Question.doc

DOC document 80 KB Posted

Attached to
Boiler Retubing
Solicitation number
15B10620Q20000034
Issued by

View the file

Other files

File Type Posted
Pre Proposal Conference Meeting-Sitevisit 10-08-20.docx DOCX document
RFI Question 2.doc DOC document
Question 10-15-20.doc DOC document
DSC00109.JPG JPG image
DSC00107.JPG JPG image
SOW.pdf PDF
DSC00108.JPG JPG image
DSC00105.JPG JPG image
Letter to Quoters.pdf PDF
WDL.pdf PDF
DSC00103.JPG JPG image
DSC00104.JPG JPG image
Special Contract Conditions.docx DOCX document
DSC00106.JPG JPG image
15B10620Q20000034 RETUBE BOILER.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of Justice

Federal Bureau of Prisons

Federal Correctional Complex Low Security Correctional Institution P.O. Box 999

Butner, North Carolina 27509

10/6/2020 RE: 15B10620Q20000001 Boiler Retubing Federal Bureau of Prisons Federal Correction Complex, Butner, North Carolina

Company Name: NBW

Requester Name: Joe Shepard

Question:

1. Do you have a compressed air system with at least 100 psig that we can tie into for equipment?

2. Are their overhead structures we can utilize to rig the refurbished rear door into place?

3. Can we work 12 hours days? 7:00 am to 7:00 pm?

4. Are we able to store tools and materials at the job site or will we have to checkin/out the tools everyday?

5. Is the job site within the protected area of the prison or is it located in an area where our trucks can access?

BOP reply:

1. Vendor will have to supply their own air.

2. No.

3. Works hours are as stated in the SOW.

4. Storage of tools and materials is possible.

5. It is located outside of the secure area of the prison at the powerhouse; trucks have direct access to powerhouse.