Amendment 00001 - Changes to SOW

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

00001

BFAO

Jeff Kercheval

AMENDMENT IS AS FOLLOWS:

A. SEEE PAGE 2 FOR ALL CHANGES MADE TO THIS SOLICITATION.

NO OTHER CHANGES ARE MADE.

FEDERAL BUREAU OF PRISONS

FIELD ACQUISTION OFFICE

US ARMED FORCES RESERVE COMPLEX

346 MARINE FORCES DRIVE

GRAND PRAIRIE, TX 75051

0037-19

15B21219B00000001

2D1M

1 2

01/29/2019

01/07/2019

15B21219B00000001

Replace Roofs Phase IV FCI Ray Brook – Project 2D1M

The following changes are made to the Statement of Work:

1. Section 1.2 Scope of Work Definition (page 3) – The fully adhered TPO must be adhered to the required new product of (5.2) inch minimum rigid insulation foam board with an accompanying R-value.

This sentence replaces the original statement in the SOW which required (4) inch minimum rigid insulation foam board.

2. Section 1.8 Insulation, Underlayment Board and Fasteners: Insulation (pages 10 & 11) – All areas in

“Section 1.0 Building Callouts” are to be covered in their entirety with two (2) layers of (2.6) inch uniformed thickness Polyisocyanurate Insulation (Polyiso). This product must be membrane manufacturer’s approved closed cell foam core insulation faced on both sides with factory applied fiber facing. This will leave a uniform (5.2) inch thickness of Polyisocyanurate Insulation throughout the renovated areas. All sloping to existing roof drains must be retrofitted to insure proper drainage. Any insulation boards damaged by handling or moisture must not be applied to the roofs. These materials must be kept dry and free of damage.

This paragraph replaces 1.8 Insulation, Underlayment Board and Fasteners: Subsection Insulation from the original Statement of Work in its entirety.

NO OTHER CHANGES ARE MADE AT THIS TIME.