15B50225Q00000031.pdf

PDF 290 KB Posted

Attached to
Dairy 2nd Qtr. FY 2025 Federal contract opportunity
Solicitation number
15B50225Q00000031
Issued by
Department of Justice Bureau of Prisons Federal Correctional Complex Beaumont

About this file

This is a Request for Quote (RFQ) issued by the Federal Bureau of Prisons FCC Beaumont for dairy products for the second quarter of FY 2025. The solicitation (15B50225Q00000031) is set aside 100% for small businesses under NAICS code 311512 with a size standard of 750 employees.

The RFQ was issued on January 14, 2025 with quotes due by January 17, 2025 at 10:00 CT. Delivery is required by January 29, 2025 to FCC Beaumont at 5980 Knauth Road, Beaumont, TX 77705. This is a firm-fixed price contract with NET 10 payment terms. Specific delivery requirements include receiving hours of 7:00am-1:30pm Monday-Friday (except Federal holidays), first come first serve basis. The solicitation includes detailed specifications regarding product freshness, with frozen meats required to be produced within 9 months of delivery, and no expired or "Best If Used By" dates accepted on any dry or frozen products. Multiple awards may be made based on price and past performance considerations.

View the file

Other files for this federal contract opportunity

Other files attached to Dairy 2nd Qtr. FY 2025, newest first.
File Type Posted
Dairy_Cheese Offer Letter.docx DOCX document
Dairy and Cheese Specs - 15B50225Q00000031.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15B50225Q00000031 Page 1 of 50

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 AND 30.

1. REQUISITION NUMBER PAGE 1 OF

5. SOLICITATION NUMBER

15B50225Q00000031

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 6. SOLICITATION ISSUE

DATE

01/14/2025

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

Dillon Tydlacka dtydlacka@bop.gov

b. TELEPHONE NUMBER (No collect calls) 8. OFFER DUE DATE / LOCAL

TIME

01/17/2025 10:00 CT

CODE 15B502

Federal Bureau of Prisons

FCC Beaumont

5430 Knauth Road

Beaumont, TX 77705

9. ISSUED BY UNRESTRICTED OR X SET ASIDE:100.00 % FOR

X SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

8(A)

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

311512

SIZE STANDARD:

750 Employees

10. THE ACQUISITION IS

SEE SCHEDULE

11. DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

NET 10

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER THE

DEFENSE PRIORITIES AND

ALLOCATIONS SYSTEM -

DPAS (15 CFR 700)

13b. RATING

X REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

14. METHOD OF SOLICITATION

BBMXCODE15. DELIVER TO

Federal Bureau of Prisons FCC Beaumont 5980 Knauth Road Beaumont, TX 77705

CODE 15B50216. ADMINISTERED BY

Federal Bureau of Prisons FCC Beaumont 5430 Knauth Road Beaumont, TX 77705

Dillon Tydlacka dtydlacka@bop.gov

FACILITY

CODE

CODE

TELEPHONE NUMBER

17a. CONTRACTOR/

OFFEROR

15B502CODE18a. PAYMENT WILL BE MADE BY

Federal Bureau of Prisons FCC Beaumont

PO BOX 26015

Beaumont, TX 77720 rjacob1@bop.gov edean@bop.gov

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER SEE ADDENDUM

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

Delivery Date: 01/29/2025

Dairy 2nd Qtr. FY 2025

UEI #: _____________________________________

TIN #: _______________________________________

EMAIL: ______________________________________

Firm Fixed Price

See Continuation Sheet(s) (Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

X 27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

X ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

X 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPIES TO

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE

TERMS AND CONDITIONS SPECIFIED.

29. AWARD OF CONTRACT: REFERENCE _____________________________

OFFER DATED _________________ . YOUR OFFER ON SOLICITATION (BLOCK

5) INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

BOP70839

Highlight

BOP70839

Highlight

BOP70839

Highlight

BOP70839

Highlight

BOP70839

Highlight

BOP70839

Highlight

15B50225Q00000031 Page 2 of 50

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

PARTIAL FINAL

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

COMPLETE PARTIAL FINAL

36. PAYMENT 37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 11/2021) BACK

15B50225Q00000031 Page 3 of 50

Table of Contents

Section Description Page Number

Solicitation/Contract Form 1 Commodity or Services Schedule 2 Contract Clauses

52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services (Nov 2023) 52.232-37 Multiple Payment Arrangements (May 1999) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) Tailoring DOJ-02 Contractor Privacy Requirements (JAN 2022) DOJ-05 Security of Department Information and Systems DOJ-05 (OCT 2023) DOJ-08 Continuing Contract Performance During a Pandemic Influenza or other National Emergency (OCT 2007) 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Products and Commercial Services (Nov 2024) 52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services (Nov 2023) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.204-27 Prohibition on a ByteDance Covered Application (Jun 2023) 52.223-23 Sustainable Products and Services (May 2024) 52.226-8 Encouraging Contractor Policies To Ban Text Messaging While Driving (May 2024) 52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Nov 2024) OBD-01 Electronic Signatures (MAY 2019)

