154-WPC_85_201_1_-_A.pdf
PDF 5 MB Posted
- Attached to
- USCGC RAYMOND EVANS Pre-Alignment, Alignment, Post-Alignment Verification Federal contract opportunity
- Solicitation number
- 52050PR250000518
About this file
These technical drawings detail the installation, mounting, and excursion specifications for propulsion systems and components for the United States Navy's Office of Naval Engineering. The documents include detailed technical diagrams for Ship Service Diesel Generators (SSDG), main engines, gearboxes, and various mounting configurations for equipment such as MTU engines (P/N X5262310058 kZ) with rubber design mounts. The drawings provide comprehensive technical specifications including elevation views, plan views, sensor locations, installation procedures, and mounting instructions for different engine and generator configurations across multiple pages. The technical drawings are part of the 154F Fast Response Cutter (FRC) propulsion system documentation, with precise engineering details for installation, alignment, and mounting of critical naval vessel propulsion equipment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW Alignment.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERATOR END SOLE PLATE
ENGINE END SOLE PLATE
SSDG FOUNDATION ARRANGEMENT WITH MOUNTS SHOWN
MOUNT MEASUREMENTS USING A STARRETT PARALLEL GAUGE #154E
| 154-WPC_85_201_-_-_A |
| 154-WPC_85_201_1_A_A |
| 154-WPC_85_201_1_B_A |
| 154-WPC_85_201_1_C_A |
| 154-WPC_85_201_1_D_A |
| 154-WPC_85_201_1_E_A |
| 154-WPC_85_201_1_F_A |
| 154-WPC_85_201_2_-_A |
| 154-WPC_85_201_3_-_A |
| 154-WPC_85_201_4_-_A |
| 154-WPC_85_201_5_-_A |
| 154-WPC_85_201_6_-_A |
File details come from the government source that posted it. Updated .