This is a Questions & Answers document for solicitation 15BFA024B00000029 regarding the FCI Oxford Replace Roofs Phase III project in Oxford, Wisconsin.
The Q&A addresses key contractor questions about project execution at the federal correctional facility, including: dumpster and equipment storage protocols (dumpsters may remain overnight if properly secured); roof deck specifications (structural concrete); safety requirements (safety cones and flagging allowed 6 feet from edge); contractor personnel requirements (background checks and badging required, with FCI Oxford staff escorts); tool and equipment security (locked gang boxes allowed on roof with daily inventories); and operations details (inmates will remain housed during construction but not allowed on roof, multiple roofs may be worked simultaneously if on same side of facility). The document also clarifies that contractors are responsible for Wisconsin state licensing, taxes, EPA inspection fees, and must provide their own Air Sampling Professional for asbestos work. Security protocols and facility access requirements are detailed extensively throughout the document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Offers - 3 pages - OXF Roofs Phase III.pdf | ||
| 2 - Amendment 0005 - SF30.pdf | ||
| 2 - Amendment 0005 - Att 2 - Wage Determination.pdf | ||
| 2 - Amendment 0005 - Att 1 - Questions and Answers.pdf | ||
| 2 - Amendment 0004 - SF30.pdf | ||
| 2 - Amendment 0003 - SF30.pdf | ||
| 2 - Amendment 0003 - Att 2 - Wage Determination.pdf | ||
| 2 - Amendment 0002 - SF30.pdf | ||
| 2 - Amendment 0001 - Att 2 - Wage Determination.pdf | ||
| 2 - Amendment 0001 - SF30.pdf | ||
| 2 - Amendment 0001 - Att 1 - MeetingMinutes.SignInSheet.pdf | ||
| 1 - Instructions to Bidders.pdf | ||
| 1 - Attachment 3 - WD WI20240011.pdf | ||
| 1 - Attachment 4 - Criminal History Check Form.pdf | ||
| 1 - Solicitation - 15BFA024B00000029.pdf | ||
| 1 - Attachment 5 - Bid Bond.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCI OXFORD – REPLACE ROOFS PHASE III
PROJECT 24Z4AX9 - QUESTIONS & ANSWERS
SOLICITATION 15BFA024B00000029
From Alliance Roofs Systems and Coatings:
1. In regards to dumpsters, do they have to be removed Daily or can they stay onsite overnight?
Clarification: Dumpsters may be permitted to stay inside the secure institution overnight. However, they must be located behind the slow down fence and all dumpsters will be secured (to include the top) at the end of each day with FBOP locks to prevent inmate access.
2. Are the roof decks the same on all buildings?
Clarification: Yes
3. Are the roof decks lightweight concrete or structural concrete?
Clarification: Structural concrete
4. Can safety cones and pennant flagging be used for perimeter safety or is a safety railing system required.
Clarification: Safety cones and pennant flagging located 6 feet from the edge will be allowed by FCI Oxford Safety Department. All State and Federal regulations must be complied with.
5. There does not appear to be a specific manufacturer or specification listed for the spray foam and coating, can any approved manufacturer be used?
Clarification: See page 01 11 00 -2 to 01 11 00 -4 Summary of Work
From McKenzie Construction:
6. Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?
Clarification: No
7. Are there any phasing requirements? How many people will be in the building? Are there any temporary heating/cooling requirements?
Clarification: No heating/cooling requirements
8. Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?
Clarification: See page 01 11 00 – 14 1.8(A) (1) Construction Contract Management Requirements in the Specifications.
9. Please provide the site visit attendee sign in sheet.
Clarification: The sign in sheet was uploaded to SAM.gov via Amendment 0001
10. How should contractors manage razor wire along the edges of buildings? Are there any products or solutions that can be used to cover the wire while work is being carried out?
Clarification: Razor wire is below the fascia and should not interfere with construction. Should razor wire interfere with construction FCI Oxford Staff will remove the razor wire.
11. Where will the storage, dumpster, and laydown area be situated beyond the secure perimeter for daily operations and asbestos removal?