3 List of Attachments 4 Solicitation Provisions

52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation (Jan 2017) 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation (Nov 2015) 52.212-3 Offeror Representations and Certifications-Commercial Products and Commercial Services (May 2024) 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation (Jan 2017) 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation (Nov 2015) 52.212-3 Offeror Representations and Certifications-Commercial Products and Commercial Services (May 2024) 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation (Jan 2017) 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) 52.204-22 Alternative Line Item Proposal (Jan 2017) 52.204-7 System for Award Management (Nov 2024) 52.212-1 Instructions to Offerors-Commercial Products and Commercial Services (Sep 2023) 52.212-3 Offeror Representations and Certifications-Commercial Products and Commercial Services (May 2024)

52.27-103-71 FAITH-BASED AND COMMUNITY-BASED ORGANIZATIONS (AUG

2005) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) 52.219-1 Small Business Program Representations (Feb 2024) 52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction Goals- Representation (Dec 2016)

15B50225Q00000031 Page 4 of 50

Section 1 - Commodity or Services Schedule

SCHEDULE OF SUPPLIES/SERVICES

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 SEE ATTACHED NATIONAL MENU SPECIFICATIONS QUOTE

SHEET FOR QUANTITIES REQUESTED. PROPOSED PRICING

MUST BE PLACED ON THE ATTACHED NATIONAL MENU

SPECIFICATIONS QUOTE SHEET.

PSC: 8910

0 EA $________ $_________________

15B50225Q00000031 Page 5 of 50

Section 2 - Contract Clauses

A.1 ADDENDUM TO FAR 52.212-4, Contract Terms and Conditions-Commercial Products and Commercial Services (Nov 2023)

The terms and conditions for the following clauses are hereby incorporated into this solicitation and resulting contract as an addendum to FAR clause 52.212-4.

Clauses By Reference

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov

Clause Title Fill-ins (if applicable)

52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services (Nov 2023)

52.232-37 Multiple Payment Arrangements (May 1999)

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors (Mar 2023)

Clauses By Full Text

Tailoring

TAILORING

In accordance with FAR 12.302(a), the provision at 52.212-1 is hereby tailored to modify the following elements of the provision.

SUBMISSION OF QUOTES

Sealed quotes shall be submitted on or before the proposal deadline specified in Block 8 of the Standard Form 1449, page 1 of this solicitation. Quotes shall be submitted to the following address:

Dillon Tydlacka, Contract Specialist

15B50225Q00000031 Page 6 of 50

Federal Correctional Complex

PO Box 26015

Beaumont, TX 77720

Hand-carried quotes must be delivered to the Contracting Officer at the following address:

Dillon Tydlacka

Federal Correctional Complex

5430 Knauth Rd

Beaumont, TX 77705

Emailed quotes may be sent to: DTYDLACKA@BOP.GOV

Quotes are to be received no later than the time specified as the deadline for receipt of quotes.

Faxed quotes will not be considered. Quotes received after the proposal deadline will not be considered.

Each quoter shall complete and submit the following forms, clauses, and statements with his/her quote. Failure to do so may cause your quote to be considered unacceptable.

1. Standard Form 1449

2. Offeror's Representations and Certifications

All potential offerors are advised that this solicitation includes the clause at FAR 52.212-4(October 2018) for Commercial Items, System for Award Management (SAM). This clause requires all contractors doing business with the Federal Government, to be registered in the SAM database.

Offerors should include their Data Universal Number System (DUNS) number in their offers. The Contracting Officer will verify registration in the SAM database prior to award by entering the potential awardee's DUNS number into the SAM database. Failure to complete the registration procedures outlined in this clause will result in elimination from consideration for award.

AWARD METHODOLOGY

The Government intends to make multiple awards, pursuant to an affirmative determination of responsibility, whose quote, conforming to the solicitation, is determined to be in the best interest of the Government, considering price and past performance. The subsequent awards will be processed via Government Purchase Order and paid thru applicable net terms. Prior to making award, a sample

15B50225Q00000031 Page 7 of 50 of your product may be requested. Multiple deliveries may be requested within a specified date range.

DELIVERY

Failure to deliver within the specified date range will result in awarding to the next lowest vendor.

Delivery contract dates are subject to termination if product isn’t received within that timeframe.

Delivery of requested number of items, without going over, is expected. There is not a 10% variance in acceptance, unless otherwise noted in the specifications of the product. Please deliver as close to the solicited amount as possible without going over.

