production drawings, inspection scheduling, inspection, and approval be excluded when determining compliance with the 60-calendar-day delivery requirement?
ANSWER: No. Delivery is between 30 and 90 days.
The solicitation (x ) will ( ) will not be amended to reflect this clarification
Will the trailers be Single Axle Only? We looked over the characteristics they are needing on the trailers and noticed a 6 x 10 Tandem Axle trailer included in the Salient Characteristics but not in Requested Items.
ANSWER: Trailers are Single and Dual Axle
The solicitation ( ) will (x ) will not be amended to reflect this clarification
How many single axle trailers they are wanting a quote on and if they are wanting tandem axles as well to confirm?
ANSWER: There are no active requests for trailers at this time.
The solicitation ( ) will ( x ) will not be amended to reflect this clarification
SINGLE AND DUAL AXLE ENCLOSED TRAILERS - 15DDHQ26Q00000156
QUESTIONS AND ANSWERS
3.15 CONTRACT PERFORMANCE REPORT
The Contractor must be rated on their performance under this BPA on an annual basis using the authorized past performance system at the time of evaluation.
Any request for modification(s) of this BPA must be submitted to the Contracting Officer:
Drug Enforcement Administration Office of Acquisition Attn: Teresa Roshau-Delgado 8701 Morrissette Drive Springfield, VA 22152
3.16 INVOICES
The Contractor must submit an individual invoice after each delivery of the requested supplies, in accordance with DEA-2852.242-71 Invoice Requirements.
3.17 PURCHASE LIMITATION
No single call placed under this Agreement must exceed the maximum ordering limitation of the this BPA. The Government estimates but does not guarantee, that the volume of purchases through this BPA will be ($TBD upon award) over the term of the BPA. This is not a maximum ceiling amount. There is no minimum guaranteed amount, quantity, or initial order quantity.
The Government is obligated only to the extent of authorized purchases actually ordered under this BPA. For additional information on the purchase limitations of this BPA see
FAR 12.201.
3.18 CALL ORDER CLOSEOUT
To ensure and provide for the timely administration of the BPA and the prudent use and conservation of Government funds, the Contracting Officer anticipates the close out of Call orders associated with this contractual effort to occur promptly after all deliverables required by the contract are delivered and accepted. It is the Government’s intent to close out Call orders issued under this contract within sixty (60) days from the date that the deliverable has been received and accepted and to, thereafter, de-obligate any excess funding remaining on the contract. In furtherance of the Government’s efforts, the Contractor must ensure that every effort is made to ensure the submission of invoices, and any associated documentation or information as may be appropriate or required. Moreover, the Contractor agrees to cooperate fully and promptly with the efforts of the Contracting Office in response to requests for information and data related to invoice payments. When the Government’s resources do not permit the administrative close out of a Call order within sixty (60) days, the Contractor’s duties and responsibilities under this provision must not be waived or lessened.
FACTOR 1 – Technical Capability/Acceptability
a) The Quoter must demonstrate its ability to conform to the requirements in the solicitation.
The Quoter must meet or exceed the specification requirements as outlined in the solicitation.
b) The Quoter must demonstrate its ability to provide Lead times for delivery of all products from receipt of funded BPA call (shipping and handling). If products are subject to back order, provide opportunities for improving lead times not to exceed 90 calendar days.
FACTOR 2 – Past Performance The Quoter(s) must provide examples of real work with actual results of the prime contractor and major subcontractor(s) to perform the requirements as described in the RFQ. The Quoter(s) must provide a list of up to three (3) successful contracts with past performance history from the past three (3) years that are representative of the Offeror's capability to provide products with similar scope, magnitude, and complexity to that stated in the RFQ.
The Quoter must provide sufficient information in writing to facilitate the Government’s considerations of this factor. Contracts listed may include those entered into with the Federal Government, agencies of state and local Governments, and commercial customers. Include the following information for each contract:
• Name, address, telephone number of each contracting organization/customer and name and facsimile and telephone number of the Project Officer and Contracting Officer;
• Contract numbers, types and total contract dollar values;
• Periods of performance including the original planned completion date and actual completion date with an explanation for any variance;
• Discussion of the similarities and differences between this proposed effort and the specifications of those contracts; and
• A brief description of the expectations and scopes of each of the contracts.
The Government may supplement the information provided by the Quoter with information the Government obtains through reference checks, its own knowledge/experience, and/or from other sources. These sources may include, but not necessarily be limited to, other Government contracting offices and Performance Assessment Reporting System (CPARS), FAPIIS, etc. Past performance will be a subjective assessment based upon all relevant facts and circumstances including contract past performance for smaller requirements.
Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
6.2 52.217-5 Evaluation of Options (AUG 2025) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total bottom line price for all options to the total price for the basic requirement.
Evaluation of options will not obligate the Government to exercise the option(s).
(End of provision)
6.3 Technical Rating Evaluation Process
Technical Rating Evaluation Process. The technical rating reflects the degree to which the proposed approach meets or does not meet the minimum performance or capability requirements through an assessment of Pass or Fail of a quotation.
Factor 1 will assess the following Confidence Rating Technique listed in the table shown below:
Pass The Quotation meets or exceeds the requirements of the solicitation.
Fail The Quotation does not meet the requirements of the solicitation.
Factors 2 will assess the following ratings listed in the table shown below:
Acceptable The Quoter’s submission demonstrates same/similar requirement, and will be successful in performing the contract.
Neutral The Quoter’s submission of past performance record is neither recent nor relevant and does not count favorably nor unfavorably.
Unacceptable The Quoter’s submission does not demonstrate same/similar requirement, and will not be successful in performing the contract.
6.4 EVALUATION OF TECHNICAL QUOTATIONS (VOLUME I)
The Government will assess the Quoter’s level of confidence – High, Some, and Low, based on evaluating the Quoters expectations of success for Technical Factor 1.
Factor 1 Technical Capability:
a) The Government will assess its level of confidence in the Quoter’s ability to fully comply with the Government’s expressed technical specification requirements as stated in the solicitation.
b) The Government will assess its level of confidence in the Quoter’s ability to offer lead times for delivery of all products from receipt of funded BPA call (shipping and handling) and provide opportunities for improving lead times if products are subject to back order not to exceed 90 calendar days.
DEA PROVISION & CLAUSE MATRIX – COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
Updated through FAC 2024-07
SEPT 2024 Page 9 of 37
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Sec.889(a)(1)(A) of Pub. L. 115-232)
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) (Executive Order 13658).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004)(Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[CONTRACTING OFFICER: CHECK THE CORRESPONDING BOX FOR EACH CLAUSE THAT APPLIES TO THIS ORDER.]
(1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 4655).
(2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 3509)).
(3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5).
(Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
(4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).
(5) [Reserved]
(6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
(7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
(8) 52.204–27, Prohibition on a ByteDance Covered Application (June 2023) (Section 102 of Division R of Pub. L. 117–328).
(9) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Nov 2021) (31 U.S.C. 6101 note).
(10) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).
(11) [Reserved]
(12) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) (15 U.S.C. 657a).
(13) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
(14) [Reserved]
(15)(i) 52.219-6, Notice of Total Small Business Set-Aside (Mar 2020) (15 U.S.C. 644).
(ii) Alternate I (Mar 2020).
(16)(i) 52.219-7, Notice of Partial Small Business Set-Aside (Mar 2020) (15 U.S.C. 644).
(ii) Alternate I (Mar 2020) of 52.219-7.
(17) 52.219-8, Utilization of Small Business Concerns (Sep 2023) (15 U.S.C. 637(d)(2) and (3)).
(18)(i) 52.219-9, Small Business Subcontracting Plan (Sep 2023) (15 U.S.C. 637(d)(4)).
(ii) Alternate I (Nov 2016) of 52.219-9.
(iii) Alternate II (Nov 2016) of 52.219-9.
(iv) Alternate III (Jun 2020) of 52.219-9.
(v) Alternate IV (Sep 2021) of 52.219-9.
(19)(i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).
(ii) Alternate I (Mar 2020) of 52.219-13.
(20) 52.219-14, Limitations on Subcontracting (Sep 2021) (15 U.S.C. 637(a)(14)).
(21) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
(22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Feb 2024) (15 U.S.C. 657 f).
(23)(i) 52.219-28, Post Award Small Business Program Representation (Feb 2024) (15 U.S.C. 632(a)(2)).
(ii) Alternate I (Mar 2020) of 52.219-28.
(24) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (Oct 2022) (15 U.S.C. 637(m)).
(25) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (Oct 2022) (15 U.S.C. 637(m)).
(26) 52.219–32, Orders Issued Directly Under Small Business Reserves (Mar 2020) (15 U.S.C. 644(r)).
