This document outlines a federal contract opportunity for repair of a low HVAC chiller. The solicitation number is 15B50824Q00000015 and is being issued by the Department of Justice Bureau of Prisons Federal Correctional Complex Forrest City for repair of Chiller #1 at the PROJECT 24Z5AS1 Low-FCC Forrest City location. The opportunity type is for a solicitation to repair an existing chiller. No other details are provided in the document about response dates, pricing terms, set asides, incumbent contractors, or work requirements.

View the file

Other files

File Type Posted
Chiller Cover Letter fY 2024.docx DOCX document
Q00000015-Chiller BRQ FY2024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Repair Chiller #1 PROJECT 24Z5AS1 FCC Forrest City

I. SPECIFICATIONS

A. Scope Of Work

The Federal Bureau of Prisons (FBOP), Federal Correctional Complex – Forrest City (FCC FOX) intends to award to a responsible entity for the provision of parts and repair of a Trane 650 ton chiller #1 at FCC Forrest City Low Power House, located at 1300 Dale Bumpers Road, Forrest City, Arkansas, 72335.

Awarded contractor will be required to provide all labor, materials, tools, permits, and equipment, necessary to safely repair chiller.

B. Operation Specifications

1. Awarded Contractor shall be a reputable Mechanical Service Provider with proven experience in chiller repair services. All assigned Contractor Journeyman Level Field Technicians shall have applicable manufacturer repair certifications reflecting competency in the specific equipment being repaired. The Contractor shall provide the Institution’s Contracting Officer and his Representative (COR) with such proof.

2. Service will comply with all Local, State, and Federal codes and safety requirements as well.

3. Recover refrigerant charge and record amount (recovery holding tanks provided by contractor).

4. Mobilization and setting up rigging for repairs.

5. Dismantling of chiller components and the centrifugal compressor.

6. Perform Eddy Current testing on Condenser and Evaporator (Includes Review results with customer of Eddy Current Analysis Report Reference Sub Part E).

7. Evaporator and Condenser Tube Sheet and End Caps Ceramic Repair and Epoxy Coating (Reference sub part D).

8. Removal of the compressor motor and on-site replacement of the motor bearings.

9. Cleaning and inspection of the lubrication system sump system component replacement including;

· Oil Charge,

· Oil Filter,

· Oil/refrigerant filter,

· Oil/ refrigerant pump seal,

· Sump Sight Glass

10. Reassembly of the centrifugal compressor, motor, oil sump, purge unit, auxiliary vapor and liquid lines, sight glasses. Provide and install all new Trane gaskets and O-rings.

11. Replacement of the 2nd stage vane bushing, bearings, shims, pins, and snap rings.

12. Rebuilding of the 1st and 2nd stage guide vane operator assemblies.

13. Replace purge filter.

14. Chiller evacuation and leak testing to Trane specifications.

15. Charge chiller with recovered refrigerant.

16. Removal of locks and tags.

17. Start-up and operation check by certified Trane technician.

18. Perform vibration analysis upon completion of overhaul. Provide customer with the results.

19. Verification of operating parameters and adjustment of the chiller as per its original specifications.

20. Place machine back into service.

21. Demobilize and removal of rigging.

22. Contractor shall haul away and dispose of the old equipment through an approved licensed scrap metal recycling entity within five (5) business days of its removal from the institution. Evidence of the appropriate recycled action shall be provided to the institution’s Contacting Officer in the way of a tonnage weight receipt to FDC Houston by the selected recycler.

C. FOX Forrest City Responsibilities

1. FCC Forrest City shall ensure all energy sources needing to be secured to prevent personal injury and/or property damage will be locked-out and tagged-out with the appropriate safety measures. All system isolations and lock-out/tag-out measures to be implemented, and/or removed, will require written verification by the Contractor, COR, and the Safety Manager prior to doing so.

2. FCC Forrest City shall provide the necessary escorting staff members to the Contractor and their assigned Field Technicians carrying out the prescribed work and will allow access to project related institution areas as needed.

3. The Institution Safety Manager shall randomly monitor the project. If at any time the Safety Manager witnesses, or become privy to a deemed “unsafe work practice” being carried out by one or more of the contractor’s assigned field technicians working on site, the contractor will be required to stop work and make the necessary work practice corrections to comply with all OSHA and/or Institution advised safety requirements. Failure to do so may result in work stoppage and other administrative measures.

4. FCC Forrest City shall provide one (1) Staff Escort daily allowing the contractor to work in one area of the institution.

D. Contractor’s Responsibilities

1. The Contractor shall comply with all applicable Federal, State, and Local laws for the safe transportation, storage, use, documentation, and disposal of all chemicals that may be used on the job. Likewise, all used chemicals, chemically hazardous debris (to include used rags), must be safely collected in approved receptacles and removed by the Contractor in accordance with the aforementioned regulatory entities.

2. All work shall be inspected by the COR and Contacting Officer for quality and meet the terms of this Statement of Work as specified prior to final acceptance and closure of the project.