Pallets must be turned in the direction that allows the pallet jacks to quickly unload. If the truck is loaded with the pallets sideways, it hinders the operation and may be rejected. Receiving hours are 7:00am-1:30pm, Monday-Friday, except Federal Holidays, first come first serve.

Dry goods will not be accepted from a refrigerated trailer.

No Winston Products will be accepted.

Canned goods must have been produced within the timeframe stated on specifications. A translation of the Julian date will be submitted prior to or with delivery of goods. We should not have to call for this information.

No expired or "Best If Used By" dates will be accepted on any dry or frozen products. No letters will be accepted in lieu of this stipulation.

Frozen Meats must be produced within 9 months of delivery of product to this facility.

Any requested samples will be expected within 3 business days of request/notification.

Pastries (breakfast and dessert) will be fresh upon delivery, but in a frozen state with a sample expected within three business days of request prior to contract issuance.

If the delivery of Kosher meals/items will be hindered by holidays, make us aware with your bid.

WAREHOUSE RECEIVING HOURS

Monday – Friday (Except Federal Holidays)

15B50225Q00000031 Page 8 of 50

7:00am – 1:30pm (First Come First Serve)

NATIONAL MENU SPECIFICATIONS

All potential quoters shall ensure that they bid the national menu specifications per each individual line item. FCC Beaumont will not accept any substitutions or any products that do not meet 100 percent of the National Menu Specifications. Should a vendor submit pricing for products that do not meet the National Specs, the FBOP will consider the price submitted non responsive.

Attached to this solicitation is the National Menu Specifications for each individual line item to be purchased. Should any vendors have any questions about the Specifications feel free to contact the Food Service Department, at 409-727-8187, ext. 3247 or r2welch@bop.gov.

DOJ-02 Contractor Privacy Requirements (JAN 2022)

A. Limiting Access to Privacy Act and Other Sensitive Information

(1) Privacy Act Information

In accordance with FAR 52.224-1 Privacy Act Notification (APR 1984) and FAR 52.224-2 Privacy Act (APR 1984), if this contract requires Contractor personnel to have access to information protected by the Privacy Act of 1974, the contractor is advised that the relevant DOJ system of records notices (SORNs) applicable to this Privacy Act information may be found at https://www.justice.gov/opcl/doj-systems-records.[1] Applicable SORNs published by other agencies may be accessed through those agencies’ websites or by searching the Federal Digital System (FDsys) available at http://www.gpo.gov/fdsys/. SORNs may be updated at any time.

(2) Prohibition on Performing Work Outside a Government Facility/Network/Equipment

Except where use of Contractor networks, IT, other equipment, or Workplace as a Service (WaaS) is specifically authorized within this contract, the Contractor shall perform all tasks on authorized Government networks, using Government-furnished IT and other equipment and/or WaaS and Government information shall remain within the confines of authorized Government networks at all times. Any handling of Government information on Contractor networks or IT must be approved by the Senior Component Official for Privacy of the component entering into this contract. Except where remote work is specifically authorized within this contract, the Contractor shall perform all tasks described in this document at authorized Government facilities; the Contractor is prohibited from performing these tasks at or removing Government-furnished information to any other facility; and Government information shall remain within the confines of authorized Government facilities at all times. Contractors may only access classified materials on government furnished equipment in authorized government owned facilities regardless of remote work authorizations.

(3) Prior Approval Required to Hire Subcontractors

The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (Subcontractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any Subcontractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.

(4) Separation Checklist for Contractor Employees

The Contractor shall complete and submit an appropriate separation checklist to the Contracting Officer before any employee or Subcontractor employee terminates working on the contract. The Contractor must submit the separation checklist on or before the last day of employment or work on the contract. The separation checklist must verify: (1) return of any Government-furnished equipment; (2) return or proper disposition of personally

15B50225Q00000031 Page 9 of 50 identifiable information (PII)[2], in paper or electronic form, in the custody of the employee or Subcontractor employee including the sanitization of data on any computer systems or media as appropriate; and (3) termination of any technological access to the Contractor’s facilities or systems that would permit the terminated employee’s access to PII or other sensitive information.

In the event of adverse job actions resulting in the dismissal of a Contractor or Subcontractor employee before the separation checklist can be completed, the Prime Contractor must notify the Contracting Officer within 24 hours and confirm receipt of the notification. In the case the Contractor is unable to notify the Contracting Officer, then the Contractor should notify the Contract Officer’s Representative (COR).

Contractors must complete the separation checklist with the Contracting Officer or COR by returning all Government-furnished property including, but not limited to, computer equipment, media, credentials and passports, smart cards, mobile devices, Personal Identity Verification (PIV) cards, calling cards, and keys and terminating access to all user accounts and systems. Unless the Contracting Officer requests otherwise, the relevant Program Manager or other Key Personnel designated by the Contracting Officer or COR may facilitate the return of equipment.

