This document contains the Pre-Quote Meeting Minutes for a federal contract opportunity related to the Asbestos Abatement project at the Federal Correctional Institution (FCI) in Sandstone, Minnesota. The contract opportunity, solicitation number 15B41324Q00000006, is for the removal and disposal of asbestos-containing materials from the old powerhouse, including 4 steel water tanks, steam lines, and floor tiles. The estimated project size is between $100,000 and $250,000, and the NAICS code is 562910 with a $25 million small business size standard. The solicitation will be available on or about June 6, 2024, and proposals are due by July 9, 2024 at 12:00 p.m. CST. Key requirements include the contractor being registered in SAM, providing appropriate licenses and permits, adhering to Davis-Bacon wage rates, and attending a pre-construction meeting. The contract will be administered by the Bureau of Prisons FCI Sandstone office, and the Contracting Officer Representative is Chad DeRungs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Quote Meeting Minutes Federal Correctional Institute Sandstone
Sandstone, MN
Asbestos Abatement Old Powerhouse 15B41324Q00000006
Project 24Z4AS4 June 27, 2024, 9 a.m.
Wardens Conference Room
A pre-bid conference was held for the Asbestos Abatement project on Thursday, June 27, 2024. The meeting began at 9:13 a.m. and ended at approximately 9:45 a.m. A tour of the work site immediately followed. Contractors left the facility around 10:35 a.m.
The following representatives were present:
CONTRACTOR REPRESENTATIVES COMPANY
Stephen Nicholson Protocol Remediation Ben Birch Black Star Equities Nicholas Grivette Acct, Inc.
GOVERNMENT REPRESENTATIVES Bureau of Prisons Derek Dwyer Executive Assistant Brian Wendorff Contract Specialist Julie Franklin Facilities Manager Chad DeRungs General Foreman Luke Johnsen Safety Rebecca Watrin Facilities Assistant
Brian Wendorff, Supervisor Contract Specialist, FCI Sandstone chaired this meeting. He opened the meeting by welcoming the contractors to FCI Sandstone and introductions were made. A brief description of the project was provided and contractors were notified that topics discussed today were to assist them in providing an appropriate proposal.
More detailed information will be discussed regarding institution procedures and policies following award during the Pre-Construction Meeting.
First and foremost, Mr. Wendorff informed all present parties that the referenced Primary Contact in SAM Mr. Polk will be out of the office for the foreseeable future. All correspondence is to be routed via e-mail to both he and Mr. Wendorff who is listed as the Secondary Contact on the solicitation. All contractors were advised that discussions during this meeting do not alter or change the terms/conditions of the solicitation. Any changes will be made in writing via an amendment to the solicitation by the issuing Contracting Officer. Brian Wendorff at FCI Sandstone was identified as the issuing Contracting Officer.
Contractors were notified that following award, the Sandstone Office would be administering the contract. Mr. Wendorff identified himself as the Contract Specialist who will currently be administering and overseeing the contract portion of the project following award.
Contractors were advised that all questions concerning the technical specifications shall be detailed in writing and forwarded to the FCI Sandstone, Contracting Office. The deadline for question submission is July 3, 2024 by 12:00 p.m. CST. Questions should be submitted to bwendorff@bop.gov. No questions will be entertained after this date.
The Contracting Officer Representative (COR) was identified as Chad DeRungs (320) 245-6532. Mr. DeRungs will be the technical advisor for the project and will relay concerns to the Contracting Officer.
The project size magnitude was identified as between $100,000.00 and $250,000.00.
This range was noted as one of several available ranges per the Federal Acquisition Regulation and does not estimate or budget to the maximum selected range.
Special Contract Quote Requirements: Mr.Wendorff discussed the contract requirement for this project. He advised the contractor it was their responsibility to read the solicitation in its entirety to ensure all information is obtained and submitted with their proposal. He noted the following as required documents and information that need to be completed and returned with the proposal.
1. Proposals must be submitted to Brian Wendorff at FCI Sandstone, Sandstone, Minnesota by July 9, 2024 by 12:00 p.m. CST.
2. Ensure you submit all necessary pages to the solicitation to include pages 1 and
2.
3. The contractor MUST be registered in SAM at www.sam.gov. Business size metrics must meet the Small Business Size Standard requirements for NAICS Code 562910, as indicated in the solicitation.
Successful Contractor Requirements:
1. The successful contractor awarded the contract shall commence work within 10 days after the Notice to Proceed is issued.
2. Completion of work shall be within 180 calendar days after receiving the Notice to Proceed. This period includes processing of any security requirements and mailto:bwendorff@bop.gov http://www.sam.gov/ normal inclement weather day.
3. Successful contractor will be responsible for all required licenses and permit per
FAR 52.236-7.