(27) 52.219–33, Nonmanufacturer Rule (Sep 2021) (15 U.S.C. 637(a)(17)). X https://www.acquisition.gov/content/52204-25-prohibition-contracting-certain-telecommunications-and-video-surveillance-services#id1989I600I4C https://www.acquisition.gov/content/52209-10-prohibition-contracting-inverted-domestic-corporations#i1062680 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://www.govinfo.gov/content/pkg/USCODE-2021-title31.pdf/USCODE-2021-title31-subtitleIII-chap39-sec3903.pdf https://www.govinfo.gov/content/pkg/USCODE-2021-title10/pdf/USCODE-2021-title10-subtitleA-partV-subpartD-chap277-sec3801.pdf https://www.acquisition.gov/content/52233-3-protest-after-award http://uscode.house.gov/view.xhtml?req=(title:31%20section:3553%20edition:prelim)%20OR%20(granuleid:USC-prelim-title31-section3553)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52233-4-applicable-law-breach-contract-claim#i1048698 http://uscode.house.gov/ https://www.acquisition.gov/content/52203-6-restrictions-subcontractor-sales-government#i1063319 http://uscode.house.gov/view.xhtml?req=(title:41%20section:4704%20edition:prelim)%20OR%20(granuleid:USC-prelim-title41-section4704)&f=treesort&edition=prelim&num=0&jumpTo=true http://uscode.house.gov/view.xhtml?req=(title:10%20section:2402%20edition:prelim)%20OR%20(granuleid:USC-prelim-title10-section2402)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52203-13-contractor-code-business-ethics-and-conduct#i1063504 http://uscode.house.gov/view.xhtml?req=(title:41%20section:3509%20edition:prelim)%20OR%20(granuleid:USC-prelim-title41-section3509)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52203-15-whistleblower-protections-under-american-recovery-and-reinvestment-act-2009#i1063607 https://www.acquisition.gov/content/52204-10-reporting-executive-compensation-and-first-tier-subcontract-awards#i1064087 http://uscode.house.gov/view.xhtml?req=(title:31%20section:6101%20edition:prelim)%20OR%20(granuleid:USC-prelim-title31-section6101)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52204-14-service-contract-reporting-requirements#i1064214 https://www.acquisition.gov/content/52204-15-service-contract-reporting-requirements-indefinite-delivery-contracts#i1064243 https://www.acquisition.gov/far/52.204-27 https://www.acquisition.gov/content/52209-6-protecting-government%E2%80%99s-interest-when-subcontracting-contractors-debarred-suspended#i1062590 https://www.acquisition.gov/content/52209-9-updates-publicly-available-information-regarding-responsibility-matters#i1062651 https://www.acquisition.gov/content/52219-3-notice-hubzone-set-aside-or-sole-source-award#i1057314 http://uscode.house.gov/view.xhtml?req=(title:15%20section:657a%20edition:prelim)%20OR%20(granuleid:USC-prelim-title15-section657a)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52219-4-notice-price-evaluation-preference-hubzone-small-business-concerns#i1057352 http://uscode.house.gov/view.xhtml?req=(title:15%20section:657a%20edition:prelim)%20OR%20(granuleid:USC-prelim-title15-section657a)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52219-6-notice-total-small-business-set-aside#i1057393 http://uscode.house.gov/view.xhtml?req=(title:15%20section:644%20edition:prelim)%20OR%20(granuleid:USC-prelim-title15-section644)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52219-7-notice-partial-small-business-set-aside#i1057419 http://uscode.house.gov/view.xhtml?req=(title:15%20section:644%20edition:prelim)%20OR%20(granuleid:USC-prelim-title15-section644)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52219-7-notice-partial-small-business-set-aside#i1057419 https://www.acquisition.gov/content/52219-8-utilization-small-business-concerns#i52_219-8 http://uscode.house.gov/view.xhtml?req=(title:15%20section:637%20edition:prelim)%20OR%20(granuleid:USC-prelim-title15-section637)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52219-9-small-business-subcontracting-plan#i52_219-9 http://uscode.house.gov/view.xhtml?req=(title:15%20section:637%20edition:prelim)%20OR%20(granuleid:USC-prelim-title15-section637)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52219-9-small-business-subcontracting-plan#i52_219-9 https://www.acquisition.gov/content/52219-9-small-business-subcontracting-plan#i52_219-9 https://www.acquisition.gov/content/52219-9-small-business-subcontracting-plan#i52_219-9 https://www.acquisition.gov/content/52219-9-small-business-subcontracting-plan#i52_219-9 https://www.acquisition.gov/content/52219-13-notice-set-aside-orders#i1057715 http://uscode.house.gov/ https://www.acquisition.gov/content/52219-13-notice-set-aside-orders#i1057715 https://www.acquisition.gov/content/52219-14-limitations-subcontracting#i1057730 