B. Privacy Training, Safeguarding, and Remediation

(1) Required Security and Privacy Training for Contractors

The Contractor must ensure that all employees take appropriate privacy training, including Subcontractors who have access to PII as well as the creation, use, dissemination and/or destruction of PII at the outset of the employee’s work on the contract and every year thereafter. Training must include procedures on how to properly handle PII, including heightened security requirements for the transporting or transmission of sensitive PII, and reporting requirements for a suspected breach or loss of PII. These courses, along with more information about DOJ security and training requirements for Contractors, are available at https://www.justice.gov/jmd/learndoj.

The Federal Information Security Modernization Act of 2014 (FISMA) requires all individuals accessing DOJ information to complete training on records management, cybersecurity awareness, and information system privacy awareness. Contractor employees are required to sign the “Privacy Rules of Behavior,” acknowledging and agreeing to abide by privacy law, policy, and certain privacy safeguards, prior to accessing DOJ information. These Rules of Behavior are made available to all new users of DOJ’s computer network and to trainees at the conclusion of DOJ-OPCL-CS-0005.

The Contractor should maintain copies of certificates as a record of compliance and must submit an email notification annually to the COR verifying that all employees working under this contract have completed the required privacy and cybersecurity training.

(2) Safeguarding PII Requirements

Contractor employees must comply with DOJ Order 0904 and other guidance published to the publicly-available Office of Privacy and Civil Liberties (OPCL) Resources page[3] relating to the safeguarding of PII, including the use of additional controls to safeguard sensitive PII (e.g., the encryption of sensitive PII). This requirement flows down from the Prime Contractor to all Subcontractors and lower tiered subcontracts.

(3) Non-Disclosure Agreement Requirement

Prior to commencing work, all Contractor personnel that may have access to PII or other sensitive information shall be required to sign a Non-Disclosure Agreement (NDA) and the DOJ IT Rules of Behavior. The Non-Disclosure Agreement:

(a) prohibits the Contractor from retaining or divulging any PII or other sensitive information, or derivatives therefrom, furnished by the Government or to which they may otherwise come in contact as a result of their performance of work under the contract/task order that is otherwise not publicly available, whether or not such information has been reduced to writing; and

(b) requires the Contractor to report any loss of control, compromise, unauthorized disclosure, or unauthorized acquisition of PII or other sensitive information to the component-level or headquarters Security Operations Center within one (1) hour of discovery.

15B50225Q00000031 Page 10 of 50

The Contractor should maintain signed copies of the NDA for all employees as a record of compliance. The Contractor should also provide copies of each employee’s signed NDA to the Contracting Officer before the employee may commence work under the contract/task order.

(4) Prohibition on Use of PII in Vendor Billing and Administrative Records

The Contractor’s invoicing, billing, and other financial or administrative records or databases is not authorized to regularly store or include any sensitive PII or other confidential government information that is created, obtained, or provided during the performance of the contract without the written permission of the Senior Component Official for Privacy (SCOP). It is acceptable to list the names, titles and contact information for the Contracting Officer, COR, or other personnel associated with the administration of the contract in the invoices as needed.

(5) Reporting Actual or Suspected Data Breach

Contractors must report any actual or suspected breach of PII within one hour of discovery.[4] A “breach” is an incident or occurrence that involves the loss of control, compromise, unauthorized disclosure, unauthorized acquisition, or any similar occurrence where: (1) a person other than an authorized user accesses or potentially accesses PII or (2) an authorized user accesses or potentially accesses PII for an other than authorized purpose.

The report of a breach must be made to DOJ. The Contractor must cooperate with DOJ’s inquiry into the incident and efforts to minimize risks to DOJ or individuals, including remediating any harm to potential victims.

(a) The Contractor must develop and maintain an internal process by which its employees and Subcontractors are trained to identify and report the breach, consistent with DOJ Instruction 0900.00.01[5], Reporting and Response Procedures for a Breach of Personally Identifiable Information.

(b) The Contractor must report any such breach by its employees or Subcontractors to the DOJ Security Operations Center (dojcert@usdoj.gov, 202-357-7000); Component-level Security Operations Center and Component-level Management Team, where appropriate; the COR; and the Contracting Officer within one (1) hour of the initial discovery.

(c) The Contractor must provide a written report to the DOJ Security Operations Center (dojcert@usdoj.gov, 202-357-7000) within 24 hours of discovery of the breach by its employees or Subcontractors. The report must contain the following information:

(i) Narrative or detailed description of the events surrounding the suspected loss or compromise of information.[6] Date, time, and location of the incident.

(ii) Amount, type, and sensitivity of information that may have been lost or compromised, accessed without authorization, etc.

