Amendment 1 - Attachment - Questions and Answers.pdf
PDF 136 KB Posted
- Attached to
- FCI Greenville - Replace PLC Federal contract opportunity
- Solicitation number
- 15BFA024B00000008
About this file
This document appears to be Amendment 1 - Attachment - Questions and Answers related to Solicitation 15BFA024B00000008 for the "FCI GREENVILLE - REPLACE PLC PROJECT 23Z4AP2". The questions and answers provide clarification on several aspects of the project, including the availability of existing PLC and HMI system code, communication infrastructure between buildings, and the status of currently installed but unused systems. The key details are:
The solicitation is for a firm-fixed-price construction contract to replace the Programmable Logic Control (PLC) system at the Federal Correctional Institution (FCI) Greenville in Illinois. The project has an estimated value between $1,000,000 to $5,000,000. The North American Industrial Classification System (NAICS) code is 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a small business size standard of $19 million. The solicitation is unrestricted.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1 - Abstract of Offers - GRE PLC - 04.10.2024.pdf | ||
| Amendment 1 - Attachment - WD IL20240001 - 03.22.2024.pdf | ||
| Amendment 0001 - SF30.pdf | ||
| Amendment 1 - Attachment - Meeting Minutes.pdf | ||
| 1 - Instruction to Bidders - FINAL.pdf | ||
| 1 - Attachment 5 - Bid Bond - update 10.2023.pdf | ||
| 1 - Solicitation - FINAL.pdf | ||
| 1 - Attachment 3 - WD - IL20240001 - 01.12.2024.pdf | ||
| 1 - Attachment 4 - Criminal History Check Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCI GREENVILLE – REPLACE PLC
PROJECT 23Z4AP2 - QUESTIONS & ANSWERS
SOLICITATION 15BFA024B00000008
1. Who and how soon will be sending the code from existing PLC and HMI systems?
CLARIFICATION: If code is available to extract from the existing PLC, the information will be provided to the awardee.
2. Are there any existing PLC/HMI <-> PLC/HMI control rooms communications (such as Ethernet, Serial…) that we need to be concerned off? From instance from building to building?
CLARIFICATION: No, we have fiber home runs.
3. We were told that many, or at least some of the systems, currently installed and in use are not being utilized, or even being hardware deprived (i.e., empty racks). Is there a list or some documentation that could help us identify these PLC and HMI systems? Or perhaps even the elaboration what is missing for them not to be utilized? That is important since we ought to understand what will have to be converted and what generated from scratch.
CLARIFICATION: Refer to the statement of work. Anything that is not being utilized is due to the current PLC not being operable.
4. Do you have the information when SAM will be updated with post-conference notes and attendance, and items discussed yesterday?
CLARIFICATION: Amendment 0001 contains the information requested.
File details come from the government source that posted it. Updated .