4. The successful contractor shall abide by all Federal, State, and Local Laws, Codes and regulations.
5. A Certificate of Insurance in the amounts as determined by the contract will be required from the successful contractor before commencing work on this project.
Mr. Wendorff referred the contractor to page 11 and 12 of the Request for Quote for insurance requirements.
6. The contractor was notified that performance and payment bonds will be required within 10 days after contract award. Each shall have a good and sufficient surety or sureties acceptable to the government. Performance and Payment bonds shall be 100% of the original contract price.
7. The contractor was notified that Davis Bacon Wage Rates are applicable to the project and shall be posted on the job site. The WH-347, Certified Payroll Reports will be due weekly from the prime and subcontractors. Mr. Wendorff noted that contractors shall clearly denote the classification of employees on the payroll reports for verification purposes.
8. The successful contractor will be required to attend the Pre-Construction Meeting and Progress Meetings, which will follow every 30 days as determined by the government.
Mr. Wendorff indicated the next topics to be discussed included would be related to safety and security. This information is being provided during the pre-award phase so Contractors have an understanding of what is involved when working on federal prison property as security is of the utmost importance.
Safety: Luke Johnsen spoke on behalf of Safety and discussed the following Safety topics as they pertain to this project.
1. The Contractor was advised to adhere to all OSHA standards.
2. The Contractor shall provide documentation that verifies proper disposal of the waste.
3. Should there be an indication of air monitoring malfunction or failure, the Safety Department will be notified immediately.
4. The Safety department will monitor work to ensure compliance with OSHA standards. Any hazards or discrepancies will be routed immediately through the Safety department.
5. SDS’s for any chemicals brought on-site will need to be routed to Safety.
6. Awarded entity will need to either be licensed within the state of MN or acknowledged by the state of MN to perform these services.
7. Should there be any injuries or a determined failure to air monitoring, the Safety department shall be notified immediately.
Custody: Mr. Dwyer for Captain Warlick covered some of the basic requirements of working inside the institution. He also touched on some of the tool procedures. More extensive requirements will be covered during the Pre-Construction meeting.
1. NCIC’s will be completed on all contractors working inside the institution.
2. Tool accountability will be of the utmost importance. Tools will be inventoried daily. If tools are determined to be lost, the Facilities Foreman will be notified immediately.
3. Contractors working inside the institution will be escorted by staff at all times.
4. Any dumpsters located on the premises will remain on site for a minimum of three counts.
5. If need be, job boxes for tools may be an option to be stored on site. A final determination will be made during the pre-construction conference.
Facilities:
1. Ms. Franklin Mr. DeRungs stated that the Contracting Officers Representative
(COR) will be Mr. DeRungs for this project. The COR cannot make any changes to the scope of work or the terms of the contract. His role is simply a technical representative to the Contractor and the Contracting Officer.
Contractor Questions:
1. Nick from Act, Inc. “are there any specific approved vendors for disposal of abated material?” A.) There are no specific vendors noted.
2. Stephen from Protocol. “What lab has been utilized for testing?” A.) Twin Ports testing in Duluth / Superior.
3. Stephen from Protocol. “What does a contractor need to do to be licensed in
MN?” A.) Safety needs to see some form of approval from the State to allow for the work to be performed.
4. “Is there a local Hospital?” A.) Sandstone has a local hospital and volunteer fire department for emergency purposes.
5. “Can steam lines be de-activated:” Please also see the Q&A Sheet. A.) Most lines are off and abandoned.
6. “What kind of permits will be required?” A.) A hot work permit will be issued and facilitated internally.
7. Nick from Acct, Inc. “will we be allowed to store gasses on site?” Gasses and other flammable liquids will be stored outside the confines of the institution. The final designated location for storage will be determined during the Pre-Con meeting.
During closing, it was reiterated by Mr. Wendorff that discussions during this meeting or the site visit do not alter or change the terms/conditions of the solicitation. Any changes will be made in writing via an amendment to the solicitation from the Contracting Officer.
At approximately 9:45 a.m. a site visit was conducted in which the Contractors were afforded the opportunity to inspect all areas. Contractors were reminded that during the site visit, if there are technical questions concerning the project, please provide them in writing to Brian Wendorff, Contracting Officer at bwendorff@bop.gov by June 3, 2024 12:00 p.m. CST so the Government can respond appropriately.
With no further business, the meeting and site visit concluded at approximately 10:35 a.m.
7/01/2024 Brian C. Wendorff, Supervisory Contract Specialist Date FCI Sandstone, Sandstone MN mailto:bwendorff@bop.gov
| 2024-07-01T15:12:13-0500 | |
| BRIAN WENDORFF |