(iii) Contractor’s assessment of the likelihood that the information was compromised or lost and the reasons behind the assessment.[7]

(iv) Names and classification of person(s) involved, including victim, Contractor employee/Subcontractor and any witnesses.

(v) Cause of the incident and whether the company’s security plan was followed and, if not, which specific provisions were not followed.[8]

(vi) Actions that have been or will be taken to minimize damage and/or mitigate further compromise.

(vii) Recommendations to prevent similar situations in the future, including whether the security plan needs to be modified in any way and whether additional training may be required.

(d) The Contractor shall provide full access and cooperation for all activities determined by the Government to be required to ensure an effective incident response, including providing all requested images, log files, and event information to facilitate rapid resolution of sensitive information incidents.

(e) At the Government’s discretion, Contractor employees or Subcontractor employees may be identified as no longer eligible to access PII or to work on that contract based on their actions related to the loss or compromise of PII.

(6) Victim Remediation

At DOJ’s request, the Contractor is responsible for notifying victims and providing victim remediation services in the event of a breach of PII held by the Contractor, its agents, or its Subcontractors, under this contract. Victim

15B50225Q00000031 Page 11 of 50 remediation services shall include at least 18 months of credit monitoring and, for serious or large incidents as determined by the Government, call center help desk services for the individuals whose PII was lost or compromised. When DOJ requests notification, the Department Chief Privacy and Civil Liberties Officer and SCOP will direct the Contractor on the method and content of such notification to be sent to individuals whose PII was breached. By performing this work, the Contractor agrees to full cooperation in the event of a breach.

The Contractor should be self-insured to the extent necessary to handle any reasonably foreseeable breach, with another source of income, to fully cover the costs of breach response, including but not limited to victim remediation.

C. Government Records Training, Ownership, and Management

(1) Records Management Training and Compliance

(a) The Contractor must ensure that all employees and Subcontractors that have access to PII as well as to those involved in the creation, use, dissemination and/or destruction of PII take the DOJ Records and Information Training for New Employees (RIM) training course or another training approved by the Contracting Officer or COR.

This training will be provided at the outset of the Subcontractor’s/employee’s work on the contract and every year thereafter. The Contractor shall maintain copies of certificates as a record of compliance and must submit an email notification annually to the COR verifying that all employees working under this contract have completed the required records management training.

(b) The Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records containing PII and those covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format, mode of transmission, or state of completion.

(2) Records Creation, Ownership, and Disposition

(a) The Contractor shall not create or maintain any records not specifically tied to or authorized by the contract using Government IT equipment and/or Government records or that contain Government Agency information.

The Contractor shall certify, in writing, the appropriate disposition or return of all Government information at the conclusion of the contract or at a time otherwise specified in the contract. In accordance with 36 CFR 1222.32, the Contractor shall maintain and manage all Federal records created in the course of performing the contract in accordance with Federal law. Records may not be removed from the legal custody of DOJ or destroyed except in accordance with the provisions of the agency records schedules.

(b) Except as stated in the Performance Work Statement and, where applicable, the Contractor’s Commercial License Agreement, the Government Agency owns the rights to all electronic information (electronic data, electronic information systems or electronic databases and all supporting documentation and associated metadata created as part of this contract. All deliverables (including all data and records) under the contract are the property of the U.S. Government and may be considered federal records, for which the Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.

(c) The Contractor shall not retain, use, sell, disseminate, or dispose of any government data/records or deliverables without the express written permission of the Contracting Officer or Contracting Officer’s Representative. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. § 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the Agency records schedules.

D. Data Privacy and Oversight

(1) Restrictions on Testing or Training Using Real Data Containing PII

The use of real data containing PII from any source for testing or training purposes is generally prohibited. The Contractor shall use synthetic or de-identified real data for testing or training whenever feasible.

(2) Requirements for Contractor IT Systems Hosting Government Data

15B50225Q00000031 Page 12 of 50

The Contractor is required to obtain an Authority To Operate (ATO) for any IT environment owned or controlled by the Contractor or any Subcontractor on which Government data shall reside for the purposes of IT system development, design, data migration, testing, training, maintenance, use, or disposal.

(3) Requirement to Support Privacy Compliance

(a) If this contract requires the development, maintenance or administration of information technology[9], the Contractor shall support the completion of the Initial Privacy Assessment (IPA) document, if requested by Department personnel. An IPA is the first step in a process to identify potential privacy issues and mitigate privacy risks. The IPA asks basic questions to help components assess whether additional privacy protections may be needed in designing or implementing a project[10] to mitigate privacy risks, and whether compliance work may be needed. Upon review of the IPA, the OPCL determines whether a Privacy Impact Assessment (PIA) document and/or SORN, or modifications thereto, are required. The Contractor shall provide adequate support to complete the applicable risk assessment and PIA document in a timely manner, and shall ensure that project management plans and schedules include the IPA, PIA, and SORN (to the extent required) as milestones. Additional information on the privacy compliance process at DOJ, including IPAs, PIAs, and SORNs, is located on the DOJ OPCL website (https://dojnet.doj.gov/privacy/), including DOJ Order 0601, Privacy and Civil Liberties. The Privacy Impact Assessment Guidance and Template outline the requirements and format for the PIA.

