2 - Amendment 2 Att 2 - Addendum to Specification.pdf
PDF 60 KB Posted
- Attached to
- FCI Englewood - Emergency Electrical Repairs Federal contract opportunity
- Solicitation number
- 15BFA024B00000023
About this file
This document is an Addendum to the Specification for the FCI Englewood Emergency Electrical Repairs project. The key details are:
The contractor is responsible for removing, refurbishing, and re-installing 12 breakers with new vacuum interrupters at the FCI Englewood facility. The new vacuum interrupters shall be model RVI-41A2 or approved equals. Complete breaker replacement is not required, only replacement of the vacuum interrupters and approved breaker refurbishment. A maximum of 8 breakers shall be completed at one time to limit facility downtime and interruptions. The contractor shall also replace the secondary terminal blocks for 3 specific feeder breakers. The contractor must conduct final testing prior to commissioning the refurbished breakers and provide the test results to FCI Englewood.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1 - Abstract of Offers - Englewood Electrical.pdf | ||
| 2 - Amendment 0002 - SF30.pdf | ||
| 2 - Amendment 2 Att 1 - Responses to Bidder Questions - draft.pdf | ||
| 2 - Amendment 1 Att 1 - MeetingMinutes.SignIn.Photo.pdf | ||
| 2 - Amendment 1 Att 2 - WD CO20240023 - 09.13.2024.pdf | ||
| 2 - Amendment 0001 - SF30.pdf | ||
| 1 - Attachment 4 - Criminal History Check Form.pdf | ||
| 1 - Attachment 5 - Bid Bond.pdf | ||
| 1 - Solicitation 15BFA024B00000023 - FINAL.pdf | ||
| 1 - Instructions to Bidders - FINAL.pdf | ||
| 1 - Attachment 3 - WD CO20240023 - 08.02.2024.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCI ENGLEWOOD
PROJECT 24Z4AU9
EMERGENCY ELECTRICAL REPAIRS
ADDENDUM TO SPECIFICATION
The following changes are made to the specification:
1. Page 2; Section 1.1, A, Summary of Work, paragraph 3 is changed to read as follows:
Contractor is responsible for all processes, equipment and tools necessary to remove, refurbish and re-install breaker assemblies with new vacuum interrupters. A total of twelve (12) breakers shall require all new vacuum interrupters. The new vacuum interrupters shall be model RVl-41A2 bottles or approved equals. Complete breaker replacement isn't required, only replacement of the vacuum interrupters and approved breaker refurbishment shall be completed. A maximum of eight (8) breakers shall be completed at one time in order to limit the amount of down time and interruptions to facility operations. Contractor shall replace the secondary terminal blocks for Feeder Breaker 3A, 4A and 1B. Contractor shall be required to conduct final testing prior to commissioning of refurbished breakers and supply FCI Englewood with completed report of test results.