REVISED STATEMENT OF WORK TO CORRECT TYPO.pdf
PDF 312 KB Posted
- Solicitation number
- 15B30225Q00000014
About this file
This is a Statement of Work issued by the Federal Bureau of Prisons (FBOP) for FCC Coleman, Florida to replace water heaters in the Food Service and Laundry department of USP1 facility. The document outlines requirements for supply-only (no installation) of two Rinnai Demand Duo Commercial CHS398100HCXViN water heaters with 119G Tank Hybrid System or approved equal, plus one Commercial Neutralization Tank with Media.
The required water heaters must meet detailed specifications including: 398,000 BTU total capacity, natural gas operation, vertical double unit type, 551 gallons first hour delivery at 100°F, 97% thermal efficiency, ultra-low NOx compliance, and temperature range of 98°F-185°F. The units must be assembled in USA, include built-in redundancy, and come with warranties of 8 years for heat exchanger, 6 years for tank, and 5 years for parts. Delivery must occur between 7:00 a.m. and 2:00 p.m. Monday through Friday excluding Federal holidays at the institution warehouse. The government will only provide a loading dock for receipt of materials, with all other costs to be included in vendor quotes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 15B30225Q00000014 P00001 INCLUDED REVISED SOW.pdf | ||
| PDFRetriever15B30225Q00000014.pdf | ||
| FL - DD2V Quote E000033448.pdf | ||
| SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF JUSTICE
FEDERAL BUREAU OF PRISONS
FCC COLEMAN, FL
REPLACE WATER HEATERS
PROJECT 23Z3AL1
STATEMENT OF WORK
Supply: Water Heaters: USP1 -Food Service & Laundry
Review & Acceptance:
Review & Acceptance:
DESCRIPTION OF REQUIREMENT
FEDERAL CORRECTIONAL COMPLEX, COLEMAN, FLORIDA
PROJECT 23Z3AL1 REPLACE WATER HEATERS
January 10, 2025
1. DESCRIPTION OF REQUIREMENT / SPECIFICATIONS
A. INTRODUCTION
The Federal Bureau of Prisons (FBOP), Federal Correctional Complex, Coleman, Florida (FCC Coleman) located at 846 NE 54th Terrace, Coleman, Florida in Sumter County intends to make a single award to a responsible entity that will provide all necessary equipment and delivery costs for the purchase of domestic water heaters as described within this Description of Requirement. Supply, procurement, and contracting shall comply with Federal, state, and local regulations, codes, and standards. This contract will consist of supply only.
B. BACKGROUND INFORMATION
The USP1 component of the FCC Coleman complex is in need of new water heaters to replace failed domestic water heaters in the Food Service and Laundry department.
C. GOVERNMENT FURNISHED PROPERTY
FCC Coleman will only provide a loading dock for the receipt of the materials in order for this Description of Requirement to be achieved. All other items and expenses should be included with the vendor’s quote.
D. DESCRIPTION OF REQUIREMENT
FCC Coleman requires the vendor awarded this contract to provide the following equipment:
• 2 quantity - Rinnai Demand Duo™ Commercial CHS398100HCXViN x 2 with 119G Tank Hybrid System domestic water heater, or approved equal that meets or exceeds the requirements below:
o Hybrid Design uses 119-gallon tank (398,000 BTU total) o Natural gas o Water heater shall be the vertical double unit type.
o First Hour Delivery up to 551 gallons @ 100(degrees)F o T 97% Thermal efficient CU199 o Ultra-Low NOX compliant o Temperature range of 98°F - 185°F o Recovery rate at 100°F ∆T 459 gph or greater o ENERGY STAR tank design produces no thermal stress on tank o Optimized pump design for increased flow and faster recovery o DuoSmart(TM) Digital Controller for temperature precision and recirculation control -- no aquastat required.
o Gas Swivel Flex Line rotates 360(degrees) allowing 36"-long, 180(degrees) radius to connect to gas supply line o Factory installed gas dirt leg, electrical access, and preassembled condensate drain o AHRI certified UEF up to 0.93 efficiency o Standard integrated controller MCC-91-2US o Recover Pump shall be Grundfos UPS 26-150 (S)F; 3 speed o Shall include a water flow sensor, electronic water control and bypass control o Electrical requirements shall be 120V, 60Hz.
U. S. Department of Justice Federal Bureau of Prisons
FCC Coleman, Florida 23Z3AL1 Replace Water Heaters o Certified AHRI, ANSI Z21.10.3, CSA 4.3 and Energy Star® o Storage tank shall have:
▪ 2” eco-friendly foam insulation
▪ Glass-lined inner tank
▪ 1-1/2” MNPT dielectric hot and cold connections
▪ Pre-installed temperature and pressure relief valve.
▪ Brass drain valve
▪ Dual magnesium anode rods
▪ Hand hole clean-out
▪ Tank shall be a hybrid option using an engine to heat the water and not a burner and coil inside the tank to heat the water.
▪ Tank shall not exceed 119-gallon storage capacity.
o Required safety devices included on the unit shall be:
▪ Flame Failure-Flame Rod
▪ Boiling Protection
▪ Combustion fan RPM Check
▪ Over Current-Glass Fuse
▪ Remaining Flam (OHS)
▪ Automatic Freeze Protection o Provide eight-year warranty on the heat exchanger; six-year warranty on the tank, and five-year warranty on all parts.
o Water heaters to have built-in redundancy so as not to be completely without hot water should one of the two units fail.
o Water heater and tank shall be assembled in the USA
• 1 quantity - Commercial Neutralization Tank w/ Media
• All incidentals, material, and equipment to complete the supply order described herein shall be included in the vendor’s bid. Any materials or equipment needed to complete this supply order, not specifically identified, shall be provided by the vendor at no additional cost to the Government.
• Final payment will not be processed until all items have been received at FCC Coleman by the Complex Facility Manager.
• Delivery of materials shall be between the hours of 7:00 a.m. and 2:00 p.m., Monday through Friday, excluding Federal holidays at the institution warehouse.
File details come from the government source that posted it. Updated .