(b) If the contract involves an IT system build or substantial development or changes to an IT system that may require privacy risk assessment and documentation, the Contractor shall provide adequate support to DOJ to ensure DOJ can complete any required assessment, and IPA, PIA, SORN, or other supporting documentation to support privacy compliance. The Contractor shall work with personnel from the program office, OPCL, the Office of the Chief Information Officer (OCIO), and the Office of Records Management and Policy to ensure that the privacy assessments and documentation are kept on schedule, that the answers to questions in the documents are thorough and complete, and that questions asked by the OPCL and other offices are answered in a timely fashion.

The Contractor must ensure the completion of required PIAs and documentation of privacy controls consistent with federal law and standards, e.g. NIST 800-53, Rev. 5; and compliance with the Privacy Act of 1974, E-Government Act of 2002, Federal Information Security Modernization Act of 2014, and key OMB guidelines, e.g., OMB Circular A-130.

[1] “[T]he term ‘record’ means any item, collection, or grouping of information about an individual that is maintained by an agency, including, but not limited to, his education, financial transactions, medical history, and criminal or employment history and that contains his name, or the identifying number, symbol, or other identifying particular assigned to the individual, such as a finger or voice print or a photograph.” 5 U.S.C. § 552a(a)(4). “[T]he term ‘system of records’ means a group of any records under the control of any agency from which information is retrieved by the name of the individual or by some identifying number, symbol, or other identifying particular assigned to the individual.” 5 U.S.C. § 552a(a)(5).

[2] As stated in FAR 52.224-3 and Office of Management and Budget (OMB) Circular A-130, Managing Federal Information as a Strategic Resource (2016), “’personally identifiable information’ means information that can be used to distinguish or trace an individual's identity, either alone or when combined with other information that is linked or linkable to a specific individual.” Regarding “sensitive PII,” “[t]he sensitivity level of the PII will depend on the context, including the purpose for which the PII is created, collected, used, processed, stored, maintained, disseminated, disclosed, or disposed. For example, the sensitivity level of a list of individuals’ names may depend on the source of the information, the other information associated with the list, the intended use of the information, the ways in which the information will be processed and shared, and the ability to access the information.” OMB Circular A-130, at App. II-2.

[3] The DOJ OPCL Resources page is available at https://www.justice.gov/opcl/resources.

[4] As stated in DOJ Instruction 0900, “Contractors must notify the Contracting Officer, the Contracting Officer’s Representative, and JSOC (or component-level SOC) within 1 hour of discovering any incidents, including breaches, consistent with this Instruction, guidance issued by the CPCLO, NIST standards and guidelines, and the US-CERT notification guidelines.”

[5] https://www.justice.gov/file/4336/download [6] As stated in DOJ Instruction 0900, the description should include the type of information that constitutes PII; purpose for which PII is collected, maintained, and used; extent to which PII identifies a peculiarly vulnerable population; the determination of whether the information was properly encrypted or rendered partially or completely inaccessible by other means; format of PII (e.g., whether PII was structured or unstructured); length of time PII was exposed; any evidence confirming that PII is being misused or that it was never accessed.

[7] As stated in DOJ Instruction 0900, the report should include the nature of the cyber threat (e.g., Advanced Persistent Threat, Zero Day Threat, data exfiltration) for cyber incidents.

15B50225Q00000031 Page 13 of 50

[8] As stated in DOJ Instruction 0900, the report should include analysis on whether the data is accessible, usable, and intentionally targeted.

[9] As defined in 40 U.S.C. § 11101, the term “information technology” means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use (i) of that equipment or (ii) of that equipment to a significant extent in the performance of a service or the furnishing of a product; includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but does not include any equipment acquired by a federal contractor incidental to a federal contract.

[10] In this instance, the term “project” is used to scope the activities (e.g., creating, collecting, using, processing, storing, maintaining, disseminating, disclosing, or disposing of information) covered by an IPA. A project is intended to be technology-neutral, and may include an information system, a digital service, an information technology, a combination thereof, or some other activity that may create potential privacy issues or privacy risks that would benefit from an IPA. The scope of a project covered by an IPA is discretionary, but components should work with their SCOP and OPCL.

