SOW Chiller Maintnenance 2025.pdf

PDF 154 KB Posted

Attached to
MDC BROOKLYN_CHILLER MAINTENANCE SERVICE Federal contract opportunity
Solicitation number
15BBR025Q00000013
Issued by
Department of Justice Bureau of Prisons Metropolitan Detention Center Brooklyn

About this file

This is a Statement of Work (SOW) for chiller maintenance services at the Federal Bureau of Prisons (FBOP) Metropolitan Detention Center in Brooklyn, NY. The contractor must provide maintenance and startup services for three York Paraflow chillers (Model YPC-FP-18S-17C-S-D), with work to be completed by April 24, 2025. Required services include removing condenser and absorber heads, removing crossover pipes, mechanically brushing tubes, reinstalling components with new gaskets, providing burner services, and confirming proper operations.

The work must be performed between 6:30 PM and 4:00 AM Monday through Friday, excluding weekends and federal holidays. The contractor must submit security clearance documentation 7 days before work begins, provide their own PPE and equipment, though FBOP will provide water, restrooms, and 120V power. Contractors may wear jeans but not green/khaki clothing, shorts are prohibited. Any changes require Contracting Officer approval, and contractors are responsible for cleaning the work area daily and repairing any damage caused. All work must comply with federal, state and local codes, and follow current industry standards.

View the file

Other files for this federal contract opportunity

Other files attached to MDC BROOKLYN_CHILLER MAINTENANCE SERVICE, newest first.
File Type Posted
Wage Determination.pdf PDF
CONTRACTOR INFORMATION FORM.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK/SPECIFICATIONS

MDC Brooklyn

York Chiller Maintenance

I. SPECIFICATIONS:

A. INTRODUCTION

The Federal Bureau of Prisons (FBOP), Metropolitan Detention Center located at 80 29th Street, in Brooklyn, NY intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to perform maintenance and startup to three York Paraflow chillers. The work is to be completed no later than April 24, 2025.

B. SCOPE OF WORK

The contractor is responsible to provide all equipment and labor to performs maintenance on (3) York Paraflow Chillers, Model # YPC-FP-18S-17C-S-D. The services to be provided are as follows:

• Remove condenser and absorber head (one side only for each)

• Remove crossover pipe

• Mechanically brush each tube in the condenser and absorber barrels

• Reinstall condenser head with new gasket

• Reinstall absorber head with new gasket

• Reinstall crossover pipe

• Provide and install new flange gasket

• Provide burner services on all 3 machines

• Confirm proper operations

C. QUALITY ASSURANCE/INSTALLATION REQUIREMENTS

All requirements, environmental compliance, Life Safety, and Federal, State and Local codes and regulations will be considered during all phases of this contract.

Services and materials provided by the contractor will adhere to and shall be consistent with the most current industry standards.

D. UTILITIES

The FBOP will provide water, use of restrooms and minimal electricity service (120V) for small hand power tools including battery chargers. The contractor will provide all other equipment, supplies and materials needed to complete this project.

F. HOUSEKEEPING AND MATERIAL DISPOSAL

The contractor awarded the contract will be responsible to ensure the work area is cleaned and all trash generated from the work performed is cleaned daily prior to leaving the job site.

G. SUBMITTALS & TRAINING

Submittals:

1. All security clearance paperwork/documentation shall be submitted to MDC Brooklyn, facilities department a minimum of (7) working day prior to the start of work (see below).

2. Any deviations from this Statement of Work will be considered a Change Order Request and must be authorized through the institution’s Contracting Officer prior to the implementation of the requested change.

3. It is the Contractor’s responsibility to repair and/or replace any Government property damaged by contractors/subcontractors employees. Damage will be corrected and restored to previous condition at no cost to the Government.

II. CONTRACTOR SECURITY/WORKING REGULATIONS

A. Work Hours:

Work Hours for the contractor are 6:30 PM – 4:00 AM, Monday - Friday, excluding weekends and federal holidays. Any work required to be completed at any other time than noted above must be requested in writing to the COR five (5) working days prior to the start of the work. In the event of any equipment being replaced that would result in downtime of the normal orderly running of the institution, alternate work hours may be authorized in accordance with the time frame stated above.

C. Storage of Materials and Equipment:

The storage of any type of materials or equipment will be stored in the work location in a gang box provided by the awarded contractor.

D. Security Clearance/Contractor Badges:

The contractor shall provide the Facilities department with all the necessary security clearance documents for all contractors and subcontractor employees accessing the work area. In the event a contractor or subcontractor employee cannot pass the security clearance process, it will be the contractor’s responsibility to provide another candidate. By law the BOP cannot, and will not, release any information to the contractor concerning the nature of why a contractors or subcontractor employee was not able to pass the security clearance process.

E. Safety and Personal Protective Equipment:

All contractors and employees shall have and wear the required personal protective equipment (PPE) always prescribed by industry standards while on the job site. It is the responsibility of the contractor to provide all PPE equipment. All ladders regardless of the size shall be stored and secured to a stationary fixture with a chain and lock in a predetermined area, in a way that they cannot be removed. If ladders are required, immediately consult with the COR to ensure that he or she can make timely notification to appropriate institution staff. All extension cords regardless of length shall be in good condition with no broken outer insulation and will be secured in a locked construction gang box.

F. Additional Considerations:

1. Contractor will be permitted to wear jeans in the institution, however, shorts, green or khaki-color clothing will not be allowed. The clothes will be proper and suitable for the services that are being provided.

2. Federal smoking policy on Federal property states that smoking is only allowed in outdoor designated areas. This policy will be strictly enforced.

File details come from the government source that posted it. Updated .