Revised Drawing-heaters and fan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Paving_Building_Rigid_Frame_Plan.pdf | ||
| Paving_Building_Roof_Framing_Plan.pdf | ||
| ENG_4B8T_Pvg_Bldg_Fire_Supression_Statement_of_Work.pdf | ||
| Notice_to_Offerors_fire_sprinkler_15B40319QU8T30010A.pdf | ||
| 15B40319QU8T30010A.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C-106
SMOKE DETECTOR LOCATED ABOVE
CEILING WITHIN 5' OF THE RETURN DUCT INLET
FOR HVAC UNIT SHUTDOWN
SMOKE DETECTOR LOCATED ABOVE
CEILING WITHIN 5' OF THE RETURN DUCT INLET
FOR HVAC UNIT SHUTDOWN
WEATHER PROOF HORN/STROBE
FOR SPRINKLER WATERFLOW ALARM
LOCATE ABOVE SPRINKLER CONNECTION
AT 8' ABOVE GRADE
PROVIDE MODULES
TO MONITOR FLOW
AND TAMPER SWITCHES
C-106
C-106
C-106
HYDRAULIC SYSTEM
LOCATION
CALCULATION TITLE
NO. OF FLOWING SPRINKLERS
BASIS OF DESIGN
DENSITY
MAX AREA OF DISCHARGE/SPRINKLER
INSIDE HOSE ALLOWANCE
OUTSIDE HOSE ALLOWANCE
SYSTEM DEMAND
PSI REQUIRED
PSI AVAILABLE
SAFETY FACTOR
GPM DISCHARGE
TBD
PAVING BUILDING
XX
225 SF/130 SF
XX
0.15 GPM/0.10 GPM
45.1 PSI
XX.X GPM
XX PSI (XX%)
XX PSI
HYDRAULIC AREA
HAZARD CLASSIFICATION LIGHT/ORD GROUP 2
DATE: TBD
PROVIDED BY: FEDERAL CORRECTIONAL INSTITUTION
STATIC: XX PSI
RESIDUAL: XX PSI
FLOW: XXXX GPM
FLOW TEST INFO
LOCATION: TBD
10% REDUCTION PER CO DIVISION OF FIRE SAFETY
STATIC: XX PSI
RESIDUAL: XX PSI
FLOW: XXXX GPM