(End of Clause)

DOJ-05 Security of Department Information and Systems DOJ-05 (OCT 2023)

I. Applicability to Contractors and Subcontractors Section 2839.102 of the Justice Acquisition Regulation (JAR), (48 C.F.R. § 2839.102), applies to this contract. Accordingly, all contractors are obligated to comply with all applicable DOJ security policies, directives, or guidance documents, including the security requirements in the provisions in this contract clause. This contract clause applies to all contractors and subcontractors, including cloud service providers (“CSPs”), and personnel of the contractors and subcontractors (hereinafter collectively, “Contractor”) that may access, collect, store, process, maintain, use, share, retrieve, disseminate, transmit, or dispose of DOJ Information. The security requirements set forth herein are in addition to those required by the Federal Acquisition Regulation (“FAR”), and any other applicable laws, mandates, contract clauses, DOJ policies, directives or guidance documents and Executive Orders pertaining to the development and operation of Information Systems and/or the protection of Government Information. This clause does not alter or diminish any existing rights, obligations, or liability under any other civil and/or criminal law, rule, regulation, or mandate.

II. General Definitions The following general definitions apply to this clause. Specific definitions also apply as set forth in other paragraphs.

A. Authorization to Operate (“ATO”), as defined in National Institute of Standards and Technology (“NIST”) Special Publication (“SP”) 800-37 Revision 2, is the official management decision given by a senior Federal official or officials to authorize operation of an information system and to explicitly accept the risk to agency operations (including mission, functions, image, or reputation), agency assets, individuals, other organizations, and the Nation based on the implementation of an agreed-upon set of security and privacy controls.

B. Cloud Computing, as defined in DOJ Order 0904 Cybersecurity Program, is a model for enabling ubiquitous, convenient, on-demand network access to a shared pool of configurable computing resources (e.g., networks, servers, storage, applications, and services) that can be rapidly provisioned and released with minimal management effort or service provider interaction. This cloud model is composed of five essential characteristics, three service models, and four deployment models in accordance with NIST SP 800-145.

C. Covered Contract is any contract, order or other agreement under which the contractor, or a subcontractor at any tier, including a cloud service provider, may access, collect, store, process, maintain, use, share, retrieve, disseminate, transmit, or dispose of DOJ Information (as defined below) in the course of providing a product or service to the Department, with the exception of acquisitions under the micro-purchase threshold.

D. Covered Information System means any information system used for, involved with, or allowing, the processing, storing, or transmitting of DOJ Information under a Covered Contract.

E. Data means recorded information, regardless of form or the media on which it may be recorded. The term includes technical data, computer software, and personally identifiable information (PII) (defined below). The

15B50225Q00000031 Page 14 of 50 term does not include information incidental to contract administration, such as financial, administrative, cost or pricing, or management information.

F. DOJ Information, as defined in DOJ Order 0904, means any Information that is owned, produced, controlled, protected by, or otherwise within the custody or responsibility of the DOJ, including, without limitation, information related to DOJ programs or personnel. It includes, without limitation, Information (1) provided by or generated for the DOJ, (2) managed or acquired by the Contractor for the DOJ in connection with the performance of the contract, and/or (3) acquired to perform the contract.

G. Information, as defined in DOJ Order 0904, is any communication or representation of knowledge such as facts, data, or opinions, in any form or medium, including textual, numerical, graphic, cartographic, narrative, or audiovisual. This includes any communication or representation of knowledge in an electronic format that allows it to be stored, retrieved, or transmitted.

H. Information System, means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502(8)).

I. Personally Identifiable Information (“PII”), as defined in the FAR 24.101, means information that can be used to distinguish or trace an individual's identity, either alone or when combined with other information that is linked or linkable to a specific individual. It includes but is not limited to common data elements such as names, addresses, dates of birth, and places of employment, to identity documents, Social Security numbers or other government-issued identifiers, precise location information, medical history, and biometric records.

This definition covers all PII that is created by or becomes available to the contractor, including its employees, subcontractors, or affiliates, as a result of performing under this contract. PII, as supplementally defined in DOJ Order 0904, also includes information about an individual maintained by an agency, including, but not limited to, information related to education, financial transactions, medical history, and criminal or employment history and information, which can be used to distinguish or trace an individual’s identity.

J. Private Cloud, as defined in NIST SP 800-145, is the deployment model for cloud infrastructure provisioned for exclusive use by a single organization comprising multiple consumers (e.g., business units). It may be owned, managed, and operated by the organization, a third party, or some combination of them, and it may exist on or off premises.