http://uscode.house.gov/view.xhtml?req=(title:15%20section:637%20edition:prelim)%20OR%20(granuleid:USC-prelim-title15-section637)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52219-16-liquidated-damages-subcontracting-plan#i1057758 http://uscode.house.gov/view.xhtml?req=(title:15%20section:637%20edition:prelim)%20OR%20(granuleid:USC-prelim-title15-section637)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52219-27-notice-service-disabled-veteran-owned-small-business-set-aside#i1057823 http://uscode.house.gov/view.xhtml?req=(title:15%20section:657f%20edition:prelim)%20OR%20(granuleid:USC-prelim-title15-section657f)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52219-28-post-award-small-business-program-rerepresentation#i1057874 http://uscode.house.gov/view.xhtml?req=(title:15%20section:632%20edition:prelim)%20OR%20(granuleid:USC-prelim-title15-section632)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52219-28-post-award-small-business-program-rerepresentation#i1057874 https://www.acquisition.gov/content/52219-29-notice-set-aside-or-sole-source-award-economically-disadvantaged-women-owned-small#i1057902 http://uscode.house.gov/view.xhtml?req=(title:15%20section:637%20edition:prelim)%20OR%20(granuleid:USC-prelim-title15-section637)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52219-30-notice-set-aside-or-sole-source-award-women-owned-small-business-concerns-eligible#i1057947 http://uscode.house.gov/view.xhtml?req=(title:15%20section:637%20edition:prelim)%20OR%20(granuleid:USC-prelim-title15-section637)&f=treesort&edition=prelim&num=0&jumpTo=true https://www.acquisition.gov/content/52219-32-orders-issued-directly-under-small-business-reserves https://www.acquisition.gov/content/52219-33-nonmanufacturer-rule
| A29 15DDHQ26Q00000156_AMEND 0001__.pdf |
| ADPB730.tmp |
| Work performed under this contract will involve any one or more of the following: access to DOJ Information, which may include Controlled Unclassified Information (CUI), i.e., unclassified, sensitive DOJ information, and/or access to DOJ Information T... |
| (Check if applicable) Access to/safeguarding of classified information will be required. ALTERNATE I sections also apply. |
| 2. CITIZENSHIP AND RESIDENCY REQUIREMENTS |
| 3. BACKGROUND INVESTIGATION REQUIREMENTS |
| (c) Adjudication and Pre-Employment Background Investigation Waivers |
| (1) Except as set forth in this section, background investigations must be conducted and favorably adjudicated for each contractor employee prior to commencing their work on this contract. Where programmatic needs do not permit the federal governmen... |
| 5. IDENTITY PROOFING AND BADGING |
| 6. EMPLOYEE REPORTING REQUIREMENTS |
| 7. REPLACEMENT PERSONNEL |
| ADPBED0.tmp |
| Work performed under this contract will involve any one or more of the following: access to DOJ Information, which may include Controlled Unclassified Information (CUI), i.e., unclassified, sensitive DOJ information, and/or access to DOJ Information T... |
| (Check if applicable) Access to/safeguarding of classified information will be required. ALTERNATE I sections also apply. |
| 2. CITIZENSHIP AND RESIDENCY REQUIREMENTS |
| 3. BACKGROUND INVESTIGATION REQUIREMENTS |
| (c) Adjudication and Pre-Employment Background Investigation Waivers |
| (1) Except as set forth in this section, background investigations must be conducted and favorably adjudicated for each contractor employee prior to commencing their work on this contract. Where programmatic needs do not permit the federal governmen... |
| 5. IDENTITY PROOFING AND BADGING |
| 6. EMPLOYEE REPORTING REQUIREMENTS |
| 7. REPLACEMENT PERSONNEL |
| ADPC529.tmp |
| Work performed under this contract will involve any one or more of the following: access to DOJ Information, which may include Controlled Unclassified Information (CUI), i.e., unclassified, sensitive DOJ information, and/or access to DOJ Information T... |
| (Check if applicable) Access to/safeguarding of classified information will be required. ALTERNATE I sections also apply. |
| 2. CITIZENSHIP AND RESIDENCY REQUIREMENTS |
| 3. BACKGROUND INVESTIGATION REQUIREMENTS |
| (c) Adjudication and Pre-Employment Background Investigation Waivers |
| (1) Except as set forth in this section, background investigations must be conducted and favorably adjudicated for each contractor employee prior to commencing their work on this contract. Where programmatic needs do not permit the federal governmen... |
| 5. IDENTITY PROOFING AND BADGING |
| 6. EMPLOYEE REPORTING REQUIREMENTS |
| 7. REPLACEMENT PERSONNEL |
| ADPD4B0.tmp |
| Sheet1 |
| 2026-08-03T13:43:46-0400 | |
| TERESA ROSHAU-DELGADO |
File details come from the government source that posted it. Updated .