PICTURES.pdf

PDF 4 MB Posted

Attached to
FCI Otisville, NY - Boiler Repair 2 & 3
Solicitation number
15B21124PR000016
Issued by

About this file

This file contains pictures related to a solicitation for boiler repair services at the Federal Correctional Institution in Otisville, New York. The solicitation number is 15B21124PR000016 and seeks repair of Boilers 2 and 3, including replacing furnace extensions, throat tiles, and boiler tube sheets. Specific needs for Boiler 2 include repairing the furnace extension, front intermediate door insulation, rear door davit hinge and pin/bearing. For Boiler 3, requirements consist of replacing the boiler tube sheet, furnace extension, and corroded/sheared threaded studs in the boiler flange ring. The pictures show the current conditions of Boilers 2 and 3 with some parts, such as the furnace extensions and throat tiles, already removed. The Department of Justice Bureau of Prisons Federal Correctional Institution Otisville is the contracting agency. The file provides visual documentation related to the solicitation but does not include pricing terms, response dates or other procurement details.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Boilers 2 & 3 B&F Project 23Z2AL9: EMG Repair Boiler 1, 2 & 3

FCI Otisville, Otisville, New York November 14, 2023

Boiler 2: Boiler furnace extension, furnace throat tile and boiler tube sheet

Boiler 2: Existing sheared threaded (machine) stud, furnace extension and boiler tube sheet

Boiler 2: Front intermediate door insulation

Boiler 2: Rear door davit hinge

Boiler 2: Rear door davit hinge pin and bearing

Boiler 2: Rear door davit hinge pin and bearing

Boiler 2: Rear boiler tube sheet

Boiler 2: Rear boiler tube sheet

Boiler 3: Boiler tube sheet, furnace extension in place prior to removal

Boiler 3: Boiler furnace throat tile prior to removal

Boiler 3: Boiler furnace extension, sheared/corroded threaded (machine) stud, tube sheet prior to furnace extension being removed.

Boiler 3: Boiler tube sheet, boiler flange ring, threaded (machine) studs. Current condition with furnace extension, furnace throat and liner tile removed.

Boiler 3: Boiler tube sheet, boiler flange ring, threaded (machine) studs. Current condition with furnace extension, furnace throat and liner tile removed.

Boiler 3: Boiler tube sheet, boiler flange ring, threaded (machine) studs, furnace tube. Current condition with furnace extension, furnace throat and liner tile removed.

Boiler 3: Boiler flange ring, corroded/sheared threaded (machine) stud

Boiler 3: Boiler flange ring, threaded (machine) stud

File details come from the government source that posted it. Updated .