K. Security Breach means any security incident (as defined below) that directly relates to the loss of control, compromise, exfiltration, manipulation, unauthorized disclosure, unauthorized acquisition, unauthorized exposure or unauthorized access or any similar occurrence of any Covered Information System or any DOJ Information or any PII accessed by, retrievable from, processed by, stored on, or transmitted within, to or from any such system. This includes incidents where (1) a person other than an authorized user accesses or potentially accesses PII or DOJ Information or (2) an authorized user accesses or potentially accesses PII or DOJ Information for an unauthorized purpose.

a. Potential Security Breach (hereinafter, “Potential Breach”) means any suspected, but unconfirmed security breach (as defined above).

b. Confirmed Security Breach (hereinafter, “Confirmed Breach”) means any confirmed security breach (as defined above).

L. Security Incident means any occurrence that (1) may actually or imminently jeopardize, without lawful authority, the availability, integrity, authentication, confidentiality, or nonrepudiation of DOJ Information or a Covered Information System; or (2) may constitute a violation or imminent threat of violation of law, security policies, security procedures, or acceptable use policies.

a. Potential Security Incident means any suspected, but unconfirmed security incident (as defined above).

b. Confirmed Security Incident means any confirmed security incident (as defined above).

M. Vulnerability, as defined in DOJ Vulnerability Management Plan, and the OCIO Information Security Management Procedure, means a weakness or flaw discovered in the design of a system that, when exploited, may result in a loss of confidentially, integrity, or availability of DOJ Information or an Information System.

III. Confidentiality and Non-Disclosure of DOJ Information

15B50225Q00000031 Page 15 of 50

A. Preliminary and final contract deliverables and all associated working papers and material generated by the Contractor developed using DOJ Information, product, source code, and/or methods of operations, are the property of the U.S. Government and must be submitted to the Contracting Officer (“CO”) or the CO’s Representative (“COR”) at the conclusion of the contract. The U.S. Government has unlimited data rights to all such deliverables and associated working papers and materials in accordance with FAR 52.227-14 (Rights in Data-General). The Contractor will define a method of monitoring the development activity to include any activity associated with DOJ Information, product, source code, and methods of operations. The data rights and development details shall be defined within the Contract.

If the Contractor intends to utilize its existing data, for which it has a patent or copyright, to develop a contract deliverable, it is incumbent upon the Contractor to negotiate with the CO the proper FAR Part 27 clauses in the contract to protect its existing data.

B. Pursuant to FAR 52.227-14(d)(2), all documents and data produced in the performance of this contract containing DOJ Information, product code, source code, and/or methods of operations are the property of the U.S. Government and, without the prior written permission of the CO, the Contractor shall neither reproduce nor release such information to any third-party at any time, including during performance or following expiration and/ or termination of the contract.

C. Any DOJ Information made available to the Contractor under this contract shall be used only for the purpose of performance of this contract and shall not be divulged or made known in any manner to any persons except as may be necessary in the performance of this contract. In performance of this contract, the Contractor assumes responsibility for the protection of the confidentiality of all DOJ Information processed, stored, or transmitted by the Contractor. The Contractor shall comply with information security responsibilities and duties throughout the contract and after expiration/termination as appropriate per contract close-out activities. When requested by the CO (typically no more than annually), the Contractor shall provide a report to the CO identifying, to the best of the Contractor’s knowledge and belief, the type, amount, and level of sensitivity of the DOJ Information processed, stored, or transmitted under the Contract, including an estimate of the number of individuals for whom PII has been processed, stored or transmitted under the Contract and whether such information includes social security numbers (in whole or in part).

IV. Compliance with Information Technology Security Policies, Procedures and Requirements A. For all Covered Information Systems, in addition to any other applicable requirements, as set forth in Part I, the Contractor shall comply with the security requirements of the Federal Information Security Modernization Act of 2014 (“FISMA”), Privacy Act of 1974, E-Government Act of 2002, National Institute of Standards and Technology (“NIST”) Special Publications (“SP”), including NIST SP 800-37, 800-53, and 800-60 Volumes I and II, Federal Information Processing Standards (“FIPS”) Publications 140-2, 199, and 200, Federal Risk and Authorization Management Program (“FedRAMP”), DOJ IT Security Standards as amended, and OMB Memoranda relating to the security of information and/or Federal Information Systems.

B. In addition, for all Covered Information Systems, the Contractor shall comply with the following requirements, which are listed here only to highlight certain specific applicable requirements from one of the sources identified in the first paragraph of this Section. This is not an exhaustive list of all such requirements with which the Contractor is obligated to comply, and the omission of a requirement from this list should not be construed as negating the materiality of that requirement. These requirements and those in the authorities in the prior paragraph should be read together.

1. Limiting access to DOJ Information and Covered Information Systems to authorized users and to transactions and functions that authorized users are permitted to exercise.

2. Providing security awareness training at least annually to all Contractor employees and contractors involved with the Covered Contract. Such training shall include, but not be limited to, recognizing and reporting potential indicators of insider threats to users and managers of DOJ Information and Covered Information Systems.

3. Creating, protecting, and retaining, in accordance with…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .