Site Visit Questions - Refurbish Lift Station-Answers.pdf
PDF 169 KB Posted
- Solicitation number
- 15B10726Q00000055
- Issued by
-
Department of Justice Bureau of Prisons
About this file
This file contains site visit questions and answers related to a federal contract opportunity for refurbishing a lift station facility.
Contract 15B10726Q00000055 involves refurbishing a lift station at FCI Cumberland (Project 26Z1AN1). The document captures a follow-up inquiry from Kappe Associates regarding whether existing rail systems in the wet well require replacement, to which the government responded negatively—the rail systems do not need to be replaced. Additionally, an RFI submission requests plan pages and drawings for the existing lift station, specifically documentation showing the interior of the well, pump model information, and design flow and head specifications. The government's response references attached drawings that provide the requested technical information. The document is dated 2026.08.06 and attributed to Donald Harden.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Visit Questions
15B10726Q00000055- Refurbish Lift Station
FCI Cumberland – Project 26Z1AN1
Kappe Associates
To follow up from yesterday’s Pre-Bid Meeting, are the rail systems that are currently in the wet well to be replaced as well?
No…..they do not need replaced.
STH
RFI submission for the contract number above. Please provide any plan pages and/or drawings for the existing lift station. Specifically drawings that show the interior of the well, specific pump model information, and design flow and head.
See attached drawings.
| 2026-08-06T08:32:16-0400 | |
| DONALD HARDEN |