WIP SOW Dryer details for solicitation.docx
DOCX document 44 KB Posted
- Attached to
- FCC Florence Dryers FY 24 Federal contract opportunity
- Solicitation number
- 15B40624Q00000016
- Issued by
- Department of Justice Bureau of Prisons
About this file
This document is a Statement of Work (SOW) for the acquisition of five (5) commercial UniMac 120lb gas dryers with UniLinc Touch Control Combustion Automated Response Equipped (C.A.R.E.) - OPTidry- Reversing White 440-480V 60Hz dryers for the Federal Bureau of Prisons' Federal Correctional Complex in Florence, Colorado. The SOW outlines the requirements for the dryer installation, including removal and disposal of existing equipment, delivery and installation of the new dryers, and connection to existing utilities within 3 feet. The awarded contractor is not responsible for any necessary utility upgrades or interior finish work. The solicitation for this requirement, Solicitation Number 15B40624Q00000016, will be issued on or about June 5, 2024, with responses due by June 14, 2024 at 10:00 a.m. Payment will be made via Electronic Funds Transfer (EFT) or Government Purchase Card. Past performance will be considered approximately equal in value to price, and poor past performance may result in a vendor being considered non-responsible.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| UT120L and UT120N.pdf | ||
| PDFRetriever.pdf | ||
| UT030E Dryer for SHU Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Justice Federal Bureau of Prisons
Federal Correctional Complex Florence, Colorado
June 5, 2024
Requirement for Five (5) Commercial Dryers
UniMac 120lb Gas Dryer UniLinc Touch Control Combustion Automated Response Equipped (C.A.R.E.) - OPTidry- Reversing White 440-480V 60Hz.
INSERT MODEL No. UT120NVN0RNC6W0000
3-year warranty on all parts.
Install- Service Labor:
Includes removal and disposal of existing equipment. Delivery and installation of new equipment. The awarded Contractor shall complete all connections to existing utilities within 3ft. The customer is to verify all correct utilities are in place before installation. The awarded Contractor will not alter any utilities. If additional supplies are needed to make connections, the awarded contractor will bill on a separate line item on the final invoice. The customer is responsible for any utility upgrades that may be needed. The awarded contractor is not responsible for the concrete condition as floor work may need to be done. The awarded contractor will not perform any interior finish work on doors, jams, walls, trim, or bulkheads. The customer is responsible for providing access to and through the laundry room. If any doors, walls, or jams need to be removed, this will need to be done before the awarded Contractor's arrival. Please include freight charges in the bid.
Delivery, removal, and installation schedule shall be coordinated with the FCC Florence Facilities Department after award.
Contractor employees working at an FBOP facility after the award of the contract will be subject to a background investigation. Contractor employees must complete the applicable forms provided by the FBOP. Following the investigation, the FBOP will provide the Contractor with a list of employees approved to work at the institution. If a contractor’s employee is not approved, only that fact will be communicated to the Contractor. No additional justification will be released, in compliance with Privacy Act requirements.