Clarification: Access Route – FCI Oxford access road off Hwy G to Powerhouse Parking – Powerhouse parking lot Material and Equipment storage – Located by Rear Gare/Powerhouse. All staging areas must be approved by FCI Oxford Staff
12. Will there be training available on handling security protocols and emergency procedures?
Clarification: See page 01 11 00 – 7, 1.3 (D) Contractor Personnel and Equipment Security in the Specifications
13. Will there be third-party EPA inspections for the asbestos? Is the contractor responsible for covering the inspector's fees?
Clarification: All State and Federal regulations must be complied with. Contractor is responsible for contacting Wisconsin DNR for EPA inspection requirements. All inspection fees will be covered by the contractor.
14. Who will be responsible for granting access or providing an escort to the job site? Will this be an expense covered by the contractor?
Clarification: All contractor employees will pass criminal background checks. FCI Oxford Staff will conduct the criminal background checks at no charge to the contractor. All contractor employees inside the secure institution will be escorted by FCI Oxford Staff at all times.
15. What is the maximum number of workers allowed on the job site at any given time?
Clarification: No limit of contractor workers allowed on the job site. FCI Oxford reserves the right to limit the number of contractor workers due to emergencies, institution security, safety, or staff shortages.
16. Are there specific-colored vests required for the contractors to wear?
Clarification: 01 11 00 -6 Contractor use of premises #10
17. Will inmates be moved from the working areas in the building?
Clarification: Inmates will not be allowed on the roof. Inmates will remain housed in the unit during construction.
From Utility Systems Solutions:
18. Is the roofing contractor allowed to establish a Tool gang box on the roof with equipment and all classifications of tools (AA/A/B) with the appropriate tool inventory and checks?
Clarification: Contractor will be allowed to maintain a tool gang box on the roof for tools. Gang boxes will be locked and chained to an anchor. Locks will be controlled by FCI Oxford Staff. Tool gang boxes will be inventoried at the start and end of each workday. Each gang box will have a tool checklist posted in it. FCI Oxford reserves the right to have the contractor remove the gang box at any time due to emergencies and institution security.
19. Are the roofing contractor employees going to complete this project under an Entrance memo and Criminal history check? Or, will contractors be required to do full badging with the extensive background check/ EQIP program and interviews?
Clarification: Contractor will be badged. This process would require contractor employees taking a 4-hour security class, pictures, and fingerprints at the institution. The process may require more extensive background checks.
20. What is the criminal history rule-outs for background checks, and length of time from incident?
Clarification: Criminal history rule-outs are at the discretion of the Captain and Warden at FCI Oxford based on the safety and security of FCI Oxford.
21. Many of our FBOP projects have a set ratio of FBOP escorting staff to contractors working site. Is there a maximum allowed # of contractor employees working on-site for this project?
Clarification: There is no limit of contractor workers allowed on the job site. FCI Oxford reserves the right to limit the number of contractor workers due to emergencies, institution security, safety, or staff shortages.
22. We expect that only one roof can be worked on at a single time, is that an accurate statement?
Clarification: No, working on multiple roofs may be possible in certain conditions. All roof construction sites would need to be located on either the east side or west side at one time. FCI Oxford reserves the right to limit the number of construction sites due to emergencies, institution security, safety, or staff shortages.
23. Can the contractor spray foam trailer be inside the secure facility overnight or will it need to be removed each day?
Clarification: Spray foam trailer may be permitted to stay inside the secure institution overnight. FCI Oxford does not guarantee all spray foam trailers will be allowed to stay inside the secure institution overnight. This will be based the size, type, contents, and ability to secure the trailer. If permitted to stay inside overnight, it must be located behind the slow down fence and the trailer will be secured at the end of each day with FBOP locks to prevent inmate access.
24. Can dumpsters for tear off and abatement be left inside the secure perimeter overnight?
Clarification: Dumpsters may be permitted to stay inside the secure institution overnight. However, they must be located behind the slow down fence and all dumpsters will be secured (to include the top) at the end of each day with FBOP locks to prevent inmate access.
