This document is a Statement of Work (SOW) for the Federal Bureau of Prisons to replace the air makeup units at the FCI Englewood facility in Littleton, Colorado.
The SOW specifies the required features for the replacement air makeup units, including air flow, heat output, power requirements, and optional evaporative cooling functionality. Brand name products are listed, but the agency will accept "approved equal" products that meet all requirements. The contractor must submit technical data for any proposed "or equal" products for review. The project name is "23Z4AP7 - Replace Air Makeup Units" and the NAICS code is 423730.
The related federal contract opportunity, Solicitation Number 15B40324Q000000030001, is for the replacement of the air makeup units at FCI Englewood. The solicitation will be available on or after March 25, 2024, with a due date of April 16, 2024 at 11:00 am Mountain Daylight Time. All responsible sources are encouraged to submit offers, and faith-based and community-based organizations have the right to submit offers equally with other organizations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 15B40324Q00000003 0001.pdf | ||
| Synopsis Replace Air Makeups Units 03-25-2024.docx | DOCX document | |
| FY24 Replace Air Makeups units Instructions 03-25-2024.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Bureau of Prisons, FCI Englewood Project: 2324AP7 - Replace Air Makeup Units
June 14, 2023
Specification B&F Project: 23Z4AP7- Replace Air Makeup Units
United States Department of Justice
Federal Bureau of Prisons
FCI Englewood
SUMMARY OF WORK
A. All work described in these documents and all work necessary to complete the work as described or shown is to be executed in a thoroughly substant ial and workmanlike manner. All work shall be done by persons who are thoroughly ex perienced in their particular trade or craft. The work includes, but is not neces sarily limited to the following description:
FCI Englewood is looking to hire a reputable vendor to supply and deliver two
(2) Air Makeup Units and associated hardware that meet all of the required specifications listed below.
B. Brand name products are listed in this Technical Specification. FBOP will ac cept an "approved equal" product, but it must meet each individual require ment in the specification. Should a potential Contractor decide to submit an "or equal" product that is not the name brand listed, the potential Contractor must submit all technical data with their bid for technical examination. Should the product not meet the requirement as an absolute "or approved equal" product, the potential Contractor will be notified in writing that your bid will not be accepted.
Project Name: Project: 23Z4AP7 - Replace Air Makeup Units
Location: FCI Englewood
Address: 9595 W. Quincy Avenue, Littleton, CO 80123
Owner: U.S. Department of Justice, Federal Bureau of Prisons
(FBOP)
PROPERTY OF THE UNITED STATES GOVERNMENT
COPYING. DISSEMINATION. OR DISTRIBUTION OF THESE
DRAWINGS. PLANS. SPECIFICATIONS OR INFORMATION TO
UNAUTHORIZED USERS IS PROHIBITIED.
Do not remove this notice.
Properly destroy documents when no longer needed.
Furnace Specifications:
Project: 23Z4AP7 - Replace Air Makeup Units
June 14, 2023
A. Reznor Model RPB-400 {left hand) or approved equal.
1. Required supply air flow shall be 4050 sdm.
2. Heat output 314.9 mbh/320 max
3. Power requirement - 460vac/3ohm/60Hz./15A
4. No flue pipe requirement.
5. Required features.
a. Natural Gas
b. Burner orifice for elevations of 5001-6000 feet.
c. Stainless 409 E-3 heat exchanger construction
d. Steel burners with 409 E-3 stainless ribbon inserts
e. Aluminized steel burner drip pan and unit bottom for heat exchanger condensation collection.
f. AG3 gas controls designed for makeup air heating applications
(1) Discharge air monitoring "ductstat" for setpoint control, high fire demand and control.
(2) Gas valve shall include a servo regulator control of high/low fire stages, safety pilot valve and a manual shut-off valve.
(3) A DPST wall switch shall also be furnished by the manufacturer for on-off control of the unit.
g. Certification to ANSI Standard AGA. .
h. Spark ignited intermittent pilot with electronic flam supervision.
i. Left side controls gas connection facing airstream.
j. Horizontal air discharge.
k. 100% 0/A makeup
I. Filter rack for 2N disposable filters.
m. Unit shall not have any networking connections or capabilities.
n. 2 hp 1800 rpm motor.
Project: 23Z4AP7 - Replace Air Makeup Units
June 14, 2023
o. Cooling stage I relay contact.
p. Two stage digital heat/cool thermostat with f.in switch for field installa tion.
q. Smoke/alarm contact.
r. Evaporc1tive cooling recirculation system Rc211or REC-90 or ;ipproved equal.
( 1) 12" cellulose cvapor;itive coo Ii ng media, self clean ing/high EFF.
(2) Direct mount to rurn,ice (no adapters or metal work should be required)
(3) 90% evapor;itivP efficiency or better.
(4) 7,100 maximum coolingcfm.
(S) Duct outlet opening shall he 54" wide x 21 1/.," high.
(6) Duct inlet opening shall be 56 K' wide x 24" high.
(7) 300 series grade st;iinless steel water reservoir.
COl·:',.f!A,'.Tt,, ,,, Hi t= l'lf,-'.!:.::o:_nr;; r,1•,, A:•.--, L(,;,_1 .~ ~1:, i ·.; , r~
CQ ••~ <I', " .. I
r---:---ti ;\,:,. ••·'.!..J
D 11• ", ., , D C..l . I .• I .:-.
[.J r:,-i", J' •·O i'>. I • , r
O,ill: 0·;
c,/~l:tc13 t;~-' P/10JECT c:}./4 J.Yl:· 11- M 1 ~~ a.;._ !>1~- ~
I
-- I
File details come from the government source that posted it. Updated .