This document is a Questions and Answers (Q&A) file for Solicitation 15BFA025B00000034, titled "Replace Fire Pump FCC Tucson". The Q&A contains seven questions submitted by Southwestern Dakotah, Inc. addressing project-specific details such as personnel role responsibilities, conduit installation requirements, project duration, and lead-based paint concerns. Key responses include confirming that the Quality Control Manager (QCM) can assume Safety and Security Health Officer (SSHO) responsibilities, the project duration is 365 calendar days from notice to proceed, conduit can be surface mounted, and conduit does not need to be red for fire alarms. Regarding lead-based paint, the document notes the facility was constructed in 1982 after lead paint was banned, and if contractors suspect lead paint, they should test materials and issue a Request for Information (RFI) to identify questionable materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS:
15BFA025B00000034
Replace Fire Pump FCC Tucson
Questions submitted by: Southwestern Dakotah, Inc. (7 questions)
1. May the QCM assume the responsibilities of the SSHO on this project?
Answer: Yes
2. May the QCM assume the responsibilities of the Superintendent on this project?
Answer: No
3. May the SSHO assume the responsibilities of the Superintendent on this project?
4. Can conduit be surfaced mounted?
5. Will conduit need to be red for the fire alarm?
Answer: No
6. What is the duration of the project either after award or after notice to proceed?
Answer: Per solicitation 15BFA025B00000034, box 11, The contractor shall begin performance within 10 calendar days and complete within 365 calendar days after receiving notice to proceed.
7. Per the general notes on the plans indicate to assume lead-based paint has been identified throughout the facility by the scope of work. Is there a survey available for the lead-based paint?
Answer: The institution was constructed in 1982 after lead paint was banned in the Uniter State in 1978. There is no lead paint survey, but if contractor suspects lead paint is present, they are to test suspected paint materials and issue a RFI to identify materials in question.