25. Can rock removal dump trailers be dumped at the location outside the secure perimeter designated by the FBOP and brought right back in the secure facility through the Rear Gate or do all trailers need to stay in the rear gate overnight for the inmate counts required.
Clarification: Rock removal trailers will be allowed to enter and exit the rear gate with out waiting overnight under approved conditions. Each trailer must be able to meet FCI Oxford security checks. FCI Oxford reserves the right to hold a removal trailer at the rear gate overnight due to emergencies, institution security, or safety.
26. Are the housing units going to be vacated (inmate residents) when that roof is being replaced?
Clarification: No, inmates will remain housed in the unit at all times during construction.
27. Is the contractor responsible for the razor wire removal if needed?
Clarification: Razor wire is below the fascia and should not interfere with construction. Should razor wire interfere with construction FCI Oxford Staff will remove the razor wire.
28. Please confirm if the contractor is required to pay all applicable Wisconsin taxes for this project?
Clarification: The contractor will be responsible to pay applicable taxes.
29. Please confirm that a Wisconsin state license is required for the abatement on this project and that other state licenses are not acceptable.
Clarification: All State and Federal regulations must be complied with. Contractor is responsible for contacting Wisconsin DNR for licensing information.
30. The definitions on specification 01 11 00-30 (PDF page 31) state that the "Air Sampling Professional" (ASP) is employed by the building owner however, specification 01 11 00 - 38 (PDF page 39) states that the Air Sampling Professional is to be provided by the contractor. Please confirm all air sampling for asbestos (including the ASP) on this project will be provided by the contractor.
Clarification: Air Sampling Professional is to be provided by the contractor.
31. Please confirm that only 100% polyester stitched-bonded reinforcing fabric may be used for this project to match the existing roofs completed in phase II.
Clarification: See page 01 11 00 -4 Summary of Work
| FCI OXFORD – REPLACE ROOFS PHASE III |
| 1. In regards to dumpsters, do they have to be removed Daily or can they stay onsite overnight? |
| Clarification: Dumpsters may be permitted to stay inside the secure institution overnight. However, they must be located behind the slow down fence and all dumpsters will be secured (to include the top) at the end of each day with FBOP locks to pre... |
| 2. Are the roof decks the same on all buildings? |
| Clarification: Yes |
| 3. Are the roof decks lightweight concrete or structural concrete? |
| Clarification: Structural concrete |
| 4. Can safety cones and pennant flagging be used for perimeter safety or is a safety railing system required. |
| Clarification: Safety cones and pennant flagging located 6 feet from the edge will be allowed by FCI Oxford Safety Department. All State and Federal regulations must be complied with. |
| 5. There does not appear to be a specific manufacturer or specification listed for the spray foam and coating, can any approved manufacturer be used? |
| Clarification: See page 01 11 00 -2 to 01 11 00 -4 Summary of Work |
| From McKenzie Construction: |
| 26. Are the housing units going to be vacated (inmate residents) when that roof is being replaced? |
| Clarification: No, inmates will remain housed in the unit at all times during construction. |
| 27. Is the contractor responsible for the razor wire removal if needed? |
| Clarification: Razor wire is below the fascia and should not interfere with construction. Should razor wire interfere with construction FCI Oxford Staff will remove the razor wire. |
| 28. Please confirm if the contractor is required to pay all applicable Wisconsin taxes for this project? Clarification: The contractor will be responsible to pay applicable taxes. |
| 29. Please confirm that a Wisconsin state license is required for the abatement on this project and that other state licenses are not acceptable. |
| Clarification: All State and Federal regulations must be complied with. Contractor is responsible for contacting Wisconsin DNR for licensing information. |
| 30. The definitions on specification 01 11 00-30 (PDF page 31) state that the "Air Sampling Professional" (ASP) is employed by the building owner however, specification 01 11 00 - 38 (PDF page 39) states that the Air Sampling Professional is to be pro... |
| Clarification: Air Sampling Professional is to be provided by the contractor. |