pre bid meeting minutes signed.pdf
PDF 186 KB Posted
- Attached to
- Water Softeners Replace Resin and Re-Bed Media Federal contract opportunity
- Solicitation number
- 15B41824Q00000002a
About this file
This document is the Pre-Bid Conference Meeting Minutes for solicitation 15B41824Q00000002A, which is for the "Water Softeners Replace Resin and Re-Bed Media" project at the Federal Correctional Complex in Terre Haute, Indiana.
The key details are:
- The purpose of the meeting was to familiarize contractors with the correctional facility requirements and explain the solicitation.
- The project requires the contractor to supply all labor, materials, services, insurance, permits, and equipment to replace the water softener resin and re-bed the media at the facility.
- The performance period is 90 calendar days from the notice to proceed.
- The project is estimated to be between $100,000 and $250,000.
- The NAICS code is 221310 with a $41 million small business size standard.
- Quotes are due on September 10, 2024 by 11:00 AM EST.
- This is a 100% Small Business Set-Aside solicitation.
- Evaluation will be based on price, past performance, and conformance to the Statement of Work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QUESTIONS RECEIVED CLARIFICATION.pdf | ||
| IMG_0517.JPG | JPG image | |
| IMG_0518.JPG | JPG image | |
| Softener OM.pdf | ||
| Contractor Whistleblower Rights - EACI.pdf | ||
| wage rates.txt | TXT text file | |
| SOW.pdf | ||
| RFQ UPDATED.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-BID CONFERENCE MEETING MINUTES
1ss41a24000000002A - REPLACE WATER SOFTENER RESIN AND RE-BED MED
FCC TERRE HAUTE -
DATE: WEDNESDAY AUGUST 21, 2024, 2024 at 9:30a.m. EST Place: Business Office I USP Administration Building
CONTRACT SPECIALIST (NAME): Scott Ballinger
I. INTRODUCTIONS:
Round table introduction of all attendee's.
II. PURPOSE OF MEETING:
Indicate the purpose of this meeting is to familiarize the contractor with the unique circumstances and requirements surrounding a correctional setting . This meeting is also to explain the solicitation , as issued , and not to furnish additional information .
State - nothing said here shall be interpreted as a change to the solicitation without the issuance of a formal amendment through the Contracting Officer, Scott Ballinger
Ill. MINUTES:
Advised minutes will be recorded and distributed via unison marketplace website.
IV. SITE VISIT INFORMATION:
Walk to selected site(s) for Water Softener Resin Replacement immediately following the meeting.
VI. TIME FRAMES AND LOCATION FOR SUBMISSION OF BIDS:
State the deadline for submission of bids for this project is September 10, 2024 , by 11 :00a.m. EST to the above mentioned address.
VII. GENERAL TOPICS:
The following submission/completion items will be addressed :
• LICENSING AND PERMITS: All required licensing and permits are required to be obtained by the contractor who receives contract award.
• WORK HOURS: Work hours outside the secure perimeter shall be between 7:30 am and 3:30 pm Tuesday through Thursday.
• COR: The Contracting Officer's R~presentative (COR) is Dan Meuser, Engineering Technician.
1 ! Page
1ss41a24aooooooo2A - REPLACE WATER SOFTENER RESIN AND RE-BED MED
FCC TERRE HAUTE -
• PERIOD OF PERFORMANCE: The completion period is 90 calendar days . From notice to proceed .
• TIME EXTENSIONS: Time extensions for inclement weather will not be granted unless the weather is unusually severe and abnormal in comparison to prior years.
• LIQUIDATED DAMAGES: N/A
• QUESTIONS: Oral questions asked at Site Visit of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. All questions shall be sent through the unison marketplace website.
• ACCESS TO SITE/PARKING OF VEHICLES: Parking will be provided for employee vehicles and contractor work vehicles .
• STORAGE OF MATERIALS: Storage of materials will be coordinated with the COR.
• CONTRACTOR TEMPORARY OFFICE: No temporary office space will be provided.
SAFETY MANAGER :
• The contractor is responsible for providing required protective gear to all contractor workers , should it be required . Contractor will ensure that all workers have proper safety gear at all times.
• Contractor is responsible for the prevention of accidents on the project site and has spill kit onsite and containment procedures. OSHA requirements will be adhered to .
• The Contractor will have a Safety Representative on site at all times during the completion of this project.
• Proper storage of any chemicals in lay down yard with SOS present.
VIII. ADDITIONAL DISCUSSION:
After the meeting the group headed to the site where work will be accomplished. They were reminded that anything they saw or discussed would not change the scope of the project. Only written questions with clarifications or change requests could alter the scope and these would be posted to unison marketplace website .
2 I Page
1ss41a24aooooooo2A - REPLACE WATER SOFTENER RESIN AND RE-BED MED
FCC TERRE HAUTE -
Meeting minutes recorded by:
Scott Ballinger, Contract Specialist FCC Terre Haute
NOTICE:
MEETING MINUTES ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THEY ARE NOT
INTENDED TO CHANGE ANY SPECIFICATIONS, TERMS OR CONDITIONS OF THE
SOLICITATION. ANY AND ALL CHANGES TO THE SOLICITATION SHALL BE ISSUED IN
SUBSEQUENT AMENDMENTS ISSUED BY THE CONTRACTING OFFICER ON A STANDARD
FORM 30 (SF-30).
3 I P age
FCC Terre Haute Water softeners replace resin re-bed media 15B41824Q000000002A
August 21, 2024
(! ti 11.
File details come from the government source that posted it. Updated .