Q A 15B41725Q00000019.docx

DOCX document 15 KB Posted

Attached to
FCI MILAN INMATE CABLE Federal contract opportunity
Solicitation number
15B41725Q00000019
Issued by
Department of Justice Bureau of Prisons

About this file

This document is a Questions and Answers (Q&A) file for Solicitation Number 15B41725Q00000019, a cable service contract for the Federal Correctional Institution (FCI) Milan. The Q&A reveals that this is a replacement of an existing cable infrastructure, with 74 televisions already having installed cable lines. The current contract involves replacing existing cable services, and no existing receivers, dishes, or other equipment will remain in use.

The solicitation is issued by the Department of Justice Bureau of Prisons, with quotes to be e-mailed to C1DENNIS@bop.gov and A1WEAVER@BOP.GOV. The contract will be awarded based on price and past performance, with a firm fixed price structure. Vendors must sign the order upon award, or the order will be rejected. The solicitation appears to be seeking a new cable service provider for the Milan correctional facility, with specific requirements around existing infrastructure and equipment replacement.

View the file

Other files for this federal contract opportunity

Other files attached to FCI MILAN INMATE CABLE, newest first.
File Type Posted
Questions and Answers 15B41725Q00000019.docx DOCX document
15B41725Q00000019.pdf PDF
Statement of Work-TV Contract.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Is there currently an existing satellite or cable infrastructure in place at the facility? There is.

1. Are the cable lines to the 74 televisions already installed and functional, or will new lines need to be installed? Lines are installed.

1. Will this contract be a replacement of existing services, or is it a brand-new setup?

Replacement of existing setup

1. Are there existing receivers, dishes, or other equipment currently installed that will remain in use? No

File details come from the government source that posted it. Updated .