II. CONTRACTOR SECURITY/WORKING REGULATIONS

A. Working Hours

1. The schedule for these services will be five (4) days a week, Tuesday through Friday, with the exception of Federal holidays. The schedule will continue weekly until the installation is completed, not to exceed thirty (30) calendar days from Notice to Proceed (NTP). Working hours start at 6:00 A.M. and close at 3:00 P.M. Requests to extend hours or change workdays must be submitted in writing by the Contractor to the Contracting Officer (CO) for approval at least forty-eight (48) hours in advance.

B. Delivery of Materials

1. All materials/equipment required for work on this project is required to be processed by the Contractor and coordinated with the COR for temporary storage.

2. Construction related deliveries which are directly shipped to the institution can be received between the hours of 7:30 AM - 2:30 PM, Monday - Friday, excluding federal holidays. At no point will a Bureau of Prisons (BOP) staff member receive or sign for a delivery if the contractor, or his representative, is not present to verify and accept the delivery.

3. Under no circumstances will FCC Forrest City staff be responsible for the acceptance of any Contractor deliveries.

4. The Contractor shall be responsible to provide for its own means of loading and unloading Contractor material and equipment.

5. The Contractor will not be permitted to impede or block driveways for any extended period that would hinder the normal operations of the institution.

C. Storage of Equipment/Tools

1. If required, all equipment/tools shall be stored in a designated area mutually agreed upon between the COR and the Contractor. If required, the Contractor shall provide a securable, single point access storage container, such as a Job or Gang Box that will be left in the agreed upon storage area for the duration of the project. Size of the storage container will be determined by the Contractor and the COR. The container will be secured using a two-padlock protocol with one padlock being provided by the institution lock shop and the other provided by the contractor. For institution security purposes, the contractor shall provide the institution lock shop with one key copy for every contractor padlock being used. If necessary, a contractor provided heavy duty chain may be used to facilitate the locking requirement. All equipment/tools stored within the container will be maintained in a safe an orderly fashion. All Contractor padlock key copies will be returned to the contractor upon 100% proven tool accountability by the institution and removal of assigned storage containers from the property.

2. The Contractor shall be responsible for loading and unloading contractor materials and equipment. At no time shall Contractor materials or equipment being staged in a fashion that would block, impede or otherwise hinder the typical operations of the institution.

3. All Contractor ladders that may be needed for the job shall be stored and secured in the immediate work site area. Such ladders will be secured to an agreed upon stationary fixture with a chain and padlock application following the same contractor storage container lock protocol with one padlock provide by the contractor and one provided by the institution’s lock shop.

4. The Contractor shall be required to adhere to the institution’s tool inventory program as it pertains to their tools and equipment entering and exiting the institution. If a contactor owned storage container is to be used for tools, materials, and equipment for the duration of the project, the Contractor will be required to use an institution approved “Daily Inventory Check Sheet” for all items maintained in the container. The process for container tool accountability will require a FCI Facilities Staff member, along with an overseeing

Institution Shift Custody Lieutenant, to be present. The container will be inventoried and verified by the Contractor, the Facility Staff Member, and the Shift Lieutenant at the end of every work shift prior to locking the container shut.

D. Security Clearance/Contractor Badges

1. The Contractor shall provide the COR with the necessary security clearance information on all Contractor Field Technicians assigned to work on the project. In the event a Field Technician does not clear the Institution’s security screening process the contractor may, if necessary, submit another Field Technician candidate. By law, the BOP cannot, and will not, release any information regarding the reason as to why a Contractor employee was not able to clear the institution’s security screening process.

2. All security clearance documentation shall be reviewed, and institution approved five (5) working days prior to contractor institution access. Approved security clearances will be in effect for the duration of the project.

3. If required, contractors assigned to the project will access and depart the institution grounds via the Rear Gate or when necessary, the Front Lobby.

E. Safety and Personal Protective Equipment

3. The Contractor shall comply with all applicable Federal, State, and Local safety standards providing their field technicians with all necessary safety equipment to include, proper personal protective equipment, Lock-Out / Tag-Out equipment, and any “job-site specific” safety equipment deemed necessary to safely complete the project described in this Statement of Work.

4. All contractor employees shall have, and wear required personal protective equipment prescribed by industry standards at all times while on the job site. It is the responsibility of the contractor to provide such equipment.

F. Other Considerations

1. Contractor technicians will NOT be allowed to bring cell phones, cameras or two-way pagers into the Institution. Use of such devices however, may be used on institution exterior grounds. FDC Houston reserves the right to restrict their use at any time if deemed a security threat or risk.

2. The Facilities Department at FCC Forrest City maintains a digital camera that will be utilized by FCC Forrest City Facility Staff to document the project work. The Contractor may request copies of the digital photos for their record keeping.

3. All deviations from this Statement of Work must be approved in writing by the Contracting Officer and COR.

4. In the event of an institution emergency the contractor may be instructed to secure from all work, secure all tools, equipment and materials, and if necessary escorted off institution grounds. Work will be suspended until the institution emergency passes.

G. Utilities

1. FCC Forrest City will provide electrical power for all tools required for the project and restroom facilities.

END STAEMENT OF WORK