This document contains a federal solicitation for the installation of gun lockers at the Metropolitan Detention Center in Los Angeles, California. The solicitation requests bids for a firm-fixed-price construction contract to build a new gun locker room including class B walls and ceiling, a new door and window, finishes, individual gun lockers and a pistol unloading station, mechanical ventilation, a fire sprinkler system, fire alarm and security system modifications, and electrical work. Interested vendors must be registered as a small business on beta.SAM.gov with annual revenue less than $39.5 million to qualify for this 100% small business set-aside. The performance period is 79 calendar days from notice to proceed. The solicitation will be distributed solely through the Contract Opportunity website and all future information and amendments will also be distributed there, so interested parties must continuously monitor the site.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| 5 - Construction Wage Rate 02122021.pdf | ||
| AMEND 0003 LOS.pdf | ||
| Additional Questions and Answer LOS.pdf | ||
| 5 - Construction Wage Rate 02052021.pdf | ||
| AMEND 0002 LOS.pdf | ||
| Site Visit Meeting Minutes.pdf | ||
| 8 - Photos.pdf | ||
| AMEND 0001 LOS.pdf | ||
| 7 - Criminal History Check Form.pdf | ||
| 6 - SF24 Bid Bond.pdf | ||
| 2 - Solicitation.pdf | ||
| 5 - Construction Wage Rate.pdf | ||
| 1 - Instructions to Bidders.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MDC LOS ANGELES – INSTALL GUN LOCKERS
PROJECT 6D7M QUESTIONS & ANSWERS
SOLICITATION 15B60621B00000001
SUBMITTED BY REDESIGN GROUP, INC.:
1. See E-2.0, please clarify if 2" conduit that goes from Gun Room to Control Room is surface mount or goes in the walls & ceiling. Do we need to remove drywall in order to run the conduit? Is there space in the walls & ceilings for additional conduit? How can we price patch & paint since we don't have exact rout?
CLARIFICATION: Yes dry wall and plaster removal. Portions of the 2” conduit route will be installed behind walls that are drywall and plaster in the front lobby area near the gun locker. The pictures provided show the areas in the front lobby and the route located on our ground level/basement for the 2 inch and electrical routes to both the PABX and the Electrical panel for access. Yes. Space in the walls and ceilings/hallways have additional space for new conduit.
2. See E-1.1, where is Equip. Rm. PBX in relation to the Control Room? Is it right below the Control Room? Do we need to Core drill the slab? What is the thickness of the floor slab? What is the height of the basement?
CLARIFICATION: The PBX is located directly below the Control Room. Possible core drill for slab due to limited conduit space from PBX to Control. Thickness is 5- 6 inch with Robinson Decking (to be verified by awarded contractor). Height of ground floor/basement is approx. 10’.
3. What kind of permit are you requiring for General Contractor to obtain for this job? Do we need to obtain permit from Los Angeles Building Department? Who inspects our work?
CLARIFICATION: The Contractor is required to follow all local, state and federal regulations/guidelines to complete project and to be licensed accordingly. The BOP will not require any permits. The CORR will ensure compliance to local, state and Federal building compliance.
4. Do we need to rent Temporary toilets & hand wash station or we can use the restroom adjacent to the work area?
CLARIFICATION: Basic toilet and sink will be accessible for use.
5. Please provide pictures of the room that the gun locker will be built in.
CLARIFICATION: See attachments
6. Please provide pictures of the rout that 2" conduit will be installed.
CLARIFICATION: See attachments. Approx 100’to PAX/Electrical approx.300’ (Contractor to verify)
7. What is the floor finish of the Gun Locker Room?
CLARIFICATION: Looks like marble (Contractor to verify). See attachments
SUBMITTED BY CALTEC CORPORATION:
8. Can you please provide us with pictures of the gun locker room?
CLARIFICATION: See attachments
9. Hiring Goals: Hiring goals for this project are 28.3% minorities and 6.9% for females…” – if we are not able to meet these goals will this cause our bid to be considered as non-responsive?
CLARIFICATION: No, FAR Provision 52.222-23 states, “The Contractor shall make a good faith effort”.
10. Please specify Existing manufacturer and model No of below systems:
• Access Control panel
• Fire Alarm Panel
• CCTV system
• Detention monitoring system
CLARIFICATION: • Access Control panel (Solid State Technologies)
• Fire Alarm Panel (Gamewell- IF 650)
• CCTV system (Quagnify – AMS9410-G38JG52
(NV-NVD-5204) (NV-SVR-9820)
• Detention monitoring system (Senstar, MX- 5020)
SITE VISIT QUESTION:
11. Will on-site parking be available for the contractor?
CLARIFICATION: Privately owned parking structure is available for on-site parking within walking distance for contractor use with associated costs to be paid by contractor.