Questions and Answers Gun Lockers at the Federal Detention Center, Seatac, WA.

8/27/2020

Q: Is contractor responsible for CCTV cameras, and Door Controllers?

A: CCTV cameras, and Door Controllers (PLC) will be completed by the Institution Communication Technicians. Conduit raceways for wire runs of these components will however be installed by the contractor.

Q: For the exterior of the CMU wall that will be constructed closest to the existing structure (9 inch gap), it appears that there are no coatings or EIFS specified. Are there no coatings and/or insulation on the east exterior CMU wall?

A: Yes, there are no coatings on the east side of the new wall that is adjacent to the existing building.

Q: The elevations on A5.0 show the CMU wall to be 10 feet tall, but keynote 6 on A2.0 mentions 12 feet tall. Which is correct?

A: Please follow the Elevations, the CMU wall is 10’-0” high.

Q: Division 10 lists corner guards, but unable to identify any corner guards called out for installation on the plans. Were the corner guards left off the plans by accident or are they not a part of this project?

A: No corner guards will be required on this project.

Q: Sheet T0.3 under “Testing and Inspections” says that the owner will be responsible for selecting a testing agency, but the contractor will be responsible for paying them. Who has been selected?

A: Otto Rosenau & Associates, Inc. http://ottorosenau.com/expertise/services/

Q: What is the manufacturer of fire alarm system at this location?

A: Edwards Techologies EST-3 system with their FireWorks monitor and control interface.

Q: What is the process/protocol for badging?

A: Badging is not required.

Q: Is hand-delivery acceptable?

A: Yes, as long as it meets the date and time cutoff.

Q: Will there be a public opening?

A: No, due to covid-19 and security requirements.